Calculation Spreadsheet_Slug Catcher

13
002-000-PDF-566 (015311) EPF-0027 Rev 7 (1-Mar-10) Corporate Base Page 1 of 13 Calculation Cover Sheet Customer MPN Proj No 11109 Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no Calculation Title Slug Catcher Foundation Design Phase/CTR phase Elec File Location 'file:///home/website/convert/temp/convert_html/55cf9c9c550346d033aa6e5a/document.xls'#$Calculation Cover Sheet Project File Locati proj file Page 1 6 pages Calculation Objective To design a suitable foundation base and pedestal for the pig launcher Calculation Method Assumptions Software Used Validation (Y / N / N/A) Microsoft Excel 2010 References 1. ACI 318-11 (Building Code Requirement for Structural Concrete) Conclusions rev3 date3 desc3 by3 chkd3 app3 rev2 date2 desc2 by2 chkd2 app2 rev1 date1 desc1 by1 chkd1 app1 Rev Date Description By Checked Approved Title Version This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik , its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.

description

calculation spreadsheet for Slug Catcher

Transcript of Calculation Spreadsheet_Slug Catcher

002-000-PDF-566 (015311) EPF-0027Rev 7 (1-Mar-10)

Corporate Base Page 1 of 13

Calculation Cover Sheet

Customer MPN Proj No 11109

Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no

Calculation Title Slug Catcher Foundation Design Phase/CTR phase

Elec File Location'file:///tt/file_convert/55cf9c9c550346d033aa6e5a/document.xls'#$Calculation Cover Sheet

Project File Location proj file Page 1 6 pages

Calculation Objective

To design a suitable foundation base and pedestal for the pig launcher

Calculation Method

Assumptions

Software Used

Validation (Y / N / N/A)

Microsoft Excel 2010

References

1. ACI 318-11 (Building Code Requirement for Structural Concrete)

Conclusions

rev3 date3 desc3 by3 chkd3 app3

rev2 date2 desc2 by2 chkd2 app2

rev1 date1 desc1 by1 chkd1 app1

Rev Date Description By Checked Approved

Title Version

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik , its subconsultants nor their respective

employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.

Changes since previous revision include:Section Description

General Disclaimer wording modifiedGeneral Project and calc information created as named fieldsChecklist

Template Change History (this sheet may be deleted from final document)

Added checkboxes regarding signoffs and date formats. Modified units checkbox to include unit conversions. (per PI#4508)

002-000-PDF-566 (015311) EPF-0027Rev 7 (1-Mar-10)

Corporate Base Page 3 of 13

Calculation Checklist

Customer MPN Proj No 11109

Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no

Calculation Title Slug Catcher Foundation Design Phase/CTR phase

Elec File Location'file:///tt/file_convert/55cf9c9c550346d033aa6e5a/document.xls'#$Calculation Cover Sheet

Project File Location proj file Page 2 of 6 pages

Please check boxes for all applicable items checked or mark as "N/A" if not appropriate:

Calculations:

Project title shown.

Calculation title shown.

Revision history box complete and signed.

Table of Contents.

Appropriate stamp for preliminary issues.

Calculation objectives (aims) stated.

Calculation method defined or described (including formulae if relevant).

Reference made to text, standard or code. Check version/edition with that required for project.

Source of input data stated (with revision number and date if relevant).

Customer's requirements included/addressed.

Assumptions stated.

Summary of results or conclusions if appropriate.

For software based calculations, reference to software verification if available.

Approach used is appropriate for problem being solved.

Method clear and easy to follow.

Input data correct.

Calculation arithmetically correct OR software previously verified and reference to verification checked.

Calculation result within expected limits.

Calculation tolerances stated if significant.

Units used as required by customer. Unit conversions correctly performed.

Abbreviations correct.

Appropriate cross-references.

Sketches included and clearly labelled, where required.

Appendices included and referenced, as required.

Considered design reviews, Hazop actions, client input, safety and environmental issues, etc.

Document Sign-offs (typed full names of Originator, Checker, Approver; to be initialed beside at sign-off)

Dates in standard format (DD-MMM-YY)

Checking Records:

Checked and annotated copy of calculation filed (use "Check Print" stamp).

Corrections made as required and calculation dated and signed on cover sheet by checker.

Alternative method calculation and/or representative check performed and filed, as required.

Revisions:

Changes clouded.

Revision history block updated.

Calculation re-checked if required.

rev3 date3 desc3 by3 chkd3 app3

rev2 date2 desc2 by2 chkd2 app2

rev1 date1 desc1 by1 chkd1 app1

Rev Date Description By Checked Approved

Calculation number assigned and registered (refer to project numbering system or Document Numbering System EPP-0040 for format).

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither

DeltaAfrik , its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.

002-000-PDF-566 (015311) EPF-0027Rev 7 (1-Mar-10)

Corporate Base Page 4 of 13

Calculation Sheet

Customer MPN Proj No 11109

Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no

Calculation Title Slug Catcher Foundation Design Phase/CTR phase

Elec File Location'file:///tt/file_convert/55cf9c9c550346d033aa6e5a/document.xls'#$Calculation Cover Sheet

Project File Location proj file Page 3 of 6 pages

Rev Date By Checked Rev Date By Checked Rev Date By Checked

rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

Table of Contents

1 Calculation cover sheet 1

2 Calculation checklist 2

3 Calculation sheets 3 - 6

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither

DeltaAfrik , its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.

002-000-PDF-566 (015311) EPF-0027Rev 7 (1-Mar-10)

Corporate Base Page 5 of 13

Calculation Sheet

Customer MPN Proj No 11109

Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no

Calculation Title Slug Catcher Foundation Design Phase/CTR phase

Elec File Location'file:///tt/file_convert/55cf9c9c550346d033aa6e5a/document.xls'#$Calculation Cover Sheet

Project File Location proj file Page 4 of 6 pages

Rev Date By Checked Rev Date By Checked Rev Date By Checked

rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

Weight of slug catche = 377,150 lbs = 377 kips Length of pig launcher = 13.2 ft

Bearing pressure = 2000 psf = 2 ksf Distance between supports = 6.2 ft

377 kips

26.3 ft

Ra = 188.6 kips Rb = 188.6 kips

f'c = 4 ksi

fy = 60 ksi Critical plane

Dead load, D = 188.6 kips 188.6 k

Cover = 2 in 12 ft

Bar diameter = 0.05 in

3 ft

10 ft 20.220.2

20

10 ft

12 ft

ACI318-11 Design

Procedure Calculation Section Aid

Sizing the footing Ignoring the self weight of the footing

D/a = 94.29 sq.ft

Use 12 x 10.0 ft

Area = 120 sq.ft > 94.29 sq.ft OK

Required strength U = 1.4 D 9.2

U = 264 k or 2.2 ksf

Design for shear Ф shear = 0.75 9.3.2.3

Assume Vs = 0 (no shear reinforcement)

Ф Vn = Ф Vc 11.1.1

One way shear action bw = 144 in d =### in

h = 20 in

Vc = 11.3.1.1

Ф Vc = 245 kips

Vu = B x[(L/2) - ((b/2) + d)/12)] x U

Vu = 54.86 11.12.1.1

2 (f'c)^½ bw d

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik ,

its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.

002-000-PDF-566 (015311) EPF-0027Rev 7 (1-Mar-10)

Corporate Base Page 6 of 13

Calculation Sheet

Customer MPN Proj No 11109

Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no

Calculation Title Slug Catcher Foundation Design Phase/CTR phase

Elec File Location'file:///tt/file_convert/55cf9c9c550346d033aa6e5a/document.xls'#$Calculation Cover Sheet

Project File Location proj file Page 5 of 6 pages

Rev Date By Checked Rev Date By Checked Rev Date By Checked

rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

ACI318-11 Design

Procedure Calculation Section Aid

Ф Vn = Ф Vc > Vu OK

Calculate moment at Mu = U x critical plane distance x l/2 15.4.2

pedestal face 1370 kip-ft

Compute flexural Ф kn = Mu (12000) / bd2

tension reinforcement = 425.080 psi

(bottom bars)

for Ф kn = 425.080 1.45 % Flexure 1

Area of steel, As = ρbd 7.12

= 31.2 in2

Check for As,min = 0.0018bh 10.5.4

As,min = 4.32 in2

As,min < As OK

Use 23 no of #4 (0.5'') bars distributed uniformly

across the entire 8ft width of the footing @

8'' c/c

Use 12 no of #4 (0.5'') bars distributed uniformly

across the entire 15ft width of the footing @

8'' c/c

12 ft

10 ft 20.2

19- #401 - 8'' U. BAR

16 - #402 - 8'' U. BAR

psi, select ρ =

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither

DeltaAfrik , its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.

002-000-PDF-566 (015311) EPF-0027Rev 7 (1-Mar-10)

Corporate Base Page 7 of 13

Calculation Sheet

Customer MPN Proj No 11109

Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no

Calculation Title Pedestal Design Phase/CTR phase

Elec File Location'file:///tt/file_convert/55cf9c9c550346d033aa6e5a/document.xls'#$Calculation Cover Sheet

Project File Location proj file Page 6 of 6 pages

Rev Date By Checked Rev Date By Checked Rev Date By Checked

rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

Loading

Ultimate load, Pu = 189 kips (Weight of Slug catcher)

Ultimate moment, Mu = 59491 kip-in

= 0.7

Nominal axial load = 269 kips

Nominal moment = 84987 kip-in

Material

f'c = 4 ksi

fy = 60 ksi

Column size

h = 120 in

b = 20.2 in

ACI318-11 Design

Procedure Calculation Section Aid

Determine reinforcement Pn = 269 kips

ration ρg using known Mn = 84987 kip-in

values of variables on h = 120 in

appropriate interaction b = 20.2 in

daigram(s) and compute Ag = b x h = 2424 in2

required cross section

area Ast of longitudinal

reinforcement

A. Compute Kn=Pn/(f'cAg) Kn = 0.027784

B. Compute Rn=Mn/(f'cAgh) Rn = 0.073043

ϒ = 0.958333

D. Determine the

appropriate interaction For a rectangular tied column with bars along

diagram(s) four faces f'c = 4ksi, fy = 60ksi and an

10.2 &10.3 Columns 3.2.4

(R4-60.9)

E. Read ρg for Kn and Rn Provide nominal reinforcements

values from appropriate

interaction diagrams

Assume ϕ

C. Compute ϒ ≈ (h-5)/h

estaimated ϒ of 0.90, use R4-60.9

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik ,

its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.

002-000-PDF-566 (015311) EPF-0027Rev 7 (1-Mar-10)

Corporate Base Page 8 of 13

Calculation Sheet

Customer MPN Proj No 11109

Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no

Calculation Title Slug Catcher Foundation Design Phase/CTR phase

Elec File Location'file:///tt/file_convert/55cf9c9c550346d033aa6e5a/document.xls'#$Calculation Cover Sheet

Project File Location proj file Page of pages

Rev Date By Checked Rev Date By Checked Rev Date By Checked

rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik , its subconsultants nor

their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.

002-000-PDF-566 (015311) EPF-0027Rev 7 (1-Mar-10)

Corporate Base Page 9 of 13

Calculation Sheet

Customer MPN Proj No 11109

Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no

Calculation Title Slug Catcher Foundation Design Phase/CTR phase

Elec File Location 'file:///tt/file_convert/55cf9c9c550346d033aa6e5a/document.xls'#$Calculation Cover Sheet

Project File Location proj file Page of pages

Rev Date By Checked Rev Date By Checked Rev Date By Checked

rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik , its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.

002-000-PDF-566 (015311) EPF-0027Rev 7 (1-Mar-10) Corporate Base Page 10 of 13

Calculation Sheet

Customer MPN Proj No 11109

Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no

Calculation Title Slug Catcher Foundation Design Phase/CTR phase

Elec File Location 'file:///tt/file_convert/55cf9c9c550346d033aa6e5a/document.xls'#$Calculation Cover Sheet

Project File Location proj file Page of pages

Rev Date By Checked Rev Date By Checked Rev Date By Checked

rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik , its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation

herein.

002-000-PDF-566 (015311) EPF-0027Rev 7 (1-Mar-10)

Corporate Base Page 11 of 13

Calculation Sheet

Customer MPN Proj No 11109

Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no

Calculation Title Slug Catcher Foundation Design Phase/CTR phase

Elec File Location 'file:///tt/file_convert/55cf9c9c550346d033aa6e5a/document.xls'#$Calculation Cover Sheet

Project File Location proj file Page of pages

Revision Date By Checked Revision Date By Checked Revision Date By Checked

rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik , its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.

002-000-PDF-566 (015311) EPF-0027Rev 7 (1-Mar-10)

Corporate Base Page 12 of 13

Calculation Sheet

Customer MPN Proj No 11109

Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no

Calculation Title Slug Catcher Foundation Design Phase/CTR phase

Elec File Location 'file:///tt/file_convert/55cf9c9c550346d033aa6e5a/document.xls'#$Calculation Cover Sheet

Project File Location proj file Page of pages

Revision Date By Checked Revision Date By Checked Revision Date By Checked

rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik , its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.

002-000-PDF-566 (015311) EPF-0027Rev 7 (1-Mar-10)

Corporate Base Page 13 of 13

Calculation Sheet

Customer MPN Proj No 11109

Project Title Oso-QIT Pipeline FEED Update Project Calc No calc no

Calculation Title Slug Catcher Foundation Design Phase/CTR phase

Elec File Location'file:///tt/file_convert/55cf9c9c550346d033aa6e5a/document.xls'#$Calculation Cover Sheet

Project File Location proj file Page of pages

Rev Date By Checked Rev Date By Checked Rev Date By Checked

rev1 date1 by1 chkd1 rev2 date2 by2 chkd2 rev3 date3 by3 chkd3

Appendix A

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither

DeltaAfrik , its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.