Cam flick group

58
CAM FLICK GROUP

Transcript of Cam flick group

Page 1: Cam flick group

CAM FLICK GROUP

Page 2: Cam flick group

WHO WE ARE?

Cam Flick Group is registered with Ministry of

Commerce under the law of Cambodia.

Cam Flick Group was founded in 1997 aim to

provide construction services, construction

materials and equipment to all partner,

subcontractors and engineers and workers.

We also provide technical training support to

workers who want become construction leader,

subcontractors…

Page 3: Cam flick group

WHAT WE DO?

Formworks, Materials, Tools and

Equipment

Product set up training

Construction

Design

Page 4: Cam flick group

Film Faced Plywood, Plywood for Construction

PONY TEST is a large-scale comprehensive testing organization with service branches around

the country. Our inspection scope covers Factory Audit, Initial Production Check ,First Article

Inspection, Sampling, During Production Inspection, Pre-Shipment Inspection(PSI), Container

Loading Supervision. The inspection product categories included Hard goods, Soft goods, Auto

parts.

Waterproof, wear-resisting, balanced strength, not easy to distort,

not cracking, wide range of size, surface modeling easier, etc.

A:ISO9001 and ISO14001

Page 5: Cam flick group

Our Products

Page 6: Cam flick group

Our Products

Page 7: Cam flick group

JAPANESE TEMPLATE CONSTRUCTION METHOD

Page 8: Cam flick group

RID WASHER NUT SET

Purpose and Characteristics:

1. Suitable for wood formworks support system, such as wall, beam abd column cast-in-place reinforced concrete member.

2. Keep concrete in uniform thickness, metope is flat

3. After the work the metope smooth, mortar plastering thickness decrease, or no need to plaster, so it can reduce the cost of plaster(the cost of raw materials and artificial)

4. Waterproof effect is better if increased water stopper lip for basement, exterior wall, templates support

Rid Washer suitable for steel reinforcement. It can be used repeatedly.

Page 9: Cam flick group

RID WASHER NUT SET, P CONE, SAPERATOR

Page 10: Cam flick group

RID WASHER NUT SET

1. Position support template spacing, keep the component thickness. It can be re-use

2. Separator connection P Cone, it is thickness of the walls and Pillars.

3. Separator through adopting new materials, special craft processing, wire diameter 6.9 mm, tensile strength reached more thans 23 kn

4. Padding concrete is used to fill the P Cone grooves, simple and easy to construction

Page 11: Cam flick group

CONSTRUCTION EXAMPLE OF WALL (Wooden Frame)

Page 12: Cam flick group

RID WASHER NUT SET, P CONE, SEPARATOR

Page 13: Cam flick group

CONSTRUCTION EXAMPLES IN CHINA

Page 14: Cam flick group

CONSTRUCTION EXAMPLES IN CHINA

Page 15: Cam flick group

CONSTRUCTION EXAMPLES IN CHINA

Page 16: Cam flick group

KKL Washer, 2 P form tie, P cone, Separator

1. Position support template spacing, keep the component thickness. It can be re-use

2. Separator connection P Cone, it is thickness of the walls and Pillars.

3. Separator through adopting new materials, special craft processing, wire diameter 6.9 mm, tensile strength reached more thans 23 kn

4. Padding concrete is used to fill the P Cone grooves, simple and easy to construction

Page 17: Cam flick group

KKL Washer, 2 P form tie, P cone, Separator

Page 18: Cam flick group

KKL Washer, 2 P form tie, P cone, Separator

Page 19: Cam flick group

Combination washer set (angle 50, angle

60) 2 P formtie, P cone, separator

Page 20: Cam flick group

Combination washer set (angle 50, angle 60) 2 P formtie, P cone, separator

Page 21: Cam flick group

Samples of works

Page 22: Cam flick group

Samples of works

Page 23: Cam flick group

Samples of works

Page 24: Cam flick group

Samples of works

Page 25: Cam flick group

Next-Generation system formworks TZ SYSTEM

Page 26: Cam flick group

Next-Generation system formworks TZ SYSTEM

Page 27: Cam flick group

Next-Generation system formworks TZ SYSTEM

Use and Characteristic:

1. Suitable for aluminum panel, plastic

panel and steel form

2. The P cone can remove and re-use

3. Dual-side separator with water stopper

lip, it is effect to water-proof.

Page 28: Cam flick group

Next-Generation system formworks

TZ SYSTEM

Page 29: Cam flick group

PINCER STYLE INSERT Characteristic:

Pre-construction- It is easy to implement and fast in installation. Easily hammered in

Pincer style insert stay in place with concrete. Can sue with screw bar and pipe clip

Characteristic:

Using pre-construction anchors can reduce the total cost in construction sharply.

Punching of concrete is not need like when the post-construction anchors

Page 30: Cam flick group

PINCER STYLE INSERT

Page 31: Cam flick group

PINCER STYLE INSERT

Page 32: Cam flick group

PINCER STYLE INSERT Construction examples of pincer style insert

Page 33: Cam flick group

Wall Joint- Scaffolding Insert Use and Characteristic:

1. Wall joint and scaffold insert is easy to implement and fast in installation. After taking down temporary construction, cover the hole with specific cap

2. Scaffolding insert stay in place with concrete

3. Wall Joint and Scaffolding insert will connect scaffolding. It is to implement and fast in installation after,

4. Tensile strength to reach more than 880kg compression resistance to reach 440kg.

5. I can be re-used

Page 34: Cam flick group

Wall Joint- Scaffolding Insert Example in Japan

Page 35: Cam flick group

Wall Joint- Scaffolding Insert Example in China

1. Hole is made to match scaffolding support pipe

2. It is cost time, labor, and materials if mend pipe hole

3. If not taking down, it will affect the later bricklaying, but taking down it will pose a safety hazard

Page 36: Cam flick group

Wall Joint- Scaffolding Insert

Marks are wall joint points (recommended)

Please change construction pitch conforming to various condition such as size and height of construction

Examples of wall joint Construction place

Page 37: Cam flick group

Combined top and bottom space , Bottom Space

Uses and Characteristic:

1. Bottom reinforcing steel keep the cover in correct

2. Fixed spacing between bottom and top. To meet the design requirement

3. Can be fastened to spacer by binding wire to ensure it’s never dislocated even when pouring concrete.

4. Base made of plastic, so it does not rust

5. 100-300kg Steel axis does not changing shape nor deteriorate by heat.

Page 38: Cam flick group

Combined top and bottom space , Bottom Space

Page 39: Cam flick group

Spacer with Levee Crown Point

Uses and Characteristic:

1. Can restore tis vertical standing against external pressure because of its spring structure.

2. Yellow cap marks the edge of levee crown point, so it is easy to locate

3. Combined with spacer to prevent dislocation even when pouring concrete

Page 40: Cam flick group

Using of Spacer with Levee Crown Point

Set up bottom bar,

Set up top bar

Adjust the elevation

Pour Concrete

Cut Mark

External Layer

Page 41: Cam flick group

LEVEE CROWN POINT Uses and Characteristic:

1. Can restore tis vertical standing against external pressure because of its spring structure.

2. Yellow cap marks the edge of levee crown point, so it is easy to locate

3. Combined with spacer to prevent dislocation even when pouring concrete

Page 42: Cam flick group

Polyester edge timber balk catcher

Purpose and Characteristic:

1. Structure panels have difference and support mode. Such as elevation difference of the bathroom floor and indoor floor.

2. Base made of plastic so it does not rust

3. No need for nail disposal effort because of its pincers type design

Page 43: Cam flick group

P Piece with Nail (S type , L type)

Purpose and Characteristic:

1. Suitable for the over the lateral templates straightening fixed

2. Ensure that the lateral template in a line

3. Nails are specially designed to fasten composite panel

4. Nail base will be stripped together with composite panel when formwork is disassemble.

Page 44: Cam flick group

TG Net Bracket Uses and Characteristic:

1. Suitable for between outer layer and the main building

2. Prevent falling objects because cantilever hanging nets

3. Does not interfere with wall construction its stand up design

4. Easy to store because it can be folded in compact size , also re-use

Page 45: Cam flick group

Simple Frame Uses and Characteristic:

Suitable for exterior scaffolding. It is lightweight, easy to implement and fast in installation , the safety performance is high.

Composition: Simple frame + Crossing stripe + Safety bar + V + connection pin

Qualified by Scaffolding and construction Equipment

Association of Japan

Page 46: Cam flick group

Exterior Wall Scaffolding Safety of construction is born from quality. This bar is certified by Scaffolding and Construction Equipment Association of Japan(SCEA). Safety qualification provided by SCEA.

Testing Procedure: attach bottom rail to testing jig, and impose a load to central port.

Loading direction: 3 ways (vertically, extrorsely horizontal cross at right angle, introrsely horizontal cross at right angle)

Test1 : Bending under pressure of 60 kgf should be less than 100 mm to same

Test 2: Must with stand pressure of 116kgf for 30 seconds.

Page 47: Cam flick group

Exterior Wall Scaffolding

Characteristics:

1. Locking bend joint

2. Improves Safety and fitting efficiency.

Connecting Pin

Page 48: Cam flick group

Exterior Wall Scaffolding

Page 49: Cam flick group

Exterior Wall Scaffolding

Page 50: Cam flick group

Exterior Wall Scaffolding

Page 51: Cam flick group

Exterior Wall Scaffolding

Page 52: Cam flick group

STAR SPACER

Page 53: Cam flick group
Page 54: Cam flick group

STAR SPACER

Page 55: Cam flick group

Our Products

Page 56: Cam flick group

Quality of Products

Quality of building

Cost Saving

Time Saving

More Professional

The Benefits

Page 57: Cam flick group

Quality of Materials /Products

available in stock

Quality Services

Training Support

Financial solution

Be good partner

Why work with us

Page 58: Cam flick group

Thanks Sithsophary Nhev

https://www.facebook.com/camflickgroups

www.camflickgroups.com