Campus Infra – evolution by PPP

99
“because THINKING may be a great way of getting things started, But DOING is the only way of getting things DONE.” Infra – Evolution 2030 via Public - Private Partnership

description

This is the presentation of my Major project. It outlines the idea of how a Government institute can develop its campus infrastructure with the help of Public Private Partnership. Its a case study for Government College of Engineering, Amravati

Transcript of Campus Infra – evolution by PPP

Page 1: Campus Infra – evolution by PPP

“because THINKING may be a great way of getting things started,

But DOING is the only way of getting things DONE.”

Infra – Evolution 2030 via

Public - Private Partnership

Page 2: Campus Infra – evolution by PPP

The Campus of Government College of Engineering, Amravati

Page 3: Campus Infra – evolution by PPP

The Govt. of Maharashtra awarded autonomous status to college academic session 2006-07

The latest ranking of the college is 33th all over the India

Government college of engineering Amravati was established in year 1964

The campus is spread over 105 acres of land on Amravati-Walgaon Road

Institute have seven discipline i.e. CE, ME, EE, ENTC, CS, IE & IT

INTRODUCTION

Page 4: Campus Infra – evolution by PPP

PERIPHERY & TOPOGRAPHY OF THE CAMPUS

Page 5: Campus Infra – evolution by PPP

Master Planning

Implementat-ion of

master plan via PPP

Scope of project

Page 6: Campus Infra – evolution by PPP

SCOPE OF MASTER PLAN

Accessing current infrastructure & the needs of the institute

Accessing the capacity of the infrastructureLocating current & proposed infrastructureModifications & re-arrangement of existing

infrastructureSuggestions regarding road network, parking

facility, landscaping, illumination, etc.

Page 7: Campus Infra – evolution by PPP

Necessity of Infra-evolution 2030

• To achieve Mission & Vision of institute• Lack of Infrastructure development• Lack of high quality research labs• Lack of sporting facilities• Poor road network of college• To enrich good quality faculty, students, status

of institute

Page 8: Campus Infra – evolution by PPP

OBJECTIVES

• To plan the college with a long- term roadmap of growth

• To plan the college with respect to its outdoor spaces (including parking, circulation routes, etc.)

• To plan more efficiently and effectively using space within our existing campus facilities

• To promote the faster delivery of the public capital programme

Page 9: Campus Infra – evolution by PPP

THEME

• Main theme for master planning is to create pollution free campus

• Implementation of master planning by Public-Private Partnership

• The whole college is divided in number of zones such as academic zone, non-academic zone, residential zone and a sports zone

• Use of renewable energy source is in much amount

Page 10: Campus Infra – evolution by PPP

Different zones for master planning

Page 11: Campus Infra – evolution by PPP
Page 12: Campus Infra – evolution by PPP

Campus Gateway

• In master planning of campus, the development of campus gate is also included.

• The campus will have single primary vehicular access Point or gateway to enter in campus.

• A low masonry wall with Campus identification signage is provided.

• A raised planter bed with colorful annual flowers. A backdrop of distinctive flowering canopy trees differentiated from the eucalyptus trees are provided.

• Landscaping at entrance with lighting system for signage is provided.

Page 13: Campus Infra – evolution by PPP

Campus Gateway

• Artist representation of proposed entrance of Government College of Engineering, Amravati

Page 14: Campus Infra – evolution by PPP

Entrance of college

• Artist representation of road crossing at the entrance of Government College of Engineering, Amravati

Page 15: Campus Infra – evolution by PPP

Road Network

• Existing road network of the campus

Page 16: Campus Infra – evolution by PPP

• Proposed road network of the campus

Page 17: Campus Infra – evolution by PPP

Advantages of Road Network

• All the main buildings of departments, hostels, staff residential area and sports area is on the main roads

• It will create direct access to any place in college campus from main road

• Footpath, Arboriculture, Landscaping, Benches, Shelters, Drinking Water, Toilets, Dust bins, etc. are provided along the road network to attract more pedestrians which will serve as a pollution free campus theme

Page 18: Campus Infra – evolution by PPP

Proposed cross-section of road

Page 19: Campus Infra – evolution by PPP

Pedestrian Lighting

• To enhance ambience and ensure pedestrians feel safe travelling the campus, a higher level of lighting is recommended

Figure showing physical features for illumination and lighting system.

Page 20: Campus Infra – evolution by PPP

Student Activity Center (SAC)

LocationLocated along the entrance main road and opposite to then frontal area of Civil Engineering Department

Featuresgymkhana, Prajwalan control room, alumni office, conference hall, meeting hall, computer Centre, auditorium, food court area, hospitals, estate management office, rehearsal halls, student co-operative Centre, photocopy facility, gymnasium, general stores, coffee, etc.

Page 21: Campus Infra – evolution by PPP
Page 22: Campus Infra – evolution by PPP

Graphic representation showing entrance area for Student Activity Centre

Page 23: Campus Infra – evolution by PPP

Graphical representation showing common hall and other facilities

Page 24: Campus Infra – evolution by PPP

Graphical representation showing common hall and other facilities

Page 25: Campus Infra – evolution by PPP

New Departmental Buildings

• Building Sites and Orientation• This design approach is often conceptualized as

creating an ‘indoor-outdoor’ environment -- usually accomplished by devoting large building wall areas to glass doors and windows adjacent to outdoor patios and gardens

• Building floor plan would typically be developed as rectangle, “L” or “U” forms serving to frame and therefore create campus open spaces.

Page 26: Campus Infra – evolution by PPP

Artist representation of departmental green buildings

Page 27: Campus Infra – evolution by PPP

Campus Way finding and Sign Design Guide

• To better articulate the location, and content of all major campus signs a Master Way Finding/Sign Plan should also be developed

• Major campus identity signs associated with campus gateways, vehicular circulation systems and pedestrian pathways are provided.

• Sign board with a map of campus is provided. map is marked with ‘you are here' mark so that visitors will understand the map easily.

Page 28: Campus Infra – evolution by PPP

Building identification,Way findings and Sign bord

Page 29: Campus Infra – evolution by PPP

Sculpture Garden and Amphitheatre

• Develop a pathway system that signals a logical access to the college Theater and the campus interior; use pathway special paving, pedestrian lighting, landscape systems and campus banners to visually identify the pathway connecting the SAC.

• Open canteen is provided.• Contemporary style Amphitheater is provided.• Events like AAGAZ & all student related small

programs can be conducted in this open theater.

Page 30: Campus Infra – evolution by PPP

Amphitheatre

Page 31: Campus Infra – evolution by PPP

Student Housing Areas

• Master Plan proposes that the student housing areas be developed to a higher density than the current campus housing. 7 new boys hostel comprise of pg. students, visitors , tyranny student hostel having capacity of 300 each should be provided.2 new girls hostels of capacity 360 are proposed.

• Separate parking facility should be provided for hostels.• A common mess is provided for all boys hostel.• A key to the planning and design of future campus student

housing areas would be the creation of a contained residential community where students could live, study, dine and recreate within a comfortable residential environment.

Page 32: Campus Infra – evolution by PPP

Proposed Boys Hostel Cluster

Page 33: Campus Infra – evolution by PPP

Staff housing area

• Master plan includes the residential township for its staff members. The scope of this housing scheme is to accommodate 50% of the institute’s staff.

• The township will contain 12 apartment schemes of G+4 types. Each floor will contain spacious two 3BHK apartment with carpet area of 1200 sq. ft. and one 2BHK apartment with a carpet area of 1000 sq. ft. Thus one apartment scheme will contain eight 3BHK and four 2BHK apartments. Thus 144 families of class I faculty will be accommodated in the apartment schemes.

• 18 row houses are provided for heads of the department and dean. The township thus accommodates around 162 families of faculty.

• The township is provided with gardens and playfields for children, also a recreation center is provided at the core of the township.

• Class III employees will be provided with 800 sq. ft. of apartments, while class IV employees will be provided with 600 sq. ft. apartments. The apartment schemes designed for class III will be G+2 having 4 apartments. Class IV employee’s apartment will be G+2 style with 3 apartments on each floor. Thus this township will accommodate 54 class IV employees while 48 class III employees. Thus it cumulatively account to 102 families.

Page 34: Campus Infra – evolution by PPP

Housing scheme

For teaching faculty For non teaching faculty

Page 35: Campus Infra – evolution by PPP

Artist representation of Class I Housing

Page 36: Campus Infra – evolution by PPP

Sports Facility

• In master planning of campus separate area for sports is provided on east side of campus.

• It includes running track, cricket ground, separate football and hockey grounds are proposed. Indoor Sports Center includes badminton hall and table tennis facility. Two volley ball and two basketball ground are proposed along with the two tennis courts.

• A bigger gymnasium is proposed near the area of boy’s hostel and besides the tennis courts

Page 37: Campus Infra – evolution by PPP

Proposed Sporting Facility

Page 38: Campus Infra – evolution by PPP

Centralized Parking Facility

• Central parking is ensured so that the campus will be free from the pollution caused by the vehicular traffic.

• Four places have been identified along the main roads dividing the campus, as the traffic will be allowed only on the main roads

• Each parking facility will accommodate 500 to 700 two wheelers and 10 to 20 four wheelers depending on their size

Page 39: Campus Infra – evolution by PPP

Table Showing Details of proposed parking location and area under influence.

Parking No. Location Area Under Influence

1. Beside Civil Dept. , Near Main Entrance

Civil Engineering Department, Administrative Building. & Student Activity Centre New

Department 1.

2. Besides To Canteen Electrical & Power Engg. Department, PhD Research Lab & New Department 5

3. Behind To New Extc Department Central Library, New Dept. 3, 4 & Extc

4. Behind To CS, IT Engg. Department.

Workshop, Computer Science & Information Technology, Mechanical Engg , New Department 2

,6

Page 40: Campus Infra – evolution by PPP

Location of parking facility

Page 41: Campus Infra – evolution by PPP

Some Other Modifications

• A single point entry for students is provided from main gate, which is on main road as shown in map.

• One more gate only for staff is provided on shegaon road as shown in map. Barriers are provided to restrict entry on pedestrian street.

• Data center is shifted to existing gymkhana building.

• Campus water & electricity facility is provided as shown in map.

Page 42: Campus Infra – evolution by PPP

In this part of Presentation

1PPP & its case for GCoEA

3Action Plan

2Financial Trials

Page 43: Campus Infra – evolution by PPP

Public Private Partnership& a case for GCoEA

Design, organize, and collaborate

1

Page 44: Campus Infra – evolution by PPP

What is

Public- Private

Partnership ??

• A government service venture

which is funded and operated

through a partnership of

government and one or more

private sector companies.

A toll booth on a National Highway is the best

example

Page 45: Campus Infra – evolution by PPP

TRENDS IN PPP

• More than 50% of the major

infrastructure projects in

Maharashtra are based on the

P3 model.

• Delays in Govt. operated

Projects.

• A rapid increase in number of

colleges.

• In the 11th five year plan allocated around Rs 850 billion for higher education but according to Planning Commission, there is resource gap of about Rs 2.2 trillion.

• PPP is a consequence of the New Public Management of the late 20th century, globalization pressures, and the advent of a more strategic rather than bureaucratic state.

• HRD Ministry has initiated a new scheme of PPP in setting up 20 IIITs.

• UGC set up a committee under K. B. Pawar to file a report on implementation of PPP in higher education

Page 46: Campus Infra – evolution by PPP

?But wait…

Why Public Private Partnership In GCoEA?

Page 47: Campus Infra – evolution by PPP

• In scenario Public funding is no more in a position to take-up the challenging task of expansion and diversification of the infrastructure of sate colleges to meet the continuously growing demands at present

Government’s Position

Page 48: Campus Infra – evolution by PPP

• High population, rapid global growth is giving rise to the demand of infrastructure. Plan is to increase GER from 15% in 2011-12 to 30 % by 2020

• the standards of living and per capita consumption of students is also increasing.

Demand and Consumption

Page 49: Campus Infra – evolution by PPP

• Preparing a master plan is easy, but bringing it to reality is difficult.

• If the institute want to create infrastructure 2030 it can’t rely on government’s funds.

• Different avenues need to be explored

Institute’s Position

Page 50: Campus Infra – evolution by PPP
Page 51: Campus Infra – evolution by PPP

SO HOW IS THIS MASTER PLAN FEASIBLE ??

Page 52: Campus Infra – evolution by PPP

K. B. Pawar Committee

• Model I –

Basic Infrastructure Model: Private sector invests in infrastructure while government runs the operations and management and make annualized payments to the private investor;

Mr. K. B. Pawar, (Former Secretary General, Association of Indian Universities, New Delhi)

This committee was appointed by University Grants Commission to submit its report on PPP in higher technical education

Model II – Outsourcing Model: Private sector invests in infrastructure and runs the operations and management while responsibility of the government is to pay the private investor for the specified services;

Model III – Equity/Hybrid Model: Investments in infrastructure is shared between the government and private sector while operations and management vests with the Private sector;

Model IV – Reserve Outsourcing Model : Government invests in infrastructure and the private sector takes the responsibility of operations and management.

RECOMMENDATIONS

Page 53: Campus Infra – evolution by PPP

The first thing we can do is to increase the

development fee.

Page 54: Campus Infra – evolution by PPP

Assu

mpti

ons

• The current strength of the college is assumed to be 2000

• As per earlier discussion the aim is to accommodate 4000 students by 2030

• Considering the reservations allowed by the government, it is assumed that 75% of students pay the development fees of INR 19150 /-

• The estimate is considered to be 170 Crs. to make calculations easy.

• Interest rate on investment is

considered 10 p.c.p.a.

• Average rate of inflation from

2009 is considered 5%.

• Entire development fees collected

will be directed towards the

Project.

• Per capita income growth rate is

considered below 9%

Page 55: Campus Infra – evolution by PPP

PROCEDURE

• Net capital to be invested in a particular year will be the base of

calculations, rather than considering the entities to be raised.

• 2000 students will be admitted in the institute linearly. Which means 118

new admissions per year till 2030

• Considering the 75% reservation 88 students out of 118 will pay the

development fees.

• The amount will be calculated by multiplying the number of new

admissions with the development fees charged in the respective year.

• Net revenue received under development fees will be calculated.

• The actual capital to be invested in that particular year will

thus be computed by considering inflation.

• Various trials will be undertaken to increase the development

fees by combination of different payback periods and annual

percent increase in fees.

• Cumulative payback per year will be calculated. Due

considerations will be given for the interest to be paid.

• Various graphs are then plotted to understand the patterns.

Page 56: Campus Infra – evolution by PPP

Compute , edit, and analyse

FINANCIAL TRIALS 2

Page 57: Campus Infra – evolution by PPP

Case 1

3 % Annual Increment in Dev. Fees

Page 58: Campus Infra – evolution by PPP

3 % increment 3 year payback period

Page 59: Campus Infra – evolution by PPP

3 % increment 4 year payback period

Page 60: Campus Infra – evolution by PPP

Inflation based Investment

Page 61: Campus Infra – evolution by PPP

3 % increment 5 year payback period

Page 62: Campus Infra – evolution by PPP

3 % increment 6 year payback period

Page 63: Campus Infra – evolution by PPP

3 % increment 7 year payback period

Page 64: Campus Infra – evolution by PPP

3 % increment 8 year payback period

Page 65: Campus Infra – evolution by PPP

Deficit Profile

Page 66: Campus Infra – evolution by PPP

Deficit Profile

Page 67: Campus Infra – evolution by PPP

4 % increment 3 year payback period

Page 68: Campus Infra – evolution by PPP

Deficit Profile

Page 69: Campus Infra – evolution by PPP

4 % increment 6 year payback period

Page 70: Campus Infra – evolution by PPP

Deficit Profile

Page 71: Campus Infra – evolution by PPP

6 % increment 4 year payback period

Page 72: Campus Infra – evolution by PPP

Deficit Profile

Page 73: Campus Infra – evolution by PPP

6 % increment 7 year payback period

Page 74: Campus Infra – evolution by PPP

Deficit Profile

Page 75: Campus Infra – evolution by PPP

8 % increment 5 year payback period

Page 76: Campus Infra – evolution by PPP
Page 77: Campus Infra – evolution by PPP

8 % increment 8 year payback period

Page 78: Campus Infra – evolution by PPP
Page 79: Campus Infra – evolution by PPP

Summary of Trials

Page 80: Campus Infra – evolution by PPP

IN 2030

Page 81: Campus Infra – evolution by PPP
Page 82: Campus Infra – evolution by PPP

Funds to be Sourced Versus Critical Payback For Different Percent Increment

Page 83: Campus Infra – evolution by PPP

Percent Increment Versus Funds to be Sourced For Differentpayback period

Fund

s to

be

sour

ced

Percent increment in development fees

Page 84: Campus Infra – evolution by PPP

Percent Increment Versus Critical Deficits For Different Year

Percent increment in development fees

Criti

cal p

ayba

ck

Page 85: Campus Infra – evolution by PPP

Different avenues to Source the funds.

Page 86: Campus Infra – evolution by PPP

• Industries may be encouraged to be partners with educational institutions directly for the development of human resources dedicated to their interests. Raising of student fees to some extent, in consultation with student bodies and parents’ organizations.

• Taxing the individuals, who had the benefit of the State resources in the past for their education, and the industries,

• Borrowing and Re-financing of debt for infrastructure: The National Education Finance Corporation is proposed as a Development Financial Institution to support expansion in education infrastructure.

Page 87: Campus Infra – evolution by PPP

• The industries of specific discipline or shall be encouraged to establish the Research and Training centres to develop the necessary specialized man power. Automobile industry is a case point.

• The new Companies Bill passed in Parliament in December 2012 makes it mandatory for corporate houses to contribute 2% of their profits as Corporate Social Responsibility..

• Encouraging alumni to contribute to their alma-mater. A very active and college devoted Alumni Association needs to be set up.

• A tie-up with a foreign institution of higher education could also be a possible to make entry into the target markets.

Page 88: Campus Infra – evolution by PPP

• College can design their E-courses which could be leased/rented to other institutes with less experienced faculty .

• Charging capitation fees and obtaining donations.• Launching lucrative and specific courses for foreign

students.• Obtaining research grants from industries• Developing innovative educational

programs/products, having high potential for raising resources, making use of the institutional autonomy.

• Encouraging taking up national/international and Government funded R&D projects.

Page 89: Campus Infra – evolution by PPP

• Reducing manpower costs based on a formula developed by the college and Encouraging optimum utilization of infrastructure and equipment by reducing wastage and under utilization of facilities.

• Harnessing the institution’s location advantages.

• Encouraging knowledge – based consultancy services at the institutions

• Sensitizing the students’ community regarding raising of resources for the institute

Page 90: Campus Infra – evolution by PPP

3 Action Plan

A road map for seamless delivery

Page 91: Campus Infra – evolution by PPP

The target is to accommodate additional 118 students every year

a) Increasing the intake in existing departments.

b) Setting up new departments.

c) Distributing the additional intake in existing as well as new departments.

d) night college or a two shift college.

Page 92: Campus Infra – evolution by PPP

Depending on its capabilities to generate the deficits, institute shall

choose any one combination of percent increment and payback period.

Page 93: Campus Infra – evolution by PPP

Institute may ask the government to grant it a special status

Page 94: Campus Infra – evolution by PPP

Four Principles that should guide the Institute

• Ensure that the services to be provided respond to a clear public need and can be clearly identified and measured; • Ensure that public sector has the expertise to assess and manage risk; • Ensure that the partnership can deliver the high-quality, efficient and responsive services through an optimal allocation of risk; and • Ensure that there are clear lines of accountability and redress.

When these are met, the only reason not to pursue a Public Private Partnership is failure of the administration‘s will

Page 95: Campus Infra – evolution by PPP

RESULTS & CONCLUSIONS

Page 96: Campus Infra – evolution by PPP

• adopt Basic Infrastructure Model as recommended by K.B. Pawar committee

• be first of its kind in India wherein Public-Private-Partnership will be implemented in higher education on such a large scale.

• At the institute level it will exceed the Planning Commission target to expand the higher education sector in all its modes of delivery to increase the Gross Enrolment Ratio (GER)

• infrastructure would finally match the infrastructure provided by IITs, NITs and other premier institutes..

Page 97: Campus Infra – evolution by PPP

• will encourage other institute to make steps toward environmental conservation

• financially self-sufficient eventually.• enter in an agreement with the government

to provide it with certain pre decided amount on money per year or the government

• The state government should identify the college under some special scheme launched by the union or the state government

Page 98: Campus Infra – evolution by PPP

• A very ambitious project and not a cake walk. A separate team should be appointed which will be solely devoted on this project. The team should comprise of faculty, students, planners, managers et

• Healthy relations with the industries and alumni should be maintained.

• Decentralization must be encouraged with a broad frame work of Institute system.

Page 99: Campus Infra – evolution by PPP

THANK YOUWith the feasibility of the project being explained; thorough consistency, determination and vision will definitely lead it to reality.