Case History of First Liner Drilling Application in Romania
Ali QureshiWell Delivery Team Leader-Team-5OMV Petrom S.A.
Bucharest, 28th April 2016
| Liner Drilling Application – Bucharest, 28th April 2016
Agenda
• Introduction
• Background (well design, prognosis etc.)
• Sequence of Events
• System Specs
• Conclusions and Recommendations
2
|
Romania
Liner Drilling Application – Bucharest, 28th April 20163
|
Well Design
Liner Drilling Application – Bucharest, 28th April 20164
Well Design Casing objectives:
1) 13 3/8” Surface Casing @ Sarmatian formation top:
1- Support unconsolidated top formation
2- Isolate active shale in Meotian formation
3- Implement CwD Technology
2) 9 5/8” Production Casing @ Salt formation top:
Case off long Sarmatian formation open hole section.
3) 7” Production Liner @ T2 formation top:
Case off and isolate Salt formation section.
4) 6” OH Section
Drill 6” hole through T2, T1 and Paleozoic formation with mud weight 1.20 - 1.25 SG
NADF to avoid losses in Paleozoic formations.
13 3/8” Surface CSG
9 5/8” Production CSG
7” Production Liner
6” OH section
KCl mud 1.15 – 1.2 SG
NADF mud 1.25 – 1.35 SG
NADF mud 1.8 – 1.85 SG
NADF mud 1.2 – 1.25 SG
Romaian
Dacian
Pontian
Meotian
Sarmatian
Jurassic / Salt
Triassic
Paleozoic
|
Well Prognosis
Liner Drilling Application – Bucharest, 28th April 20165
|
PlannedWell Path
Liner Drilling Application – Bucharest, 28th April 20166
|
What happened? (1 of 2)
Liner Drilling Application – Bucharest, 28th April 20167
• Drilled through Sarmatian and Badenian formations; encountered aggressive salt layer @
4238mMD.
• Bit got stuck in salt @ 4239mMD. Jarring and pumping fresh water pills didn’t work. MW
1.35sg (NADF).
• Cut and retrieve string; 20m fish left in hole. TOF @ 4219m.
• Pump and set cement plug above fish. Dressed down top of cement to 4150mMD, then ran
and cemented 9 5/8” casing above fish.
• Drilled out shoe-track, kicked-off from 4163m, 56m above TOF, to perform side-track #1.
• Drilled through salt with 1.73sg to section TD @ 4326mMD; MW limited by losses in
exposed sand layers below 9 5/8” casing shoe. POOH.
• Ran 7” liner, equipped with reamer shoe; stood up at 4245mMD (HUD).
|
What happened? (2 of 2)
Liner Drilling Application – Bucharest, 28th April 20168
• POOH liner to perform wiper trip.
• RIH dumb iron BHA, accidentally side-tracked from 4245mMD in open hole (side-track #2)
while trying to ream obstruction; POOH, switch to directional BHA and drilled ahead through
salt to casing point at 4326mMD.
• RIH 7” liner; could not pass salt layer. POOH and set another cement plug @ 4022mMD.
• Drill out cement to 4157mMD.
• RIH directional BHA, side-track hole again from 4157mMD (side-track #3). Drill to top of
salt, POOH BHA.
• RIH 7” liner with casing bit and rotating liner hanger system. Drilled through salt successfully
from 4238mMD – 4255mMD (17m); average ROP 5 m/hr. No further progress possible.
• Cemented liner in place.
|
Mud Log from the problematic section
Liner Drilling Application – Bucharest, 28th April 20169
|
Liner Drilling Parameters Chart
Liner Drilling Application – Bucharest, 28th April 201610
|
Actual Well Trajectory in Reservoir Section
Liner Drilling Application – Bucharest, 28th April 201611
|
Liner Drilling Bit
Liner Drilling Application – Bucharest, 28th April 201612
|
System Specs
Liner Drilling Application – Bucharest, 28th April 201613
Weatherford Liner Hanger System:
• Hydraulics Set Rotating Liner Hanger System
• Premium Liner System with Dual Plug System and Top Set Packer
• Type R Running tool, MX Ball Seat
7” Liner:
• 32PPF, TN110HS, TN Blue
• M/U Torque: 13,000 ft-lbs
Top of Shoe Tract 4224m
Previous Casing Exit
True Vertical
Description
Hanger Slips
Measured
Measured
3930m
Liner Shoe
Section TD
True Vertical
Measured True Vertical
4254m
4254.8m 4252.7m
4252m
Measured True Vertical
Measured True Vertical
4247m
4226m
4251m
Liner Systems Central Europe
End of Job Report
Well Schematic
Measured True Vertical
Depths
Top of Liner
Packer Element
3922m
N/A
True Vertical
3923m
N/A
3929m
Measured
|
Conclusions and Recommendations
Liner Drilling Application – Bucharest, 28th April 201614
• Drilling with liner (DwL) helped to cross the problematic salt layer and
facilitated drilling ahead to the targeted reservoir.
• It was first such application in Romania; promising technology to case
off problematic formations.
• Stronger bit could have drilled further; bit selection can be improved.
• 7” liner and Liner hanger system worked fine; no issues encountered.
• Some pressure fluctuations were observed while drilling, could be from
bit nozzles washing out but cannot be confirmed.
|
Thank you!
Any Questions?
Liner Drilling Application – Bucharest, 28th April 201615