Cancer Center Support Grant Preparation

13
Cancer Center Support Grant Preparation Michael Darling Associate Director for Administration IU Simon Cancer Center

description

Cancer Center Support Grant Preparation. Michael Darling Associate Director for Administration IU Simon Cancer Center. Challenges. Planning: September due date with guidelines published in January impacted the planning stage - PowerPoint PPT Presentation

Transcript of Cancer Center Support Grant Preparation

Page 1: Cancer Center Support Grant   Preparation

Cancer Center Support Grant

Preparation

Michael DarlingAssociate Director for Administration

IU Simon Cancer Center

Page 2: Cancer Center Support Grant   Preparation

• Planning: September due date with guidelines published in January impacted the planning stage

• Experience: Several key members new to CCSG preparation and submission or in a new role since previous submission: Director; 4 out of 6 Associate Directors; 7 out of 10 Program Leaders; 2 new cores with new directors

• Guidance: EAB in old guideline mode during construction of CCSG

• Logistics: Difficulty in developing template for 12 page research narrative

Challenges

Page 3: Cancer Center Support Grant   Preparation

CCSG Guidelines: Briefly discuss the following

• How the interests, expertise and research approaches of the Program members facilitate achievement of the central themes listed in the description above (80-90 pages above!)

• The most significant scientific accomplishments of the Program

• Briefly describe how the cancer research relevant to the catchment area is addressed

Research Program Narrative

Page 4: Cancer Center Support Grant   Preparation

Our folks and the EAB asked “where are these items?”

• Response to summary statement critique• Value added to the Program from the Cancer

center (also in review criteria)• Value added to the Cancer Center from the

Program • Research Program Training and Education

activities• Future Plans

But…

Page 5: Cancer Center Support Grant   Preparation

Page Limit: 12 Pages!

The Problem

Page 6: Cancer Center Support Grant   Preparation

Page 1 • Program Goals and Themes (restated from program description) • Response to Previous Summary Statement (brief and just the

critical ones)

Pages 2-10 • Major Scientific Accomplishments

Pages 11-12 • Program Relevance to the Catchment Area • Research and Clinical• Education and Outreach Activities• Value Added to the Cancer Center from the Program• Vision and Future Plans

Template

Page 7: Cancer Center Support Grant   Preparation

Retitled Section

• Value Added by the Cancer center to the Research Program: Shared Resource and Services Usage (also in review criteria for research program)

• We added support through: – Seminars – Pilot projects– Grand Rounds speakers– Faculty recruitment

Value Added By Cancer Center

Page 8: Cancer Center Support Grant   Preparation

• Major services/equipment• Management Structure• Cost Effectiveness• Qualifications of personnel• Use of Service• Policies on Operation

Formatting Shared Facilities

Page 9: Cancer Center Support Grant   Preparation

• What are the quality and cost efficiency of the service provided, and how effective are accessibility policies governing institutional and other specialized shared resources?

• How appropriate are the qualifications of the staff and their time commitment?

BUT…

• FOA/Guideline Changes: More emphasis on support of science as opposed to usage metrics

Shared Facilities Review Criteria

Page 10: Cancer Center Support Grant   Preparation

Additions• More emphasis on support of science as opposed to

usage metrics

Template• 6 pages addressing the formatting from above

including response to summary statement• 6 pages on importance to Center’s Scientific Needs

and Objectives; short science stories and publications

FAO/Guideline Changes

Page 11: Cancer Center Support Grant   Preparation

• Get everyone to know and use the new terms: e.g. Interventional therapeutic, Interventional non-therapeutic, Non-therapeutic and where they are used

• Use an EASY mechanism to transmit files to internal and external reviewers: IU Box is too complicated

• Clever ideas for metrics created 6-9 months earlier need an easy to find place for the data details

Other Hurdles / Lessons Learned

Page 12: Cancer Center Support Grant   Preparation

What I won’t miss:

Lugging over 8,000 single sided pages of paper across campus to our Office of

Research Administration

Other Things

Page 13: Cancer Center Support Grant   Preparation