Carbon Reduction Carbon Reduction John Imperatore, PE John Imperatore, PE Director of Resource Management Director of Resource Management Regional and Local Efforts Regional and Local Efforts - - Schools and Universities Schools and Universities

Transcript of Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW...

Page 1: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

Carbon ReductionCarbon Reduction

John Imperatore, PEJohn Imperatore, PE

Director of Resource ManagementDirector of Resource Management

Regional and Local Efforts Regional and Local Efforts -- Schools and UniversitiesSchools and Universities

Page 2: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

Where the Rubber Where the Rubber Meets the Road…Meets the Road…

…Except when we go Airborne

Page 3: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

Where is Rowan University?

Page 4: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

Fast Facts about Rowan Fast Facts about Rowan UniversityUniversity

2.5 Million GSF2.5 Million GSF72 Buildings72 Buildings800 Acres, 205 Developed800 Acres, 205 Developed10,000 Students10,000 Students6 Colleges, Grad. School, & 6 Colleges, Grad. School, & Continuing EducationContinuing Education70 Majors: Undergrad, Grad, & 70 Majors: Undergrad, Grad, & DoctoralDoctoral13:1 Student/Faculty Ratio13:1 Student/Faculty Ratio

Page 5: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

A Unique Public Offering

Commitment from the TopCommitment from the Top

Page 6: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

A Unique Public Offering

Dr. Farish, active in the New Jersey Association of State Colleges and Universities, NJASCU.

Chair of the NJASCU Liaison Subcommittee to NJHEPS.

First College / University President in NJ to sign the Presidents Climate Commitment.

Page 7: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

Rowan & the NJHEPS ProgramRowan & the NJHEPS Program

““Sustainable Campus InitiativeSustainable Campus Initiative””•• FiveFive--Year Plan to change:Year Plan to change:

–– curriculum, research, campus facility operations and community ocurriculum, research, campus facility operations and community outreachutreach–– focused on reducing campus impact on global climate change focused on reducing campus impact on global climate change

Six Elements:Six Elements:–– Sustainability EducationSustainability Education–– Energy Efficiency and Conservation Energy Efficiency and Conservation

(in accord with NJDEP Greenhouse Gas Action Plan)(in accord with NJDEP Greenhouse Gas Action Plan)

–– High Performance Green Building DesignHigh Performance Green Building Design–– Green ProcurementGreen Procurement–– Formation of Energy TeamFormation of Energy Team–– Student InvolvementStudent Involvement

Page 8: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

Energy Review Panel

COLLABORATION

Page 9: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

Rowan Energy Engineering Education & ResearchRowan Energy Engineering Education & Research

•• ACE Renewable Energy Study: PV and Fuel CellsACE Renewable Energy Study: PV and Fuel Cells

•• BP Solar / Mesa Environmental: PV site assessments throughout SNBP Solar / Mesa Environmental: PV site assessments throughout SNJJ

•• NJ Anemometer Loan ProgramNJ Anemometer Loan Program

•• NJ Wind Working GroupNJ Wind Working Group

•• Carbon Footprint Study of Rowan Residential StudentsCarbon Footprint Study of Rowan Residential Students

•• NJHEPS/ Campus Building AuditsNJHEPS/ Campus Building Audits–– Camden County, Salem Community, College of St. ElizabethCamden County, Salem Community, College of St. Elizabeth

Page 10: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

Rowan University President Donald J. Farish

Page 11: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

•• Completing an emissions inventoryCompleting an emissions inventory

•• Within two years, setting a target date and interim Within two years, setting a target date and interim milestones for becoming climate neutral.milestones for becoming climate neutral.

•• Taking immediate steps to reduce greenhouse gas Taking immediate steps to reduce greenhouse gas emissions by choosing from a list of shortemissions by choosing from a list of short--term actions.term actions.

•• Integrating sustainability into the curriculum and making it Integrating sustainability into the curriculum and making it part of the educational experience.part of the educational experience.

•• Making the action plan, inventory and progress reports Making the action plan, inventory and progress reports publicly available.publicly available.

The CommitmentThe Commitment

Page 12: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

JerseyJersey--Atlantic Wind FarmAtlantic Wind Farm

25% of Electricity comes from Wind Sources this year!

Page 13: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

Rowan University PolicyRowan University Policy

Approved by President and Cabinet on September 12, 2007Approved by President and Cabinet on September 12, 2007

Title:Title: Purchasing Energy Star Rated ProductsPurchasing Energy Star Rated Products

Policy Statement:Policy Statement: Effective September 15, 2007, all products Effective September 15, 2007, all products purchased by Rowan University shall bear the Federal purchased by Rowan University shall bear the Federal

Environmental Protection Agency’s Energy Star label in all areasEnvironmental Protection Agency’s Energy Star label in all areas for for which such ratings exist. Examples include but are not limited twhich such ratings exist. Examples include but are not limited to: o: computers, printers, copiers and other electronic devices, lightcomputers, printers, copiers and other electronic devices, lighting ing and indoor climate control products, and commercial or residentiand indoor climate control products, and commercial or residential al

appliances. Grants awarded to the university that designate specappliances. Grants awarded to the university that designate specific ific equipment are exempt from this policy. Exceptions to this policyequipment are exempt from this policy. Exceptions to this policyshall be determined by the Vice President for Administration andshall be determined by the Vice President for Administration and

Finance or his/her designee on bases of reasonable cost and Finance or his/her designee on bases of reasonable cost and consistency with the public interest.consistency with the public interest.

Page 14: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

www.presidentsclimatecommitment.org

Page 15: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

Campus Master PlanningCampus Master PlanningRowan University has integrated Sustainability into their Rowan University has integrated Sustainability into their Campus Master Plan Guiding Principles as follows:Campus Master Plan Guiding Principles as follows:

“Sustainability “Sustainability –– Sustainability is defined as the ability to Sustainability is defined as the ability to provide for current needs without jeopardizing the ability provide for current needs without jeopardizing the ability of future stakeholders to provide for their needs. The of future stakeholders to provide for their needs. The Campus Master Plan will strive to be an outstanding Campus Master Plan will strive to be an outstanding example of longexample of long--term sustainable development in its plan term sustainable development in its plan and implementation. Our measures of sustainability will and implementation. Our measures of sustainability will be gauged by our participation in NJHEPS and LEED be gauged by our participation in NJHEPS and LEED environmental performance standards.”environmental performance standards.”

Page 16: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

Sounds great but what are our Marching Orders?Sounds great but what are our Marching Orders?

Was anything mentioned about prescriptive design Was anything mentioned about prescriptive design standards, technical specifications, and construction standards, technical specifications, and construction methods?methods?

Was anything even mentioned about stopping pollution, Was anything even mentioned about stopping pollution, planting trees, or saving the whales?planting trees, or saving the whales?

This is a very broad philosophy that addresses our This is a very broad philosophy that addresses our habits, culture, how we live, work, and playhabits, culture, how we live, work, and play

What Tools are at our disposal?What Tools are at our disposal?

Page 17: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits
Page 18: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

February 13, 2007: Governor Corzine Sign Executive Order #54 Calling for Sweeping Reduction of Greenhouse Gas Emissions in New Jersey

April 22, 2006April 22, 2006: Governor Corzine Signs Executive Order #11 to Increase Energy Efficiency in State Government

Page 19: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

Incorporation of LEED Certified Design Standards

Page 20: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

NJHEPS High Performance Campus Design Guidelines

Page 21: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

What Else?

A Unique Public Offering

Formation of Sustainability Council to Implement PCC

Student Recycling Team

2007 US EPA Environmental Excellence Award for placing3rd Nationally in Recyclemania

2007 US EPA Green Power Partnership Award for Purchasing 25% of the Electricity we use.

Page 22: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

Added 17 New Outdoor Recycling Stations

Page 23: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

So How are we Really Doing?

GG Emissions Currently at 1990 levels!

Page 24: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

Square Footage Growth

0

1,000,000

2,000,000

3,000,000

1900 1920 1940 1960 1980 2000 2020

Year

GSF

Page 25: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

Boiler Plant Upgrade to High Efficiency Received $156K Rebate

Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW

Centralizing Chilled Water Production as Equipment Ages

T8 Lighting Retrofits including Controls

45 VFD’s have been installed in the 10HP to 50HP Range

All New Computers Setup for Sleep Mode after 2 hours of Inactivity

Energy Star “Back to School” List Distributed to Residential Students

Physical Changes and Improvements

A Unique Public Offering

Page 26: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits

Boilers 1, 2, & 3

Natural Gas IN Fuel Oil IN

3.5MW CogenerationUnit

1.2MWCogeneration Unit

Natural Gas IN Fuel Oil INNatural Gas IN Fuel Oil IN

12kV E

lectric

H2O H2O H2O

Steam Chiller Plant

150 psig Sat.Steam

150 psig Sat.Steam

ElectricChiller Plant

STEAM TO CAMPUS

ELECTRIC TO CAMPUS

CHILLED WATER TO CAMPUS

GRID PURCHASED ELECTRICOverall Power Plant

12kV Electric

44 deg ChilledWater

2300 Ton 2000 Ton

Page 27: Carbon Reduction - NJ Clean Energy · ¾Upgrading and Expanding Existing CoGen from 1.5MW to 4.7MW ¾Centralizing Chilled Water Production as Equipment Ages ¾T8 Lighting Retrofits