CAMECO RESOURCES CROW BIUiTE OPERATION z_/6 -- ?'7/5 86 Crow Butte Road P.O. Box 169 (308) 665-2215 Crawford, Nebraska 69339-0169 (308) 665-2341 - FAX October 12, 2015 CERTIFIED MAIL RETURN RECEIPT REQUESTED Marty Link, Acting Water Quality Division Administrator Nebraska Department of Environmental Quality P0 Box 98922 Lincoln, Nebraska 68509-8922 Subject: UIC Permit NE0 122611 SM8-28 Monitor Well Excursion Dear Ms. Link: On May 21, 2015 during routine biweekly water sampling of Cameco Resources, Crow Butte Operation (CBO) shallow monitor well SM8-28 the single parameter upper control limit (SCL) for conductivity was exceeded. As required by Section B.lI of Part II of UIC Permit NE012261 1, a second sample was collected within 24 hours and analyzed for the three excursion indicator parameters. The results of the second sample also exceeded the SCL for conductivity. In accordance with Section B. 1 Part 11 of the UIC permit, CBO increased the sampling frequency for SM8-28 to weekly. Weekly samples were obtained from May 21, 2015, to August 3, 2015. The samples collected on July 20, 27, and August 3, 2015, were below the excursion criei from Section B. 1 of the permit. Based on these results, CBO removed SM8-28 from excursion status. In accordance with the requirements of Section B.I1, weekly sampling continued for an additional three weeks. During the stability monitoring period, the excursion parameters were not exceeded and SM8-28 was returned to biweekly sampling status. Attached are copies of the analytical data for each of the three weekly stability monitoring samples and graphs for each parameter covering the period of May 21, 2015 through October 8, 2015. If you have any questions regarding this submittal, please feel free to contact me at (308) 665- 2215, ext. 114.

Transcript of CAMECO RESOURCES z /6 CROW BIUiTE OPERATION -- ?'7/5 P.O ...

Page 1: CAMECO RESOURCES z /6 CROW BIUiTE OPERATION -- ?'7/5 P.O ...

CAMECO RESOURCESCROW BIUiTE OPERATION z_/6 -- ?'7/5

86 Crow Butte RoadP.O. Box 169 (308) 665-2215Crawford, Nebraska 69339-0169 (308) 665-2341 - FAX

October 12, 2015

CERTIFIED MAILRETURN RECEIPT REQUESTED

Marty Link, Acting Water Quality Division AdministratorNebraska Department of Environmental QualityP0 Box 98922Lincoln, Nebraska 68509-8922

Subject: UIC Permit NE0 122611SM8-28 Monitor Well Excursion

Dear Ms. Link:

On May 21, 2015 during routine biweekly water sampling of Cameco Resources, Crow ButteOperation (CBO) shallow monitor well SM8-28 the single parameter upper control limit (SCL)for conductivity was exceeded. As required by Section B.lI of Part II of UIC Permit NE012261 1,a second sample was collected within 24 hours and analyzed for the three excursion indicatorparameters. The results of the second sample also exceeded the SCL for conductivity.

In accordance with Section B. 1 Part 11 of the UIC permit, CBO increased the sampling frequencyfor SM8-28 to weekly. Weekly samples were obtained from May 21, 2015, to August 3, 2015.The samples collected on July 20, 27, and August 3, 2015, were below the excursion crieifrom Section B. 1 of the permit. Based on these results, CBO removed SM8-28 from excursionstatus. In accordance with the requirements of Section B.I1, weekly sampling continued for anadditional three weeks. During the stability monitoring period, the excursion parameters werenot exceeded and SM8-28 was returned to biweekly sampling status. Attached are copies of theanalytical data for each of the three weekly stability monitoring samples and graphs for eachparameter covering the period of May 21, 2015 through October 8, 2015.

If you have any questions regarding this submittal, please feel free to contact me at (308) 665-2215, ext. 114.

Page 2: CAMECO RESOURCES z /6 CROW BIUiTE OPERATION -- ?'7/5 P.O ...

CROW BUTTE RESOURCES, INC.

Sincerely,Cameco ResourcesCrow Butte Operation

Larry Teahon

SHEQ Manager

Enclosures: As Stated

cc: CBO-FileNRC - Document Control Desk Director,

ec: CR- CasperNancy Harris - NDEQ Program CoonhinatorShar Sapp - Chadron Field Office

Page 3: CAMECO RESOURCES z /6 CROW BIUiTE OPERATION -- ?'7/5 P.O ...

•sample t.:* os/1ot2IS

Analysis Date: 06/10/2015

Crow Butte ProjectMonitor Well Laboratory Report

IAlkeilnity' Conuctivity I horidcWell 1) , (snglL) Alk SCL Alk MCL j(pMbejcm) Coed SCL Coed MCL (ragIL) ai SCL C! MCL

... SMO5•-P2 -4...

SM06,.11

--- SMO6_014--

... M06-0,19 ....

__SM06-oP2_.•__.

SM06-020. ...

SMOgS.92

.. .1 . . . 2T_4_.... ... 232 ...

21,8. 318 265:

240 3 48 _29S0._._

_2• ..... 3_60_.... 3}00_.._..2•... 301-----...25.1_ ..

.._203-----...3Q:5. .......254 ..----- -------------297-----..•Y...

._2_24 ... .. 3_2_3 ... .26 _9222•z ..... 312 . ... 260 ...

277 ---;. .... 351.-.......29,3. ..

_. ... . . .327 _.... ... 274.._

.. _4.59 ~ 755-----... 629........ -, ..... ~773..--....-,644 ......44 -.....73 .... .7- - -62& -....

..... • ....... 700 ---...... .3 ..

....46 . ...... 72.4------..6 ..• 522 691 576

* 534----.....736 __613_. .

62 776 698

473. - _._ 674. *562

7(.... ---_---778 ..64•..._646------... 0_1 . ..... 667__

-.. .4,.8 .. . .. 29 2.. .. .;4. . .

... ..... 31-----2...:6 ...i.11 24 20

.. T .......- 2_6 .. . . ._ 1 . . .

____2---....58.......-49 ...

1._6. 26 . ... 22•...

-.-. t4...- 25 21 ...

__9.....2_4-----20

Monday, August10, 2015 Page 2 of 2

Monday, August 10, 2015 P•g• 2 of 2

Page 4: CAMECO RESOURCES z /6 CROW BIUiTE OPERATION -- ?'7/5 P.O ...

ii ..

Crow Butte ProjectMonitor Well Laboratory Report

Sample Date: O8117/O15

Analysis Date: OW/17J2O15

Well Ii (mgIL) Alk SCL, Alk MCL , ( e/hom) Coed SCL Coed MCLJ (rag/L) ,Cl SCL CI MCI

.... •M07.-0 3 ...

...S.M9.-014...

~....SM1 .0 s_ ......SM1042 ....

SM!O-0•A

... SM10 ..2 _.

_ _ SM .0=-.•9_A ..

_. 32•+-......-27_4_:

230 346 288230. .... 33.1------.. 27.6..

S40•3---336 •----------------------- 301 lii+iiiiS.:7__ _36.0--......309_. .

531 778 648-------------------------------79_2...

..... ----- .- •_ .......-72o ...

1 28----2311 25 21

__.1----..4... ---.- 36

Monday, August 17,2015 Page 2 @12

Monday, Ausust 17,2015 Pege 2 of 2

Page 5: CAMECO RESOURCES z /6 CROW BIUiTE OPERATION -- ?'7/5 P.O ...

Analysis Date: 03124/2015

Crow Butte ProjectMonitor Well Laboratory Report

WellD ) J (sn/L) Alk SCL AIk MCL (l/m)Coed SCL Cored MC!L (meJL) Cl SCL eC MCL

___sM9n424.....-

-. __ SM~o6._ o 3 ......... ,SM_ o-_ o14. ..

... M _O •_O6.___-

_ M.• -91....

_ _ _SM06.-020-

-.... M69P ...

-_ _SMO6-02S

--- SM_8:-_028. ..

............. 718- --.....-- ..

... •S ..... 287-----..2~3_..... __1 .--.....264-----... 23__ ..

. .1 .6.....2.64-.....-- 2.- ..... W--..---318--......--- ..

:__2S......348s_ 290.. • _

_.2 .... 305-----....2,5 ....

.225 __323_. ... _26.9...

__222 3.12 ..... _260_ _

-------------------- 3A___ ... 2- .._ S ._...351_--...... 293_.

._4_ ---- 37.......- __-- _

.. ..4 _. .. . . 7.723 . . ... • . .... 45; ..... 7.5.3-.....--- . .... . 4 )9. . . . . 7_9Q .. . . .583. ...

• _• .691 .......-- 6._4

._ ...... 73.6-----.. 61_ ...... . • ... .. ... 7_8 .. .. ..640. . .

.. 4.. . ...... --_-.....-- 0 ..

... .. 52_ . . . . 83.7_ . . . . . .

.... 62.3 ...... 717_ 598...S.g .5.. S76 _7_1_3 5.....9P4._

.. .. 6•'6..... .. . 8.01-.. .. .. _-- _- ..

..................................&4....... 3-----.....28 ..

... -6._-......3.1-----2.. 6_ ..

_.11-----...2.4-----...2_0..

7.?.4 . . .. 2_6_. . . .2.1. . .

... 14.-......33-----...27. ...__ _ 2 . .22_ . .

16 2 •6_ 22__1. .. .. .25.. . . . 21_ _ _

_. _ ---..... 24_-......-2 ...... _.....2.4-----...20....

(umlay, August.2A,.2111j Pap.2 q12

Page 6: CAMECO RESOURCES z /6 CROW BIUiTE OPERATION -- ?'7/5 P.O ...

SM8-02810/9/ 15

AU ~imty

350

250

200

3j83jS3j!3j~

274274274 274274 278 274274274274274274274

4-Ma SQ

1001

501

0

24

20

2~4224

20

12

8

4

0

14 14 1413 ~ 13

12 12Am 12 12 1211

10 10 ~9

+CSQ

//~~Z~ //(P

Page 1 of 2

Page 7: CAMECO RESOURCES z /6 CROW BIUiTE OPERATION -- ?'7/5 P.O ...

SM8-02810/9/15

ConduciityI000900

800

700

-C-• fcQ

400

300

200

0

/444~4V4~t4~4 ~%%

Water Le•12

10

8

4

2

0

12 11e 1 1 1 2 12 12

9 999999

8

-~ wv~ ~

-@-AWO W~Ms te~

4 p4~44~

Page 2 of 2