Caslano Densification and Intensification Proposal
-
Upload
huang-yinxing-jason -
Category
Documents
-
view
249 -
download
2
description
Transcript of Caslano Densification and Intensification Proposal
MASTER IN URBAN VISION AND ARCHITECTURAL DESIGN 2012-2013strategies and vision
02CANTON TICINO: TERRITORY OF A NEW MODERNITY
a perspective of densifi cation after the urban sprawl
YIN SENG NG/ RISHAB JAIN
singapore/ india
02
Master Director/Gianandrea BarrecaTutor/Francesca Vargiu
Project leader/Andrea Vercellotti
Caslano with its well-connected infrastruture with the FLP line provides high value in densifying the town with intensifi cation of public activities. The approach to den-sify is not to pack the place with the maximum amount of people but instead to fi ll up the void space with qual-ity living infrastructure.Thus public socialising spaces are suggested on specifi c locations to anchor the spirit
and create a stronger presence to the void place.
PARKING & PUBLIC SPACES
emptying and redefi ning
PROJECT CONTEXT
FLP TERRITORY/CASLANO POTENTIALS
Lugano
Caslano
Sorengo
Lake di Muzzano
Airport Bioggio
Agno
Magliaso
Mal Cantone
Ponte Tresa
M
Lugano
- the main city of Ticino with an array of com-mercial facilities and opportunities support-ing the majority population livelihood.
FLP TERRITORY/CASLANO POTENTIALS
Lugano
Caslano
Sorengo
Lake di Muzzano
Airport Bioggio
Agno
Magliaso
Mal Cantone
Ponte Tresa
M
Caslano
- a satelite residential town in Ticino, 15 mins car ride away from Lugano and linked to Lugano through the FLP Line.- it is a small residential built-up area of around 4000 people supporting the main city Lugano.
FLP L
INE
MAIN
AX
IS
CASLANO/CENTRAL AXIS AS INFRASTRUCTURAL LINKS
FLP
PORT
Main infrastructure link between
FLP station and the portRegional Scale
STATI
ON
PORT (LAKE)
ANALYSIS
CASLANO/MAIN AXIS AS LOCAL PUBLIC SPHERE
Point of References
Private Residential
L1 Train Station L2 Small Church
L3 Cemetry L4 Church
L5 Historical Center
L6 Lake
Train Station
Small Church
Cemetery
Historical Center
Lake
Church
L1
L2
L3
L4
L5
L6
1KM
/ 15-2
0m
ins w
alk
Local Scale
MAIN AXIS/CAR FLOWS AND PARKING
PUBLIC CARPARKS
17%
PRIVATE CARPARKS66%
COMMERCIALCARPARKS
17%
MAIN AXIS
SUBSIDARY
TRAFFIC FLOWS
Public Parking
Private Parking
Commercial Parking
SIDEWALKS/CARPARKS AND SIDEWALKS
BREAKS
SIDEWALKS
MAIN AXIS/CARPARKS AND POINT OF REFERENCES
Point of References
Public Parking
Commercial Parking
P1
P2 P3
P4
C1C2
C3
C4
MAIN AXIS/POTENTIAL PUBLIC CARPARKS
P1
P2 P3
P4
P1
P2
P3
P4
70lots
3073 sqm
44lots
1709 sqm
64lots
2205 sqm
20lots
568 sqm
MAIN AXIS/POTENTIAL COMMERCIAL CARPARKS
C1C2
C3
C4
C1
C2
C3
C4
5lots
72.5 sqm
4lots
60 sqm
12lots
288 sqm
14lots
552 sqm
SIDEWALKS
SIDEWALKS/RELATIONS_PLAN
E1
E2
E3
E4
E5
E6E7
BREAKS
SIDEWALKS
SIDEWALKS/RELATIONS_ELEVATIONS E1 & E2
MAIN AXISPRIVATE SIDEWALKK
CARPARK
E1 MAIN AXISSIDEWALK
CARPARKPRIVATE
E2
SIDEWALK
E1
E2
SIDEWALKS/RELATIONS_ELEVATIONS E3 & E4
E3
MAIN AXISSIDEWALK
COMMERCIAL
E4
MAIN AXISSIDEWALK
PRIVATE COMMERCIAL
E3
E4
SIDEWALKS/RELATIONS_ELEVATIONS E5
MAIN AXISCARPARK SIDEWALK
EKE5
SIDEWALK
E5
SIDEWALKS/RELATIONS_ELEVATIONS E6 & E7
E6MAIN AXISSIDE
WALKCARPARK
E7
MAIN AXISCOMMERCIAL
SIDEWALK
E6
E7
MAIN ISSUE
MAIN ISSUE/SCHEMATIC
1. Fragmented Parking Spaces along Main Axis 2. Parking Spaces Closed to Point of References
4. Narrow Sidewalks as Only Space for Interaction3. Parking Entrances Breaking the Sidewalks
STRATEGY
STRATEGY/FINAL MAP
Pharmacy
Super Market
Cemetery
Station
To intensify and create vibrancy to the main axis by:1. Emptying, Relocating & Re-
furbishing existing Carparks along the main axis.
2. Creating New Public Socialis-
ing Space with the New Empty
Pockets and Unused Open Space.
3. Defi ning a Clear Presence of Public Socialising Space through the Sidewalks and Forecourt.
STRATEGY/EMPTY & RELOCATE CARPARK ALONG AXIS
C1 C2
C2
C1
EXISTING
EXISTING
EXISTING
NEW
NEW
STRATEGY/EMPTY & RELOCATE CARPARK ALONG AXIS
C3 C4
C3
C4
NEW
NEWEXISTING
EXISTING
EXISTING
STRATEGY/PUBLIC SPACE ON SIDEWALKS
S1 S2
S1
S2
PUBLICPOCKET
PUBLICPOCKET
PUBLICPOCKET
PUBLICPOCKET
STRATEGY/PUBLIC SPACE ON SIDEWALKS
S4S3
S3 S4
PUBLICPOCKET
PUBLICPOCKET
PUBLICPOCKET
STRATEGY/NEW PROGRAM BESIDE SIDEWALKS
N1 N2
N1
N2
NEW PROGRAM
NEW PROGRAM
PROGRAM
PROJECT/STATION
70lots 3073 sqm
83lots 2954 sqm
CARPARK
MAIN
AX
IS
CURRENT
OFFICE
RESTAURANT
CASLANO STN
OFFFOFICE
OFOFOFO
RESTAURANTTTTTTTTTTTTTTTTT
publicsocial 252 sqm
9lots 133 sqm
Refurbished Old Carpark
38m/ 2mins
MAIN
AX
IS
CARPARK
OFFICE
RESTAURANT
CASLANO STN
MAIN
AX
IS
Possible Expansion
PROPOSED
OFFICE
OFOO
RESTAURANT
PROJECT/STATION
E1
E2
E3
MAIN AXISSIDEWALK
SIDEWALK/ CONCOURSEPRIVATE
MAIN AXISSIDEWALK/FORECOURT
SIDEWALKK
CARPARK
MAIN AXISSIDEWALK
SIDEWALK/ CONCOURSE
E2
38m/ 2mins
MAIN
AX
IS
CARPARK
OFFICE
RESTAURANT
CASLANO STN
MAIN
AX
IS
Possible ExpansionOFO
FICE
OFOFOOOO
RESTAURANT
E1
E2
E3
PROJECT/STATION
PROJECT/STATION
PROJECT/STATION
PROJECT/STATION
PROJECT/PHARMACY
10lots 288 sqm
13lots 248 sqm
PROPOSED
MAIN
AX
ISPHARMACY
SPORT FACILIT
IES
CARPA
RK
CURRENT
MAIN
AX
IS
MAIN
AX
IS
PHARMACY
Proposed New Public Facilities
Relocated New Carpark
PUBLIC O
PEN SPACE
ACYCYCYCYCYCYCYCYCYCYCCYCYCY
PHARARARARARRRRRARARRARRMAMMMMMMMMMMMMMC
P PHPHPHPPHPHPHPHPHPHPHPP ARRRRRRRMAMAMAMAMAMAMAMAMAMAMAMAMCYCYYCYCYCYCYCYCYCYYYYYYYCYYCYYCYYYY
publicopen 1601 sqm
publicsocial 656 sqm
sportfi eld 1267 sqm
38m/ 2min
PROJECT/PHARMACY
E1
E2
MAIN
AX
ISPHARMACY
SPORT FACILIT
IES
CARPA
RK
PHPHPHPHPPHPHPHPHPHPHPHARRRRRRRRMAMAMAMAMAMAMAMMAMAMAMAMAMCYCYCYCYYCYCYYCYYYYYYYYCYYCYYYCYYYYYY
38m/ 2min
E1
MAIN AXIS SIDEWALK/FORECOURT
SIDEWALK T
PRIVATE
E2
MAIN AXIS SIDEWALK
SIDEWALK/ CONCOURSE
PRIVATE CARPARK
PROJECT/PHARMACY
PROJECT/PHARMACY
PROJECT/SUPER MARKET
CURRENT
MAIN
AX
ISSUPERMARKET
Relo
cate
d
New
Carp
ark
PROPOSEDROPOSED
MAIN
AX
ISSUPERMARKET
CARPA
RK
59lots 1635 sqm
publicsocial 921 sqm
SUPERMARKET
SUPERMARKET
38m/ 2mins
44lots 1709 sqm
OPE
N SPA
CE
publicopen 2764 sqm
POSS
IBLE
FUTU
RE O
FFIC
E
BUILDIN
G
PROJECT/SUPER MARKET
E1E1
E1MAIN AXISSIDEWALK/
CONCOURSESIDEWALK
EK
MAIN
AX
ISSUPERMARKET
CARPA
RK
SUPERMARKET
38m/ 2mins
PROJECT/SUPER MARKET
PROJECT/SUPER MARKET
PROJECT/CEMETERY
90lots 3356 sqm
publicsocial 913 sqm
play-ground 783 sqm
CURRENT
CEMETERY
RESTAURANT
OFFICE
OFFICE
MAIN
AX
IS
CARPARK
ESESSESESESESESTAURANANANNNNNNNTTTTTTT
OFFICE
FFICEICEICEICICEICEICEICEICEICEICECC
OFFOOOOOOO
Relocated New Carpark
64lots 2205 sqm
8lots 551 sqm
PROPOSED
CEMETERY
RESTAURANT
OFFICE
OFFICE
MAIN
AX
IS
PLAYGROUNDDOUBLE STOREY
CARPARK
ESESESESESESESESESTAURANANNNNNNNNNTTTTTTTT
OFFICE
OFFOOOOOOOO
ICEICEICICICICEICICECICEICEC
43m/ 2.5mins
PROJECT/CEMETERY
CEMETERY
RESTAURANT
OFFICE
OFFICE
MAIN
AX
IS
PLAYGROUNDDOUBLE STOREY
CARPARK
EEEEEEEEEEEEEESSSSSSSSSSSSSSTAURANNNNNNNNNNNNNNTTTTTTTTTT
OFFICE
OOOOOOOOOOOOOOOFFICCCCCCCCCCCCCC
43m/ 2.5mins
E1
E2
E1MAIN AXIS SIDEWALK/
FORECOURTTSIDEWALK
PLAYGROUND
E2
MAIN AXISSIDEWALK/ CONCOURSE
CARPARK
PROJECT/CEMETERY
PROJECT/CEMETERY
PROGRAM/OVERALL MAP
PROGRAM/FINAL MAP
ECONOMIC
ECONOMIC/SCHEMATIC
CURRENT
+POSSIBLE
+
=