Cable Burying in Vung Tau Project_fni
-
Upload
lenghiemckt07 -
Category
Documents
-
view
226 -
download
0
Transcript of Cable Burying in Vung Tau Project_fni
-
8/2/2019 Cable Burying in Vung Tau Project_fni
1/36
1FVS
-
8/2/2019 Cable Burying in Vung Tau Project_fni
2/36
SEATRENCH CO.,
LTD Skogveien 19, 1672Krakeroy, Norway
Tel : +47 952 43 407
F.V.S Float Vehicle
Services J.S Company 1428/24, 30/4 Road,12 Ward, Vung Tau
Province, VietnamTel : + 84.64. 3627611Fax: + 84.64. 3627612
2
-
8/2/2019 Cable Burying in Vung Tau Project_fni
3/36
33
-
8/2/2019 Cable Burying in Vung Tau Project_fni
4/36
Launching and recoverysystem
Electric motor: MitsubishiJIS C 4004Working load 1.5 tonMax load 3.0 tonDivercage with capacity
for two diversA-frame hydraulicallycontrolled
44
Equipments
-
8/2/2019 Cable Burying in Vung Tau Project_fni
5/36
Recompression Chamber
Manufacture: Jamakuni Japan
Capacity: 2600 liters Working pressure: 6 barsProduction date: 2004Production code: 080 2KS
SX10 TYPETesting date: 2008
5
Equipments
-
8/2/2019 Cable Burying in Vung Tau Project_fni
6/36
Underwater camera & CCTV systemSONY HDR- XR500E HANDYCAM AND HOUSINGOLYMPUS TOUGH 8100 AND HOUSING
6
Equipments
-
8/2/2019 Cable Burying in Vung Tau Project_fni
7/36
Item Discription
Communication control The AMCOM II 2820 Systems
Full face mark KMB-BandMask 18 (Q.ty 03)Kirby Morgan EXO-26 Balanced Regulator Full Face Mask(Q.ty 04)
High pressure compressor
(The MC1A air compressor)
Kirby Morgan Air Control System 5 (KMACS 5) is a
lightweight, portable control box for use in surfacesupplied air diving operations.
Air control system Kirby Morgan Air Control System 5 (KMACS 5) is alightweight, portable control box for use in surfacesupplied air diving operations.
Diving umbilical Design pressure: 30psiWorking pressure: 14psi
Scuba Design pressure: 207barWorking pressure: 203bar
7
Other Equipments
-
8/2/2019 Cable Burying in Vung Tau Project_fni
8/36
Underwater Marine Construction
8
Services
-
8/2/2019 Cable Burying in Vung Tau Project_fni
9/36
Underwater Welding & Construction
9
Services
-
8/2/2019 Cable Burying in Vung Tau Project_fni
10/36
( ABS / DNV) Vessel Inspection, Repair & Maintenance
10
Services
-
8/2/2019 Cable Burying in Vung Tau Project_fni
11/36
Burying the optical cable
11
Services
-
8/2/2019 Cable Burying in Vung Tau Project_fni
12/36
Submarine Cable & Pipeline Installation & Repair Works
12
Services
-
8/2/2019 Cable Burying in Vung Tau Project_fni
13/36
Burying the optical cable atVung Tau sea area
Burial and survey about5000 meters optical cableat Vung Tau Long Hai seaarea.Water depth: 30 85 fsw.
13
Diving Work Records
-
8/2/2019 Cable Burying in Vung Tau Project_fni
14/36
Survey the seabed around theHamrong-1X & Yentu-2XBoreholes
Max water depth is about 30meters.FVS diving team dive to takesurvey camera around the
borehole with 50 metersradius.
14
Diving Work Records
-
8/2/2019 Cable Burying in Vung Tau Project_fni
15/36
Survey the seabed around the Doson-1x & Hamrong-2x boreholes
FVS diving team dive to takesurvey camera around theborehole with 50 metersradius.
Max water depth is about30 meters
15
Diving Work Records
-
8/2/2019 Cable Burying in Vung Tau Project_fni
16/36
Additional support forboatlanding at PLDP-A
Total weight of all partswhich will be attached toBoatlanding of the rig isabout 15,250kgs, whichis combined of manyparts. The biggest part isabout 4,966kgs
16
Diving Work Records
-
8/2/2019 Cable Burying in Vung Tau Project_fni
17/36
Removing finishing net andnet-chain at Ruby field
Remove the fishing net andnet-chain stuck/cover tothe PLEMs (No.4 & No.7) atRuby Field.Survey and film the PLEMs
(No.1 to No.7) before/afterremoved the fishing netand net-chain.
17
Diving Work Records
-
8/2/2019 Cable Burying in Vung Tau Project_fni
18/36
18
Diving Work Records
Underwater surveys forMV Lady Valisia 20/06/2010
MV Posh Venture 06/12/2010
MV Posh Verdant 22/01/2010
MV VTC Globe 21/01/2011
MV Bremen 20/05/2011
MV SANTIAGO 11/05/2011
MV Lewek Penguin 04/05/2011
MV Lewek Stork 01/11/2011
MV ALAMO H188 13/12/2011
-
8/2/2019 Cable Burying in Vung Tau Project_fni
19/36
19
Our Clients
-
8/2/2019 Cable Burying in Vung Tau Project_fni
20/36
20
-
8/2/2019 Cable Burying in Vung Tau Project_fni
21/36
Marine Trench AS & Subsea Trenching Services AS mergedops 2009
All contracts & operation will be performed in Seatrench AS20 years of experience from trenching worldwideMain office in Norway, sales offices in UK, Thailand andBrazil
21
History of Seatrench
-
8/2/2019 Cable Burying in Vung Tau Project_fni
22/36
Oil & Gas, Infrastructure, Offshore & Inshore projectsSeatrench operate a fleet of 4 trenching rigs and pumpbargesThe Seatrench concept consist of: Trenching Machine,Pump Barge, Operational crew, Diving crewDedicated crew with more than 20 years experiencearound the world. More than 5000 diving hours on the
equipmentFast mobilisation at site. Important in areas with strongcurrent and harsh weather conditions.
22
Service of Seatrench
-
8/2/2019 Cable Burying in Vung Tau Project_fni
23/36
Trenchers2 off Double Pump Trenchers. Soil conditions max 350 - 400 KPA
23
Equipments
-
8/2/2019 Cable Burying in Vung Tau Project_fni
24/36
24
Equipments
-
8/2/2019 Cable Burying in Vung Tau Project_fni
25/36
The advantages with the Seatrench concept for shallow watertrenching can be summarized as follows:
High efficient equipment with documented performance.Ensuring fast mobilisation to reasonable cost worldwideIndependent rigs with less requirements for support vessels
Minimized number of personnelPowerful and light weight design.A staff of experienced and well qualified operators.Self designed and produced equipment
Environmentally friendly processOur equipment is designed to minimize the impact on the subseaenvironment. Due to oil free operation, the system has zeropollution to the sea.
25
Advantages
-
8/2/2019 Cable Burying in Vung Tau Project_fni
26/36
26
Work Records
Projects performed in 2010Comorro Island 1000 mtr FO cable for Alcatel LucentCork Bay Irland 14000 mtr Power cable for Nexans
Wave hub England 2000 mtr Power cable for CTC Marine
Abu Dhabi 60 km FO cable for E MarineAbu Dhabi 6000 mtr FO cable for E MarineLebanon Beirut 16 Steel Pipeline for Total (400mmincluding concreteinsulation)
Projects to be performed in 2011
34 km FO cable in Brazil for GrupoSchahin & Petrobras (Ongoing)
-
8/2/2019 Cable Burying in Vung Tau Project_fni
27/36
27
Process of Cable Burying
-
8/2/2019 Cable Burying in Vung Tau Project_fni
28/36
28
-
8/2/2019 Cable Burying in Vung Tau Project_fni
29/36
29
-
8/2/2019 Cable Burying in Vung Tau Project_fni
30/36
30
-
8/2/2019 Cable Burying in Vung Tau Project_fni
31/36
31
-
8/2/2019 Cable Burying in Vung Tau Project_fni
32/36
32
-
8/2/2019 Cable Burying in Vung Tau Project_fni
33/36
33
-
8/2/2019 Cable Burying in Vung Tau Project_fni
34/36
34
-
8/2/2019 Cable Burying in Vung Tau Project_fni
35/36
35
-
8/2/2019 Cable Burying in Vung Tau Project_fni
36/36