Report of Activities for WASCO HORANY Site Metering Station A staff meeting has been held in WASCO/ HORANY Site on 1/9/2015 to finalize The pressure transmitter of branch”2” and FCA keypad issues. So,The following activities have been done as follows: 1- Change the pressure transmitter by another one and adjust its range to be “1-101 Bara”. 2- Replace the FCA keypad by another one without any change at the configuration. 3- Check the value of the new pressure transmitter at the two flow computers.
-
Upload
hashemalihashem -
Category
Documents
-
view
1 -
download
0
description
kffksd
Transcript of Calibration Report With Wastany Site 1-9-2015
![Page 1: Calibration Report With Wastany Site 1-9-2015](https://reader036.fdocuments.net/reader036/viewer/2022072003/563dbafb550346aa9aa9472c/html5/thumbnails/1.jpg)
Report of Activities for WASCOHORANY Site Metering Station
A staff meeting has been held in WASCO/ HORANY Site on 1/9/2015 to finalize
The pressure transmitter of branch”2” and FCA keypad issues.
So,The following activities have been done as follows:
1- Change the pressure transmitter by another one and adjust its range to be “1-
101 Bara”.
2- Replace the FCA keypad by another one without any change at the
configuration.
3- Check the value of the new pressure transmitter at the two flow computers.