case: new building TIMELINE OF NEW CONSTRUCTION PROJECTS · when the new administrative building is...

2
The changes associated with re-envisioning the use of space in the Banks Street building present the right time to construct a new building to meet the current and future needs of the school. The new building will ensure that school business and classrooms no longer physically overlap, creating a safer and more focused environment for teachers and students. The school’s business affairs which welcome the most visitors to campus, which include the bookstore, admissions, advancement, maintenance, student check-out, and the president’s office, among others, will exist in a building physically separated from space used for academic and formational activities. The re-envisioned space will include a reception area to appropriately welcome and screen visitors to campus. The building will serve as the formal main entrance to campus. The façade of the new building, which faces Will Clark Field along Banks Street, will be consistent with the architectural elements of the wing constructed in 1953 on Palmyra Street. case: new building More than 22,000 sq. ft. will be added to Jesuit’s campus when the new administrative building is constructed. TIMELINE OF NEW CONSTRUCTION PROJECTS 1926 New campus on Carrollton & Banks 1953 Chapel of the North American Martyrs, auditorium, cafeteria, band room, library 1957 Jesuit Recreation Center (gymnasium) 1974 Resource Center (updated library) 1986 Louis J. Roussel Physical Education Building 2002 Traditions Courtyard, Student Commons, 3rd floor science labs 2012 John Ryan Stadium square feet 22,000 Knowing that parents are entrusting us with the care of their sons, the safety and security of our students should always remain a top priority. —Fr. Christopher S. Fronk, S.J., president

Transcript of case: new building TIMELINE OF NEW CONSTRUCTION PROJECTS · when the new administrative building is...

Page 1: case: new building TIMELINE OF NEW CONSTRUCTION PROJECTS · when the new administrative building is constructed. TIMELINE OF NEW CONSTRUCTION PROJECTS 1926 New campus on Carrollton

The changes associated with re-envisioning the use of space in the Banks Street building

present the right time to construct a new building to meet the current and future needs

of the school. The new building will ensure that school business and classrooms no

longer physically overlap, creating a safer and more focused environment for teachers

and students.

The school’s business affairs which welcome the most visitors to campus, which include

the bookstore, admissions, advancement, maintenance, student check-out, and the

president’s office, among others, will exist in a building physically separated from space

used for academic and formational activities. The re-envisioned space will include a

reception area to appropriately welcome and screen visitors to campus. The building will

serve as the formal main entrance to campus.

The façade of the new building, which faces Will Clark Field along Banks Street, will

be consistent with the architectural elements of the wing constructed in 1953 on

Palmyra Street.

case: new building

More than 22,000 sq. ft. will be added to Jesuit’s campus when the new administrative building is constructed.

TIMELINE OF NEW CONSTRUCTION PROJECTS

1926 New campus on Carrollton & Banks

1953 Chapel of the North American Martyrs, auditorium, cafeteria, band room, library

1957 Jesuit Recreation Center (gymnasium)

1974 Resource Center (updated library )

1986 Louis J. Roussel Physical Education Building

2002 Traditions Courtyard, Student Commons, 3rd floor science labs

2012 John Ryan Stadium

square feet22,000

Knowing that parents are entrusting us with the care of their sons, the safety and security of

our students should always remain a top priority. —Fr. Christopher S. Fronk, S.J., president

Page 2: case: new building TIMELINE OF NEW CONSTRUCTION PROJECTS · when the new administrative building is constructed. TIMELINE OF NEW CONSTRUCTION PROJECTS 1926 New campus on Carrollton