Capita AutoCAD Template - Amazon Web...
Transcript of Capita AutoCAD Template - Amazon Web...
G
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
L
I
G
H
T
S
I
G
N
S
I
G
N
S
I
G
N
S
I
G
N
B
O
X
P
L
A
N
T
P
L
A
N
T
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
G
M
H
M
H
M
H
M
H
G
M
H
M
H
M
H
M
H
M
H
M
H
G
G
G
G
M
H
M
H
G
M
H
M
H
M
H
M
H
M
H
M
H
G
G
G
G
G
G
M
H
M
H
M
H
M
H
F
H
M
H
M
H
M
H
M
H
M
H
E
L
E
C
B
O
X
M
H
M
H
M
H
C
L
7
0
.
7
5
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
M
H
L
I
G
H
T
M
H
B
O
X
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
L
I
G
H
T
B
O
X
B
O
X
S
T
O
R
E
S
T
O
R
E
S
T
O
R
E
S
T
O
R
E
S
T
O
R
E
S
T
O
R
E
S
T
O
R
E
S
T
O
R
E
M
H
M
H
M
H
M
H
M
H
NARROW WIDENING REQUIREDREFER TO CONSTRUCTION DETAIL
NARROW WIDENING REQUIREDREFER TO CONSTRUCTION DETAIL
NARROW WIDENING REQUIREDREFER TO CONSTRUCTION DETAIL
NARROW WIDENING REQUIREDREFER TO CONSTRUCTION DETAIL
NARROW WIDENING REQUIREDREFER TO CONSTRUCTION DETAIL
TYPE D PAVEMENT EDGE DETAIL
NOTES:
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANTDRAWINGS, ANY DISCREPANCIES, ERRORS OR OMISSIONS TO BE BROUGHTTO THE ATTENTION OF CAPITA.
2. ALL DIMENSIONS TO BE CHECKED BEFORE COMMENCEMENT OF WORK ONSITE.
3. ALL DIMENSIONS IN METRES UNLESS OTHERWISE STATED.
4. ALL WORKS TO BE IN ACCORDANCE WITH THE SPECIFICATION FORHIGHWAYS WORKS (SHW) AND THE PAVEMENT SPECIFICATION.
5. FOR STANDARD ROAD CONSTRUCTION AND TIE IN DETAILS REFER TODRAWING [MAN000-CAP-D-0000-XXX-DE-735-335-001].
6. WHERE EXISTING SURFACE IS TO BE OVERLAID, TACK COAT TO BE APPLIEDAS DETAILED IN APPENDIX 7/4.
7. ALL TRENCH REINSTATEMENTS TO BE IN ACCORDANCE WITH SPECIFICATIONAND STANDARD DETAILS.
8. PRIOR TO LAYING CARRIAGEWAY FOUNDATION, CBR TO BE TAKEN ATFORMATION LEVEL, TO DETERMINE FOUNDATION THICKNESS. REFER TOTABLE A AND TABLE B IN DRAWING [MAN000-CAP-D-0000-XXX-DE-735-335-001].
9. WHERE EXISTING SUB-BASE TO BE RE-USED, CBR TESTS MUST BE TAKEN TOCONFIRM MINIMUM 15%.
KEY:PT 1 - NEW PAVEMENT CONSTRUCTION (20 MSA)
PT 2 - EXISTING CARRIAGEWAY REGULATING
PT3 - NEW PAVEMENT CONSTRUCTION (8 MSA)
PT4 - APRON CONSTRUCTION PAVEMENT QUALITY CONCRETE
PT5 - APRON CONSTRUCTION COMPOSITE
PT6 - NEW PAVEMENT CONSTRUCTION
PT7 - NEW PAVEMENT CONSTRUCTION
PT8 - NARROW WIDENING
N
ORIG.
CLIENT
© Capita Property and Infrastructure Ltd S:\PROJECTS\CS087398 Manchester Airport Transformation\03 Delivery\03 Drawings\MAN200-CAP-D-0000-L00-PL-735-335-001.dwg
16/06
/2017
16:37
:17 B
Y JA
MES
HARR
ISON
ORIGINATOR'S JOB NO.
APPROVED BY
PROJ.CODE NUMBERLEVEL TYPE AFC1 STATUS
THE WAREHOUSES 10 BLACK FRIARS LANE LONDON EC4V 6EJ
T +44 (0)20 3837 2500 www.pascalls.co.uk
TITLE
KEY PLAN
CAPITA
INFRASTRUCTURE
CS087398
CLIENT
PROJECT NAME
DISCIPLINE
DRAWING ORIGINATOR
NOTES:1. SAFETY IS A PRIORITY. IF YOU HAVE ANY CONCERN ABOUT SAFETY IN THE
CONSTRUCTION OR ULTIMATE USE OF THE WORKS DESCRIBED, PLEASE RAISE ITIMMEDIATELY WITH THE PROJECT MANAGER.
2. DO NOT SCALE FROM THIS DRAWING.3. ALL DIMENSIONS TO BE CHECKED ON SITE.4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL OTHER ARCHITECTURAL,
MECHANICAL, ELECTRICAL SERVICE AND STRUCTURAL DRAWINGS, SPECIFICATION,SCHEDULES, REPORTS AND ASSOCIATED DOCUMENTS.
5. THIS DRAWING SHOWS DESIGN INTENT AND SHALL NOT BE USED FOR CONSTRUCTIONOR INSTALLATION PURPOSES.
6. SITE SURVEYS ARE TO BE UNDERTAKEN TO VALIDATE THE SETTING OUT AND SITELEVELS.
7. DEVELOPMENT OF THIS DRAWING SHALL REQUIRE THE CONTRACTOR TO CONFIRM WITHALL THEIR SPECIALISTS AND INSTALLERS ALL ASPECTS OF THE WORKS COVERED BYTHE CONTRACT. THIS SHALL INCLUDE BUT NOT BE LIMITED TO FULL COORDINATIONWITH THE BUILDING AND ALL ELEMENTS THEREIN. LEAD TIME, PROGRAMME OF WORKS,CONSTRUCTION MATERIALS / FINISHES, ACCESS FOR INSTALLATION AND MAINTENANCE,INTEGRATION WITH OTHER ELEMENTS TO ALLOW FULL FUNCTIONALITY OF ALLELEMENTS, GENERAL SUITABILITY OF THE LAYOUT ETC.
8. REFER TO RECORD AND/OR SURVEY DRAWINGS WHERE THEY EXIST.9. ENSURE ALL METHOD STATEMENTS, SIGN OFFS AND APPROVALS ARE IN PLACE BEFORE
PROCEEDING WITH ANY WORKS.10. ALL OPERATIVES TO SITE MUST HAVE A VALID PASS AND BE TRAINING FOR WORKING IN
AN AIRPORT ENVIRONMENT.
DRAWN BY CHECKED BY SCALE @ A0
PURPOSE OF ISSUE
DISC. REV.ZONE
MANCHESTER AIRPORT
TRANSFORMATION
LAING O' ROURKE
REVIEW BY
REV DRN DATE DESCRIPTION
NOTE: CONTRACTORS ARE RESPONSIBLE FOR THE VERIFICATION OF ALL DIMENSIONS ON SITE
AND THE ARCHITECT IS TO BE INFORMED OF ANY DISCREPANCY. DO NOT SCALE FROM THIS
DRAWING. USE FIGURED DIMENSIONS ONLY. THIS DRAWING MAY CONTAIN ORDNANCE SURVEY
MASTERMAP AND RASTER DATA. © CROWN COPYRIGHT AND DATABASE RIGHT 2013.
ORDNANCE SURVEY LICENCE NUMBER 100006119.
AFC2
Date
:
PP15 ENABLING WORKS
PAVEMENTS
SHEET 3 OF 3
STAGE APPROVAL
JCH PAW PAW AMB 1:250
MAN200 CAP D 0000 L00 PL 735 335 003 P01 S4
P01 JCH 16.06.17 FIRST ISSUE