~CBS 20 STANWIX STREET, 10TH FLOOR PITTSBURGH, PENNSYLVANIA 15222
November 23, 2015
To: DISTRIBUTION
Re: Fourth Quarter 2014
Dorothy M. Alke Vice President, Environmental Projects
412.642.2562 Telephone 412.642.3014 Fax
Groundwater Investigation Plan for Operable Unit 2 Bennett's Dump, Bloomington, Monroe County, Indiana
1.0 BACKGROUND
This report summarizes the results of groundwater, surface water, flow and water level monitoring work completed by CBS Corporation during the fourth quarter of2014 at the Bennett's Dump site. The work was performed for the purpose of assessing the feasibility of capturing PCB-contaminated shallow groundwater and to support the engineering design of an effective capture and treat system.
Monitoring activities in accordance with the December 2009 Final Bennett's Dump Groundwater Investigation Plan for Operable Unit 2 (GWIP) were performed at surface water and groundwater locations including test pits, quarries, piezometers, monitoring wells, springs and streams as summarized in Table 1.
The Bennett's Dump Groundwater Investigation Plan comprises different monitoring schemes for the periods before and after construction of the Passive Quarry Drain. Pre-quarry drain construction monitoring activities Were performed until completion of the quarry drain at the beginning of September 2010. The post-quarry drain monitoring program includes all of the locations and monitoring requirements formerly prescribed by the Long Term Groundwater Monitoring Plan (LTGMP). Therefore, quarterly reporting under the GWIP will replace L TGMP reporting, pending the development and approval of a final L TGMP.
2.0 SURFACE WATER MONITORING
The three month period October-December, 2014 constituted the fourth reporting quarter of2014 for the Bennett's Dump site. The monitoring work described in this report was performed December 11, 2014.
November 23, 2015 Page2
Scope of Work
The scope of water sampling for October-December 2014 comprised collecting samples at Stout's Creek Upstream and Downstream stations, Middle Spring, Rusty Spring and Icebox Quarry. Mound Spring, North Spring and Mid-North Spring were not flowing during the fourth quarter sampling event.
Sample Collection and Handling
Samples at the spring and stream locations were collected by carefully filling a new disposable beaker. The water was transferred from the beaker into pre-cleaned amber glass I-liter bottles supplied by the analytical laboratory. Routine sampling parameters including temperature and conductivity were measured and recorded.
Samples were analyzed by Pace Analytical Lab of Indianapolis, Indiana. The samples were analyzed to a detection limit of 0.1 parts per billion (ppb) for all PCB parameters by EPA SW-846 method 8082. Stout's Creek samples are analyzed to a detection limit of 0.01 ppb. Samples were also analyzed for total suspended solids (TSS) by method SM2540 D.
Quality Assurance
For quality assurance purposes a duplicate sample and a field blank were collected during each sampling event. All environmental and blank samples were labeled and logged onto a chain of custody form. The samples were stored and transported on ice in insulated coolers. Custody of the water samples was maintained by CBS until shipment to the analytical laboratory.
The field blank sample for the 2014 fourth quarter sampling event was BD 11031. No PCBs were detected in this sample.
Analytical Results for Surface Water Samples
Field parameter measurements, PCB analytical results, and QA/QC results for surface water samples collected during this reporting period are reported in Tables 2 through 9. Each table summarizes historical groundwater monitoring data collected since the completion of Passive Quarry Drain in September 2010.
Copies of the chain of custody forms are provided in Appendix A. Copies of the certificates of analysis are provided in Appendix B. A validation summary for these samples appears in Appendix C. Copies of the field sampling data sheets are on file at PSARA's Bloomington Branch Office.
November 23, 2015 Page 3
3.0 FLOW AND WATER LEVEL MONITORING
The purpose of flow and water level monitoring is to evaluate site-specific data characterizing site hydrologic response under storm and non-storm conditions, and to evaluate correlations between PCB concentrations, spring flow and groundwater elevations. The goals are to assess the feasibility and support the engineering design of a system to capture and treat Middle Spring flows and nearby shallow groundwater.
Scope of Work
The scope of groundwater level and flow monitoring during this reporting period involved numerous manual measurements and observations, as well as the use of dedicated instrumentation to record water level and other parameters as summarized in Table 10. Since the completion of the Passive Quarry Drain, Mound Spring flow occurs only during wet periods and after large rainfall events. When persistent flow is observed at Mound Spring, an instrument is installed at the weir pool.
The approximate locations of the stations are shown on Figure 1.
Flow and Water Level Plots
Middle Spring flowed intermittently during the fourth quarter. Mound Spring was not observed to flow during the fourth quarter. Manual observations made at Mound Spring were added to the plots of Middle Spring flow.
Flow observations at on-site springs also are presented in Table 11. An Excel spreadsheet file, including water level and flow observation data, accompanies this report as an attached file: BD GWIP Water Level Observations with plots - Q4 2014.xlsx.
Quality Assurance
An instrument maintenance log for the Bennett's Dump installations is provided in Appendix D. This log details the installation, re-indexing, and maintenance histories of the data logging equipment present at Bennett's Dump during the reporting quarter.
Crest Gauges
The purpose of the crest gauges at Middle Spring and Mound Spring is to provide an indication of maximum flow during each reporting period. Maximum recorded water levels and flows estimated from these data are presented in the instrument maintenance log in Appendix D.
November 23, 2015 Page4
Potentiometric Data
Potentiometric contours shown on Figure 1 were developed based on water level measurements taken on December 11, 2014. The specific water level measurement locations are listed in the table insert on Figure 1.
If you have questions regarding the sampling and flow/water level monitoring activities or findings for this reporting period, please call Neill Vaughan at (812) 335-0424.
Attachments
DISTRIBUTION Tom Alcamo, USEP A Region 5 Douglas Petroff, IDEM Simeon Baker, MCHD
cc: John Langley, CBU Jeff Lifka, Tetra Tech John Bassett, AECOM Russ Cepko, CBS Mike Hessling, PSARA Patrick Kneip, PSARA Neill Vaughan, PSARA BP Files
List of Tables
1. Groundwater Investigation Plan Monitoring Requirements and Recommended Interim Plan Requirements
2. Post-Quarry Drain PCB Results, Icebox Quarry Water Samples 3. Post-Quarry Drain PCB Results, Stout's Creek Upstream 4. Post-Quarry Drain PCB Results, Stout's Creek Downstream 5. Post-Quarry Drain PCB Results, Mound Spring 6. Post-Quarry Drain PCB Results, Rusty Spring 7. Post-Quarry Drain PCB Results, Middle Spring
8. Post-Quarry Drain PCB Results, Mid-North Spring 9. Post-Quarry Drain PCB Results, North Spring 10. Flow and Water Level Monitoring, GWIP Stations 11. Flow Observations, On-Site Springs 12. Instrument Maintenance Log (Appendix D)
List of Figures and Plots
Figure 1 - Site Map with Monitoring and Sampling Locations, Potentiometric Surface Contours
Continuous Monitoring Plots Middle Spring Continuous .Flow and Mound Spring Flow Observations, October 2014 Middle Spring Continuous Flow and Mound Spring Flow Observations, November 2014 Middle Spring Continuous Flow and Mound Spring Flow Observations, December 2014
Manual Monitoring Plots Bennett's Dump Quarries and Pits, Observed Water Levels Bennett's Dump Monitoring Wells, Observed Water Levels Bennett's Dump Piezometers, Observed Water Levels
TABLES
<lfotln~
Middle Spring
Mound Spring
Middle Spring
Mound Spring
Rusty Spring
Stout's Creek Downstream
Stout's Creek Upstream
North Spring
Mid-North Spring
Wedge Quarry
Wedge South Quarry
Test Pit A
Test Pits 1,2,3,and 4
Downstream Quarry Drain Outlet
Wedge Quarry
Icebox Quarry
Wedge Quarry
Wedge South Quarry
Icebox Quarry
Test Pit A
TestPit4
PZ-H7
PZ-K9SW
PZ-Ill
PZ-LM5
PZ-L5
MW-BC-JO
MW-Bl3
MW-C5
MW-C4A
MW-C3A
MW-I
MW-3
MW-61
MW-6D
Table 1. Groundwater Investigation Plan Monitoring Requirements
and Recommended Interim Plan Requirements
Bennett's Dump, Bloomington, Monroe County, Indiana
Frenuencv1
Water Level or Flow Measurement Samnle
2
2 weeks prior to drain construction Hourly logging of flow
12 months after drain construction at V-notch weir
Monthly after drain construction
or episodic so 12 samples collected V-notch or visual flow estimate PCBs and TSS
Every 2 weeks after drain construction Flow by velocity probe PCBs and TSS
Monthly after drain construction Flow by velocity probe PCBs and TSS
Pre-drain construction - every rain event Visual flow estimate PCBs and TSS
Post-Drain construction - 5 rain events
Post-drain construction - 5 rain events V-notch or visual flow estimate PCBs and TSS
Once pre-drain construction.
After drain construction, if PCBs found Waterlevel PCBs and TSS
in downstream drain outlet then
individual components monthly
Monthly after drain construction PCBs and TSS
Weir, velocity probe or visual flow Every 2 weeks after drnin construction estimation, depending upon
conditions
After one storm> l" Hourly water level
Quarterly after drain construction Water level PCBs and TSS
Every 2 weeks before drain construction, Water level
Monthly after drain construction
Every 2 weeks before drain construction, Water level
Monthly after drain construction
1 Frequency of monitoring and sampling is quarterly, unless amended by approved Scopes of Work for other GWIP activities. 2 At time of PCB sample collection, also measure field parameters of conductivity and temperature. 3 Previous Interim recommendations anticipated the March 2012 pumping test and a follow-up pumping test, performed in March-April 2013.
Note: All monitoring requirements subject to change when a final revised LTGMP is developed.
Interim Recommendations 3
Continue Hourly logging
of flow
Monthly samples until test
starts then follow test schedule
Continue this schedule until test starts, then follow test schedule,
Continue to Sample
Continue to Sample
Discontinue until LTGMON
Discontinue until LTGMON
. Continue on monthly schedule
Discontinue until LTGMON
Continue
Continue this schedule
but only with Icebox and PZ-H7
Continue this schedule until test
starts then follow test schedule
but with additional wells and
piezometers to be determined by
agreement and relevance to
each test.
Sampling
Sample ID Date
BD11030 11-Dec-14
BD11026 23-Sep-14
BDl 1021 18-Jun-14
BD10772 18-Mar-14
BD10759 27-Dec-13
BD10679 l 7-Seo-13
BD10625 13-Jun-13
BD10500 19-Mar-13
BD10439 19-Dec-12
BD10425 20-Sep-12
BD10406 14-Jun-12
BD10371 15-Mar-12
BD10337 19-Dec-11
BD10308 01-Sep-ll
BD10301 17-Aug-11
BD10302 17-Aug-ll
BD10300 30-Jul-11
BD10294 07-Jul-ll
BD10292 22-Jun-11
BD10283 31-May-l l
BD10236 02-Mar-11
BD10208 27-0ct-10
Table 2 . Post-Quarry Drain PCB Results
Icebox Quarry
Bennett's Dump, Bloomington, Indiana
PCBa, Data TSS, Conductivity,
ppb Validated? mg/L uS/cm
< 0.10 y 7 204
<0.10 y 1 203
<0.10 y <l 212
<0.10 y <1 215
0.11 y 3 213
<0.10 y 2 217
<0.10 y 1 218
<0.10 y 1 230
<0.10 y 2 250
< 0.10 y <1 241
<0.10 y 1 263
< 0.10 y < 1 NR
<0.10 y 1 264
<0.10 y <1 235
< 0.10 y 3 247
<0.10 y 1 247
< 0.10 y 9 231
<0.10 y <1 232
<0.10 y 1 235
< 0.10 y 6 239
<0.10 y <l 250
< 0.10 y <1 282 . . . .
•samples were analyzed to a detection hm1t of 0.1 parts per b1l110n (ppb ) .
Temperature, oc
6.0
21
26.4
6.3
4.2
23
25.1
5.4
7.1
21.9
20
NR
7.1
26.6
26.6
26.6
31.l
28
25.9
27.5
6.6
17.4
Sampling Sample ID Date
BDI1032 11-Dec-14
BD11024 23-Sep-14
BD11019 27-May-14
BDI0795 7-Apr-14
BD10769 18-Mar-14
BD10682 28-0ct-13
BD10668 19-Aug-13
BD10640 15-Aug-13
BD10628 29-Jul-13
BD10618 23-Apr-13
BD10458 4-Mar-13
BD10452 25-Feb-13
BD10447 23-Jan-13
BD10436 12-Dec-12
BD10432 16-Nov-12
BD10428 10-0ct-12
BD10423 12-Seo-12
BD10419 15-Aug-12
BD10414 12-Jul-12
BD10409 14-Jun-12
BD10401 16-May-12
BD10394 18-Apr-12
BD10387 02-Apr-12
BD10380 27-Mar-12
BD10374 19-Mar-12
BD10368 15-Mar-12
BD!0363 12-Mar-12
BD10355 05-Mar-12
BDI0349 20-Feb-12
BD10341 25-Jan-12
BD10331 12-Dec-11
BDI0321 I I-Nov-I I
BD10315 12-0ct-11
BD10316(duo) 12-0ct-l l
BD10315 12-0ct-l l
BD10316 (dup) 12-0ct-1 l
BD10312 15-Seo-l 1
BD10305 18-Aug-11
BD10306 (dup) 18-Aug-11
continued
Table 3 . Post-Quarry Drain PCB Results
Stout's Creek Upstream Bennett's Dump, Bloomington, Indiana
PCB•, Data TSS, Conductivity, ppb Validated? mg/L uS/cm
<0.01 y 8 520
< O.Ql y <1 517
<0.06 y 7 555
<0.01 y 8 597
< O.Ql y 8 672
<0.01 y 4 472
<0.01 y 3 479
<0.01 y 2 499
<0.01 y 2 539
< O.Ql y 1 634
<0.01 y 4 690
<0.01 y 4 719
<0.01 y I 651
<0.01 y 4 586
<0.01 y <I 573
<0.01 y 4 619
<0.01 y 2 597
< O.Ql y 3 493
<0.01 y <l 514
<0.01 y 1 504
< O.Ql y 2 544
< O.Ql y 2 607
< 0.01 y 3 596
<0.01 y 3 627
<0.01 y 6 607
<0.01 y 11 617
<0.01 y < 1 644
< O.Ql y <I 591
< 0.10 y 2 661
<0.01 y 2 640
<0.10 y 2 619
<0.10 y 3 610
<0.10 y I 542
<0.10 y I 542
<0.10 y l 542
<0.10 y I 542
< 0.10 y I 523
<0.10 y 3 529
< 0.10 y 11 529
Temperature, Flowb, oc gal/min
8.6 915
17.3 300
16.9 500
8.7 2000
6 600
14.8 157
19.8 125
19.8 133
19.2 465
11.5 1200
5.8 620
7.0 530
6.5 510
8.9 430
10.8 400
14.9 350
20.2 183
22.6 200
19.9 250
17.4 JOO
17.9 500
14.2 830
13.7 500
13.3 625
12.5 475
12.3 500
9.9 700
8.4 350
7.6 525
7.0 1450
9.3 720
12.9 380
16.6 140
16.6 140
16.6 140
16.6 140
16.7 70
23.8 JOO
23.8 JOO
Table 3 . Post-Quany Drain PCB Results Stoufs Creek Upstream
Bennett's Dump, Bloomington, Indiana
Sampling PCB", Data TSS, Conductivity, Temperature,
Sample ID Date ppb Validated? mg/L uS/cm
BD10296 29-Jul-l J <0.10 y 3 539
BD10285 22-Jun-l 1 < 0.10 y 5 568
BD10277 19-May-JJ < 0.10 y 4 584
BD10267 05-May-ll <0.10 y JO 520
BD10255 14-Aor-l l < 0.10 y 21 581
BD10245 18-Mar-11 < 0.10 y 17 661
BD10237 02-Mar-11 < 0.10 y 91 693
BD10227 26-Jan-l 1 < 0.10 y 4 785
BD10217 21-Dec-JO <0.10 R y 3 NR
BD10218 (duo) 21-Dec-10 <O.lOR y 4 NR
BD10213 22-Nov-10 < 0.10 y 5 627
BD10207 27-0ct-10 <0.10 y 4 655
BD10202 30-Sep-10 < 0.10 y 3 643
•samples were analyzed to a detection limit of0.01 parts per billion (ppb). Samples collected before 2012
were analyzed to a detection limit ofO.l parts per billion (ppb).
bFlow estimate calculated from a set of flow velocity measurements.
NR =Not reported.
R = Unusable; QNQC data indicated significant deficiencies in tbe analytical data.
aC
24.0
19.3
15.0
13.8
12.5
9.2
7.7
4.6
6.2
6.2
14.5
18.0
21.7
Flowb,
gal/min
106
630
565
2500
1200
800
1500
275
262
262
120
52
25
Sampling Sample ID Date
BD11027 11-Dec-14
BD11028b 11-Dec-14
BDI 1022 23-Seo-14
BD11023b 23-Sep-14
BDI 1010 27-May-14
BDllOllb 27-May-14
BDl0787 7-Apr-14
BD10788b 7-Apr-14
BDI0767 18-Mar-14
BD10768b 18-Mar-14
BDI0680 28-0ct-13
BD10681b 28-0ct-13
BDI0626 29-Jul-13
BDI0627b 29-Jul-13
BDI0616 23-Aor-13
BDI0617 23-Aor-13
BD!0609 22-Apr-13
BDI0456 4-Mar-13
BD10457b 4-Mar-13
BDI0450 25-Feb-13
BDI0451b 25-Feb-13
BDI0445 23-Jan-13
BDI0446b 23-Jan-13
BD10434 12-Dec-12
BDI0435b 12-Dec-12
BDI0430 16-Nov-12
BDI043lb 16-Nov-12
BDI0426 10-0ct-12
BDI0427b 10-0ct-12
BDI0421 12-Seo-12
BDI0422b 12-Sep-12
BDI0417 15-Aug-12
BDI0418b 15-Aug-12
BD10416 24-Jul-12
BDI0412 12-Jul-12
BDI0413b 12-Jul-12
BDI0411 27-Jun-12
BDI0407 14-Jun-12
BDI0408b 14-Jun-12
continued
Table 4. Post-Quarry Drain PCB Results
Stout's Creek Downstream
Bennett's Dump, Bloomington, Indiana
PCB", Data TSS, Conductivity, ppb Validated? mg/L uS/cm
0.19 y <5 503
0.18 y <5 503
0.12 y 1 510
0.10 y <1 510
0.13 J y 4 556
0.13 J y 4 556
0.10 y 6 575
0.093 y 6 575
0.092 y 1 654
0.086 y 1 654
0.085 y <I 472
0.075 y I 472
0.1 I y 3 538
0.11 y 3 538
0.067 y 2 610
0.092 y 2 610
0.14 y 4 619
0.062 y 2 685
0.073 y 3 685
0.067 y 2 709
0.082 y 2 709
0.073 J y I 645
<0.01 J y 2 645
0.03 y 2 570
0.03 y 2 570
0.047 y 1 569
0.046 y <I 569
0.032 y 2 614
0.027 y 2 614
0.040 y I 569
0.031 y I 569
0.097 y < 1 497
0.086 y 2 497
0.061 y 1 486
0.058 y I 509
0.051 y I 509
0.024 y <I 490
0.11 y 2 509
0.1 I y 3 509
Temperature, Flowe, oc gal/min
8.5 915
8.5 915
16.1 300
16.1 300
17.3 500
17.3 500
8.7 2000
8.7 2000
5.7 600
5.7 600
14.1 157
14.1 157
18.7 465
18.7 465
12.2 1200
12.2 1200
12.8 1475
5.4 620
5.4 620
7.8 530
7.8 530
6.2 510
6.2 510
8.2 430
8.2 430
9.7 400
9.7 400
14.6 350
14.6 0
'350
19.7 200
19.7 200
20 200
20 200
22.3 270
19.1 250
19.1 250
17.8 160
16.l 100
16.1 100
Sampling Sample ID Date
BDI0405 30-Mav-12
BDI0399 16-Mav-12
BDI0400b 16-May-12
BDI0398 04-May-12
BDI0392 18-Apr-12
BDI0393b 18-Apr-12
BDI0385 02-Apr-12
BDI0386b 02-Apr-12
BDI0384 30-Mar-12
BDI0379 27-Mar-12
BDl0378 22-Mar-12
BDI0373 19-Mar-12
BDI0366 15-Mar-12
BDI0367b 15-Mar-12
BDI0362 12-Mar-12
BDl0361 09-Mar-12
BDI0354 05-Mar-12
BD10348 20-Feb-12
BDI0347 07-Feb-12
BDI0340 25-Jan-12
BDI0338 05-Jan-12
BDI0330 12-Dec-l 1
BDI0325 02-Dec-ll
BDI0320 II-Nov-II
BDI0319 25-0ct-1 I
BDI0314 12-0ct-11
BDI0319 25-0ct-l I
BDI0314 12-0ct-ll
BDI0313 30-Seo-1 l
BDI0309 15-Sep-l I
BDI0310b 15-Seo-11
BDI0307 01-Sep-l I
BDI0303 18-Aug-l I
BDI0295 29-Jul-1 I
BDI0293 07-Jul-l I
BDI0287 22-Jun-l I
BDI0284 03-Jun-l 1
BDI0279 19-May-l I
BDI0269 05-May-l I
continued
Table 4. Post-Quarry Drain PCB Results Stout's Creek Downstream
Bennett's Dump, Bloomington, Indiana
PCB•, Data TSS, Conductivity, ppb Validated? mg/L uS/cm
0.11 y I 522
0.081 y 2 547
0.094 y 2 547
0.033 y <I 581
0.046 y I 850
0.064 y I 608
O.o45 y <I 594
0.055 y <I 594
0.069 y <I 607
0.046 y <I 614
0.038 y 2 581
0.062 y I 597
0.032 y 2 623
0.030 y 2 623
O.Q38 y 2 642
0.042 y 3 657
0.089 y <I 589
0.11 y I 650
0.11 y 2 629
0.036 y 2 636
0.052 y <I 628
0.038 y 2 614
0.081 y 3 628
0.097 y <I 607
0.067 y <I 623
0.063 y <l 544
0.067 y <l 623
0.063 y <I 544
0.063 y 6 614
0.093 y 2 524
0.081 y 2 524
0.068 y I 523
0.031 y <I 526
0.13 y 2 532
0.097 y I 535
0.044 y 4 566
0.085 y 4 568
0.095 y 2 580
<O.IOR y 9 510
Temperature, Flow°, oc gal/min
18.4 200
18.5 500
18.5 500
15.3 1000
14.7 850
14.7 850
13.1 500
13.1 500
12.6 470
14.6 625
13.2 450
14.3 475
13.1 500
13.1 500
10.4 700
9.6 940
9.0 350
8.2 530
8.3 970
6.8 1550
8.5 660
9.5 840
10.7 1600
12.7 380
16.2 350
16.4 140
16.2 350
16.4 140
16.4 350
14.9 57
14.9 57
20.5 55
24.2 95
23.I 85
20.I 275
20.1 590
19.2 307
15.4 580
14.5 2600
Table 4. Post-Quarry Drain PCB Results Stout's Creek Downstream
Bennett's Dump, Bloomington, Indiana
Sampling PCB", Data TSS, Conductivity, Temperature,
Sample ID Date ppb Validated? mg/L uS/cm
BD10270b 05-Mav-l l < 0.10 R y 10 510
BDI0252 14-Aor-l l 0.049 y 14 571
BD10253b 14-Aor-11 0.050 y 14 571
8010248 31-Mar-l l < 0.10 y 4 662
8Dl0248 31-Mar-l l <0.10 y 4 662
8010242 18-Mar-l l <0.10 y 13 656
8010243b 18-Mar-l l <0.10 y 12 656
8Dl0232 02-Mar-l l <O.IOR y 57 693
8010233b 02-Mar-l l 0.14 y 58 693
BD10229 09-Feb-l l <O.lOR y 3 924
8Dl0223 26-Jan-l l <0.10 R y 2 768
8010224b 26-Jan-l l <0.10 R y 2 768
8Dl0222 06-Jan-l l <O.lOR y 4 780
8010216 21-0ec-10 <O.lOR y 2 793
8010214 09-0ec-10 0.11 J y 5 677
8010210 22-Nov-10 0.31 K y s 621
8Dl02llb 22-Nov-10 0.26K y 4 621
8Dl0209 10-Nov-10 < 0.37 K y 2 601
8010204 27-0ct-10 < 0.55 K y 2 651
8Dl0205b 27-0ct-10 < 0.55 K y 2 651
8010203 13-0ct-10 0.16K y 7 625
8010199 30-Sep-IO 0.30 K y 6 641
8010200b 30-Sep-10 0.28 K y 7 641
8010198 14-Sep-10 0.55 K y 21 650
"Samples were analyzed to a detection limit of0.01 parts per billion (ppb). Samples collected before 2012
were analyzed to a detection limit ofO.l parts per billion (ppb).
bDuplicate sample.
cFlow estimate calculated from a set of flow velocity measurements.
J = Estimated value. The QA/QC data indicated an analytical bias.
K = Estimated value due to QA blank contamination
R = Unusable; QA/QC data indicated significant deficiencies in the analytical data.
oc
14.5
13.2
13.2
11.3
11.3
9.3
9.3
7.7
7.7
4.1
4.6
4.6
5.9
6.0
7.5
14.9
14.9
8.8
16.8
16.8
18.6
17.5
17.S
20.1
Flowe,
gal/min
2600
1215
1215
326
326
800
800
1500
1500
475
290
290
605
224
270
110
110
72
46
46
19
17
17
21
Sampling Sample ID Date
NA 11-Dec-14
NA 23-Sep-14
BD10798 07-Aor-14
NA 18-Mar-14
BD10760 27-Dec-13
NA 29-Jul-13
BD10615 22-Anr-13
BD10602 19-Aor-13
NA 04-Mar-13
NA 25-Feb-13
BD10440 14-Jan-13
NA 12-Dec-12
NA 16-Nov-12
NA IO-Oct-12
NA 12-Sep-12
NA 15-Aug-12
NA 07-Jul-12
NA 15-Mar-12
NA 20-Feb-12
BD10343 25-Jan-12
NA 12-Dec-l l
NA 17-Nov-l l
NA 12-0ct-11
NA 15-Seo-l 1
NA 18-Aug-l l
NA 29-Jul-l l
NA 22-Jun-11
BDI0272 05-Mav-11
BD10263 25-Aor-11
BD10261 20-Aor-11
BD10257 14-Aor-11
BDI0250 12-Aor-l l
NA 18-Mar-l l
BDI0240 07-Mar-l l
NA 02-Mar-l l
NA 26-Jan-l l
NA 21-Dec-10
NA 22-Nov-!O
NA 27-0ct-IO
NA 30-Sep-10
Table 5 . Post-Quarry Drain PCB Results Mound Spring
Bennett's Dump, Bloomington, Indiana
PCB", Data TSS, Conductivity, ppb Validated? mg/L uS/cm
- - - -
- - - -
0.77 y <I 439
- - - -
0.51 y I 470
- - - -
0.57 y <I 521
0.43 y 3 717
- - - -
- - - -
0.66 y 1 496
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
0.35 y <I 630
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
0.72 y <1 471
0.99 y <I 457
0.82 y I 505
0.53 y <I 511
0.56 y 1 518
- - - -
0.58 y 2 520
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
'Samples were analyzed to a detection limit of 0.1 parts per billion (ppb ).
bFlow estimated using V-notch weir, unless otherwise noted.
°Flow estimated visually.
Temperature, Flowb, oc gal/min
- DRY
- DRY
7.8 4.4
- DRY
9.9 0.4
- DRY
14.7 I
8.7 3
- DRY
- DRY
8.6 6.8
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
6.5 0.25
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
12.7 13.4
10.9 29
9.9 18
16.2 0.4
9.8 12
- DRY
8.9 2c
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
Sample ID Sampling Date
BD11033 11-Dec-14
NA 23-Sep-14
BD10799 07-Apr-14
BD10773 l 8-Mar-14
NA 28-0ct-13
NA 29-Jul-13
NA 22-Apr-13
BD10461 04-Mar-13
NA 25-Feb-13
NA 23-Jan-13
NA 12-Dec-12
NA 16-Nov-12
NA 10-0ct-12
NA 12-Sep-12
NA 15-Aug-12
NA 07-Jul-12
BD10359 05-Mar-12
BD10352 20-Feb-12
BD10346 25-Jan-12
BD10336 12-Dec-l l
BD10328 06-Dec-l l
NA 12-0ct-l l
NA 12-0ct-l l
NA 15-Seo-l l
NA 18-Aug-l l
NA 29-Jul-l l
BD10291 22-Jun-1 l
BD10274 05-May-l l
NA 14-Aor-l l
NA 18-Mar-l l
BD10241 07-Mar-l l
NA 02-Mar-l l
NA 26-Jan-l l
NA 21-Dec-10
NA 22-Nov-10
NA 27-0ct-10
NA 30-Sep-10
Table 6 . Post-Quarry Drain PCB Results Rusty Spring
Bennett's Dump, Bloomington, Indiana
PCB", Data TSS, Conductivity, ppb Validated? mg/L uS/cm
6.7 y 11 589
- - - -
2.8 y < 1 564
2.9 y 2 567
- - - -
- - - -
- - - -
4.2 y 160 692
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
4.5 y 6 672
3.3 y 10 672
3.8 y < 1 710
4.0 y 2 756
4.6 y 1 778
- - - -
- - - -
- - - -
- - - -
- - - -
6.2 y II 623
3.5 y I 538
- - - -
- - - -
3.5 y 2 628
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
•Samples were analyzed to a detection limit ofO.l parts per billion (ppb).
bF!ow estimated visually.
J =Estimated value. The QA/QC data indicated an analytical bias.
Temperature, Flowb, oc gal/min
10.8 1.25
- DRY
8.2 4
6.8 0.4
- DRY
- DRY
- DRY
9.5 0.1
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
8.6 0.5
8.6 0.3
9.1 1.5
12.0 1.5
11.4 2.5
- DRY
- DRY
- DRY
- DRY
- DRY
16.0 1.5
11.6 7
- DRY
- DRY
7.9 3
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
Sample ID Sampling Date
BD11029 11-Dec-14
NA 23-Sep-14
BD11020 27-May-14
BD10797 7-Apr-14
BD10771 18-Mar-14
BDI0731 8-Nov-13
BD10629 29-Jul-13
BD10624 23-Apr-13
BDI0614 22-Apr-13
BD10460 4-Mar-13
BDI0454 25-Feb-13
BD10449 23-Jan-13
NA 12-Dec-12
NA 16-Nov-12
NA 10-0ct-12
NA 12-Sep-12
NA 15-Aug-12
NA 07-Jul-12
BD10382 27-Mar-12
BD10376 19-Mar-12
BD10370 15-Mar-12
BD10364 12-Mar-12
BD10360 06-Mar-12
BDI0356 05-Mar-12
BD10357 (dup) 05-Mar-12
BD10350 20-Feb-12
BDI0351 (dup) 20-Feb-12
BD10344 25-Jan-12
BDI0345 (dup) 25-Jan-12
BD10333 12-Dec-l l
BD10334 (dup) 12-Dec-11
BDI0327 06-Dec-11
NA 17-Nov-ll
NA 12-0ct-l l
NA 15-Seo-11
NA 18-Aug-l l
NA 29-Jul-1 I
BDI0288 22-Jun-l l
BD10289 (dup) 22-Jun-1 I
continued
Table 7. Post-Quarry Drain PCB Results Middle Spring
Bennett's Dump, Bloomington, Indiana
PCB•, Data TSS, Conductivity, ppb Validated? mg/L uS/cm
3.9 y <5 529
- - - -
3.7 y <I 448
4.1 y <I 422
4.3 y I 474
2.0 y <I 570
5.4 y <I 515
4.6 y <I 534
4.3 y I 533
4.6 y <I 585
4.6 y <I 560
5.8 y <I 595
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
3.0 y 5 563
3.5 y 2 573
3.8 y I 569
4.6 y l 564
3.6 y 2 576
4.2 y <I 579
4.2 y I 579
4.2 y <I 577
4.4 y <I 577
4.8 y <I 584
4.7 y <I 584
6.4 y ·<I 594
6.6 y <I 594
7.7 y < l 618
- - - -
- - - -
- - - -
- - - -
- - - -
4.8 y <I 515
4.6 y <I 515
Temperature, Flowb,
degC gal/min
11.1 6.4
- DRY
10.6 5.5
9.2 18
8.1 3.4
10.2 0.1
15.1 5
10.5 8.3
II 9
9.3 6.4
10.0 2.3
10.3 4
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
14.3 0.1
18.8 NR
16.3 0.3
13.4 16
10.2 0.1
10.6 1.9
10.6 1.9
10.1 4
IO.I 4
10.8 10.5
10.8 10.5
12.2 6
12.2 6
12.7 12
- DRY
- DRY
- DRY
- DRY
- DRY
15.3 4
15.3 4
Sample ID Sampling Date
BDI0281 19-Mav-l l
BD10282 (duo) 19-Mav-ll
BD10273 05-Mav-l l
BDI0258 14-Apr-ll
BD10247 18-Mar-l l
BDI0235 02-Mar-l l
BDI0226 26-Jan-l l
BD10221 28-Dec-10
NA 21-Dec-10
NA 22-Nov-10
NA 27-0ct-10
NA 30-Sep-10
Table 7. Post-Quarry Drain PCB Results Middle Spring
Bennett's Dump, Bloomington, Indiana
PCB", Data TSS, Conductivity, ppb Validated? mg/L uS/cm
4.5 y < 1 470
4.8 y < 1 470
4.8 y 1 405
4.4 y <l 486
6.0 y <l 506
9.1 y < 1 542
9.2 y < 1 583
8.1 y <l NR
- - - -
- - - -
- - - -
- - - -a Samples were analyzed to a detection limit ofO.l parts per billion (ppb.
bF!ow estimated using V-notch weir, unless otherwise noted.
Temperature, Flowb,
degC gal/min
13.2 4
13.2 4
13.7 16
11.6 12
11.0 8.3
10.5 10.5
9.4 2.3
9.6 0.5
- DRY
- DRY
- DRY
- DRY
Sample ID Sampling Date
NA 11-Dec-14
NA 23-Sep-14
NA 27-May-14
NA 7-Apr-14
NA 18-Mar-14
NA 28-0ct-13
NA 29-Jul-13
NA 23-Apr-13
NA 4-Mar-13
NA 25-Feb-13
NA 23-Jan-13
NA 12-Dec-12
NA 16-Nov-12
NA 10-0ct-12
NA 12-Seo-12
NA 15-Aug-12
NA 07-Jul-12
NA 15-Mar-12
NA 20-Feb-12
NA 25-Jan-12
NA 12-Dec-11
NA 17-Nov-l 1
NA 12-0ct-l l
NA 15-Seo-11
NA 18-Aug-1 l
NA 29-Jul-l I
NA 22-Jun-1 l
BDI0275 05-Mav-1 l
BDI0266 03-May-11
BDI0265 27-Apr-1 I
BDI0262 25-Apr-11
BD10259 20-Apr-l l
NA 18-Mar-l I
NA 02-Mar-11
NA 26-Jan-1 I
NA 21-Dec-10
NA 22-Nov-10
NA 27-0ct-10
NA 30-Sep-10
Table 8 . Post-Quarry Drain PCB Results Mid-North Spring
Bennett's Dump, Bloomington, Indiana
PCB•, Data TSS, Conductivity, ppb Validated? mg/L uS/cm
- - - -- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
0.45 y 8 273
0.41 y 1 297
0.25 y 2 277
0.38 y 4 284
0.21 y 3 341
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
a Samples were analyzed to a detection limit of0.1 parts per billion (ppb).
bFlow estimated using V-notch weir.
cFlow estimated visually.
Temperature, Flow, oc gal/min
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
15.4 0.1°
14.8 3.5b
14.9 2b
13.8 4.5b
10.9 0.2b
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
Sample ID Sampling Date
NA 11-Dec-14
NA 23-Seo-14
8010974 15-Mav-14
8Dl0802 8-Apr-14
NA 18-Mar-14
NA 28-0ct-13
NA 29-Jul-13
8Dl0601 19-Aor-13
8Dl0493 18-Mar-13
8Dl0455 27-Feb-13
8Dl0441 14-Jan-13
NA 12-Dec-12
NA 16-Nov-12
NA 10-0ct-12
NA 12-Seo-12
NA 15-AuJ?;-12
NA 07-Jul-12
NA 15-Mar-12
NA 20-Feb-12
8Dl0339 19-Jan-12
NA 12-Dec-l l
8Dl0326 06-Dec-l 1
NA 17-Nov-ll
NA 12-0ct-11
NA 15-Seo-l l
NA 18-Aug-l l
NA 29-Jul-l l
NA 22-Jun-1 l
BD10276 05-Mav-ll
BD10264 25-Apr-l l
8D10260 20-Aor-l l
8D10251 12-Apr-11
8Dl0249 05-Apr-l l
NA 18-Mar-1 l
8Dl0239 07-Mar-ll
NA 02-Mar-l l
8Dl0231 28-Feb-l 1
8010230 22-Feb-l 1
NA 26-Jan-11
NA 21-Dec-10
NA 22-Nov-10
NA 27-0ct-10
NA 30-Sep-10
Table 9 . Post-Quarry Drain PCB Results
North Spring Bennett's Dump, Bloomington, Indiana
PCB', Data TSS, Conductivity, ppb Validated? mg/L uS/cm
- - - -
- - - -
6.3 y 13 493
5.0 y I 490
- - - -
- - - -
- - - -
4 y 8 507
6.5 y 13 522
6.1 y 8 559
4.9 y 2 595
- - - -
- - - -
- - - -
- - - -- - - -
- - - -
- - - -
- - - -
4.8 y 3 583
- - - -
5.5 y 8 614
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
4.0 y 7 442
5.2 y 4 431
5.7 y 7 422
5.6 y 5 447
4.9 y 13 458
- - - -
6.9 y 4 452
- - - -
6.0 y 7 482
6.1 y 2 475
- - - -
- - - -
- - - -
- - - -
- - - -
• Samples were analyzed to a detection limit of 0.1 parts per billion (ppb ).
hprow estimated visually.
Temperature, Flowb, oc gal/min
- DRY
- DRY
11.7 3
8.4 3
- DRY
- DRY
- DRY
9.8 6
7.7 3
7.8 3
,, 8.9 3
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
9.9 1
- DRY
11.8 3
- DRY
- DRY
- DRY
- DRY
- DRY
- DRY
11.3 2
11.0 8
10.5 8
IO.I 4
9.4 1.5
- DRY
8.6 5
- DRY
8.7 2
7.5 2
- DRY
- DRY
- DRY
- DRY
- DRY
Table 10. Flow and Water Level Monitoring GWIP Stations
Bennett's Dump Bloomington, Monroe County, Indiana
Monitoring Station Parameter Instrumentation
Middle Spring Water level/ flow V-notch weir and Crest Gauge
Level logging transducer
Mid-North Spring Water level/ flow V-notch weir and Crest Gauge
Mound Spring Water level/ flow V-notch weir and Crest Gauge
Level logging transducer
North Spring Flow None
Stout's Creek Flow Flow velocity meter
Downstream
Stout's Creek Upstream Flow Flow velocity meter
Quarry Drain Outlet Flow Weir or Flow Velocity Meter
~
Icebox, Wedge & Water Level Staff gauge
Wedge South Quarries
Pit A (surrogate for Test Water Level Depth-to-water meter
Pits 1-4)
Monitor Wells & piezometers Water Level Depth-to-water meter
(see Table 1)
Observation Date
12/11/2014
12/8/2014
11/24/2014
9/23/2014
9/3/2014
8/12/2014
7/1/2014
5/27/2014
5/15/2014
4/13/2014
4/11/2014
4/9/2014
4/7/2014
3/31/2014
3/18/2014
2/21/2014
1/30/2014
12/27/2013
12/23/2013
12/16/2013
11/8/2013
11/5/2013
10/28/2013
9/23/2013
9/3/2013
8/23/2013
8/15/2013
7/29/2013
6/28/2013
5/22/2013
4/2212013
4/15/2013 c
4/8/2013 c
3/26/2013 c
3/19/2013 c
3/18/2013 c
3/12/2013 c
3/4/2013
2/27/2013
continued
Table 11. Flow Observations On-Site Springs
Bennett's Dump, Bloomington, Indiana
Mound Middle Mid-North North
Spring a Spring a Spring a Spring b
0 6.4 0 0
0 9.4 0 0
0 4 0 0
0 0 0 0
0 4 0 0
0 0.8 0 0
0 0.3 0 0
0 5.5 0 0
0 9.4 0 3
2 8.8 0 0
4.5 13.I 0 I
25 18.4 0 2.5
11 17.6 0 0
0 3.4 0 0
0 3.4 0 0
0 10.5 0 0
0 3.4 0 0
0.4 10 0 0
31.7 18.4 0 3
0 0.8 0 0
0 0.1 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 5.5 0 0
0 5.5 0 0
0 4.8 0 0
5.6 9.4 0 0.1
0 1.5 0 0
0 0.3 0 0
0 1.9 0 0
0 3.7 0 1.5
0 4.0 0 3
0 0.8 0 0
0 6.4 0 0
0 7.3 0 3
Rusty
Spring b
1.25
2
1.5
0
0
NR
NR
0
0
I
2
3
4
0.5
0.4
NR
NR
0
NR
0
0
0
0
0
0
0
0
0
NR
NR
0
0
0
0
0
0
0
0.1
0
Observation Date
2/25/2013
1/30/2013
1/23/2013
1/14/2013
1/11/2013
12/12/2012
11/16/2012
10/10/2012
9/28/2012
9/14/2012
9/7/2012 .
8/15/2012
7/24/2012
7/12/2012
7/10/2012
6/27/2012
6/14/2012
5/30/2012
5/17/2012
5/4/2012
4/18/2012
4/2/2012 c
3/27/2012 c
3/19/2012 c
3/15/2012 c
3/5/2012
2/29/2012
2/20/2012
2/10/2012
2/7/2012
1/25/2012
1/18/2012
1/12/2012
12/30/2011
12/19/2011
12/12/2011
12/5/2011
12/2/2011
11/30/2012
continued
Table 11. Flow Observations On-Site Springs
Bennett's Dump, Bloomington, Indiana
Mound Middle Mid-North North
Spring a Spring a Spring a Spring
0 2.3 0 0
0 7.3 0 0.5
0 4 0 0
7 13.I 0 3
0 7.3 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0.0 0 0
0 0.0 0 0
0 0.7 0 0
0 4.8 0 0
0 2.8 0 0
0 2.8 0 0
0 0.0 0 0
0 0.12 0 0
0 0.15 0 0
0 0.3 0 0
0 1.9 0 0
0 2.8 0 0
0 4.0 0 0
0 6.4 0 0
0 8.3' 0 0
0.3 10.5 0 0
0 9.4 0 5
0 4 0 0
0 6.4 0 0
0 6.4 0 0
0 6 0 0
0 11.8 0 3
0 5.5 0 0
0 10.5 0 1
Rusty b s . b pnng
0
NR .0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.25
1.25
·1
0.5
0
0
0
0.05
0.5
0.5
0.3
I
I
1.5
1
0.1
0.25
NR 1.5
2.5
0.5
2.5
Observation Date
11/23/2011
11117/2011
11/15/2011
11/14/2011
11/4/2011
10/22/2011
10/12/2011
10/4/2011
9/30/2011
9/30/2011
9/26/2011
9/15/2011
9/8/2011
9/1/2011
. 8/26/2011
8/18/2011
8/9/2011
8/5/2011
7/29/2011
7/15/2011
717/2011
7/1/2011
6/24/2011
6/22/2011
6/16/2011
6/14/2011
6/3/2011
5/28/2011
5/19/2011
5/6/2011
5/5/2011
4/25/2011
4/20/2011
4/14/2011
4/12/2011
4/5/2011
3/31/2011
3/25/2011
3/18/2011
continued
Table 11. Flow Observations On-Site Springs
Bennett's Dump, Bloomington, Indiana
Mound Middle Mid-North North Spring a Spring a Spring a s . b pnng
0 1.9 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 1.9 0 0
0 1.5 0 0
0 3.4 0 0
0 4 0 0
0 3.4 0 1
0 1.9 0 0
0 3.4 0 0
0 6 0 0
0 7.3 0 0
6.8 13.1 3.5 1
13.4 16 3.5 2
28 18 4.5 8
32 16 0.2 NR
0.4 11.8 0 0
11.5 14.5 0 4
0 8.3 0 1.5
0 6.4 0 0
0 7.3 0 0
0 I 8.3 0 0
Rusty s . b pnng
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.1
0.5
1.5
1
0
0
0
1.5
NR 7
0
NR 0
0
0
0
0
0
Table 11. Flow Observations On-Site Springs
Bennett's Dump, Bloomington, Indiana
Observation Mound
Date Spring a
3/11/2011 2
317/2011 2
3/2/2011 0
2/28/2011 0
2/22/2011 0
2118/2011 0
2/9/2011 0
2/4/2011 0
1/26/2011 0
1/21/2011 0
1/4/2011 0
12/28/2010 0
12/23/2010 0
12/21/2010 0
12/9/2010 0
11/30/2010 0
11/22/2010 0
11/12/2010 0
10/27/2010 0
10/15/2010 0
9/30/2010 0
9/15/2010 0
"Flow estimated using V-notch weir.
bFlow estimated visually. 0 Pump test in progress.
NR - Not Recorded
Middle Mid-North North
Spring a Spring a Spring
NR 0 0
12 0 5
10.5 0 0
14.5 0 2
12 0 2
1.9 0 0
NR 0 0
NR 0 0
2.3 0 0
3.4 0 0
3.4 0 0
0.5 0 0
0.4 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Rusty b Spring b
0
3
0
0
0
0
NR
NR
0
0
0
NR
NR
0
NR
0
0
NR
0
NR
0
NR
FIGURES
Mile Quarry Complex
Intermittent Overflow \ Discharge from Quarter
Quarry Drain .
Monitoring well
Survey Control Point
Piezometer Location
/\ Stream Gauging and L.::. Sampling Point
) Outfall
@ Staff Gauge
d Springs
@ Test Pit
-730 -
Monitor Yell, Plaomel4r ~rlnp - Quarry Yater
Station
lllf-1 lllf-3 lllf-5 lllf-lli PZ-B7 lllf-BC10 lllf-C3A lllf-c.A lllf-C5 Icebox Quarry 11'edce Quarry Middle Sprin& Mound Sprin& Mid-North Sprinc North Sprin& SCD staff PZ-1.5 PZ-LM5 PZ-F3 PZ-H PZ-M
Potentiometric Surface Contour on December 11, 2014
0-ber 11, 2014.
Waler Yater Level Station Level
El.,.,..tion El.,.,..tion 733.73 PZ-E5 734.04 721.11 PZ-111 736.29 724.90 lllf-K9Slr 739.52 727.14 lllf-813 723.117 733.96 TPZ-2 727.86 730.94 TPZ-11 724.29 731.43 Infiltration Gallery 723.57 731.45 TP 11 736.52 731.00 Pit A 740.55 736.07 GP-3 730.03 736.50 GP-11 730.911 Flo'lrin& GP-17 723.74 Dry PZ-GP16 721.91 Dry PZ-GP25 722.56 Dry PZ-GP31 722.60 721.93 PZ-867 726.79 736.92 PZ-BC1011 731.49 740.37 PZ-CDIHO 731.96 734.07 PZ-CD1112 731.97 733.99 PZ-CD67 729.01 734.15 PZ-CD69 731.59
@TP3
CBS Corporation
J'i&ure 1. Monilorin&: and Se.mplbi& Locations
Bennetts Dump Bloomin&lon, Indiana -8/4/15
Soak: 1:100
CONTINUOUS MONITORING PLOTS
-
Middle Spring Continuous Flow and Mound Spring Flow Observations
October 2014 35 -.---------------------------------------~ 6.0
• • • • • .. . • 30 -+-----------------------------------~-------'l
5.0
-. 25 -+--------------------------,-=-=~~"""""'=========================d...._--~ c -
4.0 ~
E 20-1--~~~~~~~~~~~~~~-t-~~~~~~~~~~~~~~~~~~~-,i c ·-ca c. CJ -3:
~
3.0 ~
0 15 +----------------~---------------------------'! ~ -u.
10 -1----------------1------F---Vl-----------------------j
~
E 2.0 j
u
1.0
0 -J....,A, ........ ~_....._ .......... --l-____ ...__ ........ __..._;--....._~----1--'----t---L-'--~--'-----t--+---'----L-'---+---'-----'----'------'------+ 0.0
1-0ct 6-0ct 11-0ct 16-0ct 21-0ct 26-0ct 31-0ct
-2014
-Middle Spring Flow .& Middle Sp obs. • Rain Events -Cumulative Rain
-E Q. C> -;: 0 -LL
Middle Spring Continuous Flow and Mound Spring Flow Observations
November 2014 25 -.----------------------------------------~ 5.0
• ... 20 4.0
15 3.0
10 2.0
5 1.0
o t:::::::::=~::::~:::::::::::::=:=::;:~=*==~~=::'.'.'.:::'.:::=~~~!!lof-~:::::i::::L-e-.___+--_.____.___..__J_ o.o 1-Nov 6-Nov 11-Nov 16-Nov 21-Nov 26-Nov
2014
-Middle Spring Flow & Middle Sp obs.· • Rain Events CJ Mound Sp obs. -Cumulative Rain
""':"' c: ·---~ c: ca
e:::: CD > :;= ca -::::s E ::::s u
-E c. C> ·-~ 0
LL
. .. 20
15
10
5
Middle Spring Continuous Flow and Mound Spring Flow Observations
December 2014
•
Erratic instrument data after 12/5-12/6 storm. Instrument pulled for testing 12/11 and re-installed on 12/16/2014
.. •
4.0
- 3.0
2.0
1.0
o _µ.._._~.___.___._~+--'----'--e--'---'---+-a-_..__._~.__.....__-+-~"'---'----'-~....._--+-____.'--_..__._~..__-+-__._~..___._---'-~+o.o
1-Dec 6-Dec 11-Dec 16-Dec 21-Dec 26-Dec 31-Dec
2014
-Middle Spring Flow ._ Middle Sp obs • Rain Events a Mound Sp obs. -Cumulative Rain
-. c: ·----~ . c: ·-ca ~
CJ)
.2:: -ca -~ E ::::s 0
MANUAL MONITORING PLOTS
Bennett's Dump Quarries & Pits, Observed Water Levels Post-Quarry Drain Data and 2014 4th Quarter Observations
744
742
Q4 hand measures
0 • 12/11/2014
740
I -~ 738 -c: 0 ·z; ns > aJ 736
LL.I
I I I I I I
I • I ! 1 T " • I
Max
J '" Qo.rt;1 ,
1 1 Median
734 1st Quartile
Min
732 Icebox Wedge Quarry Wedge South PIT-A Pit 6
-~ -c 0 ·-.... ta > GJ -w
755
Bennett's Dump Monitoring Wells, Observed Water Levels Post-Quarry Drain Data and 2014 4th Quarter Observations
,.. f I
745-+----------
740 1--1-l
735
730 ~-725
720
715
~6 <.,, ..... <;:,
~ ~~ ~
~..... (.,,,,~ <)'~ ~ ~~ ~~
~ ~~ ~
~~ ~
~~ ~
~'o<:> ~
~~ ~
~ ~"
<§.~ <§.:-.-"" ~
<§.:-.-
Q4 hand measures
• 12/11/2014
r .. ~ I 3rd Quartile
•, Median
1st Quartile
M in
Bennett's Dump Piezometers, Observed Water Levels Post-Quarry Drain Data and 2014 4th Quarter Observations
745
740 I I Q4 hand measures
~ ....
I I I • 12/11/2014
I I 735
-~ -c 0 r .. ·z; 730 C'O >
I C11 -w ~J '" Q"'"'''
725 ~ , Median
$ $ I I LJ 1st Quartile
1 I -'- Min
I 720
PZ-H7 PZ-111 PZ-L5 AB-89 867 GP12A BC-1011 PZ-2 PZ-4 PZ-5 PZ-8 PZ-9
APPENDIX A
Chain-of-Custody Records
a Analytical" 1. 11WW.p.oolalm.ll!lm
CHAIN·OF .. CUSTODY I Anaiytical Request Document The ChiiliH>f-Gue1Ddy Is a LEGAL DOCUMENT. All relevant fields must be completed accurately.
'· ·=,~~Il~l~n: .~~B.·. .
. Reqult&d P.roJBc! liiform~tioll: _ . _ . .. $eCtJonC·
. . 1nvo"1ce 1m0rinatton: · . J of. ·J.
SectlonD ·. RllqlllreciCllent 1niQimatlon
.SAMPLE UIO . . . (A-Z; 0-9 / ,-) .. . .
· . Sample IDs MUST BE UNIQUE
;;~h'i r<:~•:t-++++-+-+-+-+'' -+-+-+---ir--'--'lf---~---.-,.....,..-11 J#~
·-.·.;--:,:··· SAMPLE CONDniONS
. __ : .• : F--:.. s. v ~ ··_:::- f P<:;,,.,nk
' . •.
·. t...)
..........
ORIGINAL .. ·~~~~~~,': ·'' •i~.i:.=·} f' . •,;;;; '·• ""-'•'!'< ; > .'•''·'·: ;;; i ~ [ f ! [ h . . . _ SIGNf\TuREotiiAMfi~~- ~· , ~ :~~:;;: j;) /') ll'-f . r- J .§ G ! . . ~
"Im-Note: Byolgnlng thl8 tonn ~ ilfEI accepUngPa:e's NET ao c1ay poymonttenna end aglll&~ lltlat& cheJ.g;ia of 1.5% permonthtirl!n)' 1nw1ces·+d wl1hln 30 clays. . F-Au.-Q.02orev.07, 15-Ma'y-2007
APPENDIXB
Certificates of Analysis
Pace Analytical Services, Inc.
P?eAnalytica!' (-ACi www.pacelabs.com
(
Not NELAP Accredited
4860 Blazer Parkway
Dublin, OH 43017
(614)486-5421
Pace Analytical Services, Inc.
7726 Moller Road
Indianapolis, IN 46268
(317)228-3100
December 26, 2014
Mr. Russ Cepko CBS Corporation 20 Stanwix Street 10th Floor Pittsburgh, PA 15222
RE: Project: BENNETT'S DUMP Pace Project No.: 50109036
Dear Mr. Cepko: Enclosed are the analytical results for sample(s) received by the laboratory on December 13, 2014. The results relate only to the samples included in this report. Results reported herein conform to the most current TNI standards and the laboratory's Quality Assurance Manual, where applicable, unless otherwise noted in the body of the report.
If you have any questions concerning this report, please feel free to contact me.
Sincerely,
ca-~cfZ Chris Boyle [email protected] Project Manager
Enclosures
cc: Mr. Neill Vaughan, PSARA
REPORT OF LABORATORY ANALYSIS
This report shall not be reproduced, except in full,
without the written consent of Pace Analytical Services, Inc .. Page1of19
Project: BENNETI'S DUMP
Pace Project No.: 50109036
Sample: 8011027
Parameters
8082 GCS PCB Water Low Level
PCB-1016(Aroclor1016) PCB-1221 (Aroclor 1221) PCB-1232(Aroclor1232) PCB-1242(Aroclor1242) PCB-1248(Aroclor1248) PCB-1254(Aroclor1254) PCB-1260 (Aroclor 1260) PCB-1262 (Aroclor 1262) Surrogates Decachlorobiphenyl (S)
25400 Total Suspended Solids
Total Suspended Solids
Date: 12/26/2014 04:44 PM
Pace Analytical Services, Inc.
Not NELAP Accredited
4860 Blazer Parkway
Dublin, OH 43017
(614)486-5421
Pace Analytical Services, Inc.
7726 Moller Road
Indianapolis, IN 46268
(317)228-3100
ANALYTICAL RESULTS
Lab ID: 50109036001 Collected: 12/11/1411:55 Received: 12/13/14 09:15 Matrix: Water
Results Units Report Limit OF Prepared Analyzed CAS No. Qua I
Analytical Method: EPA 8082 Preparation Method: EPA 3510
ND ug/L 0.010 12/17/14 15:00 12/18/14 15:59 12674-11-2 ND ug/L 0.010 12/17/14 15:00 12/18/14 15:59 11104-28-2
0.19 ug/L 0.010 12/17/14 15:00 12/18/14 15:59 11141-16-5 ND ug/L 0.010 12/17/14 15:00 12/18/14 15:59 53469-21-9 ND ug/L 0.010 12/17/14 15:00 12/18/14 15:59 12672-29-6 ND ug/L 0.010 12/17/14 15:00 12/18/14 15:59 11097-69-1 ND ug/L 0.010 12/17/14 15:00 12/18/14 15:59 11096-82-5
ND ug/L 0.010 12/17/14 15:00 12/18/14 15:59 37324-23-5
84 %. 12/17/14 15:00 12/18/14 15:59 2051-24-3
Analytical Method: SM 25400
ND mg/L 5.0 12/16/14 10:11
REPORT OF LABORATORY ANALYSIS
This report shall not be reproduced, except in full,
. without the written consent of Pace Analytical Services, Inc .. Page 5 of 19 .
www.pacelabs.com
Project: BENNETI'S DUMP
Pace Project No.: 50109036
Sample: 8011028
Parameters
8082 GCS PCB Water Low Level
PCB-1016(Aroclor1016) PCB-1221 (Aroclor 1221) PCB-1232 (Aroclor 1232) PCB-1242 (Aroclor 1242) PCB-1248(Aroclor1248) PCB-1254 (Aroclor 1254) PCB-1260 (Aroclor 1260) PCB-1262 (Aroclor 1262) Surrogates Decachlorobiphenyl (S)
25400 Total Suspended Solids
Total Suspended Solids
Date: 12/26/2014 04:44 PM
Pace Analytical Services, Inc.
Not NELAP Accredited
4860 Blazer Parkway
Dublin, OH 43017
(614)486-5421
Pace Analytical Services, Inc.
7726 Moller Road
Indianapolis, IN 46268
(317)228-3100
ANALYTICAL RESULTS
Lab ID: 50109036002 Collected: 12/11/14 11:55 Received: 12/13/14 09:15 Matrix: Water
Results Units Report Limit DF Prepared
Analytical Method: EPA 8082 Preparation Method: EPA 3510
ND ug/L 0.010 12/17/14 15:00 ND ug/L 0.010 12/17/14 15:00
0.18 ug/L 0.010 12/17/14 15:00 ND ug/L 0.010 12/17/14 15:00 ND ug/L 0.010 12/17/14 15:00 ND ug/L 0.010 12/17/14 15:00 ND ug/L 0.010 12/17/14 15:00 ND ug/L 0.010 12/17/14 15:00
80 %. 12/17/14 15:00
Analytical Method: SM 2540D
ND mg/L 5.0
REPORT OF LABORATORY ANALYSIS
This report shall not be reproduced, except in full,
without the written consent of Pace Analytical Services, Inc ..
Analyzed CAS No.
12/18/14 16:17 12674-11-2 12/18/14 16:17 11104-28-2 12/18/14 16:17 11141-16-5 12/18/14 16:17 53469-21-9 12/18/14 16:17 12672-29-6 12/18/14 16:17 11097-69-1 12/18/14 16:17 11096-82-5 12/18/14 16:17 37324-23-5
12/18/14 16:17 2051-24-3
12/16/14 10:11
Qual
Page 6 of 19
aeAnalytica.!' / www.pacelabs.com
{
Project: BENNETI'S DUMP
Pace Project No.: 50109036
Sample: 8011029
Parameters
8082 GCS PCB
PCB-1016 (Aroclor·1016) PCB-1221 (Aroclor 1221) PCB-1232 (Aroclor 1232) PCB-1242 (Aroclor 1242) PCB-1248 (Aroclor 1248) PCB-1254 (Aroclor 1254) PCB-1260 (Aroclor 1260) Surrogates Decachlorobiphenyl (S)
25400 Total Suspended Solids
Total Suspended Solids
Date: 12/26/2014 04:44 PM
Pace Analytical Services, Inc. Not NELAP Accredited
4860 Blazer Parkway
Dublin, OH 43017
(614)486-5421
Pace Analytical Services, Inc.
7726 Moller Road
Indianapolis, IN 46268
(317)228-3100
ANALYTICAL RESULTS
Lab ID: 50109036003 Collected: 12/11/1412:10 Received: 12/13/14 09:15 Matrix: Water
Results Units Report Limit OF Prepared
Analytical Method: EPA 8082 Preparation Method: EPA 351 O
ND ug/L 0.10 12/15/14 14:57 ND ug/L 0.10 12/15/14 14:57 ND ug/L 0.10 12/15/14 14:57 ND ug/L 0.10 12/15/14 14:57 3.9 ug/L 0.10 12/15/14 14:57 ND ug/L 0.10 12/15/14 14:57 ND ug/L 0.10 12/15/14 14:57
76 %. 29-154 12/15/14 14:57
Analytical Method: SM 25400
ND mg/L 5.0
REPORT OF LABORATORY ANALYSIS
This report shall not be reproduced, except in full,
without the written consent of Pace Analytical Services, Inc ..
Analyzed CAS No.
12/16/14 11:39 12674-11-2 12/16/14 11 :39 11104-28-2 12/16/1411:39 11141-16-5 12/16/14 11 :39 53469-21-9 12/16/14 11 :39 12672-29-6 12/16/14 11 :39 11097-69-1 12/16/14 11:39 11096-82-5
12/16/14 11:39 2051-24-3
12/16/14 10:11
Qua I
Page 7of19
~An. alytic. al~ (~~i:J.{il www.pacela~.com i
Project: BENNETT'S DUMP
Pace Project No.: 50109036
Sample: 8011030
Parameters
8082 GCS PCB
PCB-1016(Aroclor1016} PCB-1221 (Aroclor 1221} PCB-1232 (Aroclor 1232) PCB-1242 (Aroclor 1242} PCB-1248(Aroclor1248} PCB-1254(Aroclor1254} PCB-1260(Aroclor1260} Surrogates Decachlorobiphenyl (S)
25400 Total Suspended Solids
Total Suspended Solids
Date: 12/26/2014 04:44 PM
Pace Analytical Services, Inc.
Not NELAP Accredited
4860 Blazer Parkway
Dublin, OH 43017
(614)486-5421
Pace Analytlcal Services, Inc.
7726 Moller Road
Indianapolis, IN 46268
(317)228-3100
ANALYTICAL RESULTS
Lab ID: 50109036004 Collected: 12/11/14 12:03 Received: 12/13/14 09:15 Matrix: Water
Results Units Report Limit DF Prepared
Analytical Method: EPA 8082 Preparation Method: EPA 351 O
ND ug/L 0.10 12/15/14 14:57 ND ug/L 0.10 12/15/14 14:57 ND ug/L 0.10 12/15/14 14:57 ND ug/L 0.10 12/15/1414:57 ND ug/L 0.10 12/15/14 14:57 ND ug/L 0.10 12/15/14 14:57
ND ug/L 0.10 12/15/14 14:57
66 %. 29-154 12/15/14 14:57
Analytical Method: SM 2540D
7 mg/L 5.0
REPORT OF LABORATORY ANALYSIS
This report shall not be reproduced, except in full,
without the written consent of Pace Analytical Services, Inc ..
Analyzed CASNo. ·
12/16/14 11:57 12674-11-2 12/16/14 11:57 11104-28-2 12/16/14 11:57 11141-16-5 12/16/14 11 :57 53469-21-9 12/16/14 11 :57 12672-29-6 12/16/14 11:57 11097-69-1 12/16/14 11 :57 11096-82-5
12/16/14 11 :57 2051-24-3
12/16/14 10:11
Qual
Page 8 of 19
Project: BENNETT'S DUMP
Pace Project No.: 50109036
Sample: 8011031
Parameters
8082 GCS PCB
PCB-1016(Aroclor1016) PCB-1221 (Aroclor 1221) PCB-1232 (Aroclor 1232) PCB-1242(Aroclor1242) PCB-1248 (Aroclor 1248) PCB-1254 (Aroclor 1254) PCB-1260 (Aroclor 1260) Surrogates Decachlorobiphenyl (S)
25400 Total Suspended Solids
Total Suspended Solids
Date: 12/26/2014 04:44 PM
Pace Analytical Seivices, Inc. Not NELAP Accredited
4860 Blazer Parkway
Dublin, OH 43017
(614)486-5421
Pace Analytical Seivlces, Inc.
7726 Moller Road
Indianapolis, IN 46268
(317)228-3100
ANALYTICAL RESULTS
Lab ID: 50109036005 Collected: 12/11/1412:08 Received: 12/13/14 09:15 Matrix: Water
Results Units Report Limit OF Prepared
Analytical Method: EPA 8082 Preparation Method: EPA 3510
ND ug/L 0.10 12/15/14 14:57 ND ug/L 0.10 12/15/14 14:57
ND ug/L 0.10 12/15/14 14:57 ND ug/L 0.10 12/15/14 14:57 ND ug/L 0.10 12/15/14 14:57
ND ug/L 0.10 12/15/14 14:57 ND ug/L 0.10 12/15/14 14:57
74 %. 29-154 12/15/14 14:57
Analytical Method: SM 25400
ND mg/l 5.0
REPORT OF LABORATORY ANALYSIS
This report shall not be reproduced, except in full,
without the written consent of Pace Analytical Services, Inc ..
Analyzed CAS No.
12/16/14 12:15 12674-11-2 12/16/14 12:15 11104-28-2 12/16/14 12:15 11141-16-5 12/16/14 12:15 53469-21-9 12/16/14 12:15 12672-29-6 12/16/14 12:15 11097-69-1 12/16/14 12: 15 11096-82-5
12/16/14 12:15 2051-24-3
12/16/14 10:11
Qua I
Page 9of19
Project: BENNETI'S DUMP
Pace Project No.: 50109036
Sample: 8011032
Parameters
8082 GCS PCB Water Low Level
PCB-1016 (Aroclor 1016) PCB-1221 (Aroclor 1221) PCB-1232(Aroclor1232) PCB-1242 (Aroclor 1242) PCB-1248 (Aroclor 1248) PCB-1254 (Aroclor 1254) PCB-1260(Aroclor1260) PCB-1262(Aroclor1262) Surrogates Decachlorobiphenyl (S)
25400 Total Suspended Solids
Total Suspended Solids
Date: 12/26/2014 04:44 PM
Pace Analytical Services, Inc.
Not NELAP Accredited
4860 Blazer Parkway
Dublin, OH 43017
(614)486-5421
Pace Analytical Services, Inc.
7726 Moller Road
Indianapolis, IN 46268
(317)228-3100
ANALYTICAL RESULTS
Lab ID: 50109036006 Collected: 12/11/14 12:05 Received: 12/13/14 09:15 Matrix: Water
Results Units Report Limit DF Prepared
Analytical Method: EPA 8082 Preparation Method: EPA 3510
ND ug/L 0.010 12/17/14 15:00 ND ug/L 0.010 12/17/14 15:00 ND ug/L 0.010 12/17/14 15:00 ND ug/L 0.010 12/17/14 15:00 ND ug/L 0.010 12/17/14 15:00 ND ug/L 0.010 12/17/14 15:00 ND ug/L 0.010 12/17/14 15:00 ND ug/L 0.010 12/17/14 15:00
95 %. 12/17/14 15:00
Analytical Method: SM 2540D
8 mg/L 5.0
REPORT OF LABORATORY ANALYSIS
This report shall not be reproduced, except in full,
without the written consent of Pace Analytical Services, Inc ..
Analyzed CAS No.
12/18/14 16:35 12674-11-2 12/18/1416:35 11104-28-2 12/18/14 16:35 11141-16-5 12/18/14 16:35 53469-21-9 12/18/14 16:35 12672-29-6 12/18/14 16:35 11097-69-1 12/18/14 16:35 11096-82-5 12/18/14 16:35 37324-23-5
12/18/14 16:35 2051-24-3
12/16/1410:11
Qua I
Page 10of19
Project: BENNETT'S DUMP
Pace Project No.: 50109036
Sample: 8011033
Parameters
8082 GCS PCB
PCB-1016(Aroclor1016) PCB-1221 (Aroclor 1221) PCB-1232(Aroclor1232) PCB-1242(Aroclor1242) PCB-1248(Aroclor1248) PCB-1254(Aroclor1254) PCB-1260(Aroclor1260) Surrogates Decachlorobiphenyl (S)
25400 Total Suspended Solids
Total Suspended Solids
Date: 12/26/2014 04:44 PM
Pace Analytical Services, Inc. Not NELAP Accredited
4860 Blazer Parkway
Dublin, OH 43017
(614)486-5421
Pace Analytical Services, Inc.
7726 Moller Road
Indianapolis, IN 46268
(317)228-3100
ANALYTICAL RESULTS
Lab ID: 50109036007 Collected: 12/11/1412:30 Received: 12/13/14 09:15 Matrix: Water
Results Units Report Limit DF Prepared
Analytical Method: EPA 8082 Preparation Method: EPA 3510
ND ug/L 0.51 5 12/15/14 14:57 ND ug/L 0.51 5 12/15/14 14:57 6.7 ug/L 0.51 5 12/15/14 14:57 ND ug/L 0.51 5 12/15/14 14:57 ND ug/L 0.51 5 12/15/14 14:57 ND ug/L 0.51 5 12/15/14 14:57 ND ug/L 0.51 5 12/15/14 14:57
76 %. 29-154 5 12/15/14 14:57
Analytical Method: SM 2540D
11 mg/L 5.0
REPORT OF LABORATORY ANALYSIS
This report shall not be reproduced, except in full.
without the written consent of Pace Analytical Services, Inc ..
Analyzed CAS No.
12/16/14 23:04 12674-11-2 12/16/14 23:04 11104-28-2 12/16/14 23:04 11141-16-5 12/16/14 23:04 53469-21-9 12/16/14 23:04 12672-29-6 12/16/14 23:04 11097-69-1 12/16/14 23:04 11096-82-5
12/16/14 23:04 2051-24-3
12/16/14 10:11
Qua I
Page 11 of 19
APPENDIXC
Data Validation
Validation Results December 11, 2014
Bennett's Dump SDG #50109036
Groundwater Monitoring Samples
1. Validation of the following sample has been completed:
• BD11027 thru BD11033
2. Validation was performed per the requirements for level 4 data in the project QAPjP. This includes a check for; Holding Time, Calibration, Blank Contamination, Precision, Accuracy, and Accuracy of Nominal Reporting Limits against method requirements.
3. Based on this review no data qualifications are recommended.
4. The QAPjP requires an assessment of the overall data quality with respect to Precision, Accuracy, Representativeness, Completeness and Comparability (PARCC).
o Precision and accuracy: Precision and accuracy were accessed by reviewing the lab performance on lab spiked samples, lab spike duplicates and field duplicates. All requirements were met.
o Representativeness: The representativeness requirement involves an assessment of the field sampling and lab analytical techniques. The field sampling locations and techniques as well as lab procedures were in accordance with the approved sampling plan and QAPjP. Therefore the representativeness requirements were met.
o Completeness: The completeness goal for the project was for all project data to be 90% accepted. Completeness is calculated by dividing the total number of acceptable analyses by the total performed. An acceptable analysis is defined as one that conformed to QC protocols and is not rejected. All these analyses were accepted. The project completeness goal has been met to date.
o Comparability: All the samples taken, analyzed and validated by CBS were taken by CBS or it's contractors sampling crews using the same procedures as previous samples at this location. These samples were analyzed by Heritage Labs. Care should be taken when attempting to trend Heritage sample results with other labs using slightly different procedures. Overall these results should be directly comparable to other Heritage lab results from these locations.
Overall, the main objective of the sampling event was to determine if PCBs are present at a concentration of .1 ppb or more (0.01 ppb for Stout's Creek Downstream, SCD and Upstream, SCU). This data is of sufficient quality to satisfy this goal.
\\Sgty0002\groups\LEA\Environmental\Bloomington\SHAREDIR\BP validation\reports\validation report-BO Dec 1I,2014.docx 7/30/15
APPENDIXD
Instrument Maintenance Log
Bennett's Dump Instrument Maintenance Log Fourth Quarter 2014
Office Rain Gauge: Instrument Date Action
HOBO 10/1/2014 to Normal function.
#9928483 12/31/2014
Mound Sp.: Instrument
10/1/2014- Not instrumented. Manually observed due 12/31/2014 to infrequent and short-duration flow.
Crest gauge 10/17/2014 0.19 ft. /18 gpm 12/9/2014 0.10 ft. I 3.5 gpm
Middle Spring: Instrument
In-Situ LevelTROLL 10/1/2014 No re-index needed
#168310 10/17/2014 Re-indexed by 0.11 ft., cable adjustment 10/30/2014 Re-indexed by 0.02 ft. 11/12/2014 No re-index needed 11/26/2014 Re-indexed by 0.01 ft. 12/10/2014 Re-indexed by 0.05 ft. 12/11/2014 Pulled for testing/cleaning 12/16/2014 Re-installed #168310 12/29/2014 No re-index needed
Crest gauge
10/17/2014 0.23 ft. I 11.8 gpm 11/24/2014 0.18 ft. I 6.4 gpm 12/9/2014 0.26 ft. I lq gpm