    Tekla STrucTureS in pracTice:

    aldar HeadquarTerS

    uniTed arab emiraTeS

  • 8/2/2019 Case AldarHQ AbuDhabi 4pg en Web

    2/3

    a The ft pheica bidi i the Midde Eat,

    the Ada Headqate, wa Wiiam Hae ft

    BIM (Bidi Iomatio Modei) eieei

    poject o civi tcte i the Midde Eat.

    Eieei ad mode data wee ed at the eaiet

    tae o the poject to tae advatae o ea

    pocemet ad optimized e o mateia.

    BIM AT THE EArlIEsT sTAgE

    A Voted a the Bet Futuitic Deign 2008 by the Building

    Exchange Coneence, Alda HQ epeent a tiking

    addition to the Abu Dhabi kyline, whilt poviding fexible

    oce accommodation to the mot atute o copoate

    occupie. In addition to the ditinctive deign o it

    tuctue and nihe, it foo plate etain a high level o

    eciency and povide unctional, open plan oce pace

    capable o accommodating a multitude o t-out option.set upon an elevated peninula aoding pectacula

    view o the city, canal and ea, the building location

    povide poximity to leiue and etail

    outlet located in Al Dana

    and thoughout Al

    raha Beach.

    aldar Project ParticiPants

    a Poject owe: Ada/lai Oroe JVa Mti-dicipie cotat: Apa Achitect: MZ&Patea stee cotacto: Wiiam Haea Faade: gate/Pemateeia

    Full ADVAnTAgE OF EArlyPrOCurEMEnTs William Hae ue Tekla stuctue BIM otwae to

    develop thei client deign, maximize eciency, and

    enginee pactical olution to manuactuing acilitie.

    Engineeing and model data wee ued at the ealiet

    tage o the Alda HQ poject to take ull advantage o

    ealy pocuement and optimized ue o mateial.A a goup, William Hae ha ued Tekla otwae o

    the lat 10 yea. On peto-chemical poject BIM i a

    outine poce o the company, but o civil tuctue,

    the Alda HQ wa the t BIM poject o them in the

    Middle Eat. The challenge in the poject wa to abob

    mino detail om the enginee and achitect deign,

    o which moe integated model check had to be caied

    out with othe tade modeling olution.

  • 8/2/2019 Case AldarHQ AbuDhabi 4pg en Web

    3/3

    TEklA sTruCTurEs InTEllIgEnT 3D MODElIng

    COnTACTTea Copoatio (HQ)Metpojaja 1, P.O. Box 1FI-02131 Epoo, FInlAnDTe. +358 30 661 10Fax +358 30 661 1500

    Fid o oca Tea cotact at

    Tea i a ati-piac membe o BsA (Bie sotwae Aiace)i the EMEA, APAC ad lati Ameica.

    T Tea mode-baed otwae otio maectome coe pocee moe eective i bidiad cotctio, ee ditibtio, iatcte

    maaemet ad wate pp. Tea ha ctome iea 100 cotie. Tea gop et ae o 2009wee appoximate 50 miio eo ad opeatiet 7 miio eo. Iteatioa opeatio accoto moe tha 80% o et ae. Tea gop cetempo 470 peo, o whom 40% wo otideFiad. Tea wa etabihed i 1966 ad i oe othe oet opeati otwae compaie i Fiad.

    T Tea techoo ceate ew oppotitieo the cotctio idt. Tea stcte, themot advaced BIM (Bidi Iomatio Modei)

    otwae o the maet, povide a accate, damic,ad data-ich 3D eviomet that ca be haedb cotacto, tcta eiee, tee detaiead abicato, a we a cocete detaie admaacte. The hih detaied a-bit tctamode ceated i Tea stcte eabe the hiheteve o cotctabiit ad podctio coto.Cetaizi mode ad o-mode baed data ito themode aow o moe coaboative ad iteatedpoject maaemet ad deive. Thi taate itoiceaed podctivit, eimiatio o wate, ad a

    ehaced vae o tcta modei.