Caltrans District 4

Contractors’ Outreach

MeetingAugust 31, 2005

Page 2: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Introductions

Janet AdamsSFOBB East Span Project

Manager, Caltrans

Page 3: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Welcome

Bijan SartipiDistrict 4 Director, Caltrans

Page 4: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Welcome

Olivia FonsecaDeputy Director

Civil Rights Program and Small Business Advocate

Page 5: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

SFOBB Self-Anchored Suspension Span Contract

Janet AdamsSFOBB East Span Project

Manager, Caltrans

Page 6: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

San Francisco - Oakland Bay Bridge

East SpanSeismic Safety

Replacement Project

Page 7: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Contract 04-0120F4

• This contract constructs the self-anchored suspension portion of the new East Span

• Advertised on 8/1/05• Bids open on 2/1/06• Estimated cost is $1,450,000,000• Project funded by Toll revenues and State

funds, therefore Buy America is not required

• Contract duration is 2130 working days (7 days/week)

Page 8: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Contract 04-0120F4• Contract consists of the following

components:– Two steel orthotropic box girders and decks– Steel tower consisting of 4 tower shafts with

elevator– Concrete cap beam at Piers W2 and E2– Steel bike path– Steel prefabricated parallel wire strand

cable system– All steel fabrication will be off-site

Page 9: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Self-Anchored Suspension Span

Page 10: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

SAS and Skyway

Page 11: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

View from Yerba Buena Island

Page 12: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

District Contracts

Bob FinneyDeputy District Director -

Construction

Page 13: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Alameda 28 $325,370Contra Costa 10 $87,881Marin 11 $92,566Napa 7 $9,637Santa Clara 30 $125,833San Francisco 6 $1,706,620San Mateo 22 $423,026Solano 15 $64,835Sonoma 11 $79,799Var 2 $4,422

Total: 142 $2,919,989

Fiscal Year 2005 - 2006 Construction Workload ($1000s)

Page 14: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

North Counties Upcoming Projects

80

12

101

101

29

37

1

Son 101 HOV SR 12 – Steele Ln

SON 101 Steele Ln IC

Mrn 101 HOV Central San Rafael 580

Mrn 580 RSR - Polyester Deck Overlay

Napa 29 - St Helena Roadway Rehabilitation

Mrn 101 Blithedale Off-Ramp

Napa 121 – Replace Tulucay Bridge

Page 15: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Richmond San Rafael Bridge Polyester Deck Overlay

041521 Complete Bridge Deck Overlay, Deck joint

Cost: $18.6 M Adv: Dec. 2005

Page 16: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Marin 101 HOV Gap Closure Central San Rafael

226151 Mrn 101 HOV Widening Central San Rafael

Cost $42.5 M Adv: Oct. 2005

Page 17: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

East Blithedale Off Ramp

N

131

101

2937U1 Mrn 101 E. Blithedale Off Ramp

Cost $5.8 M Adv: Feb. 2006

Page 18: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Napa 29 St. Helena Roadway Rehabilitation

128471 Napa 29 Pavement Rehabilitation

Cost: $4.7 M Adv: Sept. 2005

Rehabilitate Roadway :• Curve Improvements• Super elevation Correction• Shoulder Widening• Drainage Modification• Digout and AC Overlay

N

29

St Helena

128

128

29

Project Limit – York Creek Bridge

Project Limit – Bale Lane

Page 19: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Sonoma 101 HOV Widening Route 12 - Steele Lane

245411 Son 101 HOV Route 12 to Steele Lane

Cost: $52.1 M Adv: Sept. 2005

12

N

Route 12 / 101 I/C Ramp Modification

College Ave. Bridge Replacement and I/C Modification

6th Street New Undercrossing 4th Street Bridge

Widening Santa Rosa Creek

Replace Bridge

Soundwall

Route 101 Widening Bicentennial Way -

Earle Street OC

Auxiliary Lane - Steele Lane -

College Avenue

101

101

12

Santa Rosa

Page 20: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Sonoma 101 HOV Widening Steele Lane IC

263901 Son 101 HOV Steele Lane I/C

Cost: $12.4 M Adv: Sept. 2005

Route 101 Widening Cleveland -

Edwards Avenue

Steele Lane Bridge Widening

Steele Lane NB On Ramp Metering

Steele Lane Off Ramp Relocation

Soundwall

101

101

N

Santa Rosa

N

Page 21: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

San Francisco, San Mateo and Santa Clara Counties Projects

280

80

92

1

101

82

84

87

101

680

Devil’s Slide Tunnels

SCl 680 Median Barrier

SM 101 Auxiliary Lane

SCl 101 Grind PCC Pavement

SF 101 Presidio Viaduct

SF 80 SFOBB Resurface Upper & Lower Deck

Page 22: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

0105U1 – Overlay SFOBB Upper/Lower Deck

0105U4 SFOBB Resurface Upper

and Lower Deck Cost: $25.0 Million Adv: 8/29/05

Resurface SFOBB :• ¾” Polyester Deck Overlay• Grind ¾” Existing Epoxy Asphalt• Lower Deck - Replace 9

Expansion Joints

Project Limits – YBI

N

80

80

Project Limits – SFO SFOBB Anchorage

Page 23: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

SF 101 - Presidio Viaduct Rehabilitation and Repaint

449404 Rehab and Paint Presidio Viaduct

Cost: $19.6 Million Adv: Dec. 2005

Page 24: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

SM 101 Auxiliary Lanes

Auxiliary Lanes :• NB and SB Auxiliary Lanes• Reconstruct Peninsula OC• Monte Diablo Ped. Bike OC• Soundwall and Retaining Wall• Drainage Improvements

Project Limits – Millbrae Avenue

Project Limits – E 3rd Avenue

N

82

280101

101

101

82

264201 SM 101 Auxiliary Lanes 3rd Ave – Millbrae Ave.

Cost: $74.2 M Adv: June. 2006

Page 25: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Devil’s Slide Tunnels and Approach Roads

1123U1 Devil Slide – Construct Tunnels

Cost: $225.0 Million Adv: Apr. 2006

North PortalBridge

South Portal

South Rock Cut

New RoadwayTunnels

Operation Maintenance

Center

N

Page 26: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

0C890 SCL 101 Grind PCC Pavement

0C8901 SCl 101 Grind PCC Pavement

Cost: $19.9 M Adv: 8/15/05

Grind PCC Pavement :• Grind PCC Pavement• Slab Replacement• AC Overlay Mainline & Ramps• Fog Seal Shoulders

Project Limits – San Mateo County

Line

Project Limits – Quadalupe

River Bridge

N

87

280880

82

680

880

101

101

101

101

82

237

237

Page 27: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

SCl 680 Upgrade Median Barrier

270511 SCl 680 Upgrade Median Barrier

Cost: $13.7 M Adv: Sept. 2005

Upgrade Median Barrier :• Replace MBGR w/ Concrete

Barriers• Minor Drainage Modifications

Project Limits – Alameda County

Line

Project Limits – I 280 / 101 IC

N

87

680

880

232

880

680

680

280

101

101

Page 28: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Contra Costa County Upcoming projects

80

4

680

24

Richmond San Rafael Bridge

Benicia Martinez Bridge

Antioch Bridge

Carquinez Bridge

CC 680 Auxiliary Lanes

CC 80 Westbound HOV Lanes

Page 29: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

I 80 WB HOV Extension CC4 - Cummings Skyway

I 80 Widening

I/C Modification

I/C Modification

Auxiliary Lanes

I/C Modification

80

80

4

263701 CC 80 Extend WB HOV SR4 - Cummings

Cost: $19 M Adv: Oct. 2005

Page 30: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Construct Auxiliary Lanes Diablo Road - Bollinger Canyon Road

228551 CC 680 Construct Auxiliary Lanes

Cost: $15.2 M Adv: Nov. 2005

Construct Auxiliary Lanes:• NB And SB Auxiliary Lanes• Relocate Existing Soundwalls • Widening Laurel Drive UC • Retaining Walls

N

Project Limits – Bollinger Canyon Rd.

Project Limits – Diablo Road.

Project Limits – Sycamore Valley Rd.

Project Limits – Crow Canyon Rd.

680

680

Page 31: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Alameda County Upcoming Projects

Dumbarton Bridge

San Mateo Hayward Bridge

SF Oakland

Bay Bridge

880

580

680

92 238

80

84

5th Avenue IC Retrofit

High Street IC RetrofitI 238/580 Widening and Rehabilitation

MacArthur Blvd. On Ramp

Distribution Struct. Retrofit

SR 84 Pigeon Pass Realignment

I 580 PCC Pavement Rehab.

Page 32: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Ala I 80 / 580 / 880 Distribution Structure Retrofit - Utility Corridor

143554 Retrofit I 80/580/880 Distribution Structure

Cost: $13.2 M Adv: Dec. 2005

Page 33: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

1706U4 Ala 880 – 5th Avenue Interchange Retrofit

Cost:$102 Million Adv: Aug. 2006

Alameda 880 - 5th Avenue Interchange Retrofit

Replace Existing Structure:• Maintain Existing Capacity• Raise Profile of New Structure• Auxiliary Lane, from Oak St. Off Ramp• Standard Shoulders• Bike and Pedestrian Lane• Lake Merritt Channel

Project Limits – Oak Street

Project Limits – 10th Avenue

N

Page 34: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Alameda 880 - High Street Interchange Retrofit

165424 Ala 880 – High Street Interchange Retrofit

Cost:$60.7 Million Adv: Sept. 2006

Replace Existing Structure:• Maintain Existing Capacity• Reconfigure SR 77 / 42 Ave./880 IC-

Partial diamond w/ at grade intersection• Reconstruct Frontage Road: - Oakport Street - E. Eight Street• Standard Shoulders• Bike and Pedestrian Lane

Project Limits - Fruitvale Avenue

Project Limits- .9 km S. of High Street

N

Page 35: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

I-238 Widening and Rehabilitation I-238/580 IC to I-

238/880 IC

249041 I-238 Widening and Rehabilitation

Cost: $82.4 M Adv: Jan. 2006

Widening and Rehabilitation:• Widen I-238 from 4 to 6 Lanes• Rehabilitate I-238 with LLP • SB I-880 Aux. Lane from I238/880 IC

to A Street Off Ramp• Widen NB I-880 to I-238 to 2-Lanes• Widen NB I-238 to I-880 to 2 Lanes

N

Project Limits – A Street

880

880

238

Project Limits – I-238/880 IC

Project Limits – I-238/580 IC

238580

Page 36: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

PCC Pavement Rehabilitation Hacienda Drive - I 238

284311 Ala 580 PCC Pavement Rehab

Cost: $28 M Adv: 8/8/05

Project Limits – Hacienda Dr.Project Limits –

I - 238

Upgrade Existing Pavement :• Replace Cracked Slabs• Grind All Lanes• Repair Shoulders• Replace Approach Slab• AC Overlay Ramps• Rehab Bridge Decks• Install Bridge Rails

580

680

238880

580

N

Page 37: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

State Route 84 Realignment Pigeon Pass

172401 Ala 84 Roadway Realignment

Cost: $21.3 M Adv: Aug. 2006

Project Location

Livermore

Dublin

Pleasanton

580680

84

680

680

84

238

580

N

Roadway Realignment :• Improve Horizontal / Vertical

Alignment• Median Buffer • Current Design Standard• Standard Outside Shoulder• Guardrail• Steep Terrain• Environmental Sensitive Habitat

Page 38: Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Caltrans District 4

Networking

Network session