> Ventilation Air Conditioning Refrigeration Heating 22 º C Inside OUTSIDE HUMIDITY PROVIDED BY HEINEN & HOPMAN 35 C 90% CASE REPORT OFFSHORE LUKOIL’s production facilities at Vladimir Filanovsky Field (Northern Caspian region, Russia)

Transcript of case report offshore - Marine & Offshore HVAC · PDF fileHeating Ventilation Air Conditioning...

Page 1: case report offshore - Marine & Offshore HVAC · PDF fileHeating Ventilation Air Conditioning Refrigeration 22ºC Inside OUTSIDE HUMIDITY PROVIDED BY HEINEN & HOPMAN 35 C 90% case

>

Ventilation Air Conditioning RefrigerationHeating

22ºCInside

OUTSIDEHUMIDITY

PROVIDED BYHEINEN & HOPMAN

35 C

90%

case report offshoreLUKOIL’s production facilities at Vladimir Filanovsky Field (Northern Caspian region, Russia)

Page 2: case report offshore - Marine & Offshore HVAC · PDF fileHeating Ventilation Air Conditioning Refrigeration 22ºC Inside OUTSIDE HUMIDITY PROVIDED BY HEINEN & HOPMAN 35 C 90% case

KEY FEATURES Central Processing Platform (CCP):The CCP, weighing 21.000t, will be used for processing and piping ashore the oil and gas. Depth: 38.50m Width: 46.70m Length: 74.30m

Riser Block (RB):The RB platform will connect the infield pipelines with export pipelines.

CHALLENGES

Being a well-known and experienced offshore HVAC supplier, Heinen & Hopman was introduced by LUKOIL to take part in the basic design in partnership with the design company and owner.The purpose of the project was to achievethe highest focus on:

1. Quality2. Functionality3. Comfort

SOLUTIONS

Heinen & Hopman participated in the EPC of the HVAC systems for the Central Processing Platform [CCP] and the Riser Block [RB]. The air cooled compressor sets are designed to withstand the harsh summer and winter conditions and are especially designed to meet the requirements of classification and end-user. These units are standardized for this purpose and can be installed on all similar projects.

DESCRIPTION OF THE PROJECT

LUKOIL completed the installation of substructures for the ice-resistant fixed platform (IRSP), central processing platform, platform with living quarters and riser block at the V. Filanovsky field in the Caspian Sea. This means that all major construction work, which was scheduled at the field at first, was successfully completed. Start of production at the V. Filanovsky field is scheduled at the beginning of 2016 and target output should exceed of 6 million tons per year. Central processing platform:

technological facilities of CPP provide the treatment of stock tank oil of 6 mln tons per year, of sea water and brine water and of associated gas of 731 million cubic meters per year. Riser block is purposed for the placement of oil pipeline risers – 10 pieces, cable lines – 8 pieces, placement of startup chambers and receiver chambers and of flare installation.

Page 3: case report offshore - Marine & Offshore HVAC · PDF fileHeating Ventilation Air Conditioning Refrigeration 22ºC Inside OUTSIDE HUMIDITY PROVIDED BY HEINEN & HOPMAN 35 C 90% case

SCOPE OF WORK

Design & EngineeringProject managementCustom built productionCommissioningService & Maintenance

SCOPE OF SUPPLY

Central Processing Platform:

Air Handling Units 6xAir cooled compressor sets 8x Axial flow fans 30x Centrifugal fans 65xFire dampers 165xDuct Air filters 29xCassette Air filters 35x Flow control dampers 159x Non return dampers 129xSplit systems 22xSupply grill incl. regulating damper 221xExhaust grill 133xWater/gas proof louvers with cover 108x

Riser block:

Air handling units 2x Air cooled compressor sets 4x Axial fans 6x Ventilation louvers with cover 6x Non return dampers 10x Fire dampers 16x

Page 4: case report offshore - Marine & Offshore HVAC · PDF fileHeating Ventilation Air Conditioning Refrigeration 22ºC Inside OUTSIDE HUMIDITY PROVIDED BY HEINEN & HOPMAN 35 C 90% case

www.heinenhopman.com

heinen & hopman encourages a more

sustainable world. By providing eco-friendly solutions and serviceswe offer our clients

the option of reducing energy consumption

and thus co2 emissions. Visit

greenmanifest.info for more information.

BrazilT: +5521 3587 4241/4244E: [email protected]

France - La CiotatT: +334 4204 8685E: [email protected]

France - GrasseT: +336 3090 7786 E: [email protected]

GermanyT:+49 4073 1680E: [email protected]

IndiaT: +9133 6499 1293E: [email protected]

ItalyT: +3901 8745 7970E: [email protected]

The Netherlands (HQ)T: +313 3299 2500E: [email protected]

The Netherlands (Rotterdam)T: +317 8890 8050E: [email protected]

NorwayT: +47 6919 0900E: [email protected]

Peoples Republic of ChinaT: +8621 3253 2896E: [email protected]

Peoples Republic of ChinaT: +86 510 8528 1763E: [email protected]

PolandT: +489 1433 1800E: [email protected]

RomaniaT: +402 3644 8222E: [email protected]

RussiaT: +7 (4012) 308 801E: [email protected]

SingaporeT: +65 6897 7879E: [email protected]

South KoreaT: +8270 4901 0000E: [email protected]

SpainT: +349 3225 9668E: [email protected]

SwedenT: +46 3121 7500E: [email protected]

TurkeyT: +9021 6493 8118E: [email protected]

UAE (Abu Dhabi) T:+971 2550 4147E: [email protected]

UAE (Dubai)T: +971 4263 5453E: [email protected]

USA - Fort Lauderdale, FloridaT: +195 4463 0110E: [email protected]

USA - Houma, Louisiana T: +198 5876 7989E: [email protected]