CAUTIONNUX06uj
Hoisting Procedure
□ Hoisting of this machine must always be performed by qualified personnel, and the work must be carried out in accordance with the procedure below.
□ Keep the machine in the stowed state, and check the all doors are completely looked.
□ No load or person on the platform is allowed.
□ Keep the slide deck in the stowed state, and check the all doors are completely locked.□ Attach a hoisting device to the hooks provided for hoisting on the slewing table, and hoist the machine at four points.
□ Use the hoisting device as described below.
□ If the hoisting device interferes with the machine, use a protector.
□ Use the hoisting device and crane which allow for the machine mass.
■ If the above items are not observed, falling or dropping accident may occur.
2500~3000mm
Slide deck is lockedwith stowed state
Hoisting holes4 places