Camel Race
-
Upload
irfankaushar -
Category
Documents
-
view
231 -
download
0
Transcript of Camel Race
-
8/10/2019 Camel Race
1/22
ABU DHABI COMPANY FOR ONSHORE OIL OPERATIONS(ADCO)
2014 Camel Race Guidelines
This electronic copy is a true representation of the original. The on-line version is
definitive; prints are discouraged but may be taken for reference purposes. They
shall not be retained in filing systems.
Issued on : 21 May 2014
File Location :PIMD Website
Version : 01
http://adcoportals/functions/CorporateSupport/PIMD/Performance_Report/Pages/Camel-Race.aspxhttp://adcoportals/functions/CorporateSupport/PIMD/Performance_Report/Pages/Camel-Race.aspxhttp://adcoportals/functions/CorporateSupport/PIMD/Performance_Report/Pages/Camel-Race.aspxhttp://adcoportals/functions/CorporateSupport/PIMD/Performance_Report/Pages/Camel-Race.aspx -
8/10/2019 Camel Race
2/22
ADCO Camel Race Guidelines - 2014
Revision: 1 Date: 21-May-2014
Revision History
The table below is a brief summary of the most recent revisions to this document. Details
of all revisions are held in separate records by the issuing department.
Revision # Date Author Scope / Remarks
xxx April 29, 2014 PIMDInitial Release
Incorporated comments from workshops
01 May 20, 2014 PIMD
2014 Final Camel Race Guidelines Medals criteria to include TPO -TCM Directive
Changes to HSE measures in line with
meeting on 19-05-2014
-
8/10/2019 Camel Race
3/22
ADCO Camel Race Guidelines - 2014
Revision: 1 Date: 21-May-2014
Contents
Objective ............................................................................................................................ 1
Scope ................................................................................................................................... 1
Expectations ..................................................................................................................... 1
Performance Measures ................................................................................................ 2
Common Elements ................................................................................... 2
Gates / Deductions ................................................................................... 8
Asset Specific Elements............................................................................. 9
TPO Asset Specific Elements .................................................................... 12
Medals Criteria ....................................................................................... 14
Scoring Approach ......................................................................................................... 17
Process Map ................................................................................................................... 18
High level Process .................................................................................. 18
Complaints ...................................................................................................................... 18
RACI Matrix .................................................................................................................... 19
Additional Roles & Responsibilities ..................................................................... 19
-
8/10/2019 Camel Race
4/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
Page 1
Objective
The objective of the Camel race is to create an environment of positive competition and sharing of best
practices. This document provides guidance on managing and reporting the activities that constitute the
performance elements and measures of the Camel Race Structure. The Camel Race is a competition
scheme between ADCOs participating assets and functions with an ultimate objective of driving change
in peoples behavior. Measures are designed to address ADCO Must Dos & Performance Contract in the
structure of a Balanced Scorecard. Participants will be able to track progress on the ADCO Balanced
Scorecard system (ADCOBSC).
Scope
This document is applicable to ADCOs five assets: BAB, NEB, SE, BUH, and TPO which contribute in
completing the activities forming the current and future performance elements of the race structure for
assets. The participating Functions & exclusions for 2014 will be listed in the next version of the
guideline document following workshops with relevant Functions. The measures are divided into two
categories: Common and Specific. The common measures apply to all units whereas the specific
measures are intended to address certain business processes within the unit.
Common measures will have 50% of the weight and the remaining 50% for asset specific measures.
Expectations
The camel race framework and new structure are intended to help drive and monitor the effectiveness
of the common and specific measures implementation across the assets and functions. This will only be
achieved when progress is reported in a timely and accurate manner. In addition, it is equally important
to ensure that the measures are received, reported and validated in ADCOBSC in full compliance with
ADCOs standards and specifications and in line with its quality requirements.
-
8/10/2019 Camel Race
5/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
Page 2
Performance Measures
Common Elements 50%
1. Safe Operation Indicator (SOI) 8%
Definition:
SOI represents the percentage of reportable Lost Time Injury (LTI) cases per 1,000,000
man-hours worked. It includes all contractors, subcontractors and establishment
personnel working on sites or within areas controlled by ADCOs assets and functions.
Frequency: Monthly-YTD
Calculation: Note: The SOI score will be capped at a minimum of 50 % to counter cases with high LTIF.
2. Safe Driving Indicator (SDI) 8%
Definition: This measure consists of two sub measures i.e. speeding violations (3%) and vehicle
accidents (5%) normalized by the number of kilometers driven.
Speed Violations (3%):The total number of speeding violations that are captured by the
IVMS system against the assets and functions employees per 10,000 km. A violation iscounted when a driver exceeds the corporate agreed km/hr (speed limit) & drives for
more than 2 min as per table below:
High waysNew speed
Limits in KmModification Action
(Sila-Abu Dhabi-
Dubai- Fujairah and
Al Ain)
130
For overtaking in critical
traffic condition, 2 minutes is
Allowed.
Single beep.
Over speeding between 130
to less than 140 km/h formore than 2 minutes
Record of driving time
above 130 Km/h will bepart of 1 monthly RAG (Red,
Amber, Green) Report.
Over speeding at 140 - Single beep
- Immediate violation
ADCO Internal
Roads (Freeways)120
Over speeding on other black
top roads (freeways) between
120 km/h to less than 130
km/h
- Single beep.
- Record of driving time
above 120 Km/h will be
part of monthly RAG Report
Over Speeding 130 KM/H on
other black top roads
(freeways)
- Single beep
- Immediate violation
Graded (Sand Track
and Gatch Roads)80
No speed change
-
8/10/2019 Camel Race
6/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
Page 3
Vehicle Accidents (5%): Total no of accidents recorded against the assets and functions
employees & contractors per million KMs driven. The Vehicle accident frequency (VAF) asdefined by HSE guidelines will be used for this measure. A Vehicle accident will be
recorded against an Asset or Function if investigation reveals ADCO personnel
(staff/contractor) as the responsible or liable party.
Frequency: Monthly-YTD (for both sub-measures)
Calculation:
Speeding Violations Score= 100(no. of violations YTD/ (km driven YTD/10,000))
Vehicle Accidents Score= (1VAF) *100
VAF = (No. of Vehicle Accidents YTD x 1 Million) / Million KM driven YTD
Note: Vehicle accidents score will be capped at a min of 50 % to counter cases with high VAF no.
3. People Development Index 14%
3.1 Training Man-days 35%
Definition:
Achieved man-days vs. planned (according to the Approved 2014 ATP).
A. This Measure consists of reporting actual training/conference man-days versus
planned courses/conferences. All Unplanned new requirements will be excluded from
the calculation to ensure proper implementation of the plan.
B. Reporting methodology is quarterly YTD. The Data source is the 2014 approved annual
training plan, which is distributed to all VPs within each asset and function. Monthly
progress report will be provided to monitor the progress of the implementation of the
ATP. (Reports to include last month and the next 2 months).
C. The HR training team is responsible to find similar suitable alternative course and
vendor, which meet the lines operational requirement, in case the planned course is
canceled by the vendor. HR shall notify the employee and his/her line manager 4
weeks in advance or at the discretion of the HR Training coordinator with due
consideration to employees work/leave cycles.
D.
Replacement of courses for those employees who are planned will be counted only if
replaced courses are related to employees discipline. On the other hand, replacement
of attendees who are not part of the approved 2014 ATP will not be considered in the
actual man-days reported for the camel race.
E. LSP, GCP & LEP courses are excluded from the planned man-days due to the recent
contract expiry.
F. Following are justified reasons for excluded man-days:
o Courses cancelled by vendor
o Courses fully booked
o Courses TBA
o Courses postponed by vendor
o Resigned employees
o
Employees transferred before the planned course dateo Employees with approved medical sick leave by ADCO Medical Officer and
approved compassionate leave.
-
8/10/2019 Camel Race
7/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
Page 4
Frequency: Quarterly-YTD
Calculation:
Method of calculation:
(Actual Man-days (Planned) YTD/ (Approved Man-days -Justified Exclusion))/4
= Final Score YTD%
Actual Man-days (Planned) YTD includes Changes of courses, changes of vendors, and
changes of dates for planned named employees according to the approved annual
training plan.
The final score of this measure will be calculated at the end of 2014.
3.2 E-PCR 35%
Definition:
It is defined as the number of employees eligible for e-PCR who completed the three
milestones of the PCR process before the agreed deadline dates. For 2014 the VPs are
excluded from the e-PCR measure. This element consists of three measured milestones:
o Objective setting Deadline is March 31st
o Mid-Year ReviewCompletedDeadline is July 31st
o Final Year End Review Completed (Excluding VPs) Deadline is December 5th
Data source is the oracle e-PCR system.
The reporting methodology is monthly YTD to follow up the progress while the score
mark for the three milestones will be provided three times per year
(March/July/December).
Odd cases will be excluded according to HR guidelines and are:
o Employees transferred / integrated 60 Days from the deadline of each phase.
o New recruits will be shown in e-PCR system after completion of their probation
period.
o Employees resigned.
o Employees absent for more than 60 days continuously.
o Employees transferred are excluded from the subject phase but considered as part
of the next phase calculation.
Frequency:
Monthly-YTD, with the following updates:
Objective setting: March report
Mid-Year Review: July report
Final year-end review: December report
The KPI score calculation will be performed at the completion of each of the 3 milestones
& the score will be carried forward to subsequent months in between.
Calculation:
Total marks for this measure is 35% out of People Development Index mark, distributed
as follows:
o 30% on objective settings
o 20% on mid-year review
o
50% on final yearend review
Method of calculation:((% of completed objective setting *(30% of E-PCR Mark)) + (%
of completed mid-year review *(20% of E-PCR Mark)) + (% of completed final year- end
-
8/10/2019 Camel Race
8/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
Page 5
review* (50% of E-PCR Mark)) = Final score YTD
The final mark of this measure will be calculated at the end of 2014.
Criteria Weight
Objective setting Number of employees completed objective setting to total no.
of employees entitled for PCR within the Asset and Function
30%
Mid-year review Number of employees completed Mid-year review to total no.
of employees entitled for PCR within the Asset and Function
20%
Final yearend
review
Number of employees completed Final year-end review to
total no. of employees entitled for PCR within the Asset and
Function. Recovery is not accepted after the deadline of each
milestone. Asset and Function score will be frozen at the end ofeach milestone, i.e. if an asset and Function scored 25/30 in
objective setting by end of March this mark will be considered in
the final accumulated scoring system for this measure.
50%
3.3 Integration of UAE Nationals: 30%
Definition:
This element measures the number of integrated UAE Nationals within the Asset and
Function according to the 2014 integration plan approved by SVP.
A. Data source is the approved 2014 integration plan
B.
This includes all entry points joining the assets /divisions
C.
It is the responsibility of the assets and Functions to follow up on the development of
all entry points within each asset and Function.
D. The reporting methodology is quarterly YTD (31st
March, 30th
June, 30th
September
and 31st
December).
E. Any case that is not part of the approved name in the integration plan will not be
counted.
F.
Exclusions will include the following:
o Employees transferred before the integration date between Assets or Functions
will be excluded from both Assets or Functions.
o
Change of disciplines.o Emergency cases, including medical cases, to be excluded temporarily unless it
exceeds 90 continuous days of absence which will lead to permanent exclusion.
o Integrated employees are counted only after they fill in an operational position in
the HR System, and not as and when declared operational by the panel.
Frequency: Quarterly-YTD
Calculation
Method of calculation :
((# of actual planned employees integrated YTD/ # of planned employees to be
integrated - exclusions).
The final mark of this measure will be calculated at the end of 2014. Note: any final percentage that exceeds 100% will be considered as full mark.
-
8/10/2019 Camel Race
9/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
Page 6
4. HSE Assurance Program (HSE Annual Plan Objectives) 8%
Definition: Measured as per the agreed annual plan by the assets and functions HSE Objectives.
Frequency: Quarterly-Average
Calculation:
% of completion (Actual Vs. Plan)
# of timely completed tasks / total # of tasks due for the quarter as per plan
Note: Any task/ milestone not met on time will be missed for the rest of the year.
5. Commercial Index 12%
Definition:
The commercial index for 2014 will comprise of 3 sub measures M1, M2 & M4.
M1: For all contracts, to issue e-JMC Fax with contracts value 2M for contract
strategy and bidders list in accordance with ADNOC guidelines, at least 275 days for
single award and 365 for split award before the expiration of the current contract.
o Note: In cases where there are discrepancies resulting in delays SCMD; will review
each discrepancy situation separately with the concerned asset before issuing the
resulting score for M1.
M2:
o All contract with value 100M: SCMD to obtain approval for the technical
evaluation report by the delegated authority within 81 days (excluding 10 daysADNOC approval) from the technical bids opening date.
o All contract with values < 2M and below 100M:SCMD to obtain approval for the
technical evaluation report by the delegated authority within 53 days(excluding 10
days ADNOC approval) from the technical bids opening date.
o All contract with value above 500k and below 2MSCMD to obtain approval for the
technical evaluation report by the delegated authority within 35 days from the
technical bids opening date.
Note:In order to align with SCMD following exclusions will apply for M2:
a. Engineering Project / EPC Contracts.
b. Single Source tenders/contracts
M4:
o For PR $ 10 M - Procurement technical evaluation approval by the delegated
authority obtained by SCMD within 45 days from date of opening the Technical bids.
Note: Following notes apply to both categories of M4
a. Tolerance period of 7 days will be considered as a transit period. This transit
period of 7 days is outside the target days & is applicable for the time taken by
the document to travel both ways i.e. from SCMD to the asset & from the asset
back to SCMD. Discrepancies, if any, will be handled on a case-by-case basis by
SCMD.
-
8/10/2019 Camel Race
10/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
Page 7
b. Scores calculation will be based on dates when SCMD receives procurement
technical evaluation and all purchases completed & received by SCMD during
2014 will be considered for this calculation.
c. For purchases where assets have already been penalized in the previous year i.e.
2013 these will be excluded to avoid double dipping. Discrepancies if any will be
handled on a case by case basis upon the discretion of SCMD & depending on
the nature of the purchase & its impact on the core business.
Frequency: Monthly-Average
Calculation:
M1: The number of contracts meeting the target dates divided by the total number of
contracts for that duration.
M2:
100M:
81 days reached/completed = 100% score
> 81 days = 100% - (2 X no. of days above 81) with a minimum of 60%
Above2M and below 100M:
53 days reached/completed = 100% score
> 53 days = 100% - (2 X no. of days above 53) with a minimum of 60%
Above 500k and Below 2M:
35 days reached/completed = 100% score
> 35 days = 100% - (2 X no. of days above 35) with a minimum of 60%
M4: Procurement technical evaluation
For PR 30 days = 100% - (2 X no. of days above 30). with a minimum of 60%
For PR > $ 10M
45 days completed = 100% score
> 45 days = 100% - (2 X no. of days above 45) with a minimum of 60%
The Maintenance Index (MI) is calculated as
-
8/10/2019 Camel Race
11/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
Page 8
Gates / Deductions
1. Fatalities
Definition:
Tracks Fatalities which covers employees, all ADCO contractors, subcontractors &
establishment personnel working on sites or within ADCO controlled areas during the
reporting year. Incidents resulting in Fatalities will lead to a deduction of 25% in the
overall score (Common + Specific) of that month.
(Multiple fatalities as a result of one incident will count as one).
Frequency: Monthly
Calculation:25% deduction in overall (common + specific) for the month.
2. Non reported incidents
Definition:
Intentional non-reporting of HIPONM & Significant Incidents (which require TOR) will lead
to a deduction of 10% in the overall score (Common + Specific) of that month. It includes
all contractors, subcontractors and establishment personnel working on sites or areas
controlled by ADCOs assets and functions. (HSED will report these incidents based on spot
verification exercises)
Frequency: Monthly
Calculation:
-
8/10/2019 Camel Race
12/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
Page 9
Asset Specific Elements 50%
1. Maintenance Reliability 10%
Definition:
It measures maintenance planning accuracy and the effectiveness of planned
maintenance in preventing corrective maintenance.
Scheduled WOs : The WOs scheduled & completed within schedule window.
Generated WOs : The WOs generated.
PM Units: The number of units that have been Planned and maintained. All PM WOs
(Parents, Childs, and Tasks) should be completed to consider the unit is maintained unPM Units : The number of units that have approved unplanned maintenance.
Measure are YTD
Score = Month score Z
Z = 1% if there is 5% YTD PM records overdue and for every 2% extra will add 1%
The waiting for schedule statuswindow is the generated month.
Note: The terms used in this formula are expected to be clarified further; until then the current
basis will be used changes if any will be applied only on agreement with all assets.
Frequency: MonthlyYTD
Calculation:
2. Approved well Tests 10%
Definition:
This measure tracks the well test rate for active strings where each active producer string
needs to be tested once every 6 months. i.e. % of strings with approved production test
record to the total number of active strings that flowed more than 168 hours (7 days) in
the reporting period.
Frequency: Monthly average.
Calculation:
( )
Total # of active strings= All active strings during reporting period per ADNOC guidelines.
Z = Delay factor that tracks strings that are overduefor tests i.e. have test age greater
than 6 months. As per agreed criteria from TC (I & O) any active string which has a
production test date > six months from the last validated test will be counted overdue for
testing.Z is calculated as:
(
)
For e.g. if there are two active strings overduefor tests & say have a test age of 8 & 9
months respectively in this case Z would be estimated as:
-
8/10/2019 Camel Race
13/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
Page 10
Z =
= (1.5 + 1.33) = 2.83 which will be divided by the total active strings. In
summary higher the overdue period above six months higher will be the deduction from
the percentage score achieved for the month.
Notes:
Exclusions & Inclusions: Strings which were inactive for greater than 6 months &
come active during the reporting period will have a maximum of one month grace
period within which to perform the test. This grace period starts from the date the
string starts flowing. If assets fail to test such strings within one month then these
strings will also be considered overdue for tests and includedin estimating the delay
factor Z.
Adaption Grace Period: In order for assets to adapt to the new calculation basis a
grace period of one month on the test age will be granted for the 1st
half of this year
from 01-Jan-14 to 30 June 2014. Thisgrace period of one month will be applied to
test age of the overdue string i.e. for the first half instead of using 6 months as the
violation criteria we will use (6 + 1) = 7 months to consider a string overdue for test.
For the second half (1st
Jul to 31 Dec 2014) we will go back to use TC (I & O)
recommendation of 6 months.
1stHalf of year
2ndHalf of year
3. Well Availability 10%
Definition:Well availability will be reported as a direct absolute value without any modification
prorated to 95% max (95% availability is = to 100% score).
Frequency: Monthly-Average
Calculation:
The reporting of availability will be monthly however it will be readjusted at the end of
each quarter when final data is available in system.
Prorated availability of >= 95% is = 100% score.
4. Inactive Strings 10%
Definition:The change in number of inactive strings compared to beginning of the year and in
accordance with ADNOC new Guidelines.
Frequency: Monthly-Average
Calculation: Operational Strings = Total Strings (1.8 project wells + Abandoned wells)
-
8/10/2019 Camel Race
14/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
Page 11
The asset which achieves the highest improvement i.e. reduction in inactive strings will
achieve a 100% score. The scores for the other assets will then be prorated from the 100%base line score of the asset demonstrating the highest improvement.
5. Utilization of RMP data 10%
Definition:
This measure is aimed at determining the utilization of RMP data & measured as
percentage of RMP loaded Vs. planned (as referenced in the Business Plan). The measure
tracks the turnaround time for the assets from survey execution to the date on which
survey data is loaded in the system (Finder) with a target of one month.
Frequency: QuarterlyYTD
Calculation:
Notes:
The calculation will consider only those RMP surveys that have been validated &
loaded in Finder within a month from the date of execution of surveys.
The one month target includes the one week duration for CITD to load data from the
date of receiving validated survey results from assets. However, if there is more than
one weeks delay in CITD uploading data in finder the assets will not be penalized for
this delay beyond the one week from the date of receiving data from assets. Thesurvey reports once validated are date stamped & signed by asset focal point before
sending these reports to CITD for loading in Finder.
Invalid Data or surveys will be excluded from the calculation.
This measure will be reported quarterly - YTD and a final score against the business
plan will be calculated at the end of the year 2014.
-
8/10/2019 Camel Race
15/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
Page 12
TPO Asset Specific Elements 50%
1. Maintenance Reliability 10%
Definition:
It measures maintenance planning accuracy and the effectiveness of planned
maintenance in preventing corrective maintenance.
Scheduled WOs : The WOs scheduled & completed within schedule window.
Generated WOs : The WOs generated.
PM Units: The number of units that have been Planned and maintained. All PM WOs
(Parents, Childs, and Tasks) should be completed to consider the unit is maintained
unPM Units : The number of units that have approved unplanned maintenance.
Measure are YTD
Score = Month score Z
Z = 1% if there is 5% YTD PM records overdue and for every 2% extra will add 1%
The waiting for schedule status window is the generated month.
Frequency: Monthly-YTD
Calculation:
2. Average Successful Hydro-testing turnaround 10%
Definition:
It measures the turnaround i.e. cycle time of successful hydro-testing from well receipt to
handover to operations. This measure will have a target of 7 days.
Note: Successful Hydro test is defined from the date Asset releases the well until the day
IPD confirm flow-line pass or fail in 1st
attempt.
Frequency: QuarterlyAverage
Calculation:Completed in 7 days = 100% score
> 7 days = 100% - (2 x no. of days above target) min 60%
3. Timely completion of IPS 10%
Definition:This measure ensures timely completion of Intelligent pigging surveys (IPS) avoiding
overdue IPS with a base target of 0 overdue IPS.
Frequency:
QuarterlyYTD.
This measure will be reported quarterly, however the final score will be calculated at the
end of 2014.
Calculation:
-
8/10/2019 Camel Race
16/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
Page 13
4. % MOLs with conditions assessed and MAWP is calculated 10%
Definition:The objective is to identify percentage of MOLs whose conditions are assessed & have the
MAWP (Maximum Allowable Working Pressure) calculated; the target is 95% (15MOLs).
Frequency:
QuarterlyYTD.
This measure will be reported quarterly, however the final score will be calculated at the
end of 2014.
Calculation:
5. Avoid loss of containment events (Zero leak policy)
10%
Definition: The objective is to ensure there are zero leaks from any of the MOLs.
Frequency:
QuarterlyYTD.
This measure will be reported quarterly, however the final score will be calculated at the
end of 2014.
Calculation:
= No. of loss of containment events from MOLs
Notes
Zero 0 loss of containment events = 100% score.
1 (one) loss of containment event would result in a score of 50%
Any loss of containment events more than 1 will result in 0% score for this measure.
-
8/10/2019 Camel Race
17/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
Page 14
Medals Criteria
1. FIKRA (Ideas)
Definition: The implementation of approved and published FIKRAs.
Frequency: Monthly-YTD
Calculation: Points will be given to each Asset/Function based on the table below. The measure is YTD
calculated monthly on the basis that the asset/function with highest number of points will
score 100%. Others will be prorated. Assets and functions will score points for
implementing an FIKRA. The number of points for the implementation will be equal to the
points given for FIKRA by the Business Excellence Committee (BEC).
2. Well Commissioning (BAB, BUH & SE)
Definition: New Wells:It is the duration to commission new oil and WI wells from rig release date to
production within 60 days.
Work-over Wells: 30 days duration required to re-commission the oil and WI well for
work-over after drilling unit release.
Frequency: Monthly-Average
Calculation: New Wells:
60 days completed = 100% score
More than 60 days = 100% - no. of days more than 60
The average of all wells in a month
Work-over Wells:
30 days completed = 100% score
More than 30 days = 100% - no. of days more than 30
The average of all wells in a month
Some Impact (20%) (20)
Some Impact (20%) (20)
Improve efficiency (Business Process):
Reduce Resources/Improve utilization:
Others:(10)
-
8/10/2019 Camel Race
18/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
Page 15
3. Asset Integrity (BAB, BUH, NEB & SE)
Definition: This medal will be a composite of the Facility Integrity & Well integrity measures for assets
whereas it would be a composite of Facility Integrity & MOL integrity for TPO. Below are
the definitions of the each integrity sub measure:
Facility Integrity- will comprise of the following two KPIs:
F1: Proactive Integrity Risk Management of HSE&B CES:
Identify the operational, Maintenance and C&I Risks for 50% of HSE&B CES and establish
mitigation plans that when implemented will ensure the risk levels are ALARP
F2: Establishing Safe Operation Envelops in Asset Register
Develop Safe Operation Envelops templates for 50% HSE&B CES categories, collect actual
operation data and monitor actual operation conditions are all the time within SOE limits.
Well Integrity will comprise of the following two KPIs:
W1: Make Safe the Shut-in wells with Annuli Shut-in pressure >100% MAASP
Update the wells Shut in pressures, identify wells with shut in pressure more than 100
MAASP, Kill & secure identified wells
W2: Manage risks due to annulus pressure to an ALARP level (% MAASP Calculated):
Identify wells with Annulus pressure, collect data, calculate the MAASP for 75% of the
identified wells and update records in PEIS.
MOL Integrity will comprise of the following two KPIs:
PL1: Proactive Risk Management of MOL
Proactively measures the mitigation progress against plan for MOLs identified with
integrity risk with a base target of 95% (i.e. 95% = 100% score for this measure)
PL2: Effective protection from external corrosion
The objective is to ensure maximum no. of cathodic protection test post achieve
protection criteria, the target is 95%
The winner of the Medal should score the highest end of year score among all Assets &
TPO with a minimum year end score of equal or more than 85%.
Frequency: Monthly-Average
-
8/10/2019 Camel Race
19/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
Page 16
Calculation:
Sr. Key Success Factors KPI Target
F1 Proactive Integrity Risk
Management of HSE&B
CES
No of HSE&B CES with integrity risk identified X 100
No of HSE&B CES in Asset Register
>50%
F2 Establishing Safe
Operation Envelops in
Asset Register
No of HSE&BCES with SOE identified X 100
No of HSE&B CES in Asset Register
>50%
W1 Make Safe the Shut-in
wells with Annuli Shut-in
pressure >100% MAASP
(No. of Wells Killed & Secured Made Safe) X 100
Total No. of Wells with confirmed SAP in A
and having Shut-in WHD Pressure > 100% MAASP
90%
W2 Manage risks due to
annulus pressure to an
ALARP level (% MAASP
Calculated)
No. of Wells with data submitted for MAASP calculation X 100
Total No. of Wells with annulus pressure
75%
PL1 Proactive Risk
Management of MOL
MOLs with integrity risk identified & mitigation plans developed X 100
Total No. MOLs
95%
PL2 Effective protection from
external corrosion
MOLs with under protected (low voltage level at CP posts) X 100
Total No. MOLs CP test posts
0
For Assets (BAB, BUH, NEB & SE) end of year score.
KPI A) Actual planned
Performance
target %
B)
Weight
%
C) Weighted
Progress = A
x B
D) Total
Weighted
progress
E) Integrity
Medal
Weight %
F) Integrity
Medal
Score= D x E
G) End of
integrity year
score SUM (F)
FI 30 60%
F2 20
W1
20
40%
W2 30
For TPO end of year score
KPI A) Actual planned
Performance
target %
B)
Weight
%
C) Weighted
Progress = A
x B
D) Total
Weighted
progress
E) Integrity
Medal
Weight %
F) Integrity
Medal
Score= D x E
G) End of
integrity year
score SUM (F)
FI 30 60%
F2 20
PL1 20 40%
PL2 30
-
8/10/2019 Camel Race
20/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
Page 17
Scoring Approach
Each Assets representative will collect their corresponding assets measures for all of the elements and
then feed them into ADCOBSC (http://adcobsc/). PIMD will then review and validate the data, before it is
automatically calculated by the system.
1. All calculations for 2014 are effective from 1stJanuary i.e. the beginning of the year 2014.
2. The different types of measure scores are handled as follows:
Monthly-Average : Scores are received on a monthly basis and averaged with previous months of
the year
Monthly-Year To Date (YTD): Scores are received on a monthly basis and are accumulated.
Quarterly-Average : Scores are received on a quarterly basis and averaged with previous quarter ofthe year
Quarterly- Year To Date (YTD): Scores are received on a quarterly basis with a weight of 3 months.
3. No of days- Days in the document means Calendar Day unless specified explicitly.
4. In case of a proven intentional data manipulation of any of the measures, the asset will score zero
(0) for the measure in that month and the following months until the data is corrected. The monthly
and end of year score will be reduced by (the weight of the measure to the total measures * 8.5% *
no. of months).
5. PIMD and parties selected by Executive Team (ET) will conduct a verification / audit exercise every
quarter during 2014 to ensure accuracy of data reported. The percentage of accurate data versusthe total no. of cases in the sample will be multiplied by the measure score. The monthly and end of
year score will be reduced by (the accuracy percentage * the weight of the measure to the total
measures * 8.5% * no. of months).
6. A delay by an asset to feed complete data into the system by the set date will result in a deduction
of (0.01% * number of days after due date until complete data is loaded into the system) from the
monthly and year end scores.
7. 0.01% deduction from Assets/Functions who fail to submit data (eg. HR data for people
development index) to other Assets/functions.
8. Measures that do not have a data in a specific month due to any reason i.e. no activity, will not be
counted in the average.
http://adcobsc/http://adcobsc/http://adcobsc/http://adcobsc/ -
8/10/2019 Camel Race
21/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
Page 18
Process Map
The diagram below illustrates the reporting process that has been put in place to ensure timely & accurate
reporting.
BusinessUnit
FP/AssetFP
(SPMA)
PIM
D
Assets/
Functions
Conduct activities
Receive/Extractactivity results
Yes Extract CR
Scores &
Ranking
Filter activityresults
Feed results intosystem/ Send to FP
MAXIMO, Oracle,PIES, etc...
Filter activity results
based on Common &Specific CR Measures
Feed results into
ADCOBSC system
ADCOBSC*
Verify Data Data Matches?
* ADCOBSC System will automatically perform the needed calculation of the Camel Race Scores (Initial and Final) and rank the Assets/Functions accordingly
Announce**
Winners
L1: High-level Camel Race Process
** Announcing winners include communicating and coordinating with the concerned departments, like GSD and the Fields to publish results across ADCO
NO
High level Process
PIMD with Assets, functions and Drilling jointly set clear definitions for each common and specific
measure in the new Camel Race.
Agreed measures will be uploaded in the system by PIMD.
Assets, functions and Drilling will post their actuals into the system on monthly basis.
PIMD will lead the audit team composing of selected members from Assets, functions and drilling to
perform the verification audit exercises on the reported data. This verification exercise is conducted
twice per year to verify each measure.
In addition PIMD intends to conduct Quarterly audits with selected stake holders whenever feasible.
Violations will be discussed with ET following the same approach as previous years.
ComplaintsIn the situation where an Asset, function or Drilling have any concern or complaint relevant to the Camel
Race, the party has the right to raise its concern or complaint, in confidence, to PIMM in writing andsupported by documented evidences. PIMM in return should investigate the matter and revert back to the
complained party with a decision. If the complained party is not satisfied with PIMM decision, PIMM has to
raise the matter to ET for final vetting.
-
8/10/2019 Camel Race
22/22
ADCO Camel Race Guidelines - 2014
Revision: 01 Date: 21-May-2014
RACI Matrix
The RACI table below captures the main activities related to the Camel Race management and the mainstakeholders involvement in the process:
Sr. Activities ET PIMDAsset, Function
and Drilling
1. Adding new Camel A R I
2. Add/remove/change Common and specific measures A R I
3. Revise scores of a Common and specific measures AR C
4.Adding/dropping/modifying measures within group
(Common or specific)A I
5. Changing the weight of a group (Common and specific) AR I
6. Changing/Modifying Measures Formula + Frequency A C
7. Changing Data Source (I.E. Oracle, PIES, FINDER) C C
8.Changing/Modifying Recognition/Penalty
System/ElementA R I
9. Changing Data Gathering Focal Point I
10. Reward Scheme (Who, When, How, What) A R I
11. Data Quality Control/Check R I
12. Generate/Publish of Camel Race Results (Advertise) I AR I
In this section the stakeholders need to refer to the BSC user manual or the System Feature Privilege Sheet
because it includes all the ADCOBSC system features.
Additional Roles & Responsibilities(Subject for further modification based on ADCOBSC System Workflow)
Note that majority of the processes performed by the stakeholders are conducted through ADCOBSC
system
Asset/Business Unit Focal Point (FP)
Conduct activities associated with the race common and specific measures in accordance with ADCOs
standard and procedures
Feed the activity results into ADCO systems (MAXIMO, PIES, AIMS)
Senior Performance Management Advisors (SPMAs)
Receive data and extract activities results from ADCO systems/ fields
Verify activities associated with the race common and specific measures and ensure they are executed
as per ADCOs quality standards
Feed the activity results into ADCOBSC system (by 12thof every month)
Camel Race Custodians
Checking and verifying the reported data completion and quality
Verify the total performance scores and rankings for each asset/function/drilling calculated and
reported by the ADCOBSC system. Reporting and publishing measures results and final scores to the
organization (by 20thof every month)