Campus Planning - Lehigh University · & Campus Planning Julia Parker University Architect/Director...

83
C A M P U S P L A N N I N G & P R O J E C T S Campus Planning Julia Parker University Architect, Director of Planning and Projects ERAC March 25, 2015

Transcript of Campus Planning - Lehigh University · & Campus Planning Julia Parker University Architect/Director...

C A M P U S P L A N N I N G & P R O J E C T S

Campus Planning Julia Parker

University Architect, Director of Planning and Projects ERAC March 25, 2015

Functional Organization

Grounds Services

Lead Maint Techs

Mary Jo Brown Space Manager

John Capuano Drafting Assistant

Karen Williamson Mapping Support

Yasmin Bugaighis Associate Director

Rebecca Benner Asst Dir, Projects

Jeff Hosak Asst Dir, Projects

Conrad Jones Asst Dir, Projects

David Ledger Asst Dir, Projects

Steve Schlegel Asst Dir, Projects

Erin Liston Project Manager

vacant Associate Vice President

Facilities Services & Campus Planning

Julia Parker University Architect/Director Campus Planning & Projects

Don Knowles Business Manager

Pat Johnson Vice President

Finance & Admininstration

Delicia Nahman Sustainability Officer

Gary Falasca Director

Facilities Services

Mike Trzesniowski Associate Director

Utilities & Engineering

Steve Benko Asst Director Utilities

& Maint Mountaintop

Campus

Dave Hendel Asst Director HVAC

Supervisor Life Safety Mike Oblick

Life Safety Tech John Lear

Packer and Mountaintop CH&R

Lead Boiler Operators Boiler Operators

HVAC Techs

Maint Tech Jeff Woman

Don Pasda Associate Director

Building Maintenance Packer Campus

Mountaintop Campus

vacant Associate Director Goodman Campus,

Grounds, and Waste/Recycling

David Kasten Asstistant Director

Building Maintenance Packer Campus

Joe Hartner Assistant Director

Building Maintenance Residence Halls

Fred Colon Maintenance Manager

Maintenance Services

Custodial Services

Katie Klaniecki Sustainability Program

Manager

Jeff Seymour Manager

Access Control

Locksmiths Karen Brice

Joe Cavanaugh John Rendle

Inventory Control Jorge Coronel Jerry Zarzecki

Administrative Charlotte Auman Betty Bramblet

Donna Szczepanski Rose Szczepanski

vacant

Facilities Services

• Facilities Operation and Maintenance • Major Repair Projects (Roofs, HVAC systems, envelope, etc.) • Custodial Services • Utilities Services (electric, steam, chilled water, etc.) • Waste Management and Recycling • Grounds Maintenance, Landscape and Tree Services • Snow and Ice Removal • Access Control and Locksmith functions

• Master Planning • Space Management • Facilities Information Management • Renovations • New Construction • Project Management • Architectural Review and Landscape Planning • Standards and Guidelines

Campus Planning & Projects

Sustainability & Business Office

Sustainability • Sustainability Master Plan • Environmental Initiative, Green Fund, Sustainability Tour, Sustainable

Office Program, Greek House Sustainability • Earth Day, Eco Reps, Energy Conservation, Green House,

RecycleMania, SustainabLEHIGH • Bethlehem Farmer’s Market, South Side Initiative, South Side Sale,

Community Gardens

Business Office • Access Control, Campus Locksmith • Storage, Warehouse & Inventory • Work Order System • Administrative Support • Budget Tracking, Invoice Processing

FSCP Annual Budget

Note: does not include Department or Capital Projects

Founded1865 Asa Packer; industrial

pioneer, entrepreneur and philanthropist

Campus Population 4,904 Undergraduate

Students

2,165 Graduate Students

681 Faculty Members

1,196 Staff Members

Source: Lehigh Annual Report 2013

University Center

Iacocca Hall

4 Campuses 2,355 acres

164 Buildings 4,565,164 GSF – 2,526,097

NASF

29 Academic

23 Administrative

28 Student Support

40 Residence Halls

16 Fraternity Houses

8 Sorority Houses

5 Real Estate Properties

6 Vacant Buildings

Source: Facilities Facts Dec 2013

Linderman Library Rotunda

STEPS Building

Asa Packer

Campus Mountaintop Campus

Goodman Campus

Stabler Land

N

Campuses

Asa Packer

Campus,

360 acres

15%

Goodman

Campus,

500 acres

21%

Mountaintop

Campus,

740 acres

32%

Stabler

Land,

755 acres

32%

Campus Division

N

South Bethlehem Context Map

Catalysts

Preserve Lehigh’s exceptional

architectural character and park-like setting.

Make optimal use of existing resources.

Create space to foster campus community and interdisciplinary interaction

Improve research space. Build in an environmentally

sustainable manner Integrate the campus and South

Bethlehem Improve access and walkability

Guiding Principles

Campus Changes

International studies programs move to Williams Hall

Student activities moves to UC from Upper Grace

Wrestling practice facility moves from Taylor Gym to Upper Grace

Student Affairs moves to Williams Hall from University Center -- admin space is converted to community meeting space

Space vacated in Taylor Gym becomes recreational space

Current Projects

• Williams Hall • University Center • Advancement – 125 Goodman • Police Station • Mountaintop Buildings B& C • Athletic Fields • Cundey Varsity House • Iacocca Hall Lobby Cafe • Service Building • Lighting Study • Southside Bethlehem • LU Properties, LLC

Williams Hall

Williams Hall

Williams Hall

Second Floor Plan

Williams Hall

Williams Hall

Williams Hall

Williams Hall

GUIDING PRINCIPLES

• Campus Crossroads

• Iconic Image

• Accessible, Inviting, Welcoming

• Extended Hours

• Flexible in Function

• Educational / Learning Laboratory

• Promote Wellness

• Sustainability

University Center

Lehigh University University Center

Concept Design

University Center

EXPANSION OPTIONS

University Center

PROPOSAL ORGANIZATION

University Center

University Center

University Center

NORTH – SOUTH CONNECTOR

University Center

EAST - WEST CONNECTOR

University Center

99,000 sf Renovation 41,000 sf Expansion Common Space 3 times as much space for Events, Programs, Campus Living Room Multipurpose & Meeting Space Increase capacity from 500-700 seats Student Clubs & Organizations 100 new seats for group work and meetings Multi-Cultural, LGBTQA, Women’s

Center Increase program capacity

Retail - Bank, C-Store, Mini Bookstore, - Two additional leased Kiosks

PROGRAM SUMMARY

Staff 20 staff work spaces to support:

- Fraternity & Sorority Affairs - Student Leadership & Community Service - First Year Experience - Student Activities - Gender Violence Education & Support

Student Dining (AYCE) Increase capacity from 377-450 seats

Food Court and Coffee House Increase capacity from 215-250 seats 150 additional seats in Common Spaces

Asa Packer Room / Faculty Dining 125-150 seats, Enhance event and campus dining environments

University Center

PROPOSED SCHEME – SITE PLAN

University Center

University Center

PROPOSED SCHEME – LOWER LEVEL

University Center

PROPOSED SCHEME – LEVEL 1

University Center

PROPOSED SCHEME – LEVEL 2

University Center

PROPOSED SCHEME – LEVEL 3

University Center

PROPOSED SCHEME – LEVEL 4

EAST VIEW EAST EXPANSION

University Center

SOUTH VIEW EXISTING

University Center

University Center

CONSTRUCTION PHASING

University Center

DESIGN DEVELOPMENT

MAIN STREET - TOWN HALL

TOWN HALL

Advancement – 125 Goodman

DESIGN DEVELOPMENT

MAIN STREET - TOWN HALL

112

OFFICE 114

OFFICE

OFFICE

116

OFFICE

118

120

OFFICE OFFICE

122 124

OFFICE

STORAGE

102

STORAGE

103

EXG SERVER

132

166

SMALL CONF

146

OFFICE

148

OFFICE

150

OFFICE

152

OFFICE

154

OFFICE OFFICE

168

OFFICE

170 172

OFFICE

174

OFFICE

176

OFFICE 178

OFFICE

OFFICE

111

OFFICE

113

115A

MECH

STORAGE

115

OFFICE

117 123

OFFICE

OFFICE

125

OFFICE

158

OFFICE

160

104

MAILROOM

STORAGE

105

OFFICE

140

OFFICE

144

142

OFFICE

WOMEN'S

106

MEN'S

107

145

OFFICE

KITCHEN

105

127

OFFICE

OFFICE

139

133

OFFICE OFFICE

135

141

OFFICE

000

OPEN OFFICE

OFFICE

182

OFFICE

184

OFFICE

186

OFFICE

188

OFFICE

189

OFFICE

187

185

OFFICE

183

OFFICE

181

OFFICE

COND. STORAGE

192

MECH/ELEC

190

CONDITIONED STORAGE

194

SERVER

193 MECH/ELEC

191

OFFICE

165

OFFICE

163

OFFICE

167 TECH STORAGE

169

STORAGE

171

OFFICE

161

OFFICE

159

OFFICE

157

OFFICE

155 153

SM CONF

151

MED CONF

129

OFFICE

131

OFFICE

OFFICE

143

VESTIBULE

100

130

MED CONF

LA 110

RGE CONFERENCE ROOM / TOWN HALL

JAN.

108A

LOBBY

101

164

UNISEX TR

LIBRARY

162

STORAGE

L 110

ARGE CONFERENCE ROOM / TOWN HALL

TOWN HALL

Advancement – 125 Goodman

DESIGN DEVELOPMENT

MAIN STREET & OPEN KITCHEN

MAKE THIS IMAGE SAME SIZE AS THE COLLAB ZONE OPPOSITE.

M E MAGE A E S ZE AS TH LLAB ZO OPPO TE

Advancement – 125 Goodman

Advancement – 125 Goodman

DESIGN DEVELOPMENT

TOWN HALL ELEVATIONS

CSWK

LEVEL 0' - 0"

WD

SALV BRK GAS FRPL W/ CS

SKYLT

STL, SEE STRUC

ALUM RVL

PTD GWB

CONT COVE LTG

BLK STL FOR SLIDING WHITEBD

ACOUST PNLS

SEE STRUC DWGS

SSG GLZ

LCD SCREEN, OFCI, PROVIDE BLKG, SEE ELEC DWGS

BLK STL FOR SLIDING WHITEBDS

WD BASE, AS SCH

BASE, AS SCH PTD GWB

c l a s s o f 1 9 7 1

Advancement – 125 Goodman

DESIGN DEVELOPMENT

MAIN STREET - TOWN HALL PERSPECTIVE

Advancement – 125 Goodman

Police Station

Police Station

-2' - 0"

9' - 0"

8' - 7"

7' - 0"

6' - 0" 4' - 0"

2' - 0" -2' - 0"

0' - 0" -4' - 0"

6' - 0"

4' - 0" N

2' - 0"

0' - 0"

Lehigh University Police Station Schematic Design Progress

Site Plan

Police Station

Lehigh University Police Station Schematic Design Progress

North Elevation

South Elevation

Elevations

Police Station

Lehigh University Police Station Schematic Design Progress

East Elevation West Elevation

Title

Police Station

Lehigh University Police Station Schematic Design Progress

Digital Model

Police Station

Lehigh University Police Station Schematic Design Progress

3D Views

Police Station

Mountaintop Buildings B&C

Possible Campus Development & Building Entry

Concept Design & Development of C3 interior

Mountaintop Buildings B&C

Mountaintop Buildings B&C

Mountaintop Buildings B&C

Mountaintop Buildings B&C

Mountaintop Buildings B&C

Mountaintop Buildings B&C

Baseball Field

Softball Field

Softball Field

Cundey Varsity House

Cundey Varsity House

Second Floor Plan

Cundey Varsity House

Cundey Varsity House

Iacocca Hall Lobby Cafe

Iacocca Hall Lobby Cafe

Iacocca Hall Lobby Cafe

Iacocca Hall Lobby Cafe

Iacocca Hall Lobby Cafe

Service Building

Service Building

Service Building

Lighting Study

South Side Bethlehem

South Side Bethlehem

Vine Street

South Side Bethlehem

3rd & Filmore

3D Views

Capital Projects Schedule

February 2015 Update

LU Properties, LLC

Stabler Campus Properties

6 5

7

8

23

21

14

4

3 2

9

20 10

22

12

15

17

13

18 11

19

16

N

Lake