All answer scripts, question papers, drafts and loose sheets must not be taken out of the assessment venue. Paper 1 Statutory Controls in Building Works 2014 Page 0 Candidate Number: Seat No.: The HKIA/ARB Professional Assessment 2014 Paper 1 Statutory Controls in Building Works 18 November 2014 9:00 am – 12:00 noon (3 hours) Venue Rotunda 3, 6/F Kowloonbay International Trade & Exhibition Centre (KITEC) Kowloon Bay Section II (60 marks) : Short Essay Questions (pages 1 – 13 and Appendix 1 and 2 on loose sheets) A total of 3 questions are to be answered. Question 1 is compulsory (30 marks). Answer 2 questions from Question 2, Question 3 and Question 4 (15 marks each). Time allowed : 1 hour 50 minutes Notes : 1. 3 answer books are provided for you. 2. Please attempt each question on a separate answer book and mark the question numbers you attempt on the cover of the answer book. 3. Remember to write your candidate number and room/seat number on the answer book (including all the appendices which form part of your answers) and question paper. DO NOT write your name on the question paper and answer books. 4. Please attach the appendices which form part of your answers to the respective answer books with the tag provided. Section II Short Essay Questions

Transcript of Candidate Number: Section II - Hong Kong Institute of ... · and his TCP for the large diameter...

All answer scripts, question papers, drafts and loose sheets must not be taken out of the assessment venue. Paper 1 Statutory Controls in Building Works 2014 Page 0

Candidate Number: Seat No.:

The HKIA/ARB Professional Assessment 2014 Paper 1

Statutory Controls in Building Works

18 November 2014

9:00 am – 12:00 noon (3 hours)

Venue

Rotunda 3, 6/F

Kowloonbay International Trade & Exhibition Centre (KITEC)

Kowloon Bay

Section II (60 marks) : Short Essay Questions (pages 1 – 13 and Appendix 1 and 2 on loose sheets)

A total of 3 questions are to be answered.

Question 1 is compulsory (30 marks).

Answer 2 questions from Question 2, Question 3 and Question 4 (15 marks each).

Time allowed : 1 hour 50 minutes

Notes :

1. 3 answer books are provided for you.

2. Please attempt each question on a separate answer book and mark the question numbers

you attempt on the cover of the answer book.

3. Remember to write your candidate number and room/seat number on the answer book

(including all the appendices which form part of your answers) and question paper. DO

NOT write your name on the question paper and answer books.

4. Please attach the appendices which form part of your answers to the respective answer

books with the tag provided.

Section II Short Essay Questions

All answer scripts, question papers, drafts and loose sheets must not be taken out of the assessment venue. Paper 1 Statutory Controls in Building Works 2014 Page 1

This is a blank page.

All answer scripts, question papers, drafts and loose sheets must not be taken out of the assessment venue. Paper 1 Statutory Controls in Building Works 2014 Page 2

Paper 1 Section II – Short Essay Questions Question 1 (Compulsory Question – 30 marks) Read the supplied material carefully : Please refer to the site plan (Appendix A) provided. The combined site, assembled under a single ownership, has frontages on three streets, Roads A, B and C, with widths as shown. Area of the combined site is approximately 3,472 m². Existing buildings are generally 4-storey tenement houses, each with a single access staircase. Please also refer to the abstract from the relevant Outline Zoning Plan (OZP) (Appendix B) for the area, and the accompanying Notes, also provided. The site is zoned R(A)2 with qualifications and restrictions that can be gathered from information shown on the OZP and the accompanying Notes (Appendix C). Lease conditions are not provided. For this exercise: assume that under the lease conditions any buildings erected on the lots are restricted to four storeys for residential purpose, and that shops are allowed on ground floor only. Then elaborate on the following issues: 1(a) Identify and discuss the restrictions to possible redevelopment of

the combined site, as stipulated under the OZP and accompanying Notes.

(4 marks)

1(b) Identify and discuss the criteria, under Building (Planning) Regulations, governing any kind of redevelopment with respect to the actual site constraints, by referring to the site plan provided.

(4 marks)

1(c) Considering the given restrictions under the land lease, how would you advise your client on a more intensive redevelopment, as permitted under the OZP?

(4 marks)

1(d) How would you advise your client, if he were to redevelop the site as a hotel? What are the planning procedures involved and what concessions would the redevelopment qualify for, with reference to Building Authority’s Practice Notes for Authorized Persons and Registered Structural Engineers (PNAP)?

(4 marks)

All answer scripts, question papers, drafts and loose sheets must not be taken out of the assessment venue. Paper 1 Statutory Controls in Building Works 2014 Page 3

1(e) Assuming redevelopment with a commercial podium on the lower three levels, one or more residential towers above, and provision for parking of facilities (make your own reasonable assumptions for private cars, loading/unloading and refuse collection), demonstrate maximum development potential with broad calculations of permitted gross floor areas and site coverage.

(10 marks)

1(f) Broadly demonstrate compliance of your proposal with planning criteria for sustainable site planning as laid down in ‘PNAP APP-152.’

(4 marks)

All answer scripts, question papers, drafts and loose sheets must not be taken out of the assessment venue. Paper 1 Statutory Controls in Building Works 2014 Page 4

Appendix A

All answer scripts, question papers, drafts and loose sheets must not be taken out of the assessment venue. Paper 1 Statutory Controls in Building Works 2014 Page 5

Appendix B

Site

Outline Zoning Plan (OZP)

All answer scripts, question papers, drafts and loose sheets must not be taken out of the assessment venue. Paper 1 Statutory Controls in Building Works 2014 Page 6

Appendix C (Page 1 of 3)

All answer scripts, question papers, drafts and loose sheets must not be taken out of the assessment venue. Paper 1 Statutory Controls in Building Works 2014 Page 7

Appendix C (Page 2 of 3)

All answer scripts, question papers, drafts and loose sheets must not be taken out of the assessment venue. Paper 1 Statutory Controls in Building Works 2014 Page 8

Appendix C (Page 3 of 3)

All answer scripts, question papers, drafts and loose sheets must not be taken out of the assessment venue. Paper 1 Statutory Controls in Building Works 2014 Page 9

Answer 2 questions from Question 2, Question 3 and Question 4. Question 2 (15 marks) A local non-government welfare organization is considering to extend an existing residential care home for the elderly by erecting a new multi-storey annex block within the garden area of the existing home. The existing home is situated at a site zoned “Green Belt” in the Outline Zoning Plan. You are engaged as the architect to conduct a feasibility study for this extension proposal. 2(a) Advise the issues relating to land grant and statutory control to be

covered in the feasibility study and describe how these issues affect the extension proposal.

(6 marks)

2(b) Addressing the issues relating to land grant and statutory control,

suggest to your client what other professionals and specialists should be engaged to conduct this feasibility study and describe their duties in the study.

(3 marks)

2(c) Your client also intends to modify the existing home to suit the operation of the expanded home. Suggest and explain to your client the statutory submission strategies that may be followed to implement the modification works under 2 scenarios :

(6 marks)

Scenario 1 – modification works involving re-alignment of non-structural internal partitions and replacement of above-ground drain pipes only. Scenario 2 – modification works involving substantial structural alteration of the existing building.

All answer scripts, question papers, drafts and loose sheets must not be taken out of the assessment venue. Paper 1 Statutory Controls in Building Works 2014 Page 10

Question 3 (15 marks) The Minor Works Control System (MWCS) has been fully implemented since December 2010. 3(a) Describe the aim of the MWCS.

(3 marks)

3(b) Describe the advantages of the MWCS over the prescribed approval and consent procedures.

(3 marks)

3(c) Explain the purpose of classification of minor works and describe the notification procedures of each class of minor works.

(9 marks)

Question 4 (15 marks) You are administering a foundation contract for a development in Scheduled Area No. 3 and are assisting the Authorized Person (AP) to compile his own part of site supervision plan. The foundation contract involves construction of large diameter bored piles, socketted H-piles, pile caps and sheet piles for the construction of the pile caps. All plans for the works as well as the hoarding have been approved. The following are some details of the foundation contract. A. Contract period : 12 months including certification of completion for

all works by Buildings Department.

B. Time required for major site activities are : - Mobilization and site preparatory works : 0.5 months

- Site construction of hoarding : 1 month - Site construction of large diameter bored piles : 5 months - Site construction of socketted H-piles : 5.5 months - Site construction of sheet piles : 1 month - Site construction of pile caps : 2 months

C. Total costs of the works are : - large diameter bored pile : $ 27M

- socketted H-pile : $ 66M - sheet pile : $ 2M - pile cap : $ 50M

4(a) Draw a programme for the foundation contract in the attached Gantt chart (Appendix 1) based on the time provided for the major site activities. Insert critical activities and their durations as well as milestones related to the requirements of the Buildings Ordinance / Buildings Department in the Gantt chart.

(8 marks)

4(b) What are the minimum required frequency levels of site inspections for the AP and his Technically Competent Persons (TCPs) under the Code of Practice for Site Supervision 2009 for the large diameter bored pile works, socketted H-pile works, pile cap works and sheet pile works respectively? Assume no combination of

(4 marks)

All answer scripts, question papers, drafts and loose sheets must not be taken out of the assessment venue. Paper 1 Statutory Controls in Building Works 2014 Page 11

supervision resources for this part.

4(c) You are requested by the AP to combine the supervision resources as much as possible so that the minimum number of his TCP can be deployed during the foundation contract period. What are the minimum required frequency levels of site inspections for the AP and his TCP for the large diameter bored pile works, socketted H-pile works, pile cap works and sheet pile works after combination? You should work out the calculation for combination of TCPs on Form C of Code of Practice for Site Supervision 2009 (Appendix 2 attached to the question paper) and submit it together with the answer book.

(3 marks)

Note: Table 1 of Technical Memorandum for Supervision Plans 2009 is at Appendix 3.

All answer scripts, question papers, drafts and loose sheets must not be taken out of the assessment venue. Paper 1 Statutory Controls in Building Works 2014 Page 12

Appendix 3 (Page 1 of 2)

All answer scripts, question papers, drafts and loose sheets must not be taken out of the assessment venue. Paper 1 Statutory Controls in Building Works 2014 Page 13

Appendix 3 (Page 2 of 2)

END OF PAPER

Carmen
打字機文字
Candidate no.: __________ Seat no.: _____
Carmen
打字機文字
Carmen
打字機文字
Carmen
打字機文字
Carmen
打字機文字
Appendix 1

CoP for Site Supervision

Form C

Calculation sheet for combination of TCPs for one or more types of buildings works or street works under one supervision plan prepared by AP/RSE/RGE/RC *

Building Works / Street Works Supervision Input Before Combination Combined Supervision Input

( 1 ) ( 2 ) ( 3) ( 4 ) ( 5 ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11)

Types of Building works /

Street works to be combined

Scale Factor ( S )

TCP Grade

Frequency Levelof Site Inspection

Notional Supervision Input(man-day/month)

Adjusted supervision input

(2) x (5) (man-day/month)

TCP grades under

combination

TCP post with combined

duties

Summation of supervision input

under the combined TCP

No. of combined TCP

Required Frequency Level of

Site Supervision

Note: 1. Delete if inapplicable as marked *. 2. All types of building works or street works covered by the supervision plan should be listed under column (1). They should be grouped in such a way that any

portion of works under one group will not be carried out concurrently with any works under other groups.

75

Carmen
打字機文字
Candidate no.: __________ Seat no.: _____
Carmen
打字機文字
Appendix 2