Camborne Field Campaign Planning Issues

8
Camborne Field Campaign Planning Issues

description

Camborne Field Campaign Planning Issues. Camborne Site. Sunshine Statistics. Site Details. Radiosonde launches at 11:15 and 23:15 (ZT). Also run Herstmonceaux and Castor Bay sondes Have flown Snow White sondes Part of National Radiaton Sensor Network. - PowerPoint PPT Presentation

Transcript of Camborne Field Campaign Planning Issues

Page 1: Camborne Field Campaign Planning Issues

Camborne Field CampaignPlanning Issues

Page 2: Camborne Field Campaign Planning Issues

Camborne Site

Page 3: Camborne Field Campaign Planning Issues

Sunshine Statistics

Sunshine Comparison 2006 against Max and Average Sunshine 1984-2004

49.2

76.8 57.474.2

179.8

277.2

167

233.2

174.4

155.2

109.3100.6

53.976

71.908

102.944

154.86

192.612

198.236200.612

214.96

178.96

113.596

80.292

58.572

92.8

107.3

150

195.2

258.3

308.4

281.7283.9

257.2

167.9

137

87

20.139.6

64.6

101.2

129.6114.5

122.8122.1135

74.2

48.8

32.8

0

50

100

150

200

250

300

350

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

month

Ho

urs

Sunshine 2006

25 year Average Sunshine

Max monthly Sunshine

Min Monthy Sunshine

Page 4: Camborne Field Campaign Planning Issues

Site Details

• Radiosonde launches at 11:15 and 23:15 (ZT).

• Also run Herstmonceaux and Castor Bay sondes

• Have flown Snow White sondes

• Part of National Radiaton Sensor Network.

• Laser cloud base and visibility measurements

• GPS Water Vapour column.

• Microwave and other measurements ?

Page 5: Camborne Field Campaign Planning Issues

“The Ozone Shed”

Page 6: Camborne Field Campaign Planning Issues

FTIR Installation

• FTIR installed in Ozone Shed

• Solar tracker hard-mounted on concrete base outside South-facing door.

• Support structures being designed.

• Phone and hopefully internet connections available.

Page 7: Camborne Field Campaign Planning Issues

Campaign Timetable

• Preliminary installation prior to main campaign (July) • FTIR set up from 11th August• Flight window : 13th August to 26th September• Initial manned period (1-2 weeks)• Other manned periods (of 1 week +) driven by weather conditions.• If flight occurs during unmanned period then we can get to site the

evening following a noon flight briefing – in time for measurements the next day.

• Staffing : 2 people out of TG, MC & AB.

Page 8: Camborne Field Campaign Planning Issues

Other Issues

• Liquid N2 : BOC already deliver to site (helium).• Accommodation : • Other instruments ?• Communication between FAAM and Camborne.