Transcript of Case Studies from the Demand Driven Institute
1
DDMRP Case Studies from the Demand Driven Institute
All material and content © copyright 2014 Demand Driven Institute. All rights reserved.Certified Demand Driven Planner (CDDP) is a trademark of the ISCEA
2
All material and content © copyright 2012 Demand Driven Institute. All rights reserved.Certified Demand Driven Planner (CDDP) is a trademark of the ISCEA
Oregon Freeze Dry Case Study
Mountain House Division:• Sales increased 20%
• Customer Fill Rate improved from 79% to 99.6%
• 60% reduction in inventory
Industrial Ingredient Division:• 60% reduction in make to order lead
time
• 100% On-Time-Delivery
• 20% reduction in inventory
Raw MaterialNo out of stock
Reduced inventory $2.5M+
3
All material and content © copyright 2013 Demand Driven Institute. All rights reserved.Certified Demand Driven Planner (CDDP) is a trademark of the ISCEA
4
All material and content © copyright 2012 Demand Driven Institute. All rights reserved.Certified Demand Driven Planner (CDDP) is a trademark of the ISCEA
LeTourneau Case Study
MRP
DDMRP
5
C
Steel
Products
Component
Supply
(H/L)
Offshore
Products
Mining
Products
C
C
Suppliers
Drilling
Systems
Forestry
Products
C
C
Synchronization and Flow Challenge
C = Customer
= Remote Location
Supply Variability
Distortions &
amplification in
demand requirements
reverberate backward
Demand /
Information
Variability
End Item Assembly
inherits the amplifying
upstream variability.
Lead Time before DDMRP
6
SP CS
OP
MP
C
C
Suppliers
C = Customer
DS
FP
C
C
= Remote Location
= Time Buffer
= Strategic Replenishment Buffers
C
DDMRP Design
7
Stock-outs reduced by over 66%!
0
100
200
300
400
500
600
700
Dec '01 Dec '02 Dec '03 Dec '04 Dec '05 Dec '06 Dec '07 Dec '08 Sep
'09A
$M
illio
ns
Longview Inv Longview TR
0
100
200
300
400
500
600
700
Dec '01 Dec '02 Dec '03 Dec '04 Dec '05 Dec '06 Dec '07 Dec '08 Sep
$M
illio
ns
Houston Inv Houston TR
High Inventories
Shortages
Massive Expedites
Low Inventories
High Service
Fewer Expedites
DDMRP (Longview) vs. MRP (Houston)
8
Before Demand Driven – FMCG Example (soap)
9
Raw
Pack
Mix Room
Pack 1
Pack 2
Pack 3
DC
DC
DC
DC50+ Days
Planned Orders (MRP)Purchase Orders
Manufacturing Orders
Expedites/
Schedule
Break-ins
Before Demand Driven – FMCG Example (soap)
10
DDMRP Design – FMCG Example (soap)
All material and content © copyright 2013 Demand Driven Institute. All rights reserved.Certified Demand Driven Planner (CDDP) is a trademark of the ISCEA
Raw
Pack
Mix Room
Pack 1
Pack 2
Pack 3
DC
DC
DC
DC9 Days
HUB
3-8 Days
Manufacturing Orders Stock Transfer Orders
Purchase Orders
11
Immediate Results for Materials – FMCG (soap)
300 Materials are buffered without increase in RPW inventory. This is accomplished with 18% less total
RPW.
Dampened the bull whip, now operating more effectively, with less
working capital
Before
AfterReplenishment lead time has been
reduced 82% to 9 days from 50 days,
becoming Responsive
Finished Goods dropped 45+%
with consistent services level at
or above 99.7%