Capstone Project Evidence

9
Thomas Hodgson Cisco Capstone Project Evidence Contents Capstone Project Evidence..........................................1 Mobile Network.....................................................1 Internet Backbone..................................................2 Main Network.......................................................2 Mobile Network Requirements........................................6 Main Network Requirements..........................................7 Mobile Network Figure 1, Overview of the Mobile Network Structure Figure 2, View of the Routing Settings Simulated for Mobile Internet 1

Transcript of Capstone Project Evidence

Thomas Hodgson Cisco

Capstone Project Evidence ContentsCapstone Project Evidence....................................................................................1 Mobile Network......................................................................................................1 Internet Backbone.................................................................................................2 Main Network.........................................................................................................2 Mobile Network Requirements...............................................................................6 Main Network Requirements..................................................................................7 Main Network Requirements

Mobile Network

Figure 1, Overview of the Mobile Network Structure

Figure 2, View of the Routing Settings Simulated for Mobile Internet

1

Thomas Hodgson Cisco

Internet Backbone

Figure 3, The Internet Backbone

Main Network

Figure 4, T1 Internet Connection

Figure 5, Main Routeing and DHCP Server

2

Thomas Hodgson Cisco

Figure 6, Whole Main Network Overview

Figure 7, DHCP Settings

3

Thomas Hodgson Cisco

Figure 8, Client using DHCP Server Correctly

Figure 9, Connectivity between Mobile wireless users and wired

4

Thomas Hodgson Cisco

Figure 10, Naming Server Options, Static IP Servers

Figure 11, Working Naming Server for Website

5

Thomas Hodgson Cisco

Figure 12, Wifi Settings

Figure 13, Client connected to Wifi

Mobile Network RequirementsNumber of Clients 6

Service Provider Equipment Firewall Local Servers Web/Email Servers 6

Satellite Modem Intergraded None None

Thomas Hodgson Cisco

Wired/Wireless Wired Desktops Printers Wired Laptops Wireless Laptops WLAN Area

Wireless None None None 6 N/A (Standard AP Range Assumed)

Main Network RequirementsNumber of Clients 14(8 Regular + 6 mobile Group)

Service Provider Equipment Firewall Local Servers Web/Email Servers Wired/Wireless Wired Desktops Printers Wired Laptops Wireless Laptops WLAN Area

T1 Line Integrated +SPI + MAC Filtering 5 Servers(1 DHCP(Also Naming Server), 1 Web, 1 Backup, 1 FTP, 1 Email) 1 Web, 1 Email Both 2 1 None 12(6 Regular +6 mobile Group) Office Areas (Standard AP Range)

7

Thomas Hodgson Cisco

Visio Network Layout

8

Thomas Hodgson Cisco

Figure 14, Visio Network Layout

9