CAMPUS DRIVE / ADMIN CIRCLE &
S. ACADEMIC MALL
IMPROVEMENTS
Campus Stakeholders
May 15, 2020Raymond Pankopf, NCARB
Director, Architectural & Engineering Services
University of Idaho Facilities
LONG RANGE CAMPUS DEVELOPMENT PLAN (LRCDP)
• Coordinates with
UI Strategic Plan
• Guides all campus
development
• Provides a
framework for
stewardship and
preserving the
campus legacy in
concert with
moving forward
LONG RANGE CAMPUS DEVELOPMENT PLAN (LRCDP)
• The first campus comprehensive plan was prepared by John Charles Olmsted in 1908
• The plan had a clear and reverent sense of what a “university” should be
• The plan respected the setting and environment and celebrated work and residence
• Today, these principles are still aliveand vital to creating a high quality,residential campus environment
LONG RANGE CAMPUS DEVELOPMENT PLAN (LRCDP)
The LRCDP is organized into 9 Goals – Each Goal is supported by a Discussion, Objectives, and Defined
Actions in a results-oriented language & format.
▪ Land Use
▪ Transportation & Parking
▪ Open Space
▪ Preserve and enhance campus open space and landscape as a signature characteristic of the University of Idaho.
▪ Compact Academic Core
▪ Maintain and strengthen a compact, pedestrian priority academic core.
▪ Residential Campus
▪ Preserve and enhance the residential campus environment to advance UI’s vision/values and to support the Strategic
Plan.
Figuratively “growing more ivy”
▪ Residential Facilities
▪ Utility Infrastructure
▪ Space
▪ Effective LRCDP Policies
DESIGN & CONSTRUCTION TEAM
Project Administration
▪ State of Idaho Division of Public Works Design & Construction Agency
Gary Groff, Civil Engineer, DPW Project Manager
Mark Schlickenmeyer, DPW Construction Phase Field Representative
Architect / Engineers
▪ Bernardo Wills Architects Lead A/E Firm & Landscape Architect
Dell Hatch, Landscape Architect, Design Team Lead & Lead Landscape Architect
▪ Welch-Comer Engineers Civil Engineer
Matt Gillis, Civil Engineer, Design Team Lead Engineer
University of Idaho
▪ Architectural & Engineering Services Agency Representative
Raymond Pankopf, Architect, UI AES Project Manager
Richard Rader, UI AES Construction Manager
Matthew Proctor, UI AES Construction Inspector
General Contractor
▪ A & R Construction, Lewiston, Idaho General Contractor
PROJECT MILESTONES
Design Phase
▪ Funding Request Submitted, FY2019 State PBF Process August 1, 2017
▪ Funding Approved, 2018 Legislative Session Mar 2018
▪ Funds “Green” July 1, 2018
▪ A/E Selection Dec 2018
▪ Programming & Preliminary Design Phase Jan - Mar 2019
▪ Preliminary Approval Presentation to PBFAC April 2, 2019
▪ Design Development Phase Apr – Aug 2019
▪ Design Development Presentations Aug - Sep 2019
▪ Construction Document Phase Sep – Dec 2019
▪ Final Presentation to PBFAC / Construction Authorization Jan 2020
Bidding, Award, and Construction Phases
▪ Advertisement & Bidding Phase Jan – Feb 2020
▪ Bid Reconciliation & Award Phase Feb – Apr 2020
▪ Break Ground / Notice to Proceed (NTP) May 15, 2020
▪ Construction Phase May – Sep 2020
▪ Substantial Completion Oct 2020
PROJECT COSTS
University of Idaho Funds
000 – Project Support $ 5,000.00
State of Idaho Permanent Building Funds A & R Category, FY19 & FY20
100 - Professional / Design Fees $ 145,966.00
200 - Professional Services $ 25,700.00
▪ Site Survey $ 13,900
▪ Soils $ 6,800
▪ Testing During Construction $ 5,000
300 - Construction Costs: Contracted $ 1,431,255.00
▪ Construction Contract Budgeted Allowance $ 1,363,100
▪ Construction Contingency $ 68,155
400 - Misc. & Project Contingency $ 70,879.00
Total PBF Funds $ 1,673,800.00
Alle
y
Sites: Admin Circle portion of Campus Drive, East of the Administration Building & South Academic Mall, University Ave. Mall to Shattuck Arboretum, wrapping around the south side of PEB to Lot 39.
Sou
th A
cad
emic
Mal
l
Cam
pu
s D
rive
University Ave Pedestrian Mall
Park
ing
Lot
39
Swim Center
PEB
AAN
EHHS
Albertsons
Ad
min
Bld
g.
Sou
th A
cad
emic
Mal
l
Parking Lot 40
EXISTING CONDITIONS / SITE PHOTOS
South Academic Mall Campus Drive / Administration Circle
Concept, Campus Drive / Administration Circle
Note 15 May 20: This was the Conceptual Plan and describes the general intent and character of the project. The final, as-builtcondition will reflect minor changes which occurred during the design process.
Fencing and Access Plan, Campus Drive / Administration Circle
Note 15 May 20: This Fencing and Access Plan is taken from the Construction Documents and was intended to provide the contractor with a general set of scope parameters upon which they could base a bid. It is subject to change as needs and circumstances might require.
East entrance to the Administration Building will be closed. North, south and west entries will remain open.
Concept, South Academic Mall, Master Plan for Full Build-out
Concept, South Academic Mall, Currently Contracted Scope
Note 15 May 20: This was the Conceptual Plan and describes the general intent and character of the project. The final, as-builtcondition will reflect minor changes which occurred during the design process.
Fencing and Access Plan, South Academic Mall
Note 15 May 20: This Fencing and Access Plan is taken from the Construction Documents and was intended to provide the contractor with a general set of scope parameters upon which they could base a bid. It is subject to change as needs and circumstances might require.
Questions?
Raymond Pankopf [email protected]
Richard Rader [email protected]
Matt Proctor [email protected]
208.885.6246