CBM Development CBM Development ––ppAn Alternative Energy An Alternative Energy for Better Futurefor Better Futurefor Better Futurefor Better Future
Yogyakarta, 31th March 2012
Journey towards excellence
IntroductionIntroduction
Energy from Nature. For Nature
CBM Potential Business in Indonesia
Source: DitJen MIGAS
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
PETA WILAYAH KERJA GAS METANA BATUBARA DI INDONESIAPETA WILAYAH KERJA GAS METANA BATUBARA DI INDONESIAStatus : Juni 2011Status : Juni 2011
COALBED METHANE PSCs ACROSS INDONESIASTATUS OF JUNE 2011
© DJ MIGAS 2011
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
ROAD MAP PERKEMBANGAN CBM DI INDONESIAINDONESIA COALBED METHANE DEVELOPMENTROADMAP
1 0 B fDReg: CBM - 1
Rambutan CBM P d E t fCBM Prod Est of 1500 MMSCFD
Ministerial Regulation No. 036/2008, revision to
Ministerial Regulation 1.0 BcfD
1.8 BcfD
Rambutan(APBN) CBM Prod Est of
500 MMSCFD1500 MMSCFD
Gov Reg of CBM to Power
Ministerial Reg
No.1669 CBM Prod Est of 900 MMSCFD
gNo. 033/2006
2008 2009 20102005 2006 20072004 2008 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
to Power
1998 2007
900 MMSCFD
2003 2005 20092008
Ministerial
Signing of more CBM PSCsAvg prod rate assumed = 250 MSCFD/ well
Notes:Min RegNo.033/2006
1st CBM PSC
Projects with Gov. involvement
Start of CBM Contract period
CBM production
Notes:
Feasibility & Economics
© DJ MIGAS 2011
CBM production
PP: Pilot ProjectStudy
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
TYPICAL INDONESIA CBM TYPICAL INDONESIA CBM DEVELOPMENT SCHEMEDEVELOPMENT SCHEME
1. OPEN AREA
BEFORE CONTRACT
30 YEAR CONTRACT PERIOD
EXPLORATION (6+4) YEAR EXPLOITATION 20
YEAR1. OPEN AREA
GENERAL SURVEY (SPEC.SURVEY, RESEARCH)JOINT STUDY
2. OVERLAPPING AREA (O/G ANDMINING)
GENERAL SURVEY (SPEC.SURVEY, RESEARCH FULL FIELD
Firm Commitment1. G&G EVALUATION2 CORE HOLES
1. G&G EVALUATION2. CORE HOLES DRILLING3. MARKET SURVEY
1st 3 (Three) year 2nd 3 (Three) year 3 Th 17 Th
JOINT EVALUATION DEVELOPMENT2. CORE HOLES DRILLING
3. MARKET SURVEY5. PILOT PROJECT 1ST
STAGE(DRILLING & DEWATERING)
3. MARKET SURVEY4. PILOT PROJECT 2ND STAGE
(DRILLING & DEWATERING)
CONTRACT SIGNING POD
© DJ MIGAS 2011
REGIONAL GEOLOGYREGIONAL GEOLOGY
FLOW CHART CBM FLOW CHART CBM RESOURCESRESOURCES
SURFACE GEOLOGICAL SUBSURFACESURFACE GEOLOGICAL DATA
SUBSURFACE GEOLOGICAL DATA
• SURFACE MAPPING• CROSS‐SECTIONS• COAL SAMPLES
• 2D/3D SEISMIC• WELL DATA• GRAVITY• RESISTIVITY
• GEOCHEMISTRY ANALYSIS• COAL PROPERTIES
• RESISTIVITY
• 3D COAL DISTRIBUTION• WELL BASED (CORRELATION)• COAL PROPERTIES
• COAL RANKS• WELL BASED (CORRELATION)
• SEISMIC ATTRIBUTES
CBM RESOURCESCBM RESOURCESLAPI ITB, 2012LAPI ITB, 2012
INTRODUCTIONINTRODUCTION
‐ Coal is a source, seal and reservoir rock. Gas is sorbed on thecoal surface. Typically over 90% methane with some ethaned b d dand carbon dioxide.
‐ CBM production requires dewatering the coal formations.When the pressure is reduced, gases are desorbed and flow
h llb l k f f ( l )to the wellbore via a natural network of fractures (cleats).After gas arrives at the wellbore, it is produced utilizingconventional hydrocarbon gas extraction technology
Sl i i i l d i d l i bili ff D
Stage 1,
De-
Stage 2,
Mid
Stage 3,
Decline production
‐ Slow initial desorption and relative permeability effectscreate a “negative gas decline curve.” Unique productioncharacteristics of CBM results in low but inclining initial gasproduction, peaking around 4‐6 years as the coal isd d (d i d)
MCF
D o
r BP
D
Water
Gas
watering
Life
dewatered (depressurized).
‐ There are many benefits of CBM, such as for energy sourcing(gas), power (electricity), industry (methanol, fertilizer). CBM
b d l ll b d (LNG) E CBM ff
Time
8
can be used locally or to be exported (LNG). Even CBM offerbenefits for global climate purposes (CO2 sequestration,Carbon Trading)
Sedimentation and The Formation of CoalSedimentation and The Formation of Coal
From DOE 2004 ALL Consulting (RyderScott Conf CBM 2006)
Cycle of Coal DevelopmentCycle of Coal Development
The Natural Fracture SystemThe Natural Fracture System
RyderScott Conf CBM 2006
The Flow PathThe Flow Path
Ryder Scott Conf CBM 2006
The Flow PathThe Flow Path
Ryder Scott Conf CBM 2006
Regulatory Requirement for CBM Development in Indonesia
Kedalaman Sumur CBM vs. Gas Bumi
CH4
Best >300 -<1,000mCoal SeamCoal Seam
(CBM)(CBM)
Natural Gas
3,000~6,000m
Natural Gas(Gas Reserves)
Oil(Oil Gas Reserves)
Presented to MIGAS, Jakarta 19 July 05_K.Sani
,
(After Lemigas, 2005)
GAS CONTENT CALCULATION
Formula Kim (1977)
G = 32 x (1-a-m) x 0.75 x { ko x (0.096d)no – 0.14 x( 1.8d/100) + 11)} Rf
G = Gas content (sct/ton)( )a = ash content (%)m = moisture content (IM)fc = fixed carbón (%)fc = fixed carbón (%)vm = volatile matter (%)d = depth of coal seam (feet)ko = 0.8 (fc/vm)+5.6no = 0.39 – 0.013 koRf = recovery factor (%) Coal Cutoffy f
range Rf : 50% – 85%Coal Cutoff • 300 – 1500 m (depth)• ≥1.5m (thickness)
Recovery FactorRecovery FactorEstimating the RF
From the sorption isotherm:
(initial gas content – abandonment gas content) / (initial gas content) x 100 = % Recovery Factor
Depending on many factors,the expected range forRecovery factor might be 50% to 85%
Ryder Scott Conf CBM 2006
DRILLING
‐ CBM drilling basically similar to oil and gas conventional, except keeping the drilling cost as low as possiblein order to achieve economics of the project since typical CBM development needs massive number ofwells. In order to do so safe and creative approaches in CBM drilling is strongly recommended.
COMPLETION
CBM wells completion objectives : maximizing contact area of dewatering and minimizing damaging coalseamdewatering and minimizing damaging coalseam.
Surface to In‐Seam Drilling / Completion
Formation Jetting
Diagram showing the production scheme of gas and water for a Diagram showing the production scheme of gas and water for a
typical coaltypical coal--bed methane wellbed methane well
From USGS Fact Sheet FS-123-00 (RyderScott Conf CBM 2006)
SURFACE FACILITIES & VARIOUS ARTIFICIAL LIFTd l f d h
ESP
Production lift damages is the most problem encountered in CBM
PCPSUCKER
ROD PUMP
CBM well site in Marathon
CBM TRANSPORTATION
CBM can be transported and shipped similar to gas conventionalsimilar to gas conventional
LNGCNG
PIPELINES
Medco CBM Portfolios & updates
Energy from Nature. For Nature
23
24
25
26
Challenges
Energy from Nature. For Nature
CHALLENGES OF CBM DEVELOPMENT IN INDONESIACHALLENGES OF CBM DEVELOPMENT IN INDONESIA
‐ Footprint ‐ Strategy
‐ Environment ‐ Reporting
‐ Logistics ‐ Administrasi
‐ Perception
28
CHALLENGES OF CBM DEVELOPMENT IN INDONESIACHALLENGES OF CBM DEVELOPMENT IN INDONESIA
FootprintpObyektif: Mengurangi seminimal mungkin disputeyang diakibatkan bentrokan kepentingan antary g p gberbagai pemangku kepentingan
o Pembebasan Lahan: Perda, Skema (ganti rugi, sewa,, (g g , ,kontrak lahan), tumpang sari
o Luasan standar per sumur atau fasilitas pendukungo Aturan mengenai densitas / kerapatan sumur CBM
29
CHALLENGES OF CBM DEVELOPMENT IN INDONESIACHALLENGES OF CBM DEVELOPMENT IN INDONESIA
Lingkungang gObyektif: Green industry dengan tanpamengorbankan efisiensi dan efektifitasgpengembangan CBM
o UKL/UPL, AMDAL, Studi Lingkungan, Hydrogeology/ , , g g , y g gyo Aturan pemanfaatan air terproduksi ke lingkungansekitar
o Protokol Kyoto – mengurangi efek rumah kacao Reklamasi lahan / bekas sumur CBM
30
CHALLENGES OF CBM DEVELOPMENT IN INDONESIACHALLENGES OF CBM DEVELOPMENT IN INDONESIA
LogisticsgObyektif: Pengadaan barang dan jasa dalampengembangan CBM yang fleksibel, efisien, danp g g y g , ,efektif, mulai dari perencanaan, persetujuan, daneksekusi operasionalp
o Prosedur AFE, WP&Bo Aturan pengadaan barang dan jasao Kontrakting, Amandemeno Pemanfaatan asset ‐ transfering
31
CHALLENGES OF CBM DEVELOPMENT IN INDONESIACHALLENGES OF CBM DEVELOPMENT IN INDONESIA
PerceptionpObyektif: Merubah mind set dalam masyarakatbahwa CBM sangat berbeda dengan oil/gas,g g /g ,terutama dalam hal berikut:
o Keamanan – tekanan dan temperatur rendahpo Kenyamanan – bisa berdiri berdampingan denganindustri lain / masyarakat
o Kemanfaatan langsung ke masyarakat – gas metana,listrik, dan air terproduksi
32
CHALLENGES OF CBM DEVELOPMENT IN INDONESIACHALLENGES OF CBM DEVELOPMENT IN INDONESIA
StrategygyObyektif: Skema pengembangan yang sesuaiuntuk CBM
o Sangat fleksibel, disesuaikan keekonomian masing‐masing blok CBM yang bisa sangat berbeda‐beda
o Aturan mengenai POD migas yang bisa tidak sesuaio Komersialisasi retailSk PSC G PSC di t di l ho Skema PSC – Gross PSC dimana cost di manage olehkontraktor
33
CHALLENGES OF CBM DEVELOPMENT IN INDONESIACHALLENGES OF CBM DEVELOPMENT IN INDONESIA
Reportingp gObyektif: Format report yang sesuai untuk CBMdan bersifat real time
34
CHALLENGES OF CBM DEVELOPMENT IN INDONESIACHALLENGES OF CBM DEVELOPMENT IN INDONESIA
AdministrasiObyektif: Good CBM Engineering Practiceso SHE (Safety, Health, Environment)( y, , )o Metode / Teknis Pelaksanaano Peralatan – rig, sub surface, surface facilitieso Akreditasi – laboratorium pendukung, sertifikasicadangan
35
Tipikal Pengembangan GMB & Tantangan
Butuh Lahan Luas untuk mengakomodasi sumur GMB ….
Hutan disekeliling sumur ??????S O/G T t d KSalah satu stasiun O/G Medco Tetangga dengan Kampung
Pengembangan CBM yang bersahabat dengan lingkungan
Analisa Air sumur CBM di blok Sekayuy
Chemical Oxygen Demand
Total Dissolved Solid
FUTURE CBM WATER
MANAGEMENTMANAGEMENT Irrigation
Households
Providing a better life to locals
Livestock
In US, water produced from CBM field t ib t iti l t itcan contribute positively to community
Pengembangan GMB di AS
Sumber: Unlocking Indonesia’s CBM Resources Learning from Global Experiences,
Lilian Fandriana, BP, 3rd IndoCBM, 29th Apr 2010
PADMA Award 2003 & 2007 :
Government of Indonesia Award for Sustainable Community Development Program
PROPER Hijau 2009 :
Minister of Environment Award for consistent environment management
Thank YouPT Medco E&P Indonesia ….. Proud of its achievements!f
PROPER Hijau 2009 :
Minister of Environment Award for consistent environment
Zero Accident 2007 :
Minister of Manpower and Transmigration Award for zero
Social Empowerment Award 2007
National Welfare Coordination
management accident 22.927.321 hours
ISO 14001 (2007 & 2009) :
TUV Nord Indonesia certification for Minister Award for community development program commitment
environmental quality management system