LOW IMPACT DEVELOPMENT CONFERENCE LOW IMPACT DEVELOPMENT CONFERENCE NEW CHALLENGE: A CLIMATE FOR CHANGE NEW CHALLENGE: A CLIMATE FOR CHANGE 09.28.2010 09.28.2010 CASE STUDY: WALNUT GROVE, BRAMPTON CASE STUDY: WALNUT GROVE, BRAMPTON A BUILDER A BUILDER S PERSPECTIVE OF LOW IMPACT DEVELOPMENT S PERSPECTIVE OF LOW IMPACT DEVELOPMENT

Transcript of CASE STUDY: WALNUT GROVE, BRAMPTON · 2012. 5. 23. · case study: walnut grove, brampton a builder...

  • LOW IMPACT DEVELOPMENT CONFERENCE LOW IMPACT DEVELOPMENT CONFERENCE NEW CHALLENGE: A CLIMATE FOR CHANGENEW CHALLENGE: A CLIMATE FOR CHANGE

    09.28.201009.28.2010

    CASE STUDY: WALNUT GROVE, BRAMPTONCASE STUDY: WALNUT GROVE, BRAMPTONA BUILDERA BUILDER’’S PERSPECTIVE OF LOW IMPACT DEVELOPMENTS PERSPECTIVE OF LOW IMPACT DEVELOPMENT

  • THE SITETHE SITE

  • CREDIT VALLEY SECONDARY PLAN AREA 45CREDIT VALLEY SECONDARY PLAN AREA 45--66

    SITE AREA = 5.6 haSITE AREA = 5.6 ha

    EXISTING RESIDENTIAL AND VACANT GREENHOUSEEXISTING RESIDENTIAL AND VACANT GREENHOUSE

  • BORDERED BY DEVELOPMENT BLOCKSBORDERED BY DEVELOPMENT BLOCKS

    MODIFIED BLOCK PLAN PROCESSMODIFIED BLOCK PLAN PROCESS--NO OVERALL ENVIRONMENTAL IMPLEMENTATION NO OVERALL ENVIRONMENTAL IMPLEMENTATION REPORTREPORT

    ONLY LANDS CURRENTLY ANTICIPATED FOR DEVELOPMENTONLY LANDS CURRENTLY ANTICIPATED FOR DEVELOPMENT

  • TRIBUTARY TO CREDIT RIVER AND TRIBUTARY 8b.TRIBUTARY TO CREDIT RIVER AND TRIBUTARY 8b.

    NO EXTERNAL DRAINAGE TO SITE NO EXTERNAL DRAINAGE TO SITE --SANDY SOIL LAYERS AND SILTY CLAY TILLSANDY SOIL LAYERS AND SILTY CLAY TILL

    GENERAL RECHARGE FUNCTIONGENERAL RECHARGE FUNCTION-- AVERAGE ANNUAL INFILTRATION = 150mmAVERAGE ANNUAL INFILTRATION = 150mm

  • APPLICABLE APPLICABLE CRITERIACRITERIA

  • PROPOSED PROPOSED DEVELOPMENTDEVELOPMENT

  • PROCESSPROCESS

  • LOW IMPACT LOW IMPACT DEVELOPMENT DEVELOPMENT

    SCREENINGSCREENING

  • RAINWATER HARVESTING RAINWATER HARVESTING

    (BARRELS OR CISTERNS)(BARRELS OR CISTERNS)GREEN ROOFSGREEN ROOFS DOWNSPOUT DISCONNECTS / DOWNSPOUT DISCONNECTS /

    INCREASED TOPSOILINCREASED TOPSOILSOAKAWAY PITSSOAKAWAY PITS BIORETENTION GARDENS/BIORETENTION GARDENS/

    STORMWATER TREE CLUSTERSSTORMWATER TREE CLUSTERS

    PERMEABLE PAVEMENTPERMEABLE PAVEMENT VEGETATED FILTER STRIPSVEGETATED FILTER STRIPS SOIL AMENDMENTSSOIL AMENDMENTS DRY SWALESDRY SWALES GRASS SWALESGRASS SWALES

    SCREENING VIA SCREENING VIA LID MATRIXLID MATRIXTO IDENTIFY MEASURES APPLICABLE TO SITE CHARACTERISTICSTO IDENTIFY MEASURES APPLICABLE TO SITE CHARACTERISTICS

    MODIFIED CROSS SECTIONMODIFIED CROSS SECTION

  • SELECTED SELECTED MEASURES MEASURES

    (PUBLIC + PRIVATE)(PUBLIC + PRIVATE)

  • EAST HALF OF SITE EAST HALF OF SITE DRAINS TO BIOSWALEDRAINS TO BIOSWALE

    WEST HALF OF SITE WEST HALF OF SITE DRAINS TO ROW DRAINS TO ROW INFILTRATION TRENCHINFILTRATION TRENCH

  • STANDARD RIGHT OF WAY MODIFIED WITH INFILTRATION TRENCHSTANDARD RIGHT OF WAY MODIFIED WITH INFILTRATION TRENCH

  • THE COSTSTHE COSTS

  • TRADITIONAL versus TRADITIONAL versus LOW IMPACT DEVELOPMENTLOW IMPACT DEVELOPMENT

  • THE DEVELOPERSTHE DEVELOPERS’’SSPERSPECTIVEPERSPECTIVE

  • There is a place at the There is a place at the forefront of home design forefront of home design that other developers strive that other developers strive

    to reach. Our goal is to to reach. Our goal is to always be a step ahead of always be a step ahead of the rest of the industry with the rest of the industry with

    the newest products, the newest products, cutting edge technology cutting edge technology

    and intelligent, practical and intelligent, practical touches touches …… in every home in every home

    we build. Because, we we build. Because, we know you're ahead of the know you're ahead of the

    curve, and we're right there curve, and we're right there for you.for you.

  • some of our neighbourhoods some of our neighbourhoods ……

  • What does LID represent from What does LID represent from a developers perspective?a developers perspective?

    effective management of stormwater effective management of stormwater runoff initiatives / directives within our runoff initiatives / directives within our communitiescommunities

    having a direct impact on stormwater having a direct impact on stormwater properties and the amount of runoff that properties and the amount of runoff that enters our water systems enters our water systems -- treatmenttreatment

    benefits in overall community design benefits in overall community design ––form versus functionform versus function

  • but LID also represents but LID also represents ……

    L I D

    logisticalindecisive

    device

    lengthy important decision

    liability inventive debacle

    logical inexperienced disaster

    leading innovative dollars

  • WHY LID? WHY LID? MAKING THE MAKING THE DECISION DECISION ……

  • site story + the evolution of stormwater managementsite story + the evolution of stormwater management

    further reduce our impact

    changing climate

    infrastructure deficit

    decentralization

    passive versus active

    design longevity

    design integration

    resource conservation

  • increased costs versus increased revenue: increased costs versus increased revenue: the business casethe business case

  • COST CONSIDERATIONSCOST CONSIDERATIONS

    agency approvalsagency approvals

    knowledgeable consultantsknowledgeable consultants

    special construction methods for LID special construction methods for LID measuresmeasures

    sourcing suitable products/materialssourcing suitable products/materials

    experienced contractorsexperienced contractors

    operations and maintenance programoperations and maintenance program

    monitoring and performance evaluationmonitoring and performance evaluation

    replacement/repairsreplacement/repairs

  • corporate identity corporate identity –– a green a green technology platformtechnology platform

  • LID sales and marketing strategyLID sales and marketing strategy

    Area specific enhancements versus lot premiums

    Upgraded features as standards (e.g. permeable driveways)

    Additional options and upgrades (e.g. landscape materials, exterior design packages, optional loggias) … generation of revenue

  • industry responseindustry response

  • INCENTIVESINCENTIVES

  • government and government and agency supportagency support

    partnership partnership benefitsbenefits

    industry supportindustry support

  • CHALLENGESCHALLENGES

  • Corporate responsibility and low impact developmentCorporate responsibility and low impact development

    Operations and maintenance requirementsOperations and maintenance requirements

    Easements and accessibilityEasements and accessibility

    Posting of securities and certificationPosting of securities and certification

    Attaining final assumption of LID featuresAttaining final assumption of LID features

    ““ Do as I say, not as I do Do as I say, not as I do …”…”

  • taking a leap of faith taking a leap of faith …… the unknownsthe unknowns

    uncertainty with future responsibility

    entering contracts

    operations and maintenance of LID initiatives