Case History ADVANCED COATINGS TCHNOLOGY Hessen ...wassercoatings.com/docs/caseHistory/BRIDGE...
Transcript of Case History ADVANCED COATINGS TCHNOLOGY Hessen ...wassercoatings.com/docs/caseHistory/BRIDGE...
ADVANCED COATINGS TECHNOLOGY
Case History
Hessen Road Bridge, Deck WaterproofingCasco, Michigan
INTRODUCTION
St. Clair County Road Commission endorses pavement
preservation as a planned system for treating pavements
at the optimum time to maximize their useful life.
Bridge deck waterproofing is another line of defense
to protect the county bridge assets. Wasser and the
Road Commission installed Polyflex Hand Applied
Waterproofing Membrane on Hessen Road Bridge
in Casco, MI. The Commission was looking for a high
performance membrane that can be installed with their
existing work force.
The membrane is a three coat system with an easy 1:1
mix ratio for all components. The membrane process can
be completed in one day.
OWNERSaint Clair County Road
Commission
PROJECT
Bridge Deck
Waterproofing
CONTRACTORInstalled by County
Workforce
STRUCTURE
Concrete Box Beam Bridge
SUBSTRATE
Precast Concrete
APPLICATION METHOD
Rolled 1 coat of Wasser
Polyflex 111 PU Primer
and squeegeed 2 coats
Wasser Polyflex 57
DIMENSIONS
30’x57’
PROJECT DATE2017
SUBSTRATEPrecast Concrete