Case Study (GoM 2016):
Enhanced Production Strategies
Throughout Field Life Using
Standardised Flow Access Modules (FAM)
Ian DonaldManaging Director, Enpro Subsea
![Page 2: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/2.jpg)
Agenda
• Enpro Subsea background
• Flow Access Modules - FAM
• Case Study - GoM• Project Overview
• Challenge
• Solution
• Execution
• Flow Intervention Services - FIS• Hydraulic Intervention
![Page 3: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/3.jpg)
• Established 2011
• Patented products for Fluid intervention services & Flow Access Modules
• Integrated solutions provider
• 4 main business units
• Experienced team (worked together for 15 years)
• Track history of industry leading innovation
• Market acceptance; early adopters for each product group in NS, GOM and WA
Enpro Subsea Overview
doing more … with less
![Page 4: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/4.jpg)
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
Flow Access Modules (“FAM”)
Flow Intervention Services (“FIS”)
DecommissioningProject
Management
Multi-Service Hub, Production and
Intervention Modules for Greenfield &
Brownfield Applications
Life-of-Field Liquid Intervention and
Production Sampling Services
Attic Oil Recovery and Sampling
Project Management Services for Asset
Optimisation
1 2 3 4
The Four Business Lines
![Page 5: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/5.jpg)
5
• Fluid Intervention – Enabled via FAM hub• Multiphase Metering – for fiscal and production management• Flow Assurance – for production injection and integrity• Multiphase Pumping – for production boosting• Integrated FAM – multiple services from a single hub• Sampling - Adjustable Sampling take-off across the Life of Field• HIPPS - Retrievable HIPPS system for early production and reuse
Sampling
Pumping
Meter, Sample & Inject
Metering
Stimulation
![Page 6: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/6.jpg)
FAM Benefits versus project specific XT
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
Flow Access Modules (FAM)
Low risk - Standard “stock” tree = faster (known) delivery
Ability to configure FAM modules gives Life of Field flexibility
FAM design completed in parallel (off critical path)
Tree can be FAT and Installed without project specific technologies (such as flow meter)
Cost reduction opportunities due to spec break (components located off tree can be to lower material spec)
Project Specific “bespoke” Tree with Flow Control Module
Standard Tree with Flow Access Module
Bespoke design required for each project / field
Increases project schedule as system Engineering to be completed prior to finalising XT
Tree can only be FAT & Delivered once FCM is completed and integrated (Inc. long lead items e.g. flow meter)
Typically ~30% more weight & cost than standard tree
![Page 7: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/7.jpg)
FAM Overview
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
Life of field solution from single interface
Standard Tree with flowline connector mounted Flow Access Module
Metering Intervention Sampling
HIPPS Pumping
Metering & Intervention
Flow Access Modules (FAM)
![Page 8: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/8.jpg)
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
Flow Access Modules: Case Study
![Page 9: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/9.jpg)
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
• Ordered: October 2015• Delivered: July 2016• Mobilised: August 2016• Installed: September 2016• First Oil: October 2016
Project Timeline:
From PO to first oil in 12 months
Project Engineering:
Project Manufacturing:
Project Assy & Test:
Mob:
Installation:
Flow Access Modules: Case Study
![Page 10: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/10.jpg)
Project Challenge:
• 4km tieback
• Project to be completed within 12 months
• Tie-in point was an existing spare slot on PLEM
• Different OEM connector type at either end of tieback flowline
• Production profile dictated enhanced production strategies required
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
Flow Access Modules: Case Study
![Page 11: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/11.jpg)
• Use patented Flow Access Module Solution
• Use existing stock tree
• Required no modification to installed manifold
• Locate project specific technologies within the flowline
Project Solution:
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
Flow Access Modules: Case Study
![Page 12: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/12.jpg)
Project Scope: item Equipment Qty
1 Dual bore gooseneck FAM hub - CVC 1
2 Dual bore gooseneck FAM hub - Torus 1
3 Retrievable Metering Flow Access Module 1
4 Flow Assurance Flow Access Module 1
5 Fluid Intervention Hub 1
6 Associated Shipping & Test Skids set
43
2
1
5
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
Flow Access Modules: Case Study
![Page 13: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/13.jpg)
• Hand Calculation confirms both goosenecks benefit from the addition of bracing to support worst case loads that may be imparted from the flowline.
• FEA used to verify stresses throughout gooseneck remain within allowable.
• Design on N2 Gooseneck required telescoping action. Once landed and locked brace is energised and pinned to provide more rigid structure.
Project Engineering:
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
Flow Access Modules: Case Study
![Page 14: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/14.jpg)
Multiphase Metering FAM
• Multiphase Flow Meter (MPFM)
• Water Cut Meter
• Acoustic Sand Detector
• Back seat seal test (dual bore connector)
• CVC connector
• 6” Isolation Valve
Flow Access Modules: Case Study
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
![Page 15: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/15.jpg)
Flow Assurance FAM
• Flow Assurance Valve
• Chemical Injection (upstream/downstream of FAV)
• PT Sensors (upstream/downstream of FAV)
• Back seat seal test (dual bore connector)
• Torus connector
• 6” Isolation Valve
Flow Access Modules: Case Study
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
![Page 16: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/16.jpg)
Hydraulic Intervention FAM
• Acid Stimulation
• Scale Squeeze
• Well Kill
Flow Access Modules: Case Study
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
![Page 17: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/17.jpg)
Project Manufacture:
Flow Access Modules: Case Study
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
![Page 18: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/18.jpg)
Project Assembly & Test:
Flow Access Modules: Case Study
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
![Page 19: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/19.jpg)
Project Mobilisation:
Flow Access Modules: Case Study
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
![Page 20: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/20.jpg)
Project Installation:
Flow Access Modules: Case Study
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
![Page 21: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/21.jpg)
• Ordered: October 2015• Delivered: July 2016• Mobilised: August 2016• Installed: September 2016• First Oil: October 2016
Project Timeline:
From PO to first oil in 12 months
Project Engineering:
Project Manufacturing:
Project Assy & Test:
Mob:
Installation:
Flow Access Modules: Case Study
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
![Page 22: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/22.jpg)
Delivered project enhanced production strategic objectives for:
⁻ Multiphase metering
⁻ Hydrate remediation
⁻ Future tie in for well stimulation
Delivered with benefits including:
‐ Fast track procurement; enabling earlier procurement of standard architecture
‐ De-risk the projects; enabling the use of standard ‘off the shelf’ hardware
‐ De-risk the critical path; undertaking concurrent project specific engineering
‐ Lower cost; taking advantage of material spec breaks
Project Summary:
Flow Access Modules: Case Study
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
![Page 23: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/23.jpg)
• Enpro personnel have previously been directly involved in the design, delivery and operation of Hydraulic Intervention Systems for operators in North Sea, West Africa & GoM
• Modular System design can be configured to suit a range of operating criteria (depth, pressure and flow rate)
• System can interface with new and existing subsea tie in points (ESSI hub, tree cap, MARS, Unitech etc.)
• Subsea Safety Module configurable to be compatible with range of conduits and deployment methods
Hydraulic Intervention
© 2017 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
Flow Intervention Services (FIS)
![Page 24: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/24.jpg)
© 2016 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
• Modular System configured to suit a range of operating criteria (depth, pressure, flow rate)
• Subsea Safety Module configurable with range of conduits and deployment methods
• Suitable for Single vessel deployment, saving cost and improving uptime/efficiency
FAM Hub utilised as access point for Hydraulic Intervention
Hydraulic Intervention
Flow Intervention Services (FIS)
![Page 25: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/25.jpg)
© 2016 Enpro Subsea Limited. Confidential Information. All Rights Reserved. Do not replicate without permission.
Composite Conduit
Working Pressure: 15,000 psi
Nominal Bore: 3”
High Flow Rate
Coiled Tubing Conduit
Working Pressure: 15,000 psi
Nominal Bore: 2 x 2”
Low-Mid Flow Rate
Hydraulic Intervention
Flow Intervention Services (FIS)
![Page 26: Case Study (GoM 2016): Enhanced Production Strategies ...](https://reader035.fdocuments.net/reader035/viewer/2022062413/58a342b61a28abb77f8bc76b/html5/thumbnails/26.jpg)