Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

35
Green Breakfast - Renewable Energy Opportunities

description

Blake Lapthorn were pleased to welcome Andrew Watkin, Partner and Head of Energy and Marine team at Carter Jonas, as speaker at its green breakfast held on 4 May in Oxford.

Transcript of Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Page 1: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Green Breakfast - Renewable Energy Opportunities

Page 2: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Carter Jonas

� National firm of property consultants dating back to 1855

� 30 Offices across England & Wales� Multi disciplined firm:

� Residential� Rural Land & Business� Commercial� Planning & Development � Architecture & Building Consultancy Specialist Teams:� Energy & Marine� GIS CAD & Mapping� Minerals and Waste � Infrastructures

Page 3: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

The Energy Team (Energy & Marine)

West/South West Eastern/South East

Northern

Page 4: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Current projects

� Clients include: Land and property owners, developers, energy companies, utility companies, investors in the sector, businesses with high energy demands

� Proven track record: 200+ ongoing projects

� Strong market knowledge and experience of renewable energy sector, including manufacturers & their products

Wind Farm

Wind medium

Wind small

Hydro

Solar - roof mounted

Solar - ground mounted

AD

Biomass

Page 5: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

UK Renewables - drivers:(not exhaustive)

� UK signed up to EU Renewable Energy Directive - by 2020 15% of energy from renewables

- Aim to tackle climate change in UK and reduce our CO2 emissions between ’09 and 2030 by 750M tonnes

- Reduce fossil fuel demands by circa 10% and gas imports by 20-30% versus likely use by 2020

- Create employment

� Carbon Reduction Commitment – CRC (users of 6000mWh/annum -£500K+)

� Middle East – supply of fossil fuels…reliability??

� Oil price (Brent Crude) $125/barrel

� UK Nuclear development – effects of Fukushima

Page 6: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Proposed Electricity Market Reform

� Announced by Government - Dec 2010

� “Seismic shift” and proposals include long term contracts and a carbon price floor

� Aims include electricity market shake up to ensure £100++bn of infrastructure investment by 2020

� Proposals include Feed-in Tariff scheme using contracts for difference (CfD) to create a stable revenue stream for low carbon generators

� Intention to set an emissions performance standard – ruling out gas power stations not fitted with CCS tech

� Carbon floor price plans – Treasury – 3 scenarios up to either £20/30/40 per Tonne by 2020.

� Plans were out to consultation to March 2011, possible legislation by year end?

Page 7: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Support Mechanisms at present

� Renewables Obligation and ROCs

� Feed-in Tariff (FiT) – up to 5MW

� RHI – forthcoming July 2011 on a phased basis

Page 8: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Background to the Renewables Obligation

� UK’s support scheme for large renewable electricity projects – runs to 2037

� Obligation on UK electricity suppliers to source a proportion of their electricity from renewables

� ROC – the “green certificate”

� 27 April 2011: average single ROC trading at £50.54

� In England and Wales renewable projects receive varying ROC support levels

Page 9: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

ROC BandingsTechnology Payment examples:-

� Onshore Wind 1.0 ROC per MWH

� Offshore Wind 1.5

� Hydro-electric 1.0

� Solar Photovoltaic 2.0

� Wave/Tidal Steam 2.0

� Anaerobic Digestion/Energy Crops 2.0

� Biomass with CHP 2.0 (1.5 without CHP)

Page 10: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Feed-in Tariff (FiT) – Micro to Medium Scale Generation

� 1st April 2010 - AD, Hydro, Micro CHP, Solar PV, Wind

� Designed to encourage the adoption of renewable energy sources

� For projects sub 5 megawatts (MW) in generating capacity

� FiT means smaller scale schemes are also viable despite higher capital costs per MW installed

� Has led to more property owners developing their own projects

� Guarantees a fixed payment per kilowatt hour (kWh) generated for20 years, apart from solar pv which is 25 years, export tariff too.

Page 11: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Project exampleswe will look at today:

� Wind – Commercial, medium, micro

� Solar pv

� Anaerobic Digestion Plant

� Hydropower

Page 12: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Wind - Commercial Scale

� 100m -135m tall to the tip of the blades

� 2-3MW per turbine

� Wind farms and merchant sites

� Developers and large companies

� ROC’s

Page 13: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Wind - Medium Scale

� 40 – 60m tall

� 100kW – 500kW

� Located at farms, schools, companies

� Developers, local authorities individuals

� Suitable for the Feed-in Tariff

Page 14: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Micro wind

� Gaia 11kW - 18m to hub

� Less than 100 kW

� Agricultural and business use.

� Suitable for individuals and small companies

� Qualify for Feed in Tariff

� Fewer planning restrictions than larger turbines

Page 15: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Wind Energy - site selection

� Wind speed

� Proximity to Residential properties: noise and shadow flicker

� Aviation and Radar

� Microwave links from telecom sites

� Landscape designations

� Historical features

� Grid capacity and length of connection

� Access costs

Page 16: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Constraint MappingNote: Map has Client’s approval for

Carter Jonas use in PR

Page 17: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Wind Energy: Feed-in Tariff rates

Energy Source Scale

Generati

on TariffDuration

(p/kWh)[

A] (years)

Wind ≤1.5kW 34.5 20

Wind >1.5 - 15kW 26.7 20

Wind >15 - 100kW 24.1 20

Wind >100 - 500kW 18.8 20

Wind>500kW -1.5MW 9.4 20

Wind >1.5MW - 5MW 4.5 20

Page 18: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Turbine Options – examples of micro/medium

� Gaia 11kW 21m £60k

� Endurance 50kW

� WES 18 80kW

� Northwind 100 100kW

� WES 30 250kW

� Vergnet 275 275kW

� Enercon E-33 330kW 67m £760k

� Note: E-33 is IEC 61400-1 Certified (European engineering

standard)

Page 19: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Micro Windexample Gaia 11kW example at 5.5 m/s

� Generation

� Estimated annual electricity production (MWh) 29.8716

� Wholesale electricity price (MWh) £30.00

� Feed in Tariff £267.00� LEC Price £4.70

� Estimated present annual revenue £9,012

� Estimated present operating margin £8,564

� Estimated Pre Construction Costs

� Planning £3,000� Technical design (inc Met Mast)

£1,000

� Appeal (if required) £0� Ecological Assessments £0� Grid Studies £0

� Total £4,000

� Estimated Construction Costs

� Grid Connection £2,200� Turbine cost £50,000� Infrastructure £3,800

� Total £56,000

� Return � Straight Return 14.3%

Page 20: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Medium Wind Enercon E-33 330kW example at 6.4 m/s

� Generation

� Estimated annual electricity production (MWh) 621.522

� Wholesale electricity price (MWh) £30.00

� Feed in Tariff £188.00� LEC Price £4.70

� Estimated present annual revenue £138,413

� Estimated present operating margin £133,752

� Estimated Pre Construction Costs

� Planning £20,000� Technical design (inc Met Mast)

£25,000

� Appeal (if required) £0� Ecological Assessments £15,000� Grid Studies £7,500

� Total £67,500

� Estimated Construction Costs

� Grid Connection £90,000� Turbine cost £500,000 � Infrastructure

incl foundations £102,500� Total £692,500

� Return � Straight Return 17.6%

Page 21: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Solar Photovoltaics

� Solar PV uses semi-conductor technology to convert solar irradiation in to DC electrical current

� Established technology but expensive when compared to conventional sources

� Feed-in Tariff support has led to a viable investment option sub 50kW

Page 22: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Feed in Tariff Rates – Solar PVSubject to FAST TRACK REVIEW

Energy Source Scale

Generation Tariff

Duration

(p/kWh)[A] (years)

Solar PV ≤4 kW New 36.1 25

Solar PV ≤4 kW Retrofit 41.3 25

Solar PV >4 - 10kW 36.1 25

Solar PV >100 - 500kW 29.3 25

Solar PV>100kW -5MW 29.3 25

Solar PV Standalone 29.3 25

* 9% annual digression of all rates for installations commissioned after March 31st 2012

Page 23: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Solar pv – fast track potential rates……?

� Scale Existing FiT (pence/kWh) Duration (years)

Solar PV>10 - 100kW 31.4 25Solar PV>100kW - 5MW 29.3 25Solar PV Stand-alone 29.3 25

� Scale Possible FiT (pence/kWh) Duration (years)

Solar PV>50kW - ≤150kW 19 25Solar PV>150kW - ≤250kW 15 25Solar PV>250kW - ≤5MW 8.5 25

Solar pv Developers v DECC – Litigation….

Page 24: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Rooftop Array requirements

� South facing roof

� Load bearing capacity of around 15kg/sqm

� Preferably outside of visually sensitive locations

such as conservation areas

� Tiled/composite sheet roofs are easier to fix

panels to though it is possible on fibre cement

� Adequate on site transformer capacity – ideally

50 kVa or larger

� Away from potential shading obstacles such as

trees (3.5 times height)

� Planning permission will usually be required

� Summer on site electricity demand ideal

Approximately 7.5 sq m of usable roof space required per kWp

Page 25: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Solar pv rooftop array returnsExample 8kW Array on 72 sq m usable roof

� Generation

� Estimated annual electricity production (kWh) 7,120

� Electricity price saving (kWh) £0.10

� Feed in Tariff £0.361� Estimated present annual revenue

£3,282

� Estimated present operating margin £3,182

� Estimated Pre Construction Costs � Planning £500

� Technical design £1,000� Appeal (if required) £0� Ecological Assessments £0

� Grid Studies £0� Total £1,500

� Estimated Construction Costs

� Grid Connection £0� Array components £28,000 � Infrastructure £0

� Total £28,000

� Return � Straight Return 10.8%

* This model assumes all of the electricity is used on site, south facing, 20 degree pitch

Page 26: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Ground Mounted Arrays – troubled times!

� Solar parks or farms

� Commercial scale >500kW

� 3ha – 15ha of land take

� Flat or south facing and well screened

� 11kv line or 33kv substation required

� Most developers seeking 3MW+ near 33kv infrastructure

� Option and lease market on hold

� Rents £1000 - £2000 per acre RPI linked for 25 year term

Page 27: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Ground Mounted ArrayExample of projected returns 5MW Scheme (12ha)� Generation

� Estimated annual electricity production (kWh) 4,860,000

� Wholesale Export price (kWh) £0.03

� Feed in Tariff £0.293 (pre review rate)

� LEC Price £0.00496

� Estimated present annual revenue £1,591,542

� Estimated present operating margin £1,422,347

� Estimated Pre Construction Costs

� Planning £40,000� Technical design £15,000

� Appeal (if required) £0� Ecological Assessments £10,000� Grid Studies £10,000

� Total £75,000

� Estimated Construction Costs

� Grid Connection £600,000� Array components £10,214,571� Infrastructure £805,000

� Total £11,619,571

� Return � Straight Return 12.2% (pre review

rate)

Page 28: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Anaerobic Digestion – how does AD work?

Courtesy of Biogas Nord UK

Page 29: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

AD key requirements and output

� Regular and reliable source of substrate

� Sufficient land to receive digestate

� Access to a good road network

� Accessible electrical grid connection

� Upwards of 10% return on successful plants

� Electricity sales

� ROC OR FiT support

� Gate fees

� Nitrogen benefits

Page 30: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Hydropower 96 kW example

� A “low head” scheme located in North Wales

� The proposed scheme is to be located at the upper of multiple weirs with a 2.5m head feeding two Archimedes screw turbines side by side

� Recommendation from the Environment Agency secured for 70% of the water above hands off flow for winter months and 50% for thesummer months

� The full load output of the turbine will be 96kW

Page 31: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

HydropowerExample of projected returns from 96kW example� Generation

� Estimated annual electricity production (kWh) 292,231

� Wholesale Export price (kWh) £0.03

� Feed in Tariff £0.178� Estimated annual revenue £60,784

� Estimated present operating margin £52,784

� Estimated Pre Construction Costs � Planning & licensing £10,000� Technical design £5,000

� Appeal (if required) £0� Ecological Assessments £5,000

� Grid Studies £2,000� Total £22,000

� Estimated Construction Costs

� Grid Connection £92,700� Mechanical Hydro £90,710� Civil Hydro £122,490

� Total £305,900

� Return � Straight Return 16.1%

Page 32: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

FiT review

� Confirmed at the Spending Review, the FiT review will determine how the efficiency of FITs will be improved to deliver £40 million of savings, around 10%, in 2014/15

� The review is in 2 phases:

April 2012 - comprehensive and as set out when the FIT scheme started, will consider all aspects of the scheme

Current fast track review - large scale solar pv and AD this has a 6 May deadline for consultation with 1 August 2011 implementation

Page 33: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Forthcoming Renewable Heat Incentive (RHI)

� Final details of the RHI announced in March by DECC� Commence July 2011� Support for a range of technologies and fuel uses including solid and

gaseous biomass, solar thermal, ground and water source heat-pumps, on-site biogas, deep geothermal, energy from waste and injection ofbiomethane into the grid

� RHI will have scheduled 4 yearly reviews starting in 2014 and being implemented in 2015!?

� Phased implementation� Phase 1 - targeting large emitters in the non domestic sector which will

include the industrial and commercial sectors, not for profit organisations and communities

� As part of the first phase the Government will also introduce the Renewable Heat Premium Payments (RHPP) in July 2011 for the domestic sector, having ring fenced £15M which they will use to make premium payments to households who install renewable heating

� Phase 2 of the RHI will include long-term support for the domestic sector which will be introduced in 2012

Page 34: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

How Carter Jonas can assist

� Initial site assessments/screening (WindPro, HyrdaA,GIS)

� Feasibility studies

� Financial Modelling

� Advice on equipment and procurement

� Initial grid investigations and negotiations, aviation consultation

� Planning

� Procurement

� Valuation/due diligence/brokerage

Page 35: Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011

Thank you for your time

Any questions?

If you would like to receive any of our corporate literature, including Services Brochure, Energy Index, Newsletters and e-briefings please contact:

[email protected]