i CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 AUGUST 2007 3.00PM TABLE OF CONTENTS 1. MIXED STREAM BIO-ENERGY PLANT ................................................................ 1 A Bird : 1/58/13-11: #1440447 (402KB) 2 MAJOR PROJECTS STATUS REPORT .............................................................. 15 Bruce Gardiner : 24/19/32-10: #1113282 v21 (51.3KB) 3. WATER - SITUATION REPORT ........................................................................... 27 Bruce Gardiner:JEA : 24/1/5-23: #1147692 v18 (52.1KB) 4. ENVIRONMENTAL MANAGEMENT REPORT – JULY 2007 .............................. 30 Ian Clayton : 18/25/2-04 #1533576 v 1 (13.9KB) 5. CAIRNS WATER MONTHLY REPORT FOR AUGUST ....................................... 32 Bruce Gardiner : 1/3/38-01: #1532195 v1 (517KB) 6. OUTSTANDING ISSUES – CAIRNS WATER COMMITTEE .............................. 112 B Gardiner : 1/58/13-10: #1351520v9 (12.4KB)

Transcript of CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that...

Page 1: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

i

CAIRNS CITY COUNCIL

CAIRNS WATER COMMITTEE

21 AUGUST 2007

3.00PM

TABLE OF CONTENTS

1. MIXED STREAM BIO-ENERGY PLANT ................... .............................................1 A Bird : 1/58/13-11: #1440447 (402KB)

2 MAJOR PROJECTS STATUS REPORT..................... .........................................15 Bruce Gardiner : 24/19/32-10: #1113282 v21 (51.3KB )

3. WATER - SITUATION REPORT........................ ...................................................27 Bruce Gardiner:JEA : 24/1/5-23: #1147692 v18 (52.1 KB)

4. ENVIRONMENTAL MANAGEMENT REPORT – JULY 2007 ..... .........................30 Ian Clayton : 18/25/2-04 #1533576 v 1 (13.9KB)

5. CAIRNS WATER MONTHLY REPORT FOR AUGUST .......... .............................32 Bruce Gardiner : 1/3/38-01: #1532195 v1 (517KB)

6. OUTSTANDING ISSUES – CAIRNS WATER COMMITTEE..... .........................112 B Gardiner : 1/58/13-10: #1351520v9 (12.4KB)

Page 2: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

1

CAIRNS WATER COMMITTEE

21 AUGUST 2007

1 MIXED STREAM BIO-ENERGY PLANT

A Bird : 1/58/13-11: #1440447

RECOMMENDATION: That Council:

1. Authorise Cairns Water to engage CRA Internation al to undertake the feasibility analysis into the proposed bio-energy p lant;

2. Provide a report back to Council once the feasib ility study has been completed;

3. Note that the recurrent budget will be amended a t the first review to reflect the engagement.

INTRODUCTION: Cairns Water has been investigating the concept of using the old Portsmith Landfill site as a renewable energy hub with the primary goal of electricity generation. The concept is to use available resources to generate electricity with the ‘feedstock’ being a mixture of :

� Methane gas from the landfill � Biosolids (sewage sludge) � Urban green waste � Timber waste � Recycled water from the Southern Treatment Plant.

All the above are waste streams that Cairns City Council / Cairns Water has control over. This report provides the background to the proposal and recommends that Council proceed with a feasibility study into the bioenergy plant.

Page 3: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

2

BACKGROUND:

Portsmith Landfill (a conventional engineered landfill) is nearing the end of its useful life with closure plans nearing completion. Cairns City Council has operated Portsmith Landfill since 1984. Disposal of waste at the landfill proceeded with a variety of compaction methods and continued continually until 2005. In the final year of full disposal, 104,000 tonnes of municipal and other wastes were disposed of to the site. Cairns Water has been investigating the concept of beneficially re-using the Portsmith Landfill site to create a renewable energy hub with electricity generation the key deliverable. In order to achieve this goal, a feasibility analysis is required to be undertaken on the economics of power generation. This feasibility analysis is to be an economic analysis that looks at:

- Recovery of landfill gas; - Establishment of a green waste and urban wood receival and processing

facility; - Establishment of a biosolid (municipal sewerage) receival facility; and - Construction of a 5 megawatt (MW) bio-fuel power generation plant utilising

landfill gas, urban greenwaste and biosolids as feedstock. Other options may include:

- Use of available ground space for the disposal of Construction and Demolition

Waste (C&D); - Receival and Processing of other waste streams available to Council (tyres,

metals, electronic goods); and - Use of the residual heat (medium pressure process steam) as an energy

source for co-located industries. The idea is that landfill gas, the urban green waste stream, demolition timber waste and biosolids will be beneficially reused in the production of electricity. It is envisaged that due to the complexity of the analysis a number of experts shall be required covering financial, construction and electricity generation fields. It is also envisaged that the gas collection and distribution system shall be incorporated into the closure plan for Portsmith Landfill. Portsmith Landfill is targeted to be fully closed by 2010. The actual deliverables associated with the feasibility analysis will be:

1. Cairns Water is to be provided with financial models associated with the Base Case and Power Generation Option, with all costs and benefits being made fully transparent;

Page 4: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

3

2. Cairns Water is to be provided with subsidy programs capable of aiding the funding the capital contribution (both State and Federal);

3. Should power generation be economically feasible (less cost than the Base Cost) the study is to reference subsidy programs and be robust enough to provide the submission to the Agency administering the program; and

4. An options analysis on an appropriate delivery mechanism to achieve the goal of power generation while minimising risk to the Council.

5. A final report addressing the Scope with recommendations as to achieve whatever option is economically viable is required.

COMMENT: Cairns Water has put a brief to the market with a view towards gathering the right panel to undertake the feasibility analysis. CRA International, a consulting firm specialising in economic / financial analysis in the electricity industry, has put forward a bid to undertake the works identified above. Gadens Solicitors and Energy Solutions were also provided the Brief – neither responded to the Brief. Cairns Water has not formally engaged CRA International at this stage as it has been seeking ‘partners’ to aid in funding the feasibility analysis. It is considered that CRA International is the best available firm to undertake the analysis. Officers have been talking at all levels of Government in a bid to find some grant money to fund the feasibility analysis. To date, while government agencies have expressed support, none have come forward with funding assistance to date. Federal Government Involvement The Council’s Previous CEO, (Mr David Farmer) met with three senior bureaucrats in Canberra in November 2006. These senior public servants were:

• Dr Gary Dolman, General Manager, Regional Partnerships, Department of Transport and Regional Services;

• Mr Howard Bamsey, Deputy Secretary, Department of Environment and Heritage and Head of the Australian Greenhouse Office; and

• Mr Rick Belt, Manager of Renewable Energy, Dept of Industry, Tourism & Resources.

All expressed that the project appeared worthwhile but could not offer any assistance.

Page 5: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

4

State Government Involvement Cairns Water has been lobbying the State Government intensively to provide support for this project. The following time line indicates how the State Government has responded to the project concept:

Date Action

22 January 2007 Cairns Water approaches the Department of Mines and Energy providing the Terms of Reference and the CRA International response to the Terms. There was no response to the enquiry.

5 February 2007 Cairns Water accesses the State Development “Regional Business Development Scheme” grant application form.

16 February 2007 Cairns Water approaches State Development with a view towards progressing the project, providing the Terms of Reference and the CRA International response to the Terms.

State Development informs Cairns Water that it is not eligible for assistance as ‘the infrastructure would be owned by Council’

The response from State Development was:

Your eligibility as a LGA is not questioned but projects that focus on pre-feasibility studies or feasibilities studies for public infrastructure are deemed ineligible under the guidelines. The application would be received from Cairns City Council due to Cairns Water not being a separate entity. We are therefore of the opinion that the proposed Power Generation Facility would therefore be considered a publicly owned and operated facility.

19 February 2007 Cairns Water undertook research of its own accord and found the following examples of both local government ownership and feasibility study payments (funded by State Development):

• Bundaberg City Council - Convention Centre Feasibility Study

• Noosa Shire Council - Feasibility Study Redeveloping Cooroy Lower Mill Site

• Maroochy Shire Council - Feasibility Study for Proposed Arts Convention Centre

• Maroochy Shire Council - Planning for Development of Industrial Land – Sunshine Coast Airport

Page 6: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

5

26 February 2007 Cairns Water began the application process for RBDS funding of the project.

14 March 2007 Cairns Water had its first formal interview to hand the application to the State Development Office.

On advice from State Development the application was not formally handed in as more information was sought, e.g. letters of support (provided by AusIndustry) and other information on the financial modelling already undertaken by Cairns Water.

Date Action

20 April 2007 The submission was formally handed to State Development.

10 May 2007 Information was provided to State Development (at their request) on:

� a Dun and Bradstreet Analysis conducted on behalf of State Development; and

� Work conducted in Lae – New Guinea (solid waste strategy)

23 May 2007 Information was provided to State Development (at their request) on:

� Cairns Water’s internal pre-feasibility study (financial analysis of various options)

30 May 2007 Information was provided to Cairns Water indicating that it would be beneficial for the Minister (State Development) and the General Manager to meet at the Centre of Excellence opening in June.

14 June 2007 State Development sought further information from Cairns Water on ‘like’ technologies currently operating in the Country. These were provided.

17 July 2007 State Development informed Cairns Water that funding would not be provided on the basis that this was considered by the Department to be Public Infrastructure.

As can be seen from the time frame Cairns Water has sunk considerable time and effort into dealing with State Development for a period of five months with no beneficial result achieved.

Page 7: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

6

Private Equity Involvement SITA-CEC Environmental Solutions have offered to provide Cairns City Council with $30,000 towards the feasibility study, with a requirement that the company receives the report and all associated financial models. This is considered acceptable to Cairns Water. The funding pledge was made in February and remains current.

CONSIDERATIONS: Corporate and Operational Plans: Council’s Corporate Plan references sustainability as:

Sustainability means meeting the City’s present needs without compromising the ability of future generations of Cairns residents to meet their own needs. To achieve this requires:

• minimising our use or waste of non-renewable resources • sustainable use of finite renewable resources • ensuring that ecosystems can handle the effects of development,

and • protecting natural processes and climate systems.

It is considered that power generation from the use of renewable waste material such as sewage sludge and green waste meets sustainability requirements associated with the Corporate Plan. Cairns Water’s Level 2 System View has a vision statement:

By 2010 Cairns Water will be recognised as a customer focused provider of quality services to the Cairns community that 1) values innovation and continuous improvement in the delivery of our services, and 2) fosters input from staff and the community into our decision-making processes.

It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets sustainability and innovation characteristics associated with the Corporate and Operational planning framework. Bio-Energy Power It is envisaged that should the project proceed, construction of a 5 to 10 mega-watt facility is possible. It is probable that 5,000 to 10,000 homes (depending on the size) can be powered by this plant with a possible greenhouse gas saving of between 27,000 and 54,000 tonnes per annum. It is also considered that the project is an environmentally friendly means of disposing of methane gas which in-turn may reduce Council’s impact on the Greenhouse effect. The project would actively seek Renewable Energy Credits and look at the feasibility of attracting NSW Greenhouse Gas Abatement Credits.

Page 8: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

7

Financial and Risk: The project has considerable financial and technical risk associated with it, hence the requirement for a feasibility analysis to fully understand financial, operational and technical risks associated with the technology. It is also envisaged that there is risk associated with the actual delivery mechanism of the project. This is also to be reviewed in the feasibility analysis. At this stage the risks are unquantified and unknown – however, there is also a great deal of opportunity in the project. The opportunity relates to providing embedded power generation for Cairns City Council while essentially consuming waste resources generated / received by Cairns City Council. The cost of the consultancy is estimated at $145,000 of which SITA-CEC Environmental Solutions will pay $30,000. The Cairns City Council funded component is $115,000. Presently, there is $50,000 budgeted for the proposal, consisting of $120,00 in Accounting Services and $70,000 in the Grant Revenue natural account. Hence an adjustment of $65,000 will be required should the study proceed. Recurrent Operating Costs Cairns Water currently carries the burden of two significant operating costs, namely sewage sludge disposal ($1.6M) and chipping of green waste ($0.9M). These costs will be significantly reduced if the bio-energy plant comes to fruition. For the sludge, the transportation costs will only be from the sewage treatment plants to Redden St, while the vegetation will only have minor transportation costs with the bulk of the chipping being conducted on the Redden St site. It is envisaged the chipping and disposal costs will reduce by $0.3M and the sludge disposal by $1.0M for a combined saving of $1.3M. The operating costs of the bio-energy plant are envisaged to be $1.6M. With the revenue from the sale of the electricity, the savings from the sludge disposal and vegetation removal, it is envisaged that the bio-energy plant will provide a positive cashflow to the Council. The feasibility study will further draw out these costs and stress test the underlying assumptions.

CONSULTATION: At this stage the project / idea been widely floated with both State and Federal Government agencies being contacted, however, indications are that the project does not fit with their guidelines for providing seed funding. It appears that funds are primarily related to capital delivery aspects and not feasibility studies.

Page 9: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

8

OPTIONS: Council has the options of: Option A

� Co-Funding the feasibility study with SITA-CEC Environmental Solutions; or

Option B

� With the potential commercial opportunities, it is proposed to also approach commercial entities with interests in other potential fuel sources (eg compost, green wastes other than urban waste) to seek additional partners in the feasibility study. It is not known if this would be acceptable to SITA-CEC and may jeopardise the funding already attained.

Option C

� Dissolve the project and continue with business as usual.

CONCLUSION: Council has an opportunity to undertake an innovative project that has the capability of delivering embedded power generation to the networked grid. The innovation in the project is the use of up to four (4) waste streams, namely methane gas from landfill, biosolids from sewage treatment, green waste vegetation from Council transfer stations and recycled use water (generation of steam) from the Southern Wastewater Treatment Plant. Combining these renewable waste streams to develop power provides Council with flexibility in the handling of the by-products. At this stage it is recommended that Council undertake a feasibility analysis so that it is fully aware of risk (and opportunity) in the project and also to ascertain whether the project provides Council with a positive net present value over a twenty (20) year horizon.

ATTACHMENTS:

� Cairns Water Terms of Reference (SKIDS # 1242209)

Anthony Bird Manager Business Services Bruce Gardiner General Manager – Cairns Water

Page 10: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

9

Page 11: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

10

Page 12: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

11

Page 13: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

12

Page 14: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

13

Page 15: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

14

Page 16: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

15

CAIRNS WATER COMMITTEE

21 AUGUST 2007

2

MAJOR PROJECTS STATUS REPORT

Bruce Gardiner : 24/19/32-10: #1113282 v21

RECOMMENDATION:

It is recommended that the report be noted.

INTRODUCTION: The following update is provided on current major projects being undertaken by Cairns Water. As requested by Councillors, updated information is provided in a lighter font colour and information no longer relevant has a line through it. Project 1: CLEANER SEAS INITIATIVE Project Manager: Stephen Devlin Project Steering Group: Stephen Devlin, Anthony Bird, Bruce Gardiner Alliance Partners: SKM Pty Ltd, CEC Construction Ltd, GHD Pty Ltd,

United Group Infrastructure Pty Ltd Scope of Works: This major project will involve substantial upgrades to

four Wastewater Treatment Plants over the period 2006 to 2010 with expenditure in excess of $120M. Construction on the first, the Marlin Coast plant, is currently scheduled to begin construction in fourth quarter of 2007.

Key Achievements:

- Presentation to tenderers for Contract No. CW 75236/2007 “Supply of Submerged Membrane Filtration System at Southern WWTP” held in Cairns on 11th July.

- Meeting with ITT Flygt regarding Contract No. CW 75233/2006 “Supply of Diffused Aeration Equipment” held on 12th July.

- Marlin Coast WWTP TOC Independent Estimator meeting held in Cairns from 24-26 July.

- ALT meeting held in Cairns on 27th July.

Page 17: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

16

- Value Engineering meeting held in Cairns on 30th July - Contract No. CW 75236/2007 “Supply of Submerged Membrane Filtration

System at Southern WWTP” closed on 7th August at 2pm. - KRA/KPI workshop held in Cairns on 20th June. - Risk and Opportunities workshop held in Cairns on 27th June. - ALT meeting held in Cairns on 29th June. - Meeting with RDP regarding Contract No. CW 75235/2006 “Supply of Lime

Sludge Stabilisation Equipment” held in Brisbane on 5th July.

Issues

- Presentation to tenderers for Contract No. CW 75236/2007 “Supply of Submerged Membrane Filtration System at Southern WWTP” to be held in Cairns on 11th July.

- Meeting with ITT Flygt regarding Contract No. CW 75233/2006 “Supply of

Diffused Aeration Equipment” to be held on 12th July. - Aerobic Digester trial bench tests at Cairns and Hunter Water highlighted a

potential area of concern in the volume of aerobic digestion required for upgrade of the Southern WWTP. Consequently, alternative technology options for meeting the sludge stabilisation requirements of the PTR (Principals Technical Requirement) are being investigated. A Challenge and Innovation meeting in Brisbane on June 4th indicated that Anaerobic Digestion or Aerobic Digestion (as per Concept Design) of the sludge were the preferred options, and that a lifecycle cost comparison is required. This is currently being undertaken by the Alliance.

- Preparation of the Turn Out Costs is ongoing, and is expected to be completed

by early October late July.

- All alliance partners now working towards staff recruitment, as numerous positions within the Alliance are yet to be filled.

Future Milestones

- ALT meeting to be held in Cairns on 27th July.

- Closing date for Contract No. CW 75236/2007 “Supply of Submerged Membrane Filtration System at Southern WWTP” is 7th August at 2pm.

- ALT meeting in Cairns on 31st August.

- Finalisation of Marlin Coast portion of TOC by 31st August. - Full TOC expected for completion in late September /early October.

Page 18: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

17

Financial Data On 4th April 2007, the EPCM Contract between CCC and SKM/CH2MHill was suspended. On 21st May 2007, the IPAA agreement was signed, with an initial expenditure limit of $2,599,354.00 which is for a duration period of 115 days. Alliance Partner Payments to Date (ex. GST) CEC Construction Pty Ltd $93,503.36 GHD Pty Ltd $153,185.32 SKM Pty Ltd $368,394.72 United Group Infrastructure Pty Ltd $339,132.40 Project 2: BARRON RIVER WATER SUPPLY SCHEME Project Manager: Jon Turner Project Steering Group: Bruce Gardiner, Steve Devlin, Jon Turner Consultant: GHD – Process Selection of WTP GHD – Detailed design of intake and pump station Consultant currently being selected to prepare TOR for

the following tasks: - Pipelines - detailed design and documentation - Statutory Approvals - Geotechnical investigation. Scope of Works: There are a significant number of stages to this

scheme with the program for implementation intertwined with the Mulgrave River Aquifer Scheme and Demand Management Program.

The Stages include: - Raw Water Quality Monitoring Program - Intake & Pump Station Concept Design - Barron River ROP submission for release of water

and Planning Report - Kamerunga Water Treatment Plant Process

Selection - Design Phase of the Scheme - Construction Phase (yet to be approved by Council)

Page 19: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

18

Key Achievements The major achievements to date include: - Statutory approvals granted for construction of the intake and pump station on the

Barron River. - Water Quality Monitoring of the Barron River at Lake Placid is complete. - Initial response from NRW in regards to the offer price for the 4000ML

unsupplemented allocation from the Barron River ROP not favourable. - Geotechnical investigation of the intake, pump station and pipelines will be

completed by end of July 2007. - Award of Consultancy for Kamerunga Water Treatment Plant Process Selection to

GHD Pty Ltd and Hunter Water. Issues Cairns Water received a formal response from NRW in late June 2006 in relation to the Barron River ROP submission. The response outlines a comprehensive request for further information in support of the submission. It includes: 1. Confirmation that environmental flow requirements have been considered in the

operation of the extraction; 2. Evidence of effectiveness of water conservation initiatives; 3. Current update on Cultural Values; 4. Request to undertake further hydrological modelling based on the actual

entitlement of 4000ML/a in preference to the 31500ML/a anticipated maximum; 5. Further information of infrastructure requirements; 6. Provide offer price for 4000ML/a entitlement; 7. Scope of information to be provided in response to NRW has been confirmed with

NRW officers. A meeting with NRW was undertaken in mid April 2007 on the matter of the offer price. It is evident that NRW remains firm on its reserve price for unsupplemented water and will be looking to Cairns City as the first to enter unsupplemented water market in the lower Barron Basin and set the market price. Cairns Water have been reviewing options for deferred payment over a number of years based on Cairns Water progressively increasing its use of 4000ML/a over a number of years. Future Milestones - Following Cairns Waters review of the outcomes of the Mulgrave River Aquifer

Feasibility Study, a decision on whether to make a formal price offer to NRW will be made. It is likely the offer will take the form of a deferred payment system based on the progressive increase in use of the Barron Water over time.

- Public tender for pipeline design and documentation, statutory approvals on hold pending confirmation of offer price for 4000 ML/a.

Page 20: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

19

Financial Data Barron River Water Supply

Project # Description Original Budget 07/08

Expense at 27/7/07

Commitals at 27/7/07

Total Costs at 27/7/07 Variance

PCW50110BRN-KAM WTR TRTMNT PLANT 620,000 2,760 - 2,760 617,240

PCW50510BRN - RAW &TREATED WTR MAIN 750,000 1,799 4,000 5,799 744,201

PCW50710BRN- WTR SUP INTKE WORK & PS 200,000 1,597 - 1,597 198,403

PCW50810BRN-KAM CLR WTR RESERVOIR 120,000 453 - 453 119,547 Total 1,690,000 6,608 4,000 10,608 1,679,392

Project 3: MULGRAVE RIVER AQUIFER SCHEME Project Manager: Jon Turner Project Steering Group: Bruce Gardiner, Steve Devlin, Jon Turner Consultant: GHD Pty Ltd Scope of Works: Based on the outcomes of the Least Cost Planning

Study and recommendations adopted by Council, the investigation phase of the Mulgrave River Aquifer Scheme is currently underway. This work involves the following major tasks:

- Engineering Feasibility Study of the Mulgrave River

Aquifer - Environmental Feasibility Study of the Mulgrave

River Aquifer. Key Achievements Environment, Public Environment Report (PER) A draft response to the Commonwealth in the format and in the accordance with the guidelines provided by the Commonwealth has been completed and a draft document has been lodged with Cairns Water for internal review prior to finalization and issue.

The key findings of the Public Environment Report is that the Matters of National Environmental Significance as identified by the Commonwealth will not be impacted by the abstraction from the Mulgrave River aquifer.

These conclusions are based on:

- the absence of the species in the aquifer area. The majority of the matters identified have no records from the study area, were not identified in field surveys for the species, and have no suitable habitat presented;

- no native vegetation or habitats will be cleared for the project;

Page 21: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

20

- the numerical groundwater modelling has indicated that there will be no quantifiable impacts on increased salinisation or in exposure of acid sulfate soils, both issues which may have impacted on the World Heritage Area within Mutchero Inlet.

A first stage benchmarking processing in assessing the environmental flows of the Mulgrave River has been undertaken. This has identified that the proposed levels of abstraction from the aquifer will not have an impact on the environmental flows of the Mulgrave River for the average annual seasonal variation.

The information from the above study was presented to a Statutory Authorities workshop in March 2007.

Aquifer Feasibility Study Five draft technical reports comprising the body of the feasibility study have been submitted to CW and are currently under review. These technical reports have undergone a reiterative review process in which specific technical issues related to design and operation of the associated infrastructure facilities have been addressed. Cairns Water have continued to provide feedback from Council perspective on these technical issues. All the technical reports have been combined into the single document for final review by Cairns Water.

The key outcomes of the study are as follows:

� A reliable and environmentally sustainable Stage 1 aquifer water supply of 15 ML/d is feasible and is able to developed at capital cost of $12m. This proposal is also economically sound as it delays the need for the development of a major new water supply source (eg the Barron River Water Supply Scheme at a cost of at least $50m) until 2015.

� An environmentally sustainable aquifer water supply of 40ML/d is also feasible. However, the level of abstraction may need to be reduced below 40ML/d during extreme dry periods due to potential impacts on the environmental flows in the Mulgrave River. The technical assessments undertaken as part of this study have revealed a much higher interaction between the aquifer and the surface water systems and a consequent greater impact on environmental flows in the Mulgrave River than had been assumed in previous studies by NRW and others. More intensive environmental flow monitoring over a period of several years is therefore required to resolve the reliability of a 40ML/d abstraction.

A presentation on the final outcomes of the project is to be made by GHD to Cairns Water on 9th August. Future Milestones The Final Report is expected from the consultant by the end of August July 2007.

Page 22: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

21

Financial Data Included in the Barron River Water Supply Scheme report. Mulgrave River Aquifer Scheme

Project # Description Original Budget 07/08

Expense at 27/7/07

Commitals at 27/7/07

Total Costs at 27/7/07 Variance

PCW51310MLGRVE RIVER ACQ PLANNING - 2,786 - 2,786 (2,786)Total - 2,786 - 2,786 (2,786)

Project 4: WATER DEMAND MANAGEMENT PROGRAM

Project Manager: Eric Zesers Project Steering Group: Alex Ung, Jon Turner; Lia McDonald, Eric Zesers. Scope of Works: Based on the outcomes of the Least Cost Planning

Study and recommendations adopted by Council, Cairns Water are enhancing the existing demand management program which commenced in early 2004. A Demand Management Strategy has been adopted by Council, incorporating the following initiatives-

- Community education - Permanent water conservation measures - Water Conservation for Commercial Customers - Cairns Water and Cairns City Council water use

audits - A comprehensive leakage reduction effort including

the establishment of Pressure Management and District Metering areas.

- Ongoing leak detection - Reduction of unbilled and illegal connections - Review of raw water supply and Treatment Plant

operations - Recycled water opportunities.

The largest undertaking for Cairns Water is the establishment of pressure management areas and district metering areas. This involves major changes to the operation of our water reticulation system and improving our ability to track non-revenue water. The success and timeliness of the demand management program has implications on when Cairns City Council’s next water supply source is required. Key Achievements Drought Management Plan prepared and adopted by Council. Demand Management Strategy prepared, and adopted by Council.

Page 23: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

22

Funding of $1,312,135 has been approved, by the Department of Local Government, Planning and Sport, to assist with the implementation of the Demand Management Strategy. Funding will be provided for the Public Education and Communication Program, Communications and Education Officer and the District Metering program. Community attitudes and awareness survey on water conservation completed. Approximately 60% of the district metering zones are in place and operating. Leak detection works in the CBD completed in July 2006. Implementation of the use of treated effluent for process use at Northern and Marlin Wastewater Treatment Plants is completed. This will save approximately 700ML of potable water per annum. Scoping study on the potential for recycled water use at Flecker Botanic Gardens completed. Council approved further investigation into the use of recycled water at the Botanic Gardens and the Cairns Port Authority. Consultants appointed to prepare a Strategic Plan on Recycled Water Use for Cairns. The Plan is focussing on a strategic approach to utilising high quality effluent from the upgraded Wastewater Treatment Plant. Water Conservation Policy for Cairns City Council operations adopted by Council. Council approved entering into an MOU with the Queensland EPA to implement the ecoBiz program in Cairns. “Our Cairns Water” campaign was launched on April 23, 2007 with a public launch on April 29th at Fogarty Park. New website online in May 2007 - ourcairnswater.com.au EcoBiz launched with a workshop for businesses on May 10th. Application for exemption from Water Saving Targets was submitted to DLGPSR in May 2007. The Minster for Local Government Planning and Sport notified Council on, June 21 2007 that a conditional exemption of one year had been granted. Consideration of further exemptions will be dependant on reported progress against the Demand Management Strategy. Strategic Plan for Recycled Water Use completed July 2007. Report to be provided to Council in September.

Page 24: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

23

Future Milestones - Complete district metering by end of 2007 - Complete Strategic Plan for Recycled Water Use – July 2007. - Investigation into un-metered water services – July 2008 - Complete System Leakage Management Plan – August 2007 - Second “Our Cains Water” television commercial to be aired starting in October

2007. Financial Data Water Demand and Pressure Management

Project # Description Original Budget 07/08

Expense at 27/7/07

Commitals at 27/7/07

Total Costs at 27/7/07 Variance

PCW7053 DISTRICT METERING - 39,326 68,518 107,843 (107,843)PCW7050 Unmetered firelines inv & inst - 2,130 - 2,130 (2,130)

PMW7058Demand management (operational) 357,572 2,335 226,497 228,832 128,740 Total 357,572 43,791 295,015 338,805 18,767

Project 5: CAMPBELL STREET PUMP STATION,

GORDONVALE

Project Manager: Jon Turner Consultant: John Wilson & Partners (JWP) Scope of Works: Detailed design and documentation of the new

Campbell St Pump Station, Gordonvale to replace the existing aging pump station. The existing pump station was constructed in the 1940s and has been the subject of an investigation into the benefits of a major rehabilitation of the pump station versus construction of a new pump station. The recommended option was to design and construct a new pump station adjacent to the existing and abandon the existing pump station.

Key Achievements Tenders for the construction of the pump station and rising main closed on 26 June 2007. and is currently being assessed by Cairns Water officers. Issues Cairns Water have recently attended meetings with Mulgrave Central Mill on the matter of securing the conditions for approval of construction of the rising main within the tramway corridor. are currently securing final approval from Mulgrave Central Mill to construct the rising main within the tramway corridor owned by theMill.

Page 25: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

24

Based on new conditions raised by Mulgrave Central Mill, Cairns Water will be deferring the construction of the rising main to a later time pending an agreed outcome with Mulgrave Central Mill. It will therefore be necessary to retender the pump station component only to allow construction to proceed on the pump station. Future Milestones Award of pump station contract in September July 2007. Secure agreement with Mulgrave Central Mill for constructing the rising main within the Tramway corridor in august 2007 to allow tendering for the pipeline in August 2007. Financial Data Campbell Street Pump Station

Project # Description Original Budget 07/08

Expense at 27/7/07

Commitals at 27/7/07

Total Costs at 27/7/07 Variance

PCS6442 CAMPBELL ST PS - 53,233 12,549 65,782 (65,782)PCS7402 CAMPBELL ST RISING MAIN - 1,023 - 1,023 (1,023)

Total - 54,256 12,549 66,805 (66,805) Project 7: BRAMSTON BEACH SEWERAGE & WATER

SUPPLY SCHEME

Project Manager: Jon Turner Consultant: GHD Pty Ltd Scope of Works: Undertake planning report for the provision of

sewerage system for Bramston Beach Community and upgrade of the water supply system. This work will lead into the implementation phase of a sewerage collection, treatment and disposal scheme and water supply upgrade for Bramston Beach.

Key Achievements Meeting No. 3 undertaken on 19 September 2006. The full evaluation of options was presented including the preferred option. Council resolved to move forward with implementing a sewerage scheme at its Ordinary Meeting October 2006. Planning report for the Bramston Beach Sewerage Scheme and Water Supply Upgrade has been endorsed by Council. Issues The Terms of Reference for the preparation of the design and acquisition of permits and approvals is currently being developed.

Page 26: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

25

Future Milestones Design and statutory permit/approval acquisition is expected to take up to 12 months to complete, ie. August 2007. Approvals associated with GBRMPA or DEH are likely to span 18 months. Delivery of the Bramston Beach scheme is currently being considered as part of the Cleaner Seas Alliance project. The approved Planning Report was submitted in June 2007 to Department of Natural Resources and Water and Department of Local Government and Sports & Recreation to secure WASP funding for the scheme. Financial Data Bramston Beach

Project # Description Original Budget 07/08

Expense at 27/7/07

Commitals at 27/7/07

Total Costs at 27/7/07 Variance

PCS52000BRAMSTON BCH SWG PLANNING 4,142,857 - - - 4,142,857

PCW52000BRMST BCH WATER SPPLY UPG 950,960 - - - 950,960 Total 5,093,817 - - - 5,093,817

Project 8: MRF (MATERIALS RECOVERY FACILITY) Project Manager: Steve Elwell Consultant: Waste Recycling Equipment Services Scope of Works: This major project will involve an upgrade to the

Material Recycling Facility to enable the facility to receive paper and cardboard for sorting and baling for onsale to markets.

Key Achievements:

- Construction of footings commenced - Construction of paper and cardboard sorting equipment commenced - Fortnightly recycling of paper and cardboard has commenced. - Slab Floor poured - Roof supports have been installed

Issues: The ability to operate during construction.

Page 27: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

26

Future Milestones:

- Delivery of paper and cardboard sorting equipment - Completion of shed – Installation of paper and cardboard sorting equipment 27

August 2007 - Commissioning of equipment 3-6 September 2007.

Financial Data MRF

Project # Description Original Budget 07/08

Expense at 27/7/07

Commitals at 27/7/07

Total Costs at 27/7/07 Variance

PCE08110 MRF - GLASS CRUSHER 260,200 - - - 260,200 PCE08120 MRF - PAPER SORTER 900,000 - - - 900,000 PCE8801 MRF DESIGN & CONSTRUCTION 560,000 6,258 892,752 899,010 (339,010)

Total 1,720,200 6,258 892,752 899,010 821,190 B GARDINER GENERAL MANAGER CAIRNS WATER

Page 28: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

27

CAIRNS WATER COMMITTEE

21 AUGUST 2007

3

WATER - SITUATION REPORT

Bruce Gardiner:JEA : 24/1/5-23: #1147692 v18

RECOMMENDATION: It is recommended that this report be noted. Please note that water quality results are included in the monthly report, Operations - Water Services Section.

COPPERLODE FALLS DAM Copperlode Falls Dam was approximately 99.80% full to the end of July 2007. The following graph shows the spillway level from 2005 to date.

Cairns WaterCopperlode Dam Spillway - 3 Year Span

-4000

-3000

-2000

-1000

0

1000

2000

3000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecTop of Spillway

Level in MM

Year2005Year2006Year2007

Page 29: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

28

The Southern Oscillation Index, updated on 3 August 2007 from the Bureau of Meteorology, was negative.

BEHANA CREEK Behana Creek at the end of July 2007 had a creek flow at the intake weir of greater than 85 ML.

CONSUMPTION AND RAINFALL: Rainfall recorded at the Freshwater Creek Plant for July 2007 was 37mm. The graph below shows water production versus rainfall from January 2005 to date.

Cairns WaterAnnual Comparative - Water Production V's Rainfall (3 Year Span)

0.00

500.00

1000.00

1500.00

2000.00

2500.00

3000.00

3500.00

Janu

ary

Feb

ruar

y

Mar

ch

Apr

il

May

June

July

Aug

ust

Sep

tem

ber

Oct

ober

Nov

embe

r

Dec

embe

r

Months

Leve

l in

MM

& P

rodu

ctio

n M

L

2005 Rainfall2006 Rainfall2007 Rainfall2005 Production2006 Production2007 Production

Page 30: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

29

The following graph shows the volume of water extracted from Behana Creek and supplied from Freshwater Treatment Plant.

Cairns WaterAnnual Comparative - Location - Water Production V's Rainfall

0.00

500.00

1000.00

1500.00

2000.00

2500.00

3000.00

Janu

ary

Febru

ary

March

April

MayJu

ne July

Augus

t

Septe

mber

Octobe

r

Novem

ber

Decem

ber

Months

Leve

l in

MM

& P

rodu

ctio

n in

ML

2007 Rainfall

2007 Total Production

2007 FWTP Production

2007 Behana Production

NON REVENUE WATER These figures will be reported quarterly – next report due October 2007. B GARDINER GENERAL MANAGER CAIRNS WATER

Page 31: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

30

CAIRNS WATER COMMITTEE

21 AUGUST 2007

4

ENVIRONMENTAL MANAGEMENT REPORT – JULY 2007

Ian Clayton : 18/25/2-04 #1533576 v 1

RECOMMENDATION: It is recommended that this report be noted.

INTRODUCTION: Under the adopted Integrated Environmental Management System, a monthly Environmental Management report is to be prepared for consideration by Council.

BACKGROUND: During the month of July one (1) environmental incident and zero (0) wet weather overflows were recorded and reported. During the 09/07/2007, a sewer blockage occurred in Henley Street Earlville. Prior to clearing the blockage, a small amount of effluent (estimated at 200 litres) reached the curb and channel fronting the premises located at 5 Henley Street. The effluent was quickly contained and removed by vacuum tanker. The area contacted by effluent was disinfected.

COMMENT: Cairns Water has an obligation to the community to operate an efficient and effective sewerage system. Within the operational sphere, accidents and equipment malfunction will occur. The effectiveness of operational policy can be judged by the ability of the individuals to respond to such incidents. In the above case, the response was efficient and effective, with no measured or perceived environmental harm.

Page 32: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

31

CONSIDERATIONS: Corporate and Operational Plans: A related Key Goal from the Corporate Plan includes:

6. Health Safety and Community Development

A specific outcome identified is:

6.5 Healthier and safer Place for residents and Visitors Cairns Water’s Operational Plan for Wastewater Services has as its aim:

To minimise the operational costs of sewerage service delivery while maintaining agreed service standards.

Statutory: Compliance with Environmental Protection Agency (EPA) licence no. 5010000159 and the Environment Protection Act 1994.

Financial and Risk: Failure to respond quickly and effectively to incidents may result in substantial penalties.

Sustainability: N/A

CONSULTATION: EPA were advised of all incidents.

CONCLUSION: Cairns Water will continue to operate the sewerage system in an efficient and effective manner. IAN CLAYTON ENVIRONMENTAL COORDINATOR BRUCE GARDINER GENERAL MANAGER CAIRNS WATER

Page 33: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

32

CAIRNS WATER COMMITTEE

21 AUGUST 2007

5 CAIRNS WATER MONTHLY REPORT FOR AUGUST

Bruce Gardiner : 1/3/38-01: #1532195 v1

RECOMMENDATION: It is recommended that the monthly report from Cair ns Water for the month of July 2007 be received and noted. Bruce Gardiner General Manager Cairns Water

Page 34: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

33

ACTIVITY: Management and Administration Support - 6500

Mission To provide excellent customer service for internal and external clients and to develop systems

to ensure a smooth and effective operation

Output Title: Output Description: 1. Performance review of managers work Review of work performed by each branch and the

effectiveness of each branch manager; Provision of guidance and support to improve outputs; Includes the review of Divisional performance in the following areas: • Budget management; • Operating initiative management; • Capital works management; • Workplace Health and Safety performance; • Customer management.

2. Coaching and support of staff across the Division

Provision of effective support to enable all Divisional staff to meet the performance expectation of their customers.

3. Policies and Administrative Instructions relevant to Divisional operations

General Policies are Council approved statements provided for the benefit of the public; they advise Council’s position with regard to specific matters. Administrative Instructions are approved by the Executive Management team (EMT) and provide direction for staff in carrying out specific functions.

4. Business Excellence Systems Views, Self Assessment Reports and Continuous Improvement support for the Division

Business Excellence is the title of Council's adopted Organisational Effectiveness framework and program. The outputs listed to the left are the key outputs from the program. General Manager promotion and support of the program within their Division is critical to its success.

5. Agenda coordination for Council's Cairns Water Committee

Coordination of reports to be provided to Cairns Water Committee.

6. Administration Support Administration support associated with Cairns Water

Officer Responsible: General Manager Cairns Water

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Oversee review of the Total Management Plan (TMP) and Strategic Asset Management Plan (SAMP) documents.

Corporate Plan 10.2.2

Dec 2007 25% ����

* Variance Report for Initiatives not on target: Nil * Prospective Actions for Initiatives not on target : Nil

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Page 35: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

34

Performance Rating:

?

Variance Report Levels are within tolerance limits

• Result Measure (Title): Divisional Budget Performance • Result Target: Expenditure -5% / Revenue No more than -1% • Reporting Frequency: Monthly • Performance Assessment :

2.3. Operating Budget YTD Performance

0.00

2.00

4.00

6.00

8.00

10.00

2. Expenditure 3. Revenue

Mill

ions

Budget Type

Dol

lars

Recurrent YTD Budget

Recurrent YTD Actual

2.27% Variance

-6.34% Variance

Prospective Actions Refer to notes for financial statements

Performance Rating:

X

Variance Report Capital expenditure represents total commitments for Cairns Water capital projects + invoiced expenditure. Capital Budget is linear which is not reflective of actual expenditure patterns.

• Result Measure (Title): Divisional Capital Budget - % Spent • Result Target: 90% of budget spent by year end • Reporting Frequency: Monthly • Performance Assessment :

Capital Works Expenditure

0102030405060708090

July

Augus

t

Septem

ber

Octobe

r

Novem

ber

Decem

ber

Janu

ary

Febru

ary

Mar

chApr

ilM

ayJu

ne

Mill

ions

Months in Year

Dol

lars

Capital Budget

Capital Expenditure

Prospective Actions Monitor actual expenditure on a project by project basis.

Page 36: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

35

Performance Rating:

X

Variance Report N/A

• Result Measure (Title): Timeliness of Divisional Operating Initiative

Completions • Result Target: 90% of initiatives completed by year end • Reporting Frequency: Monthly • Performance Assessment :

Timeliness of Divisional Operating Initiative Compl etion

05

101520253035404550

July

Augus

t

Septem

ber

Octobe

r

Novem

ber

Decem

ber

Janu

ary

Febru

ary

March

April

MayJu

ne

Months in Year

Num

ber o

f Ini

tiativ

es

Com

plet

ed

Initiative Met

Initiative Logged

Prospective Actions 32 out of 43 initiatives (or 75%) due for completion in 2006/07 were completed. The main reasons for missing targets were staff shortages. The initiatives that were not achieved were not critical to Cairns Water operations and will be rolled over into 2007/08

Performance Rating:

?

Variance Report N/A

• Result Measure (Title): Divisional Safety Performance • Result Target: Lost time injury frequency rate - improving • Reporting Frequency: Monthly • Performance Assessment : Improvement relative to 3 year average Data not available this month.

Prospective Actions

Page 37: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

36

Performance Rating:

����

Variance Report N/A

• Result Measure (Title): Divisional Safety Performance • Result Target: Lost time injury duration rate - improving • Reporting Frequency: Monthly • Performance Assessment : Improvement relative to 3 year average Data not available this month.

Prospective Actions

Performance Rating:

����

Variance Report N/A

• Result Measure (Title): Resident Response System Divisional

Performance • Result Target: Number of overdue requests trending � • Reporting Frequency: Monthly • Performance Assessment : Trend from 05/06 levels

Summary of Overdue Requests

0

1

2

3

4

5

July

Augus

t

Septe

mbe

r

Octo

ber

Novem

ber

Decem

ber

Janu

ary

Febru

ary

Mar

chApr

ilM

ayJu

ne

Months in Year

Num

ber o

f Ove

rdue

R

eque

sts

Water Restrictions

Sew erage

Water

Garbage - Complaint

Garbage - Recycling

Prospective Actions See Waste Management Contract Management section

Operating Budget Assessment:

YTD Actual ($) YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%)

Revenue -

-

-

-

• N/A • Reasons: • Implications / Actions

Expenditure

(3,579.00) 1,995.00 5,575.00 279%

• FAVOURABLE • Reasons • Implications / Actions :

Page 38: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

37

ACTIVITY: Management and Administration Support – Communicati on

& Education - 6503

Mission To provide excellent customer service for internal and external clients and to develop systems

to ensure a smooth and effective operation Output Title: Output Description: 1. Marketing Campaigns Marketing campaigns to enable the Cairns community to

understand: � water wise initiatives; and � the waste hierarchy

This includes media releases, communication programs, promotional materials and events

2. Cairns Water and Our Cairns Water Web Pages

Web pages to ensure timely and accurate information for customers

Officer Responsible: Communications & Education Officer

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Redevelop Cairns Water Web Site Corporate Plan 9.1

30 Dec 2007 50% ����

* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Page 39: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

38

Performance Rating:

����

Variance Report Articles identified - taken from Media Monitor

• Result Measure (Title): Number of Media Releases Developed • Result Target: Monitor number developed • Reporting Frequency: Monthly • Performance Assessment :

o Cleaner Seas Alliance Launch (WIN) Cleaning up on water works (Post, 4CA, HOT/Sea)

� water to stay at top quality (Post) � Leak claims reduce bills (Post) � IN Brief – cairns Rates on way (Innisfail Advocate) � Water r flows as poll pledge (Post) � Water-saving pay back (Post) � Water pipes break 3 times in two weeks (Post) � Budget delivers big wins for environment (Sun) � City rewarded for performance (Sun) � Don’t dump it, recycle it (Cairns Central feature - Sun)

Number of Media Releases Developed

0

2

4

6

8

10

July

Augus

t

Septem

ber

Octo

ber

Novem

ber

Decem

ber

Janu

ary

Febru

ary

Mar

chApr

ilMay

June

Months in Year

Num

ber o

f Rel

ease

s

Media Release

Target

Additional Features

Prospective Actions Busy month despite 1 official release, and several additional in relation to the Budget in July. Additional 9 pick-ups for features and were covered by the media that were not generated from a press releases

Performance Rating:

?

Variance Report

• Result Measure (Title): Promotional Materials - Amount Distributed • Result Target: 100% of Budget Spent • Reporting Frequency: Monthly • Performance Assessment :

Promotional Materials - Amount Distributed

02,0004,0006,0008,000

10,000

July

Augus

t

Septe

mbe

r

Octo

ber

Novem

ber

Decem

ber

Janu

ary

Febru

ary

Mar

chApr

ilM

ayJu

ne

Months in Year

Am

ount

Exp

ende

d

Actual Expenditure

Budget

Prospective Actions No purchases YTD – pending need for coming events and value at said events

Page 40: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

39

Performance Rating:

����

Variance Report Events to date completed Additional events to be determined as per value-add to our Brand or strategies

• Result Measure (Title): Number of Events Delivered • Result Target: Delivery of all scheduled / targeted events • Reporting Frequency: Monthly • Performance Assessment :

Number of Events Delivered

0% 20% 40% 60% 80% 100%

CSA launch

Cairns Show

Carnival on Collins

Our Cairns Water - Stage 2

Eve

nts

Completion

Prospective Actions

Performance Rating:

����

Variance Report Number of visitations taken from Webstats Report

• Result Measure (Title): Cairns Water Webpage Usage • Result Target: Increasing trend over time • Reporting Frequency: Monthly • Performance Assessment :

CnsWtrOurCnsWtr

TOTAL MONTHS Successful requests (pages + links): 128992 30056 Average successful requests per DAY (pages + links): 4161 970 Busiest WEEK (beginning): 09/07/2007 16/07/2007 Busiest DAY: 10/07/2007 18/07/2007

Webpage Hits / Usage

020000400006000080000

100000120000140000

July

Augus

t

Septe

mbe

r

Octobe

r

Novem

ber

Decem

ber

Janu

ary

Febru

ary

Mar

chApr

ilM

ayJu

ne

Months in Year

Num

ber o

f Hits

Cairns Water

Our Cairns Water

Prospective Actions

Page 41: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

40

Performance Rating:

����

Variance Report

• Result Measure (Title): External Communications on Major Projects • Result Target: Increasing trend over time • Reporting Frequency: Monthly • Performance Assessment :

Number of External Communications on Major Projects

0 1 2 3 4 5

Cleaner Seas

Customer Service Standards

Water Supply

Demand Management

Regional Waste Facility

Pro

ject

s

Completed Communications

Prospective Actions

Customer Service Standards flyer completed and

expected distribution to commence by end July ’07 via the water bills

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%)

Revenue - - - -% • NA • Reasons: • Implications / Actions :

Expenditure

(20,591.00) (1,498.00) 19,093.00 1274%

• FAVOURABLE • Reasons • Implications / Actions:

Page 42: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

41

ACTIVITY: Business Support – Management and Administration S upport - 6510

Mission To provide excellent customer service for internal and external clients and to develop systems

to ensure a smooth and effective operation Output Title: Output Description: 1. Branch Management 2. Administration Support Administration support associated with Cairns Water Officer Responsible: Manager Business Services

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Facilitate Green Energy Proposal Corporate Plan 4.6.2

Dec 2007 25% ����

* Variance Report for Initiatives not on target: Nil * Prospective Actions for Initiatives not on target : Nil

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Performance Rating: ����

Variance Report No formal complaints were received for the month of July 2007.

• Result Measure (Title): Number of Complaints from Supported Areas &

Customers • Result Target: No more than 2 complaints per month • Reporting Frequency: Monthly • Performance Assessment : •

Number of Complaints From Customers (Formal)

011223

July

Augus

t

Septe

mbe

r

Octobe

r

Novem

ber

Decem

ber

Janu

ary

Febru

ary

Mar

chApr

ilM

ayJu

ne

Months in Year

Num

ber o

f Com

plai

nts Complaints

Target

Prospective Actions N/A

Page 43: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

42

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%)

Revenue - - - -% • Reasons: • Implications / Actions :

Expenditure (20,544.00) (2,102.00) 18,442.00 877% • FAVOURABLE • Reasons

Overhead recovery has resulted in greater than expected gains

• Implications / Actions

Page 44: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

43

ACTIVITY: Business Services – Customer Service and Billing - 6511

Mission To provide excellent customer service for internal and external clients and to develop systems

to ensure a smooth and effective operation Output Title: Output Description: 1. Water Consumption Accounts Water usage notices and settlement data to customers,

provided in a timely and effective manner 2. Water Usage Settlement Accounts Final reads provided in the settlement process associated with

property transfers 3. Water Meter Replacement Program Meter replacement program targeting meters at the end of

their useful lives Officer Responsible: Manager Business Services

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Develop and implement a structured approach to maintaining the meter fleet

Dec 2007 5% ����

* Variance Report for Initiatives not on target: N/A * Prospective Actions for Initiatives not on target : N/A

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Performance Rating:

����

Variance Report

• Result Measure (Title): Water Usage Notice - time from read to bill issue

date • Result Target: Within 14 days of reading date • Reporting Frequency: Monthly • Performance Assessment :

Water Consumption Account Turnaround Time - 14 Day Target

5

10

15

20

25

19/0

7/20

07

26/0

7/20

07

Account Issue Date

Num

ber of

Day

s fro

m M

eter

Rea

d

TargetULCLCL

Prospective Actions N/A

Page 45: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

44

Performance Rating:

?

Variance Report A total of 498 searches were undertaken during July 2007. 5 Day Settlment s: 30 settlement reports were outside the required time frame which consists of: 9 x staff error; 3 x verification by Operations Staff; 18 x not registered.

• Result Measure (Title): Water Settlements - Turnaround time from request

to issue • Result Target: 5 days for $29 Fee 24 Hours for $64.50 Fee • Reporting Frequency: Monthly • Performance Assessment :

Water Settlements Turnaround Time from Request to I ssue

Target 100% Compliance

92%

94%

96%

98%

100%

102%

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Months in Year

% C

om

plia

nce

5 Day % 24 Hour % Target %

Prospective Actions Internal processes have been reviewed and amendments have been made including regular variance reporting to target those settlements outside milestone requirements.

Performance Rating:

?

Variance Report Meter replacement program not yet started.

• Result Measure (Title): Meter replacement program - capital budget

compliance • Result Target: 100% of allocated capital utilised • Reporting Frequency: Monthly • Performance Assessment :

Meter Replacement Program

050000

100000150000200000

July

Augus

t

Septe

mbe

r

Octob

er

Novem

ber

Decem

ber

Janu

ary

Febr

uary

Mar

chApr

ilM

ayJu

ne

Months in Year

Cap

ital B

udge

t

Actuals

Budget

Prospective Actions

Page 46: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

45

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%)

Revenue 19,394.00 14,527.00 4,867.00 33.5% • FAVOURABLE • Reasons:

Greater than anticipated meter reading fees

• Implications / Actions N/A

Expenditure 21,780.00 63,721.00 41,941.00 65.8% • FAVOURABLE

• Reasons: Actuals less than budget due to cycles associated with meter reading (2 week layoff) after the financial year.

• Implications / Actions : N/A

Page 47: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

46

ACTIVITY: Business Services – Financial Management - 6512

Mission To provide financial management services built on strong internal process for all customers

Output Title: Output Description: 1. Cairns Water Budget Original budget and budget review documentation from

Operations, Waste and Infrastructure

2. Monthly Financial Analysis Financial analysis associated with consolidated Cairns Water provision

Officer Responsible: Management Accountant

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Develop an enhanced capital delivery accounting framework

Corporate Plan 10.4.1

Dec 2007 10% ����

2. Review the Australian Standard on Fraud Prevention with a view to implementing the principles

Corporate Plan 10.4.1

Mar 2008 0% ����

* Variance Report for Initiatives not on target: N/A * Prospective Actions for Initiatives not on target : N/A

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Performance Rating:

����

Variance Report 1st Budget Review not yet commenced.

• Result Measure (Title): Adherance to Corporate Budget Timeline • Result Target: 100% compliance • Reporting Frequency: Quarterly • Performance Assessment :

Timeliness of Budget Preparation

0%

20%

40%

60%

80%

100%

1st Budget Review 2nd Budget Review 3rd Budget Review 2007/08 OriginalBudget

Reporting Period

% C

ompl

ianc

e

Timeline Metfor QuarterlyBudget ReviewTarget

Prospective Actions Preliminary work underway.

Page 48: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

47

Performance Rating:

����

Variance Report NA

• Result Measure (Title): Timeliness of Financial Analysis • Result Target: Timeliness of financial analysis in monthly reports • Reporting Frequency: Monthly • Performance Assessment :

Timeliness of Financial Analysis

0%20%40%60%80%

100%

July

Augus

t

Septe

mbe

r

Octobe

r

Novem

ber

Decem

ber

Janu

ary

Febru

ary

Mar

chApr

ilM

ayJu

ne

Reporting Period

% C

ompl

ianc

e

AgendaCloseAchievedTarget

Prospective Actions NA

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%)

Revenue • N/A • Reasons: • Implications / Actions :

Expenditure (3,208.00) (1,378.00) 1,831.00 132.8% • FAVOURABLE • Reasons:

Annual leave taken in July. • Implications / Actions:

Page 49: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

48

ACTIVITY: Business Services – Laboratory Services - 6513 Mission Laboratory Services aims to provide a quality, commercial, expert, timely and cost-effective

scientific service to its internal and external customers in all aspects that determine water quality as it impacts on human lifestyle.

Output Title: Output Description: 1. Tests on:

- Waters for Drinking Purposes

- Waters (non-drinking)

- Solid matrices

- Other tests

Tests undertaken for client purposes include water for drinking, wastewaters, pools, creeks, lakes, sludge and soils and other tests such as swab analysis associated with food preparation. The method of analysis associated with production includes tests on:

- Anions - tests negatively charged species, eg chloride

- Bacterias- tests for bacteria such as E-coli and Faecal Coliforms

- Metals - tests for metals and metalliods such as arsenic and cadmium

- Nutrients - tests for substances such as Phosphorus, Nitrogen and Ammonia

- Other - Non-routine testing on an as required basis

- Physical Properties- tests for properties such as Biological Oxygen Demand and pH

- Solids - Tests on soils, clays, sludges, and the like - Subcontracted work - Analyses not handled by the

laboratory, due to lack of instrumentation and non-validated NATA methods

Officer Responsible: Laboratory Services Manager

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Performance Rating: ����

Variance Report TAT’s are trending up.

1. Sample Completion Time

50

60

70

80

90

100

July

Sep

tem

ber

Nov

embe

rJa

nuar

y

Mar

ch

May

July

Sep

tem

ber

Nov

embe

rJa

nuar

y

Mar

ch

May

Period Beginning July 05

Per

cent

age

Com

plet

e

99% within 14 days 80% within 5 days 100% within 30 days

Prospective Actions N/A

Page 50: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

49

Performance Rating:

����

Variance Report Batch quality scores are excellent. CAR’s are at acceptable levels.

2. Quality of Results

50556065707580859095100

July

Oct

ober

Janu

ary

Apr

il

July

Oct

ober

Janu

ary

Apr

il

Period Beginning July 2005

Qua

lity

Per

cent

age

Ach

ieve

d

Z-score ≤2 >95% of analysis batches

>95% CAR's closed out within 14days of lodging

Prospective Actions N/A

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%)

Revenue 82,966.00 60,353.00 22,613.00 37.4% • FAVOURABLE • Reasons: Record number of

analyses has helped to enhance the bottom line.

• Implications / Actions:

Expenditure 49,163.00 61,213.00 12,050.00 19.6% • FAVOURABLE • Reasons: N/A • Implications / Actions:

Page 51: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

50

ACTIVITY: Business Services – Corporate and External Reportin g - 6514

Mission To ensure that Cairns Water maintains its corporate and external reporting obligations

associated with all operations, excluding environmental compliance. Output Title: Output Description: 1. Total Management Plan (TMP) and Strategic

Asset Management Plan (SAMP) Coordination and maintenance of the TMP and SAMP for Cairns Water: � The TMP is used to address requirements of the

Environmental Protection Policy (Water) 1997 in respect of Environmental Plans; and

� The TMP or components of it, are used to satisfy the Strategic Asset Management Plan (SAMP) and Customer Service Standard requirements of the Water Act 2000.

2. Coordination of the Divisional Risk Register Coordination and maintenance of the risk register for Cairns Water

3. Coordination of incident scenario(s) Coordination of the development and implementation of incident scenario(s) to allow Cairns Water to better meet catastrophic events

Officer Responsible: Business Process Officer

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Co-project manage (with Operations) implementation of the Australian Drinking Water Quality Framework

Corporate Plan 5.2.2, 5.2.3.

Jun 2008 10% ����

* Variance Report for Initiatives not on target: NA * Prospective Actions for Initiatives not on target : NA

Page 52: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

51

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Performance Rating:

����

Variance Report

• Result Measure (Title): TMP and SAMP Compliance with Statutory

Arrangements • Result Target: Passing of State Government Audit • Reporting Frequency: Annual • Performance Assessment :

Prospective Actions NA

Performance Rating:

����

Variance Report

• Result Measure (Title): Currency of Risk Register • Result Target: EMT review and approval • Reporting Frequency: Quarterly • Performance Assessment :

Currency of Risk Register

0%

20%

40%

60%

80%

100%

Sep-07 Dec-07 Mar-08 Jun-08

Review and Approval Months

% o

f Cur

renc

y

% of RiskRegister that iscurrentTarget

Prospective Actions NA

Performance Rating:

����

Variance Report

• Result Measure (Title): Coordination of Incident Scenarios • Result Target: 4 Scenario Sessions / Year • Reporting Frequency: Quarterly • Performance Assessment :

% of Incident Scenarios Planning SessionsCompleted as Scheduled

02040

6080

100

Sep-07 Dec-07 Mar-08 Jun-08

Months

% C

ompl

ete % of Incident

Scenario PlanningSessions Completedas scheduled

Prospective Actions NA

Page 53: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

52

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%)

Revenue • N/A • Reasons: • Implications / Actions :

Expenditure (4,176.00) (478.00) 3,698.00 773.6% • FAVOURABLE • Reasons:

Employee costs higher than anticipated due to accrued annual leave.

• Implications / Actions :

Page 54: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

53

ACTIVITY: Business Services – Environmental Management and Qu ality Systems - 6516

Mission Ensure that impacts on the environment from Cairns Water’s operations and activities are

identified and minimised Output Title: Output Description: 1. Cairns Water Environmental Licence

Compliance Reports Environmental Licence compliance reports to the Environmental Protection Agency

2. Cairns Water Environmental Risk Assessment

Risk assessments associated with environmental requirements

3. Wastewater Discharge Sampling Sampling program to monitor treated wastewater discharges into estuarine waterways, in accordance with Licence requirements

Officer Responsible: Environmental Coordinator

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Operationalise the Environmental Management System

Corporate Plan 4.4.1

Dec 2007 60% ����

* Variance Report for Initiatives not on target: N/A * Prospective Actions for Initiatives not on target : N/A

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Performance Rating: ����

Variance Report

• Result Measure (Title): Compliance with Environmental Licence • Result Target: 100% compliance with licence • Reporting Frequency: Monthly • Performance Assessment :

Compliance with Environmental Licence

0

1

2

July

Augu

st

Septem

ber

Octo

ber

Novem

ber

Decem

ber

Janu

ary

Februa

ry

Mar

chAp

rilMay

June

Months in Year

Num

ber o

f PIN

S Is

sued Number of PINS

Issued

Target PIN

Prospective Actions

Page 55: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

54

Performance Rating:

����

Variance Report NA

• Result Measure (Title): Number of Environmental Risk Assessments

Undertaken • Result Target: Visitation to all operating sites once per year • Reporting Frequency: Monthly • Performance Assessment :

Number of Environmental Risk Assessments Undertaken

0.05.0

10.015.020.0

July

Augu

st

Septem

ber

Octob

er

Nov

embe

r

Dec

embe

r

Janu

ary

Februa

ry

March

April

May

June

Months in Year

Num

ber o

f

Ass

essm

ents

Target

ActualInspections

Prospective Actions NA

Performance Rating:

����

Variance Report NA

• Result Measure (Title): Number of Sample Points • Result Target: 38 sample points per month • Reporting Frequency: Monthly • Performance Assessment :

Number of Samples Taken

36

37

38

39

July

Augu

st

Septem

ber

Octob

er

Nov

embe

r

Dec

embe

r

Janu

ary

Februa

ry

March

April

May

June

Months in Year

Num

ber o

f Sam

ples

Target

# of Samples

Prospective Actions NA

Page 56: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

55

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%)

Revenue • Reasons: • Implications / Actions

Expenditure (17,911.00) (1,555.00) 16,356.00 1051.8% • FAVOURABLE • Reasons:

Competitive neutrality adjustments are the cause of the variance

• Implications / Actions

Page 57: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

56

ACTIVITY: Business Services – Plumbing and Trade Waste Compli ance - 6517

Mission To ensure that clients receive the highest level of service and professional advice to assist

them to attain the required standards in the developments for which they are responsible Output Title: Output Description: 1. Plumbing and Trade Waste Compliance

Assessments Compliance assessments of plumbing and trade waste works with the mandatory requirements of the Acts, Regulations and By-Laws

2. Water, plumbing and drainage works - processed applications

Applications received and processed for approval to proceed with water, plumbing and drainage works

3. Plumbing inspections Inspections and tests of water, plumbing and drainage works during constructions for compliance with the relevant regulations

4. Tradewaste Inspections Tradewaste inspections undertaken for compliance with the relevant regulations

Officer Responsible: Manager Business Services

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Performance Rating:

����

Variance Report NA

• Result Measure (Title): Number of legal challenges to compliance

assessment • Result Target: Zero successful challenge • Reporting Frequency: Monthly • Performance Assessment :

Number of Legal Challenges to Compliance Assessment

0%20%40%60%80%

100%

July

Augus

t

Septem

ber

Octobe

r

Novembe

r

Decembe

r

Janu

ary

Febru

ary

March

AprilMay

June

Months in Year

# of

Suc

cess

ful

Cha

lleng

es Actual Challenges

Target

Prospective Actions NA

Page 58: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

57

Performance Rating:

����

Variance Report NA

• Result Measure (Title): Number of Plumbing Applications Received • Result Target: Compliance with budgeted number • Reporting Frequency: Monthly • Performance Assessment :

Number of Plumbing Applications Received

-500

1,0001,500

July

Augus

t

Septem

ber

Octo

ber

Novem

ber

Decem

ber

Janu

ary

Febru

ary

Mar

chApr

ilMay

June

Thousands

Months in Year

Rev

enue

from

A

pplic

atio

ns

Revenue Received

Revenue Target

Prospective Actions NA

Performance Rating:

?

Variance Report 316 Applications approved in July 2007 – 15 not processed within the 20 day timeframe: 8 applications received awaiting approval from Plumbing Inspectors. 5 applications received requiring further information or plans from the applicant - applicants were notified. 2 applications received awaiting registration of property.

• Result Measure (Title): Plumbing Application Turnaround Time • Result Target: Assessment within twenty days • Reporting Frequency: Monthly • Performance Assessment :

Plumbing Approval Turnaround Time

0

10

20

30

40

50

60

70

80

1 16 31 46 61 76 91 106

121

136

151

166

181

196

211

226

241

256

271

286

301

316

Number of Approvals

# of

Wor

king

Day

s F

or A

ppro

val Plumbing Approvals

Upper Control Limit

Lower Control Limit

Target

Prospective Actions N/A

Page 59: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

58

Performance Rating:

����

Variance Report NA

• Result Measure (Title): Number of Plumbing Inspections Undertaken • Result Target: Monitor number • Reporting Frequency: Monthly • Performance Assessment :

Number of Plumbing Inspections Undertaken

450500550600650700

July

August

September

October

November

December

January

February

MarchApril

MayJune

Months in Year

Num

ber

of

Insp

ectio

ns

Und

erat

aken

Target

Actual Inspections

UCL

LCL

Prospective Actions NA

Performance Rating:

?

Variance Report

• Result Measure (Title): Number and Timeliness of Trade Waste

Inspections • Result Target: Inspections on anniversary date • Reporting Frequency: Monthly • Performance Assessment :

Trade Waste Inspection Frequency

100

125

150

July

Augus

t

Septe

mbe

r

Octob

er

Novem

ber

Decem

ber

Janu

ary

Febr

uary

Mar

chApr

ilM

ayJu

ne

Months in Year

Num

ber

of In

spec

tions

Target

Actual Inspections

UCL

LCL

Prospective Actions NA

Page 60: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

59

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%)

Revenue 167,442.00 157,655.00 9,787.00 6.2% • FAVOURABLE • Reasons: Greater than expected plumbing

application revenue • Implications / Actions

Expenditure 139,570.00 142,225.00 2,655.00 1.8% • FAVOURABLE • Reasons • Implications / Actions

Page 61: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

60

CAIRNS WATER

A Business Unit of Cairns City Council

OVERVIEW OF FINANCIAL PERFORMANCE

For the Month Ended: July-07

Notes to the Financial Statements WATER & WASTEWATER 1. Sources of Revenue Total revenue for July of $5.8M is below the budgeted monthly amount of $6.4M, a variance of

$526k or 8.2%. $335k of this variance is attributable to rates and utility charges, primarily the water usage revenue. In addition developer contributions are under budget for July by $280k.

2. Expenditure by Type Total operating expenses for July of $3.8M is below the budgeted amount of $4.2M a variance

of $397k or 9.4%. This is due to under expenditure in chemical costs, property management services and consultancy costs. This is a budget timing variance and costs will be incurred in future months.

3. Operating Capability Before Tax, Dividend and Capital Items For the month of July the net operating surplus of $1.9M is above the budgeted amount of

$2.1M a variance of $129K due to the above mentioned. WASTE MANAGEMENT 4. Sources of Revenue The total revenue for July of $1.58M is above the budgeted amount of $1.56M, a variance of

$20K a variance of 1.2%. 5. Expenditure by Type Total operating expenses for July of $1.75M are above the budgeted amount of $1.48M, a

variance of $266K or 17.97%. This variance is due to the fixed monthly charge for Sita-CEC for August being receipted in the July period.

6. Operating Capability before Tax, Dividend and Capital Items For the month of July net operating loss of $163K is below the budgeted $82K surplus, a

variance of $245K or 298.7% due to the above mentioned.

Page 62: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

61

CAIRNS WATER

A Business Unit of Cairns City Council

CAIRNS WATER CONSOLIDATED POSITION

STATEMENT OF FINANCIAL PERFORMANCE

For the Month Ended: July-07

PTD PTD PTD YTD YTD YTD Annual

Actual Budget Variance Actual Budget Variance Budget

Notes

$ $ $ $ $ $ $

OPERATING REVENUE

Rates and Utility Charges 6,391,410.00 6,693,958.00 (302,549.00) 6,391,410.00 6,693,958.00 (302,549.00) 80,327,499.00

Less Discount and Pensioner Remissions (252,543.00) (222,293.00) (30,250.00) (252,543.00) (222,293.00) (30,250.00) (2,667,517.00)

Net Rates & Utility Charges 6,138,866.00 6,471,665.00 (332,799.00) 6,138,866.00 6,471,665.00 (332,799.00) 77,659,982.00

Fees and Charges 727,881.00 585,103.00 142,777.00 727,881.00 585,103.00 142,777.00 6,940,350.00

Interest Received 12,226.00 15,635.00 (3,409.00) 12,226.00 15,635.00 (3,409.00) 187,620.00

Miscellaneous Revenue 163,555.00 195,510.00 (31,955.00) 163,555.00 195,510.00 (31,955.00) 2,363,773.00

Community Service Obligations 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Donations 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Contributions 432,119.00 712,621.00 (280,502.00) 432,119.00 712,621.00 (280,502.00) 8,551,452.00

Subsidies and Grants 0.00 0.00 0.00 0.00 0.00 0.00 213,000.00

Total Operating Revenue 7,474,647.00 7,980,535.00 (505,888.00) 7,474,647.00 7,980,535.00 (505,888.00) 95,916,177.00 1 & 4

OPERATING EXPENDITURE

Employee Costs 1,196,695.00 1,302,198.00 105,502.00 1,196,695.00 1,302,198.00 105,502.00 16,949,628.00

Materials and Services Costs 2,336,426.00 2,389,946.00 53,520.00 2,336,426.00 2,389,946.00 53,520.00 28,378,003.00

Depreciation and Amortisation Expenses 1,727,817.00 1,734,734.00 6,917.00 1,727,817.00 1,734,734.00 6,917.00 23,598,196.00

Bank Fees and Charges 0.00 2.00 2.00 0.00 2.00 2.00 41.00

Borrowing Costs 390,173.00 390,173.00 0.00 390,173.00 390,173.00 0.00 5,113,476.00

Bad and Doubtful Debts 0.00 3,178.00 3,178.00 0.00 3,178.00 3,178.00 38,140.00

Other 4,500.00 400.00 (4,100.00) 4,500.00 400.00 (4,100.00) 400.00

Competitive Neutrality Charges 116,334.00 118,674.00 2,340.00 116,334.00 118,674.00 2,340.00 1,403,133.00

5,771,945.00 5,939,304.00 167,360.00 5,771,945.00 5,939,304.00 167,360.00 75,481,016.00

Less Expenses Capitalised (120,381.00) (156,637.00) (36,257.00) (120,381.00) (156,637.00) (36,257.00) (1,907,930.00)

Total Operating Expenditure 5,651,564.00 5,782,667.00 131,103.00 5,651,564.00 5,782,667.00 131,103.00 73,573,086.00 2 & 5

OPERATING CAPABILITIES BEFORE CAPITAL ITEMS, INCOME TAX & DIVIDEND1,823,083.00 2,197,868.00 374,785.00 1,823,083.00 2,197,868.00 374,785.00 22,343,091.00 3 & 6

Notional Income Tax Expense (638,587.00) (1,787,210.00) (1,148,623.00) (638,587.00) (1,787,210.00) (1,148,623.00) (14,723,590.00)

Notional Dividend Expense (1,001,576.00) (100,899.00) 900,677.00 (1,001,576.00) (100,899.00) 900,677.00 (5,502,397.00)

OPERATING CAPABILITIES BEFORE CAPITAL ITEMS 182,920.00 309,759.00 126,839.00 182,920.00 309,759.00 126,839.00 2,117,104.00

CAPITAL ITEMS:

Gain (Loss) on Disposal of Property Plant and Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Contributions 154,751.00 1,456,536.00 1,301,785.00 154,751.00 1,456,536.00 1,301,785.00 17,478,431.00

Subsidies and Grants 150,789.00 3,383,666.00 3,232,877.00 150,789.00 3,383,666.00 3,232,877.00 23,825,547.00

Total Capital Items 305,540.00 4,840,202.00 4,534,662.00 305,540.00 4,840,202.00 4,534,662.00 41,303,978.00

INCREASE/(DECREASE) IN OPERATING CAPABILITY 488,460.00 5,149,961.00 4,661,501.00 488,460.00 5,149,961.00 4,661,501.00 43,421,082.00

Page 63: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

62

CAIRNS WATER

A Business Unit of Cairns City Council

WATER & WASTEWATER

STATEMENT OF FINANCIAL PERFORMANCE

For the Month Ended: July-07

PTD PTD PTD YTD YTD YTD Annual

Actual Budget Variance Actual Budget Variance Budget

Notes

$ $ $ $ $ $ $

OPERATING REVENUE

Rates and Utility Charges 5,163,575.00 5,476,632.00 (313,057.00) 5,163,575.00 5,476,632.00 (313,057.00) 65,719,589.00

Less Discount and Pensioner Remissions (195,615.00) (173,479.00) (22,135.00) (195,615.00) (173,479.00) (22,135.00) (2,081,754.00)

Net Rates & Utility Charges 4,967,961.00 5,303,153.00 (335,192.00) 4,967,961.00 5,303,153.00 (335,192.00) 63,637,835.00

Fees and Charges 425,235.00 329,670.00 95,565.00 425,235.00 329,670.00 95,565.00 3,875,154.00

Interest Received 10,067.00 12,805.00 (2,738.00) 10,067.00 12,805.00 (2,738.00) 153,660.00

Miscellaneous Revenue 50,304.00 53,900.00 (3,596.00) 50,304.00 53,900.00 (3,596.00) 664,450.00

Community Service Obligations 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Donations 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Contributions 432,119.00 712,621.00 (280,502.00) 432,119.00 712,621.00 (280,502.00) 8,551,452.00

Subsidies and Grants 0.00 0.00 0.00 0.00 0.00 0.00 213,000.00

Total Operating Revenue 5,885,686.00 6,412,149.00 (526,463.00) 5,885,686.00 6,412,149.00 (526,463.00) 77,095,552.00 1

OPERATING EXPENDITURE

Employee Costs 1,091,659.00 1,187,895.00 96,236.00 1,091,659.00 1,187,895.00 96,236.00 15,481,930.00

Materials and Services Costs 862,431.00 1,191,791.00 329,360.00 862,431.00 1,191,791.00 329,360.00 13,713,872.00

Depreciation and Amortisation Expenses 1,678,936.00 1,685,334.00 6,398.00 1,678,936.00 1,685,334.00 6,398.00 22,909,186.00

Bank Fees and Charges 0.00 2.00 2.00 0.00 2.00 2.00 41.00

Borrowing Costs 383,988.00 383,988.00 0.00 383,988.00 383,988.00 0.00 5,009,640.00

Bad and Doubtful Debts 0.00 3,178.00 3,178.00 0.00 3,178.00 3,178.00 38,140.00

Other 4,500.00 400.00 (4,100.00) 4,500.00 400.00 (4,100.00) 400.00

Competitive Neutrality Charges (1,755.00) 653.00 2,408.00 (1,755.00) 653.00 2,408.00 57,178.00

4,019,760.00 4,453,241.00 433,482.00 4,019,760.00 4,453,241.00 433,482.00 57,210,387.00

Less Expenses Capitalised (120,381.00) (156,637.00) (36,257.00) (120,381.00) (156,637.00) (36,257.00) (1,907,930.00)

Total Operating Expenditure 3,899,379.00 4,296,604.00 397,225.00 3,899,379.00 4,296,604.00 397,225.00 55,302,457.00 2

OPERATING CAPABILITIES BEFORE CAPITAL ITEMS, INCOME TAX & DIVIDEND1,986,308.00 2,115,545.00 129,238.00 1,986,308.00 2,115,545.00 129,238.00 21,793,095.00 3

Notional Income Tax Expense (687,554.00) (1,759,513.00) (1,071,959.00) (687,554.00) (1,759,513.00) (1,071,959.00) (14,522,892.00)

Notional Dividend Expense (1,001,576.00) (46,273.00) 955,303.00 (1,001,576.00) (46,273.00) 955,303.00 (5,153,100.00)

OPERATING CAPABILITIES BEFORE CAPITAL ITEMS297,178.00 309,759.00 12,582.00 297,178.00 309,759.00 12,582.00 2,117,103.00

CAPITAL ITEMS:

Gain (Loss) on Disposal of Property Plant and Equipment0.00 0.00 0.00 0.00 0.00 0.00 0.00

Contributions 154,751.00 1,456,536.00 1,301,785.00 154,751.00 1,456,536.00 1,301,785.00 17,478,431.00

Subsidies and Grants 150,789.00 3,373,666.00 3,222,877.00 150,789.00 3,373,666.00 3,222,877.00 23,706,547.00

Total Capital Items 305,540.00 4,830,202.00 4,524,662.00 305,540.00 4,830,202.00 4,524,662.00 41,184,978.00

INCREASE/(DECREASE) IN OPERATING CAPABILITY602,718.00 5,139,961.00 4,537,244.00 602,718.00 5,139,961.00 4,537,244.00 43,302,081.00

Page 64: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

63

CAIRNS WATER

A Business Unit of Cairns City Council

WASTE MANAGEMENT

STATEMENT OF FINANCIAL PERFORMANCE

For the Month Ended: July-07

PTD PTD PTD YTD YTD YTD Annual

Actual Budget Variance Actual Budget Variance Budget

Notes

$ $ $ $ $ $ $

OPERATING REVENUE

Rates and Utility Charges 1,227,834.00 1,217,326.00 10,508.00 1,227,834.00 1,217,326.00 10,508.00 14,607,910.00

Less Discount and Pensioner Remissions (56,929.00) (48,814.00) (8,115.00) (56,929.00) (48,814.00) (8,115.00) (585,763.00)

Net Rates & Utility Charges 1,170,906.00 1,168,512.00 2,393.00 1,170,906.00 1,168,512.00 2,393.00 14,022,147.00

Fees and Charges 302,646.00 255,433.00 47,213.00 302,646.00 255,433.00 47,213.00 3,065,196.00

Interest Received 2,159.00 2,830.00 (671.00) 2,159.00 2,830.00 (671.00) 33,960.00

Miscellaneous Revenue 113,250.00 141,610.00 (28,360.00) 113,250.00 141,610.00 (28,360.00) 1,699,323.00

Community Service Obligations 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

Contributions 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Subsidies and Grants 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Operating Revenue 1,588,961.00 1,568,385.00 20,575.00 1,588,961.00 1,568,385.00 20,575.00 18,820,626.00 4

OPERATING EXPENDITURE

Employee Costs 105,036.00 114,303.00 9,266.00 105,036.00 114,303.00 9,266.00 1,467,698.00

Materials and Services Costs 1,473,995.00 1,198,155.00 (275,840.00) 1,473,995.00 1,198,155.00 (275,840.00) 14,664,131.00

Depreciation and Amortisation Expenses 48,881.00 49,400.00 519.00 48,881.00 49,400.00 519.00 689,009.00

Bank Fees and Charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Borrowing Costs 6,185.00 6,185.00 0.00 6,185.00 6,185.00 0.00 103,836.00

Bad and Doubtful Debts 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Other 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Competitive Neutrality Charges 118,089.00 118,021.00 (68.00) 118,089.00 118,021.00 (68.00) 1,345,955.00

1,752,185.00 1,486,063.00 (266,122.00) 1,752,185.00 1,486,063.00 (266,122.00) 18,270,629.00

Less Expenses Capitalised 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Operating Expenditure 1,752,185.00 1,486,063.00 (266,122.00) 1,752,185.00 1,486,063.00 (266,122.00) 18,270,629.00 5

OPERATING CAPABILITIES BEFORE CAPITAL ITEMS, INCOME TAX & DIVIDEND(163,224.00) 82,323.00 245,547.00 (163,224.00) 82,323.00 245,547.00 549,996.00 6

Notional Income Tax Expense 48,967.00 (27,697.00) (76,664.00) 48,967.00 (27,697.00) (76,664.00) (200,698.00)

Notional Dividend Expense 0.00 (54,626.00) (54,626.00) 0.00 (54,626.00) (54,626.00) (349,297.00)

OPERATING CAPABILITIES BEFORE CAPITAL ITEMS(114,257.00) 0.00 114,257.00 (114,257.00) 0.00 114,257.00 1.00

CAPITAL ITEMS:

Gain (Loss) on Disposal of Property Plant and Equipment0.00 0.00 0.00 0.00 0.00 0.00 0.00

Contributions 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Subsidies and Grants 0.00 10,000.00 10,000.00 0.00 10,000.00 10,000.00 119,000.00

Total Capital Items 0.00 10,000.00 10,000.00 0.00 10,000.00 10,000.00 119,000.00

INCREASE/(DECREASE) IN OPERATING CAPABILITY(114,257.00) 10,000.00 124,257.00 (114,257.00) 10,000.00 124,257.00 119,001.00

Page 65: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

64

CAIRNS WATER

A Business Unit of Cairns City Council

CAIRNS WATER DEBTOR REPORT

For the Month Ended: July-07

Fees & Charges Outstanding

-600

-400

-200

-

200

400

600

Tho

usan

ds

Private Works

General Debtors

LaboratoryTesting Fees

Trade WasteCharges

Waste Charges

Private Works -58,479 -49,527 -54,141 -370,252

General Debtors 424,209 15,461 -198 -9,724

Laboratory Testing Fees 85,746 28,271 1,046 2,001

Trade Waste Charges 168,124 778 2,853 33,439

Waste Charges - 974 81 646

Current 30 Days 60 Days 90 Days +

Rates Outstanding

-

5,000

10,000

15,000

20,000

Tho

usan

ds

Water Access

Sewerage Access

Cleaner SeasLevy

CleansingCharges

Water Access 5,986,859 1,280 273,812

Sewerage Access 16,928,913 3,933 862,179

Cleaner Seas Levy 1,798,985 255 50,338

Cleansing Charges 7,099,864 1,807 388,769

Current Overdue Arrears

Water Usage Charges Outstanding

0

50

100

150

200

250

300

350

400

450

500

Tho

usan

ds

Water UsageCharges

Water Usage Charges 440,247 133,766 102,276 37,547 356,119

Current 30 Days 60 Days 90 Days 90 + Days

Page 66: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

65

CAIRNS WATER RATES REVENUE GRAPHS

For the Month Ended: July-07

Comments: No Major Variance

Comments: No Major Variance

Water Access Rates RevenueYTD

0

2,000,000

4,000,000

6,000,000

8,000,000

10,000,000

12,000,000

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Res Act

Com Act

Res Bud

Com Bud

Cleansing Rates RevenueYTD

0

2,000,000

4,000,000

6,000,000

8,000,000

10,000,000

12,000,000

14,000,000

16,000,000

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Actual

Budget

Page 67: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

66

CAIRNS WATER RATES REVENUE GRAPHS

For the Month Ended: July-07

Comments: No Major Variance

Comments: No Major Variance

Sewer Access Rates RevenueYTD

0

5,000,000

10,000,000

15,000,000

20,000,000

25,000,000

30,000,000

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Res Act

Com Act

Res Bud

Com Bud

Cleaner Seas RevenueYTD

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

3,500,000

4,000,000

4,500,000

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Actual

Budget

Page 68: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

67

CAIRNS WATER RATES REVENUE GRAPHS

For the Month Ended: July-07

CAIRNS WATER RATES REVENUE GRAPHS

For the Month Ended: July-07

Comments: No Major Variance

Comments: No Major Variance

Water Usage RevenueYTD

0

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

6,000,000

7,000,000

8,000,000

9,000,000

10,000,000

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Res Act

Com Act

Res Bud

Com Bud

Fees & Charges (Water) RevenueYTD

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

3,500,000

4,000,000

4,500,000

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Actual

Budget

Page 69: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

68

Comments: No major Variance.

Fees & Charges (Waste) RevenueYTD

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

3,500,000

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Actual

Budget

Page 70: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

69

CAIRNS WATER TOTAL EXPENSE GRAPHS

For the Month Ended: July-07

Comments: No Major Variance

Comments: No Major Variance

Total Expenses Corporate AdministrationYTD

0

5,000,000

10,000,000

15,000,000

20,000,000

25,000,000

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Actual

Budget

Total Expenses Cairns Water/Waste ManagementYTD

0

10,000,000

20,000,000

30,000,000

40,000,000

50,000,000

60,000,000

70,000,000

80,000,000

90,000,000

100,000,000

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Actual

Budget

Page 71: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

70

CAIRNS WATER/REFUSE MANAGEMENT TOTAL EXPENSE GRAPHS

For the Month Ended: July-07

Comments: No Major Variance.

Comments: Actual expenses transferred out via overhead allocation journal to CW Operations.

Total Expenses Business ServicesYTD

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

3,500,000

4,000,000

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Actual

Budget

Total Expenses InfrastructureYTD

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

160,000

180,000

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Actual

Budget

Page 72: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

71

CAIRNS WATER/WASTE MANAGEMENT TOTAL EXPENSE GRAPHS

For the Month Ended: July-07

Comments: No Major Variance

Comments: No Major Variance

Total Expenses OperationsYTD

0

10,000,000

20,000,000

30,000,000

40,000,000

50,000,000

60,000,000

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Actual

Budget

Total Expenses Waste ManagementYTD

0

2,000,000

4,000,000

6,000,000

8,000,000

10,000,000

12,000,000

14,000,000

16,000,000

18,000,000

20,000,000

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Actual

Budget

Page 73: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

72

Cairns Water – Capital Works

Cairns Water Capital Works 2007/08

-

10,000,000

20,000,000

30,000,000

40,000,000

50,000,000

60,000,000

70,000,000

80,000,000

Month

Val

ue

YTD Actuals + Commit t als 18,595,749 - - - - - - - - - - -

YTD Budget 6,899,124 13,798,248 20,697,371 27,596,495 34,495,619 41,394,743 48,293,866 55,192,990 62,092,114 68,991,238 75,890,361 82,789,485

YTD Exp + Adj commit t als 11,990,536 - - - -

July $ August $ Sept $ Oct $ Nov $ Dec $ Jan $ Feb $ March $ Apr il $ May $ June $

The above graph is representative of the total commitments (outstanding purchase orders) for Cairns Water capital projects + 07/08 invoiced expenditure. Due to the volume of projects and the linear nature of the capital budget, the data below provides a brief report of variances for major projects (where the 07/08 budget exceeded $500k). The commitments provided below have been adjusted to represent the true budgetary variance for 07/08.

Budget 07/08

Original

YTD Expenditure

YTD committals

YTD Actual Expenditure + Committals

($)

Variance ($) (on YTD figures)

Variance (%)

Carry forward

committals

Variance Report & Prospective Actions (where variance is

+/- 10%)

Cleaner Seas – Wastewater Treatment Plant Upgrades

$54.4m

$491k

$14.2m $14.7m $39.7m 72.9%

$6.6m

Page 74: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

73

Budget 07/08

Original

YTD Expenditure

YTD committals

YTD Actual Expenditure + Committals

($)

Variance ($) (on YTD figures)

Variance (%)

Carry forward

committals

Variance Report & Prospective Actions (where variance is +/-

10%) Upgrade

Pumps and Pipes at

Kamerunga Rd

Freshwater (PCS08419)

$650k 0 0 0 $650k 100%

Construct New sewer

pressure main (PCS08530)

$802k 0 0 0 $802k 100%

Upgrade sewer Jensen & Oregon St

Developments(PCS08820)

$500k 0 0 0 $500k 100%

Barron River – Clear water storage & Raw water

main (PCW50110 & PCW50510)

$1.370m $4k $4k $8k $1.362m 99.4%

Upgrade Clifton Beach Wetwell (PCS08414) $800k 0 0 0 $800k 100%

Sewer relining 07/08

(PCS08810)

$1.5ml 0 0 0 $1.5ml 100%

Unmetered Fireline installation (PCW08340) $700k $2k 0 $2k $698k 99.7%

Bramston

Beach Water Supply

Upgrade (PCW52000)

$950k 0 0 0 $950k 100%

Pressure

management and district metering

(PCW08320)

$1.5ml 0 0 0 $1.5m 100%

Installation of fibre sorter (Mrf design and construction) (PCE8801)

$560k

$6k

$892k

$899k

($339k)

(60.5%)

450 Trunk Main Ext

Walker Rd (PCW8408)

$635k 0 0 0 $635k 100%

Page 75: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

74

Budget 07/08

Original

YTD Expenditure

YTD committals

YTD Actual Expenditure + Committals

($)

Variance ($) (on YTD figures)

Variance (%)

Carry forward

committals

Variance Report & Prospective Actions (where variance is +/-

10%)

Upgrade Ventilation Swallow Rd (PCS7359)

$850k 0 0 0 $850k 100%

WhiteRock Sewer

Scheme (PCS8605)

$600k $1.8k $36k $38.7k $561.3k 93.55%

FWTP Backwash treatment

(PCW08120)

$700k 0 0 0 $700k 100%

2nd Main Behana Trunk (PCW08531)

$900k 0 0 0 $900k 100%

Fishery Falls Reservoir

(PCW08801) $500k 0 0 0 $500k 100%

Bartle Frer Reservoir

(PCW08802) $500k 0 0 0 $500k 100%

Bellenden Ker Reservoir

(PCW08803) $500k 0 0 0 $500k 100%

SPS Refurb programme – JIT Renewal (PCS08400)

$500k 0 0 0 $500k 100%

MRF – Paper Sorter

(PCE08120) $900k 0 0 0 $900k 100%

Page 76: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

75

ACTIVITY: Operations Management & Administration Support – 65 30

Mission To ensure the delivery of Water and Wastewater services are delivered in a cost effective,

efficient manner to the end user. Output Title: Output Description: 1. Branch Management 2. Performance Management for: � Water Treatment � Water Reticulation � Wastewater Treatment � Wastewater Reticulation

Report monthly the measurable outputs of the unit against Corporate and legislative requirements.

Officer Responsible: Manager Operations

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Develop a system generated report/s which identify Unit/Activity efficiency and effectiveness against defined outputs.

Corporate Plan 9.1.2

Dec 2007 85 % ����

* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Performance Rating: ����

Variance Report

• Result Measure (Title): System Generated reporting on Operational effectiveness

via Work Ordering. • Result Target: Compliance reporting for Water Treatment and Reticulation,

Wastewater Treatment and Reticulation on demand. • Reporting Frequency: Monthly • Performance Assessment: Data has highlighted areas of operational efficiency

and deficiencies in other areas.

Prospective Actions

Operating Budget Assessment:

YTD Actual ($)

YTD Budget

Revised ($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%) Revenue

1,000.00 1,100.00 (100.00) (9.09%)

UNFAVOURABLE • Reasons: • Implications / Actions :

Expenditure

133,751.00 (7,616.00) (141,366.00) (1856.7%)

UNFAVOURABLE • Reasons: Branch overhead

charges due to distribution of infrastructure’s expenses.

• Implications / Actions : No impact on the overall Operational budget.

Page 77: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

76

ACTIVITY: Operations – Workplace Health and Safety – 6535

Mission To provide the systems and tools to allow safe and effective work environments and assist staff

rehabilitation, with integration back into the workforce Output Title: Output Description: 1. Safe work instructions for Cairns Water

Operations Safe work procedures for all types of work carried out by each “Activity”

2. Cairns Water WHS M.A.P.s Compliance for Cairns Water Divisions

Operational benchmark compliance with Gold scheme member at 85% each month.

3. RiskWatch meetings 4 RiskWatch meetings per year

4. WHS Workplace inspections for Cairns Water

Workplace inspections according to schedule based on level of risk at each site

Officer Responsible: Manager Operations

Cairns Water WH&S Monthly Action Plans Overall Perf ormance

On Target Cairns Water Locations

Complete (enter % )

Yes (enter ����)

No * (enter X)

Spence St / Water Lab / Management/WH&S Unit Spence St 100% ���� Water Laboratory 100% ���� Cairns Water WH&S Unit 100% ���� Cairns Water Management 100% ���� Depots Babinda Depot 100% ���� Gordonvale Depot 100% ���� Macnamara Street Depot 100% ���� Magazine Street Depot 100% ���� Transfer Stations Babinda Transfer Station 100% ���� Buy Back Shop Portsmith 100% ���� Gordonvale Transfer Station 100% ���� Landfill Portsmith 100% ���� MRF Portsmith 100% ���� Portsmith Transfer Station 100% ���� Smithfield Transfer Station 100% ���� Treatment Plants Babinda Treatment Plant 100% ���� Edmonton Treatment Plant 100% ���� Gordonvale Treatment Plant 100% ���� Marlin Coast Treatment Plant 100% ���� Northern Treatment Plant 100% ���� Southern Treatment Plant 100% ���� Tunnel Hill Treatment Plant 100% ����

* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :

Page 78: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

77

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%)

Revenue - - - - • • Reasons: • Implications / Actions :

Expenditure

(6,744.00) (1,929.00) 4,816.00 249.6%

• FAVOURABLE • Reasons : • Implications / Actions :

Page 79: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

78

ACTIVITY: Operations – Water Services – 6537

Mission To supply potable water, be cost effective and meet our Customer Service Standards

Output Title: Output Description: 1. Potable Water for Cairns Connections to the City water supply system; supply of potable

water to a quality equal to or better than the Australian Drinking Water Guidelines; water supply systems include:

• Freshwater Supply System

• Behana Creek Supply System

• Minor Rural Supply Systems

• Distribution System

2. Water Service Infrastructure Operation and Maintenance

Maintenance of water infrastructure to service demands; principle assets are: • Freshwater Treatment Plant

• Intakes

• Numerous Pump Stations

• Distribution Network

• Reservoirs and storages

3. Water Service Asset Information Supply of Asset information on underground assets for the purpose of locating utilities

Officer Responsible: Water Services Coordinator

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Co-project Manage (with Business Services) implementation of the Australian Drinking Water Quality Framework

Corporate Plan 5.2.2, 5.2.3

Jun 2008 25% ����

* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Page 80: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

79

Performance Rating:

����

Variance Report

N/A

1. Operating capacity of Freshwater Treatment Plant

7580859095

100

July

Septe

mber

Novem

ber

Janu

ary

Mar

ch May

2007/08 Financial Year

Per

cent

age

Production Capacity

Prospective Actions

N/A

Performance Rating:

����

Variance Report

N/A

2. Compliance with Extraction Licence

020406080

100

July

Septe

mber

Novem

ber

Janu

ary

March

May

Per

cent

age

Freshw ater PercentageBehana Percentage

2007/08 Financial Year

Prospective Actions

N/A

Performance Rating:

����

Variance Report

N/A

3. Urban / Rural Supplies - Faecal Coliforms

50%60%70%80%90%

100%

July

Septe

mber

Novem

ber

Janu

ary

March

May

2007/08 Financial Year

Per

cent

age

Com

plia

nce

URBANTarget Compliance 98% 0 per 100mLRURAL

Prospective Actions

N/A

Page 81: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

80

Performance Rating:

X

Variance Report With the Behana supply being pushed North, our potential risk increases slightly.

4. Urban/ Rural Supplies - Total Coliforms

50%60%70%80%90%

100%

July

Septe

mbe

r

Novem

ber

Janu

ary

March

May

2007/08 Financial Year

Per

cent

age

Com

plia

nce

URBAN

Target Compliance 98% 0 per 100mL

RURAL

Prospective Actions Develop and implement Drinking Water Quality Management System.

Performance Rating:

����

Variance Report

N/A

5. Urban / Rural Supplies - Turbidity Compliance

50%60%70%80%90%

100%

July

Septem

ber

Novem

ber

Janu

ary

Mar

ch May

2007/08 Financial Year

Per

cent

age

Com

plia

nce

URBAN

Target Compliance 95% < 5NTU

RURAL

Prospective Actions

N/A

Performance Rating:

X

Variance Report

Low pH in both urban and rural areas was caused by long detention times of Behana water and low flows.

6. Urban / Rural Supplies - pH

50%60%70%80%90%

100%

July

Septe

mber

Novem

ber

Janu

ary

March

May

2007/08 Financial Year

Per

cent

age

Com

plia

nce

URBAN

Target Compliance 98% within 6-8.5

RURAL

Prospective Actions Investigate the installation of automatic pH correction equipment at rural intakes & reservoirs. Investigate proposal to construct reservoir & treatment plant at Maitland Rd, Gordonvale.

Page 82: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

81

Performance Rating:

����

Variance Report

N/A

7. Urban / Rural Supplies - Colour

50%60%70%80%90%

100%

July

Septe

mber

Novem

ber

Janu

ary

Mar

ch May

2007/08 Financial Year

Per

cent

age

Com

plia

nce

URBANTarget Compliance 98% RURAL

Prospective Actions

N/A

Performance Rating:

����

Variance Report

N/A

8. Drinking Water Quality Complaints / 1000 Propert ies

02468

10

July

Septe

mbe

r

Novem

ber

Janu

ary

March

May

2007/08 Financial Year

Num

ber o

f C

ompl

aint

s

Number of DWQ Complaints /1000 Propert iesTarget

Prospective Actions

N/A

Performance Rating:

����

Variance Report

N/A

10. Number of Main Breaks / 100Km of Main

0.005.00

10.0015.0020.00

July

Septe

mber

Novem

ber

Janu

ary

Mar

ch May

2007/08 Financial Year

Nu

mb

er o

f Bre

aks

Number of M ain Breaks / 100km

Target

Prospective Actions

N/A

Page 83: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

82

Performance Rating:

����

Variance Report

N/A

15. Minimum Flow Expectation at Boundary 25L / Min ute • Indicator: Minimum flow expectation at boundary • Target: 25 L/min • Reporting Frequency: As requested by customers • Performance Assessment: No requests during this month

Prospective Actions

N/A

Performance Rating:

����

Variance Report

N/A

16. Maximum Water Pressure at Boundary 600KPA • Indicator: Maximum pressure at boundary • Target: 600 KPA • Reporting Frequency: As requested by customers • Performance Assessment: No requests during this month

Prospective Actions

N/A

Performance Rating:

����

Variance Report

N/A

17. Minimum Water Pressure Expectation at Boundary 220KPA • Indicator: Minimum pressure at boundary • Target: 220KPA • Reporting Frequency: As requested by customers • Performance Assessment: 29 requests during this month

o 2 low pressure complaint was caused by water main being off. o 6 low pressure complaints there was no problem found at all. o 3 low pressure complaint is still being investigated. o 4 low pressure complaint was caused by the meter tap being off. o 2 low pressure complaints was rectified by renewing service. o 3 low pressure complaints were caused by blockage. o 6 low pressure complaints were tested with data logger & no problem found. o 2 low pressure complaints were caused by Developer’s working in area. o 1 low pressure complaint was found to be a problem on the owner’s side.

Prospective Actions

N/A

Page 84: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

83

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised ($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%) Revenue

2,259,588.00 2,742,008.00 (482,420.00) (17.59%)

• UNFAVOURABLE • Reasons: • Implications / Actions : N/A

Expenditure

1,938,275.00 2,068,309.00 130,034.00 6.28%

• FAVOURABLE • Reasons: Increase in work

gangs carrying out Capital Works projects and AB work orders.

• Implications / Actions: N/A

Page 85: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

84

ACTIVITY: Operations – Wastewater Services – 6539

Mission To minimise the operational costs of sewerage service delivery while maintaining agreed

service standards Output Title: Output Description: 1. Treated Wastewater Connection to City Sewer System; Production of a high quality

final effluent 2. Wastewater Services Infrastructure

Operation and Maintenance Maintenance of wastewater infrastructure to service demands; Principal assets to be maintained include: • Major Treatment Plants (6) • Estuarine discharge points (4) • Freshwater discharge points (2) • Pumping Stations (171) • Sewerage mains (1,012km)

3. Sewer Overflow or Blockage Responses Response time to notified sewer blockages or overflows

4. Wastewater Services Complaint Responses Response time to complaints received relating to the sewer network or treatment plants

Officer Responsible: Wastewater Services Coordinator

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory) Performance Rating:

����

Variance Report

N/A

Sewer Blockages / 100km of Main

020406080

100

July

Septe

mbe

r

Novem

ber

Janu

ary

Mar

chM

ay

2007/2008 Financial Year

Num

ber o

f B

lock

ages

Tar get Number of Sewer Chokes / 100 Km of Main

Prospective Actions

N/A

Page 86: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

85

Performance Rating:

����

Variance Report

N/A

Rising Main Breaks / per 100Km of main

01234567

July

Septe

mber

Novem

ber

Janu

ary

Mar

ch May

2220/2008 Financial Year

50%

Sca

le S

ewer

Le

ngth

Target Number of Main Breaks / 100 Km of Main

Prospective Actions

N/A

Performance Rating:

����

Variance Report

N/A

Response to Priority One Events Within One Hour

92%94%96%98%

100%102%

July

Augus

t

Septe

mbe

r

Octo

ber

Novem

ber

Decem

ber

Janu

ary

Febru

ary

Mar

chApr

ilM

ayJu

ne

2007/2008 Financial Year

% M

et

% of Events Met Target

Prospective Actions

N/A

Performance Rating:

����

Variance Report

N/A

Response to Priority One Events Within 5 Hours

92%94%96%98%

100%102%

July

Augus

t

Septe

mbe

r

Octo

ber

Novem

ber

Decem

ber

Janu

ary

Febru

ary

Mar

chApr

ilM

ayJu

ne

2007/2008 Financial Year

% M

et

% of Events Met Target

Prospective Actions

N/A

Page 87: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

86

Performance Rating:

����

Variance Report

N/A

Odour Complaints / 1000 Properties

0123456

July

Septe

mbe

r

Novem

ber

Janu

ary

Mar

chM

ay

200672008 Financial Year

Num

ber o

f Com

plai

nts

(Y A

xis

at 1

0% S

cale

)Target Number of Odour Complaints / 1000 Properties

Prospective Actions

N/A

Performance Rating:

����

Variance Report

N/A

Number of Overflows per 100Km of Main

0

20

40

60

80

100

120

July

Sept

embe

rNov

embe

r

Janu

ary

Mar

ch

May

2007/2008 Financial Year

Num

ber o

f Ove

rflow

s

Target Number of Overf lows / 100 Km of Main

Prospective Actions

N/Ap

Performance Rating: ���� Variance Report

N/A

Wastew ater Treatment Plants Environmental License Compliance July 2006 to June 2007

979899

100101

July

August

Septem

ber

October

Novembe

r

Decem

ber

Januar

y

Febru

ary

March

April

MayJu

ne

% c

omp

lianc

e

Marlin Coast Northern Southern Edmonton Gordonvale Babinda

Prospective Actions

N/A

Page 88: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

87

Performance Rating: ���� Variance Report

N/A

Infiltration Investigation Program (Sewers Inspected)

0

500

1000

1500

38353 38626 38899 39173 39448 39722 39995 40269

6 Year Program

Km

of S

ewer

s

Averaged Metres Inspected 6 Year Program

Prospective Actions

N/A

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised ($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%) Revenue

3,355,296.00 3,436,346.00 (81,050.00) (2.35%)

• UNFAVOURABLE • Reasons • Implications / Actions : .

Expenditure

1,824,359.00 2,081,581.00 257,223.00 12.35%

• FAVOURABLE • Reasons: . • Implications / Actions :

Page 89: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

88

ACTIVITY: Engineering and Maintenance – 6534

Mission To minimise lifecycle costs of assets while maintaining agreed service standards.

Output Title: Output Description: 1. Reliable and Available assets for Cairns

Water Operations Ensure reliable operation of Assets

2. Preventative maintenance for Cairns Water Operations Assets

Undertake preventative maintenance to reduce unplanned interruptions to asset performance

Officer Responsible: Electrical Engineer Operations

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Develop a maintenance strategy for water, wastewater and waste mechanical and electrical assets

Corporate Plan 10.2.1

Dec 2007 80% ����

* Variance Report for Initiatives not on target: 1. Maintenance Strategy is to be incorporated with the AMDP process which has a timeline out to 2008 for implementation. * Prospective Actions for Initiatives not on target :

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory) Operating Budget Assessment:

YTD Actual ($)

YTD Budget

Revised ($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%) Revenue

- -

-

-

• N/A • Reasons: • Implications / Actions :

Expenditure

(130,763.00) (132,666.00) (1,902.00) (1.43%)

• UNFAVOURABLE • Reasons: . • Implications / Actions :

Page 90: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

89

ACTIVITY: Infrastructure – Management & Administration Suppor t – 6700

Mission To effectively plan, manage and deliver the City's Utility Infrastructure to meet the needs of the

community to ensure a sustainable future Output Title: Output Description: 1. Branch Management 2. Performance management for;

- Project Delivery

- Planning & Design

- Asset Management

- Infrastructure

- Administration Support

Report monthly the measurable outputs of the unit against Corporate and legislative requirements.

3. Capital Works Program Management - Development of 5 and 10 Year Capital Works Program and Annual Capital Works Program - Review and performance reporting of Annual and 5 Year Capital Works Programs

Officer Responsible: Manager Infrastructure

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Implement a capital budget submission process that utilises full life cycle asset management and risk analysis methodologies

Self Assessment Corporate Plan 9.1.2, 10.3.3

June 2008 5% ����

2. Develop and implement a project management system for delivering capital works projects across Cairns Water

Corporate Plan 9.1.2

Dec 2007 5% ����

3. Apply PDSA techniques to major processes within the branch including develop and implement statistical control charts

Corporate

Plan 9.1.2

June 2008 10% ����

4. Construct new reservoirs at Redlynch, Fishery Falls, Bellenden Kerr and Bartle Frere

Corporate Plan 5.2.1 Jun 2009

25%

����

* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Page 91: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

90

Performance Rating:

����

Variance Report

• Result Measure (Title): Planning Program deadline c ompliance • Result Target: 100 % compliance • Reporting Frequency: Monthly • Performance Assessment : Key vacancies are impacting on the progress of the infrastructure planning program. Major planning projects are either currently underway or at inception stage.

Prospective Actions

Performance Rating:

����

Variance Report

• Result Measure (Title): Responses to service reque sts • Result Target: Actioned within 10 days • Reporting Frequency: Monthly • Performance Assessment : Currently no outstanding issues in response to service requests.

Prospective Actions

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%)

Revenue • FAVOURABLE • Reasons: • Implications / Actions :

Expenditure

(54.00) (54.00)

100%

• UNFAVOURABLE • Reasons: . Non revenue accrued in Management & Admin Unit. No expenditure considered in Infrastructure Branch as Operating Budget considered overhead. • Implications / Actions :

Page 92: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

91

ACTIVITY: Infrastructure – Infrastructure Project Delivery – 6701

Mission While utilising our values, we strive to provide effective and efficient capital works project

delivery within time and budget Output Title: Output Description: 1. Water, Wastewater and Waste Asset Project

Delivery - Project delivery and contract administration for Water,

Wastewater and Waste assets

- Coaching and mentoring of Project Managers

Officer Responsible: Executive Engineer, Infrastructure Project Delivery

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Develop a process to advance the computerised project management system

( MATMAN and MS Project interface) to the implementation phase

Corporate Plan 9.1.2

Oct 2007 90% ����

2. Complete process for Project management

- Finalise program to train additional staff to implement Cairns City Council procurement and tender program.

- Undertake feasibility study to automate a project delivery manual to develop alternatives for project delivery and procurement

- Refine Contract Management system to control all projects

Corporate

Plan 9.1.2

Aug 2007

95% ����

3. Develop statistical control charts for all significant activities

Corporate Plan 9.1.2

Aug 2007 95% ����

4. Standardise a program to train additional staff to implement Cairns City Council procurement and tender program

Corporate Plan 9.1.2 Aug 2007

45%

����

5. Undertake a feasibility study to investigate automated project delivery systems that encompass risk analysis and management

Corporate Plan 9.1.2 Aug 2007

20%

X

* Variance Report for Initiatives not on target: Initiative 5. Awaiting further information and feedback from IS on their review of the Cairns Water, Project Delivery proposed project/contract management system ‘ Open Windows’. * Prospective Actions for Initiatives not on target :

Page 93: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

92

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Performance Rating: ����

Variance Report

• Result Measure (Title): Capital projects delivered to the brief and on time • Result Target: 80% of projects meet practical compl etion date • Reporting Frequency: Monthly • Performance Assessment : Initiative 3 . Due to the introduction of the Project management manual which includes the processes and methods for delivery of projects. This initiative is now complete and will be monitored for continual improvement

Prospective Actions

Nil

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%)

Revenue - - - -% •

Expenditure - (4,150.00) (4,150.00)

100%

• UNFAVOURABLE • Reasons: Non revenue accrued in Project

Delivery Unit. No expenditure considered in Infrastructure Branch as Operating Budget considered overhead.

• Implications / Actions :

Page 94: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

93

ACTIVITY: Infrastructure – Planning and Design – 6702

Mission To plan and design water, wastewater and waste infrastructure that meets the needs of the

community on the basis of environmental, social and economic sustainability. Output Title: Output Description: 1. Water, Wastewater and Waste Strategic

Infrastructure Planning Strategic and tactical planning for future infrastructure

2. Technical Advice

Technical advice and support including infrastructure performance criteria

3. Infrastructure design services Infrastructure design services

4. Design and technical standards Design and documentation technical standards relating to water, wastewater, & waste services

5. Development Application Assessment Advice Tactical advice within IPA framework in respect of Cairns Water activities

Officer Responsible: Executive Engineer, Planning & Design

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Develop and manage the implementation of a comprehensive demand management strategy including media campaign and recycled water strategy

Corporate

Plan 5.3.3

Jun 2009 40% ����

2. Undertake water quality risk assessment on the rural water supplies, including Behana Creek and implement the outcomes arising from the study

Corporate

Plan 5.2.2

Dec 2007 10% ����

3. Complete formalised processes including development of statistical control charts

Corporate

Plan 9.1.2

June 2007 10% ����

4. Manage the development of a quantitative risk assessment model of the potential for C&G contamination arising from activities in the Behana and Lake Morris catchments

Corporate

Plan 5.2.3

Dec 2007 10% ����

* Variance Report for Initiatives not on target: * Prospective Actions for Initiatives not on target :

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Page 95: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

94

Performance Rating:

����

Variance Report

• Result Measure (Title): Technical support provided to customer needs • Result Target: compliance with customer requirement s • Reporting Frequency: Monthly • Performance Assessment: No complaints from customers in relation to technical support

Prospective Actions

Performance Rating:

?

Variance Report

• Result Measure (Title): Timely, accurate advice on Development Applications • Result Target: 90% completed by date, less than 10 % return from DA • Reporting Frequency: monthly • Performance Assessment : 66% completed on time during month. 10% return from Development Assessment

Prospective Actions PDSA process being applied and incorporates both Cairns Water and City Development.

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%)

Revenue

160.00 160.00 100%

• UNFAVOURABLE • Reasons: Use of timesheets across

infrastructure increased tracking of staff time assigned to capital works

• Implications / Actions :

Expenditure

57,372.00 57,372.00 100%

• FAVOURABLE • Reasons: 1.Increased personnel applied to Development approvals due to increased workload 2.Expenditure arising from recruitment costs • Implications / Actions:

Development Approval Turnaround Time

0%

20%

40%

60%

80%

100%

Month 2006/07

% o

f Pro

ject

s M

et

% of Projects M et

Target

Development Approval Turnaround Time

0%

20%

40%

60%

80%

100%

Month 2006/07

% o

f Pro

ject

s M

et

% of Projects M et

Target

Development Approval Turnaround Time

0%

20%

40%

60%

80%

100%

Month 2006/07

% o

f Pro

ject

s M

et

% of Projects M et

Target

Development Approval Turnaround Time

0%

20%

40%

60%

80%

100%

Month 2006/07

% o

f Pro

ject

s M

et

% of Projects M et

Target

Development Approval Turnaround Time

0%

20%

40%

60%

80%

100%

Month 2006/07

% o

f Pro

ject

s M

et

% of Projects M et

Target

Page 96: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

95

ACTIVITY: Infrastructure – Asset Management – 6703

Mission To have an on demand integrated assets and GIS system, supplying information and services;

timely, accurately and efficiently. Output Title: Output Description: 1. Asset Management Plans (AMP) for Cairns

Water Infrastructure

An Asset Management Strategy for Cairns Water Infrastructure, including Asset Management Plans (AMP) the maintenance of fixed asset data for all asset classes. Provide CW input into AMDP.

2. GIS Strategy for Cairns Water On going maintenance and co-ordination of Geographic Information System (GIS) Strategy for supporting the operations of Cairns Water in delivering its service target.

3. Capitalisation of Assets Asset financial information entered into asset registers and valued

4. GIS Support for Cairns Water GIS Technical Support Services to Cairns Water

Officer Responsible: Asset Coordinator

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Digitise all sewer reticulation condition videos and link to GIS to enable Inflow/Infiltration program to be based on actual asset condition.

Corporate Plan 10.4.1

Dec 2007

40% ����

2. Get all assets into Matman and link to GIS to reflect age, operational status and maintenance history.

Corporate Plan 10.2.2.; Self Assessment 4.2

Dec 2007 25% ����

3. Implement a program for linking of CCTV surveys to GIS.

Corporate Plan 10.4.1

Dec 2007 0% X

4. Implement a rolling program for assessing asset condition, performance and residual life.

Corporate Plan 10.2.2

Dec 2007 10% X

5. Develop detailed asset renewal strategies for inclusion in Asset Management Plans for all asset classes.

Corporate Plan 10.2.2

Jun 2008 20% X

6. Develop and implement data capture systems for asset condition and performance

Corporate Plan 10.2.2

Dec 2007 25% ����

7. Develop a policy for domestic meter replacement based on a lifecycle asset approach.

Corporate Plan 10.2.2

Dec 2007 50% ����

8. Develop and implement staff training procedures for asset management systems.

Self Assessment

Dec 2007 and ongoing

10% ����

* Variance Report for Initiatives not on target: Initiative 3. Difficulties in determining the best location for data in order to link in GIS Initiative 4. Dependent on the outcome of AMDP process and Iinitiative 2 Initiative 5. Staff resources impacting on delivery of this initiative and dependent on AMDP process. * Prospective Actions for Initiatives not on target : Initiative 3 Asset Management is liaising with IS. Initiative 4. Ensure AMDP completes on time and completion of Initiative 2. Initiative 5. Ensure AMDP completes on time. Ensure staff resources are available.

Page 97: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

96

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory) Result Measures (Title)

Result Targets Reporting Frequency

Performance Assessment

Performance Rating: ?

Variance Report

Feedback from customers indicates that 40-60% of data is accurate

1. Availability and reliability of asset attribute data

Within 7 days of Asset Acquisition

Monthly 95% of data accurate

Field data entered within 48 hours

Prospective Actions

1) Programs to instigate field staff to employ hand held devices for data entry are underway.

2) Plans to link operational attribute data to the asset data by address and/or GID are being investigated.

3) Completion of Initiative 2

Performance Rating: ���� Variance Report

2. Implementation of Spatial Data Strategy

100% Compliance

Bi-annual

Prospective Actions

Performance Rating: ����

Variance Report

3. Capitalisation of Assets

95% All projects Active

Quarterly

Prospective Actions

Performance Rating: ����

Variance Report

4. GIS support provided to customer needs

Compliance with customer requirements

Monthly 95% of jobs requested completed within timeframe agreed with customer Prospective Actions

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%)

Revenue - - - -% •

Expenditure -

(14,492.00) (14,492.00)

100%

• UNFAVOURABLE • Reasons: Expenditure on SAMP

approval • Implications / Actions : No action

planned.

Page 98: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

97

ACTIVITY: Infrastructure – Cleaner Seas Team – 6704

Mission While utilising our values, we strive to provide effective and efficient delivery of the project

within time and on budget Output Title: Output Description: 1. Wastewater Treatment Plant Upgrade Project delivery and contract administration using a Project

Alliance (Cleaner Seas Project Alliance) delivery model

Officer Responsible: Manager Cleaner Seas

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Performance Rating: ����

Variance Report

• Result Measure (Title): Project Delivery Measures • Result Target: Alliance Project Cost $120m 100% compliance wi th project milestones Nil unplanned dis ruptions • Reporting Frequency: Monthly • Performance Assessment :] Current projected forecast total project cost $120m. Project Alliance Partners selected. There has been no disruptions to operational activities

Prospective Actions

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%)

Revenue - - - -% •

Expenditure

0 (11,894.00) (11,894.00) 100%

• UNFAVOURABLE • Reasons: Branch Overhead

Recovery • Implications / Actions :

Page 99: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

98

ACTIVITY: Waste Services – Management & Administration Suppor t - 4000

Mission To provide cost effective, efficient and sustainable Waste Management Services. To provide

100% accuracy of data management/reporting and high level of administrative services Output Title: Output Description: 1. Branch Management

Waste contracts including: • Kerbside Waste Collection

• Kerbside Recycling Collection

• Council Waste Collection

• Bedminster Waste Treatment

• Bio-solids Removal Transfer Stations operations Landfill operations MRF operations

2. Sustainable waste management services

Buy Back Shop operations Waste Management Strategy (internal) development 3. Operational and strategic advice Sustainable waste management consultancy service projects (external)

Officer Responsible: Waste Services Manager

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Facilitate implementation of domestic paper and cardboard recycling and fortnightly kerbside collection

Corporate Plan 4.3.1

Jul 2007 90% ����

2. Review CCC Waste Management Strategy Corporate Plan 4.3.1

Jun 2008 0% ����

3. Investigate the potential to extract landfill gases for energy generation.

Corporate Plan 4.3.1

Jun 2008 95% ����

4. Develop event recycling & school recycling plans

Corporate Plan 4.3.1

Dec 2007 10% ����

5. Commission Stage 2 Lae City Council waste management strategy

Corporate Plan 4.3.1

Jun 2008 5% ����

* Variance Report for Initiatives not on target: Nil * Prospective Actions for Initiatives not on target : Nil

Page 100: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

99

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory) Performance Rating:

����

Variance Report 100% adherence.

Contractor Compliance with Contract Requirements

0%

10%

20%30%

40%

50%

60%

70%80%

90%

100%

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2007/2008

% C

ompl

ianc

e

Actual Compliance Target Compliance

Prospective Actions Continue to monitor.

Performance Rating:

����

Variance Report 100% adherence.

Compliance with EPA License

0%

10%

20%30%

40%

50%

60%

70%80%

90%

100%

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2007/2008

% C

ompl

ianc

e

Actual Compliance Target Compliance

Prospective Actions Continue to monitor.

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(where variance is +/- 2%)

Revenue

1,173,064.00 1,171,342.00 1,722.00 0.14%

• FAVOURABLE • Reasons: • Implications / Actions:

Expenditure

185,940.00 180,411.00 (5,528.00) (3.0%)

• UNFAVOURABLE • Reasons: Budget includes

corporate budget guidelines for leave for 11 days.

• Implications / Actions: No action required.

Page 101: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

100

ACTIVITY: Waste Services – Contract Management - 4129

Mission To have in place the best value for money contracts for the delivery of waste services.

Output Title: Output Description: 1. Contract No. 75086 Kerbside collection of

domestic waste Weekly collection of domestic waste

2. Contract No. 75222 Council Facilities waste collection

Collection of Council waste

3. Contract No. 75087 Kerbside collection of domestic (including Douglas Shire), commercial and Council Facility recycling.

Fortnightly collection of domestic recycling waste

4. Contract No. 1396 Treatment of domestic waste from Cairns City Council, Douglas Shire Council & Mareeba Shire Council

Treatment of waste at the privately operated Sita-CEC Environmental Solutions waste treatment facility

5. Contract No. 75230 Bio-solids Removal Removal, transport and spreading of Council bio-solids waste Officer Responsible: Waste Contracts Supervisor

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Implement domestic recycling collection on a fortnightly basis

Corporate Plan 4.3.1

Jul 2007 100% ����

2. Identify opportunities for regional contracts Corporate Plan 4.3.1

Nov 2007 60% ����

* Variance Report for Initiatives not on target: Nil * Prospective Actions for Initiatives not on target : Nil

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Page 102: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

101

Performance Rating:

����

Variance Report Within target.

Number of Missed ServicesKerbside Waste Collection

85

53

0

20

40

60

80

100

120

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun2007/2008

No.

of M

isse

d S

ervi

ces

Reported Missed Services Justif iable Missed ServicesAllow able Missed Services

Prospective Actions Matter is raised with contractor and continues to be monitored.

Performance Rating:

����

Variance Report Within target.

Number of Missed ServicesKerbside Recyclable Collection

134

38

0

20

40

60

80

100

120

140

160

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2007/2008

No.

of M

isse

d S

ervi

ces

Reported Missed Services Justif iable Missed ServicesAllow able Missed Services

Prospective Actions Matter is raised with contractor and continues to be monitored.

Performance Rating:

����

Variance Report Zero missed services.

Number of Missed ServicesCouncil Facilities Collection

0 00

1

1

2

2

3

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2007/2008

No.

of M

isse

d S

ervi

ces

Reported Missed Services Justif iable Missed ServicesAllow able Missed Services

Prospective Actions Matter is raised with contractor and continues to be monitored.

Page 103: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

102

Performance Rating:

����

Variance Report Response times remain adequate.

Overdue Service RequestsKerbside Waste Collection

0

1

2

3

4

5

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2007/2008

No.

of O

verd

ue R

eque

sts

New Service Missed Service Repair & Replacement

Prospective Actions Matter is raised with contractor and continues to be monitored.

Performance Rating:

����

Variance Report Response times remain adequate.

Overdue Service RequestsKerbside Recyclable Collection

0

1

2

3

4

5

6

7

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2007/2008

No.

of

Ove

rdue

Req

uest

s

New Service Missed Collection Repair & Replacement

Prospective Actions Matter is raised with contractor and continues to be monitored.

Performance Rating:

����

Variance Report Zero overdue service requests.

Overdue Service RequestsCouncil Facilities Collection

0

1

2

3

4

5

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2007/2008

No.

of

Ove

rdue

R

eque

sts

New Service Missed Collection Repair & Replacement

Prospective Actions Matter is raised with contractor and continues to be monitored.

Page 104: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

103

Performance Rating:

����

Variance Report Kerbside waste collection service is above the target.

Number of Complaints

0

1

2

3

4

5

6

7

8

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2007/2008

No.

of C

ompl

aint

s

Kerbside Waste Collection Kerbside Recyclable CollectionCouncil Facilities Collection Treatment of WasteRemoval of Bio-solids Target - less than 5

Prospective Actions Matter is raised with contractor and continues to be monitored.

Performance Rating:

?

Variance Report MRF at capacity due to delay with upgrade for paper and cardboard & breakdowns.

YTD % of Contaminated Material Delivered to the MRF

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2007/2008

YT

D %

Con

tam

inat

ion

% Contaminated Target - Maximum Acceptable Level

Prospective Actions The MRF upgrade will be completed in the near future.

Performance Rating:

����

Variance Report Above target.

% of Waste Diverted from Landfill for the Sita-CEC Facility

67%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2007/2008

% o

f Was

te D

iver

ted

Actual Waste Diverted Target Waste Diverted

Prospective Actions Due to contract requirements, contractor has 18 months to reach the target from Aug 06.

Page 105: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

104

Performance Rating:

����

Variance Report Above target.

% of Waste Beneficially Reused for the Sita-CEC Fac ility

79%

0%10%

20%30%

40%50%

60%70%

80%90%

100%

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2007/2008

% o

f Was

te B

enef

icia

lly

Reu

sed

Actual Beneficial Reuse Target Beneficial Reuse

Prospective Actions Due to contract requirements, contractor has 18 months to reach the target from Aug 06.

Performance Rating:

����

Variance Report 100% adherence

Bio-solid Contract Compliance with EPA License

0%

10%

20%30%

40%

50%

60%

70%80%

90%

100%

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2007/2008

% C

ompl

ianc

e

Actual Compliance Target Compliance

Prospective Actions Continue to monitor.

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(Where variance is +/- 2%)

Revenue

261,741.00 104,268.00 157,473.00 151%

• UNFAVOURABLE • Reasons: Wanless early contract

discharge payment. • Implications / Actions: No action

required.

Expenditure

1,303,656.00 970,990.00 (332,666.00) (34.2%)

• UNFAVOURABLE • Reasons: Includes Sita-Cec fixed

charge invoices for July & August. • Implications / Actions : No action

required.

Page 106: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

105

ACTIVITY: Waste Services – Buy Back Shop - 4126

Mission To providing good quality items for resale with a high level of customer service

Output Title: Output Description: 1. Quality saleable items Provide customers with quality items to purchase

Officer Responsible: Waste Services Supervisor

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Operation of Buy Back Shop as a profit making activity

Corporate Plan 4.3.1

June 2008 10% ����

* Variance Report for Initiatives not on target: Nil * Prospective Actions for Initiatives not on target : Nil

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Performance Rating:

?

Variance Report Buy Back Shop is operating at a -13% operating loss YTD.

Buy Back Shop Financial PerformanceOperate at a Profit

11,000

11,500

12,000

12,500

13,000

13,500

14,000

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2007/2008

Dol

lar

Val

ue ($

)

YTD Revenue YTD Expense

Prospective Actions Development of long term strategy to increase sales underway.

Page 107: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

106

Performance Rating:

����

Variance Report Zero complaints

Number of Complaints

0

1

2

3

4

5

6

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2007/2008

No.

of C

ompl

aint

s

Buy Back Shop Target - less than 5

Prospective Actions Continue to monitor.

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(Where variance is +/- 2%)

Revenue

12,034.00 17,866.00 (5,832.00) (32.6%)

• UNFAVOURABLE • Reasons: Buy Back Shop has been

reoganised. • Implications / Actions : No action

required.

Expenditure

13,823.00 12,601.00 (1,222.00) (9.7%)

• UNFAVOURABLE • Reasons: Staff member resigned. • Implications / Actions: No action

required.

Page 108: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

107

ACTIVITY: Waste Services – Waste Transfer Station Operations - 4101

Mission To provide sustainable waste management services with a high level of customer service

Output Title: Output Description: 1. Resaleable items Sort waste to provide resalable items to be sold at the Buy

Back Shop 2. Recyclable items Sort waste to provide recyclable items to be sent to the MRF 3. Disposed vegetation Management of vegetation stockpile 4. Disposed scrap metal Management of scrap metal stockpile 5. Disposed tyres Management of tyre stockpile 6. Disposed hazardous waste Storage of hazardous waste 7. Disposed general waste Removal of general waste Officer Responsible: Waste Services Supervisor

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Performance Rating: ����

Variance Report 1 complaint received.

Number of Complaints

0

1

2

3

4

5

6

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2007/2008

No.

of C

ompl

aint

s

Transfer Stations Target - less than 5

Prospective Actions Continue to monitor.

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(Where variance is +/- 2%)

Revenue

46,255.00 97,248.00 (50,993.00) (52.4%)

• UNFAVOURABLE • Reasons: .Delayed invoicing. • Implications / Actions: No action

required.

Expenditure

162,786.00 202,731.00 39,944.00 19.7%

• FAVOURABLE • Reasons: No mulching to place in

July. • Implications / Actions: No action

required.

Page 109: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

108

ACTIVITY: Waste Services – Landfill Operation - 4151

Mission To manage closed landfills as required by the landfill licences and in accordance with closure

plans Output Title: Output Description: 1. Minimised environmental harm associated

with Portsmith, Gordonvale, White Rock, Babinda and Yorkeys Knob landfills

All landfills maintained in accordance with license conditions particularly regarding obtaining final profile, monitoring programs and capping

Officer Responsible: Manager Waste Services/Manager Infrastructure

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Investigate the potential to extract landfill gases for energy generation from Portsmith Landfill

Corporate Plan 4.3.1 Jun 2008

95% ����

2. Closure and capping stage 1 of Portsmith Landfill site

Corporate Plan 4.3.1

Jun 2010 70% ����

3. Reclaim overflow of waste from Machans Beach Landfill

Corporate Plan 4.3.1

Jun 2008 5% ����

* Variance Report for Initiatives not on target: Nil * Prospective Actions for Initiatives not on target : Nil

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Performance Rating: ����

Variance Report 100% adherence.

Landfills Compliance with EPA License

0%

10%

20%30%

40%

50%

60%

70%80%

90%

100%

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2007/2008

% C

ompl

ianc

e

Actual Compliance Target Compliance

Prospective Actions No action required.

Page 110: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

109

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(Where variance is +/- 2%)

Revenue

66,730.00 80,000.00 (13,270.00) (15.5%)

UNFAVOURABLE • Reasons: Delayed invoicing. • Implications / Actions : No action

required.

Expenditure

33,977.00 37,107.00 3,130.00 8.4%

FAVOURABLE • Reasons: Minimal internal job

charging. • Implications / Actions: No action

required.

Page 111: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

110

ACTIVITY: Waste Services – Materials Recovery Facility (MRF) - 4127

Mission To recover 90% of recyclable product delivered to the MRF in a safe and efficient manner at a

rate of 5 tonne per hour. Output Title: Output Description: 1. Saleable recyclable product Recyclable material sorted into saleable products

Officer Responsible: MRF Supervisor

On Target Operating Initiative Status Relevant

Linkage(s) Due Date Complete

(enter %) Yes

(enter ����) No *

(enter X)

1. Install paper & cardboard sorting line and additional storage capacity

Corporate Plan 4.3.1

Jul 2007 80% ����

2. Operate MRF as a profit making activity Corporate Plan 4.3.1

Jun 2008 10% ����

* Variance Report for Initiatives not on target: Nil * Prospective Actions for Initiatives not on target : Nil

Performance Indicators (Ratings: ���� = Satisfactory, ? = Marginal, X = Unsatisfactory)

Performance Rating:

?

Variance Report MRF at capacity due to delay with upgrade for paper and cardboard.

YTD % of Contaminated Material Delivered to the MRF

78%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2007/2008

YT

D %

Con

tam

inat

ion

% Contaminated Target - Maximum Acceptable Level

Prospective Actions Installlation due end of August 2007.

Page 112: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

111

Performance Rating:

����

Variance Report Reduced product sent to market.

Percentage of Recyclable Product Sent to Market

0%

20%

40%

60%

80%

100%

July

Augus

t

Septe

mbe

r

Octo

ber

Novem

ber

Decem

ber

Janu

ary

Febru

ary

March

April

May

June

2006/07 Financial Year

Per

cent

age

of T

onne

s E

xpor

ted

% ExportedTarget

Prospective Actions Continue to monitor.

Performance Rating:

?

Variance Report MRF is operating at a -44% operating loss YTD due to reduced product sent to market.

Financial Performance of Material Recovery FacilityOperate at a Profit

0

10,000

20,000

30,000

40,000

50,000

60,000

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

2007/2008

Dol

lar

Val

ue ($

)

YTD Revenue YTD Expense

Prospective Actions Continue to monitor.

Operating Budget Assessment:

YTD Actual ($)

YTD Budget Revised

($)

Var ($) Var (%) Variance Report & Prospective Actions

(Where variance is +/- 2%)

Revenue

29,136.00 97,661.00 (68,525.00) (70.1%)

UNFAVOURABLE • Reasons: Lower product sent to

market than budget expectations. • Implications / Actions : No action

required.

Expenditure

52,002.00 82,223.00 30,220.00 36.7%

FAVOURABLE • Reasons: Late invoices and lower

freight charges. • Implications / Actions : No action

required.

Page 113: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

112

CAIRNS WATER COMMITTEE

21 AUGUST 2007

6 OUTSTANDING ISSUES – CAIRNS WATER COMMITTEE

B Gardiner : 1/58/13-10: #1351520v9

RECOMMENDATION: That this report be noted.

INTRODUCTION / COMMENT: Attached is a listing of the Outstanding Issues relating to items of the Cairns Water Committee with comments on the status of each item.

ATTACHMENTS: List of Outstanding Issues – Cairns Water Committee. Bruce Gardiner General Manager Cairns Water

Page 114: CAIRNS CITY COUNCIL CAIRNS WATER COMMITTEE 21 … › filestore › minutes...It is considered that the power plant utilising sewage sludge, green waste, methane and re-use water meets

Agenda – Cairns Water Committee 21/8/07 - #1545762

113

OUTSTANDING ISSUES

CAIRNS WATER COMMITTEE

STATUS OF ACTIONS AS AT WEDNESDAY, 15 AUGUST 2007

Meeting

Date Item Issue Action

Officer Status

21 Nov 06

CW - Cl 1 Greywater Reuse “4. Identify, for endorsement by Council,

blanket areas declared unsuitable for greywater reuse applications based on environmental considerations;

5. Develop a local law requiring annual

registration of greywater diversion or treatment systems and include a registration fee to cover the cost of annual inspections of greywater diversion or treatment systems.”

Manager Business Services

Soil Map is in process of being developed.

Subsequent to Item 4. above.