CALO News Pascal Perret LPC Clermont 9 July 2014

description

CALO News. 9 July 2014. Pascal Perret LPC Clermont. LS1 Activities : LHCb. LHCb closure week 47 (Nov. 17 ) Operation weeks: W36 : Sep. 1-5 W42: Oct. 13 – 17 → “ rehersal of full readout and calibration”. ECAL CALIB system – fibers replacement. 6. 7. 8. W31 Neon In. - PowerPoint PPT Presentation

Transcript of CALO News

Page 1: CALO  News

CALO News

Pascal Perret LPC Clermont

9 July 2014

Page 2: CALO  News

2

LS1 Activities: LHCb

LHCb closure week 47 (Nov. 17) Operation weeks:

W36: Sep. 1-5 W42: Oct. 13 – 17 → “rehersal of full readout and calibration”

Pascal Perret - LPC Clermont09/07/2014

9 10 11 12

8

2

6 7Beam Pipe Installation

Beam Pipe Installation

Beam Pipe Installation

ECAL CALIB system – fibers replacement

Week 26 : operation week #7

RICH HPD replacement

Week 19 operation week #6AUG12/5 W33 B-field measurement

CV maintenance 2014

DSO test

Sector test p2

CV maintenance 2014

W 47 Sector test p8

W31 Neon In

LHCb CLOSURE

Dipole test w19

Week 36 : operation week #8

Week 42 : operation week #9

Pump down

Page 3: CALO  News

3

LS1 Activities: LHCb Most of our activities completed:

ECAL/HCAL: see Yuri’s talk Coupling vis à bille SPD (A&C side) and ECAL A-side replaced

Pascal Perret - LPC Clermont09/07/2014

+ tuning of SPD closure position on June 25

Thanks to Bruno, Laurent B & Laurent J from LAPP!

Next: Interlock system installation for platform doorsTuning of closing position, etc.

Page 4: CALO  News

4

LS1 Activities: LHCb M1-SPD interference (June 20 opening of M1)

Pascal Perret - LPC Clermont09/07/2014

No damageAl sheet only (fibre protection)

To check tape in place every where!

Page 5: CALO  News

5

LS1 Activities: LHCb To do:

Addition of TELL1Scheduled July 21/22Software to be adapted accordingly

Maintenance MARATON water cooling circuit

Pascal Perret - LPC Clermont09/07/2014

Should fixed PRS3 and ECAL HV/LED power supply problems both in L3B01

Sub-detector Racks-Circuit Maraton PS

QuantityDate (done foreseen)

Again operational

CALO A Gantry - ECAL (4 racks) 13 Sept ? End Sept ?

CALO A Gantry – HCAL (1 rack) 3 Sept ? End Sept ?

CALO C Gantry - ECAL (4 racks) 13 End of August? End of August

CALO C Gantry – HCAL (1 rack) 3 Beginning Sept? mid SeptTotal LHCb: 73 (146 pipes, 292 fast connectors ! + 146 ‘Legris’ connectors)

Page 6: CALO  News

6

Project organizations New management & new TDR:

it was agreed at the last LHCb week that the upgrade projects of VELO, RICH, Calorimeter, Muon will be led by the current sub-detector project leaders, being the internal organization of the activities left to the decision of the sub-detector groups.

Proposal: a new appointment for calorimeter:Upgrade coordinator: Frederic

• Will take care of the upgrade, attend TB meeting in place of one deputy, etc.

1st actions: • proper organization of the activities • set up milestones

• These should concern:• the completion of the R&D activities• the various phases of production and integration

• EDR, PRR, a date of "ready for installation“, etc.

Pascal Perret - LPC Clermont09/07/2014

Page 7: CALO  News

7

Next meetings 2014

10/09* 08/10 26/11** prior LHCb week

Pascal Perret - LPC Clermont09/07/2014

To do: Calibration Commissioning Be ready to take data!