C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" =...

17
A5.20 2 6 3 5 4 A5.20 TYP. A5.20 1/4" = 1'-0" 1 TYPICAL C CLASSROOM PLAN 1/4" = 1'-0" 2 TYPICAL C CLASSROOM ELEVATION-1 1/4" = 1'-0" 3 TYPICAL C CLASSROOM ELEVATION-2 1/4" = 1'-0" 6 TYPICAL C CLASSROOM ELEVATION-4 1 1/2" = 1'-0" 4 STEP DETAIL @ C-CLASSROOM 1/4" = 1'-0" 5 TYPICAL C CLASSROOM ELEVATION-3 1/4" = 1'-0" 7 TYPICAL C CLASSROOM CEILING PLAN SHEET NUMBER: SHEET TITLE: Copyright (c) by Environetics, Inc. All Rights Reserved. CLIENT: PROJECT TEAM: MONTCLAIR, NEW JERSEY Montclair State University 090771 REV DATE DESCRIPTION

Transcript of C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" =...

Page 1: C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" = 1'-0" 3 TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-2 1/4" = 1'-0" 5 TYPICAL EXECUTIVE

A5.20

2

6 3

5

4A5.20

TYP.

A5.20

1/4" = 1'-0"1 TYPICAL C CLASSROOM PLAN

1/4" = 1'-0"2 TYPICAL C CLASSROOM ELEVATION-1 1/4" = 1'-0"3 TYPICAL C CLASSROOM ELEVATION-2

1/4" = 1'-0"6 TYPICAL C CLASSROOM ELEVATION-4

1 1/2" = 1'-0"4 STEP DETAIL @ C-CLASSROOM

1/4" = 1'-0"5 TYPICAL C CLASSROOM ELEVATION-3

1/4" = 1'-0"7 TYPICAL C CLASSROOM CEILING PLAN

SHEET NUMBER:

SHEET TITLE:

Copyright (c) by Environetics, Inc. All Rights Reserved.

CLIENT:

PROJECT TEAM:

MO

NTC

LAIR

, N

EW J

ERSE

Y

Mon

tcla

ir S

tate

Uni

vers

ity

090771

REV DATE DESCRIPTION

Page 2: C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" = 1'-0" 3 TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-2 1/4" = 1'-0" 5 TYPICAL EXECUTIVE

A5.21

2

3

4

5

CL

7A5.21

TYP.

A5.21

1/4" = 1'-0"1 TYPICAL U CLASSROOM PLAN

1/4" = 1'-0"2 TYPICAL U CLASSROOM ELEVATION-1 1/4" = 1'-0"3 TYPICAL U CLASSROOM ELEVATION-2

1/4" = 1'-0"4 TYPICAL U CLASSROOM ELEVATION-3 1/4" = 1'-0"5 TYPICAL U CLASSROOM ELEVATION-4

1/4" = 1'-0"6 TYPICAL U CLASSROOM CEILING PLAN

SHEET NUMBER:

SHEET TITLE:

Copyright (c) by Environetics, Inc. All Rights Reserved.

CLIENT:

PROJECT TEAM:

MO

NTC

LAIR

, N

EW J

ERSE

Y

Mon

tcla

ir S

tate

Uni

vers

ity

090771

REV DATE DESCRIPTION

1 1/2" = 1'-0"7 STEP DETAIL @ U-CLASSROOM

Page 3: C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" = 1'-0" 3 TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-2 1/4" = 1'-0" 5 TYPICAL EXECUTIVE

A5.23

2

5

4

3

4A5.20

SIM.

A5.23

1/4" = 1'-0"1

TYPICAL EXECUTIVE ED CLASSROOMPLAN

1/4" = 1'-0"2TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1

1/4" = 1'-0"3TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-2

1/4" = 1'-0"5TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-4

1/4" = 1'-0"4TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-3

1/4" = 1'-0"6 Second Floor Reflected Ceiling Plan

SHEET NUMBER:

SHEET TITLE:

Copyright (c) by Environetics, Inc. All Rights Reserved.

CLIENT:

PROJECT TEAM:

MO

NTC

LAIR

, N

EW J

ERSE

Y

Mon

tcla

ir S

tate

Uni

vers

ity

090771

REV DATE DESCRIPTION

Page 4: C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" = 1'-0" 3 TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-2 1/4" = 1'-0" 5 TYPICAL EXECUTIVE

A5.24

1/4" = 1'-0"1TYPICAL FLEXIBLE STANDARD CLASSROOM ELEVATION-1

1/4" = 1'-0"2TYPICAL FLEXIBLE STANDARD CLASSROOM ELEVATION-2

1/4" = 1'-0"3TYPICAL FLEXIBLE STANDARD CLASSROOM ELEVATION-3

1/4" = 1'-0"4TYPICAL FLEXIBLE STANDARD CLASSROOM ELEVATION-4

1/4" = 1'-0"6TYPICAL FLEXIBLE HIGH TECH CLASSROOM-2

1/4" = 1'-0"7TYPICAL FLEXIBLE HIGH TECH CLASSROOM-3

1/4" = 1'-0"8 TYPICAL FLEXIBLE HIGH TECH CLASSROOM-4

1/4" = 1'-0"5TYPICAL FLEXIBLE HIGH TECH CLASSROOM-1

1/4" = 1'-0"9 TYPICAL SBUS TEACHING LAB ELEVATION-1 1/4" = 1'-0"10TYPICAL SBUS TEACHING LAB ELEVATION-2

1/4" = 1'-0"11 TYPICAL SBUS TEACHING LAB ELEVATION-3 1/4" = 1'-0"12TYPICAL SBUS TEACHING LAB ELEVATION-4 SHEET NUMBER:

SHEET TITLE:

Copyright (c) by Environetics, Inc. All Rights Reserved.

CLIENT:

PROJECT TEAM:

MO

NTC

LAIR

, N

EW J

ERSE

Y

Mon

tcla

ir S

tate

Uni

vers

ity

090771

REV DATE DESCRIPTION

Page 5: C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" = 1'-0" 3 TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-2 1/4" = 1'-0" 5 TYPICAL EXECUTIVE

A5.25

1/4" = 1'-0"2 TUTORING OPEN LAB ELEVATION-2 1/4" = 1'-0"3 TUTORING OPEN LAB ELEVATION-3

1/4" = 1'-0"4 TUTORING OPEN LAB ELEVATION-4

1/4" = 1'-0"1 TUTORING OPEN LAB ELEVATION-1

SHEET NUMBER:

SHEET TITLE:

Copyright (c) by Environetics, Inc. All Rights Reserved.

CLIENT:

PROJECT TEAM:

MO

NTC

LAIR

, N

EW J

ERSE

Y

Mon

tcla

ir S

tate

Uni

vers

ity

090771

REV DATE DESCRIPTION

Page 6: C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" = 1'-0" 3 TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-2 1/4" = 1'-0" 5 TYPICAL EXECUTIVE

16

A5.41

1/4" = 1'-0"1 CLUBS ROOM ELEVATION-1 1/4" = 1'-0"2 CLUBS ROOM ELEVATION-2

1/4" = 1'-0"3 CLUBS ROOM ELEVATION-3

1/4" = 1'-0"4 CLUBS ROOM ELEVATION-4 1/4" = 1'-0"5EXECUTIVE ED MULTI-PURPOSE ROOM ELEVATION-1

1/4" = 1'-0"6EXECUTIVE ED MULTI-PURPOSE ROOM ELEVATION-2

1/4" = 1'-0"7EXECUTIVE ED MULTI-PURPOSE ROOM ELEVATION-3

1/4" = 1'-0"8 EXECUTIVE ED MULTI-PURPOSE ROOM ELEVATION-4

SHEET NUMBER:

SHEET TITLE:

Copyright (c) by Environetics, Inc. All Rights Reserved.

CLIENT:

PROJECT TEAM:

MO

NTC

LAIR

, N

EW J

ERSE

Y

Mon

tcla

ir S

tate

Uni

vers

ity

090771

REV DATE DESCRIPTION

1/4" = 1'-0"9 BLOOMBERG TERMINAL ELEVATION -1 1/4" = 1'-0"10 BLOOMBERG TERMINAL ELEVATION - 2

1/4" = 1'-0"11 BLOOMBERG TERMINAL ELEVATION - 3 1/4" = 1'-0"12 BLOOMBERG TERMINAL ELEVATION - 4

1/4" = 1'-0"13 TRADING FLOOR ELEVATION - 1 1/4" = 1'-0"14 TRADING FLOOR ELEVATION - 2

1/4" = 1'-0"15 TRADING FLOOR ELEVATION - 3

1/4" = 1'-0"16 TRADING FLOOR ELEVATION - 4

Page 7: C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" = 1'-0" 3 TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-2 1/4" = 1'-0" 5 TYPICAL EXECUTIVE

A5.42

1/4" = 1'-0"5 TYPICAL SEMINAR ROOM ELEVATION-1 1/4" = 1'-0"6 TYPICAL SEMINAR ROOM ELEVATION-2

1/4" = 1'-0"7 TYPICAL SEMINAR ROOM ELEVATION-3 1/4" = 1'-0"8 TYPICAL SEMINAR ROOM ELEVATION-4

1/4" = 1'-0"9 STUDY ROOM ON FIRST FLOOR ELEVATION-1 1/4" = 1'-0"10 STUDY ROOM ON FIRST FLOOR ELEVATION-2

1/4" = 1'-0"11 STUDY ROOM ON FIRST FLOOR ELEVATION-3 1/4" = 1'-0"12 STUDY ROOM ON FIRST FLOOR ELEVATION-4

SHEET NUMBER:

SHEET TITLE:

Copyright (c) by Environetics, Inc. All Rights Reserved.

CLIENT:

PROJECT TEAM:

MO

NTC

LAIR

, N

EW J

ERSE

Y

Mon

tcla

ir S

tate

Uni

vers

ity

090771

REV DATE DESCRIPTION

1/4" = 1'-0"1 LEVEL 00 STAIRWELL CORRIDOR ELEVATION -1 1/4" = 1'-0"2 LEVEL 00 STAIRWELL CORRIDOR-3

1/4" = 1'-0"3 LEVEL 00 STAIRWELL CORRIDOR ELEVATION -4 1/4" = 1'-0"4 LEVEL 00 STAIRWELL CORRIDOR E;EVATION -4

1/4" = 1'-0"13

TYPICAL SMALL & MEDIUMCONFERENCE ROOM - A

1/4" = 1'-0"14

TYPICAL SMALL & MEDIUMCONFERENCE ROOM - B

1/4" = 1'-0"15 MEDIUM CONFERENCE ROOM - C 1/4" = 1'-0"16 MEDIUM CONFERENCE ROOM - D

Page 8: C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" = 1'-0" 3 TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-2 1/4" = 1'-0" 5 TYPICAL EXECUTIVE

12

OPENSHELVES

OPENSHELVES

OPENSHELVES

OPENSHELVES

OPENSHELVES

OPENSHELVES

OPENSHELVES

OPENSHELVES

5

10

7

A5.43

1/4" = 1'-0"5 IT DEPARTMENT ELEVATION-1 1/4" = 1'-0"6 IT DEPARTMENT ELEVATION-2

1/4" = 1'-0"7 IT DEPARTMENT ELEVATION-3 1/4" = 1'-0"8 IT DEPARTMENT ELEVATION-4

1/4" = 1'-0"13 GRAD STUDY ROOM ELEVATION-1 1/4" = 1'-0"14 GRAD STUDY ROOM ELEVATION-2

1/4" = 1'-0"15 GRAD STUDY ROOM ELEVATION-3 1/4" = 1'-0"16 GRAD STUDY ROOM ELEVATION-4

SHEET NUMBER:

SHEET TITLE:

Copyright (c) by Environetics, Inc. All Rights Reserved.

CLIENT:

PROJECT TEAM:

MO

NTC

LAIR

, N

EW J

ERSE

Y

Mon

tcla

ir S

tate

Uni

vers

ity

090771

REV DATE DESCRIPTION

1/4" = 1'-0"1 CENTER FOR SUSTAINABILITY-1 1/4" = 1'-0"2 CENTER FOR SUSTAINABILITY-2

1/4" = 1'-0"3 CENTER FOR SUSTAINABILITY-3 1/4" = 1'-0"4 CENTER FOR SUSTAINABILITY-4

1/4" = 1'-0"9 ACCOUNTING SUITE-1

1/4" = 1'-0"10 ACCOUNTING SUITE-2 1/4" = 1'-0"11 ACCOUNTING SUITE-3

1/4" = 1'-0"12 ACCOUNTING SUITE-4

Page 9: C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" = 1'-0" 3 TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-2 1/4" = 1'-0" 5 TYPICAL EXECUTIVE

A5.50SHEET NUMBER:

SHEET TITLE:

Copyright (c) by Environetics, Inc. All Rights Reserved.

CLIENT:

PROJECT TEAM:

MO

NTC

LAIR

, N

EW J

ERSE

Y

Mon

tcla

ir S

tate

Uni

vers

ity

090771

REV DATE DESCRIPTION

1/4" = 1'-0"5 GRADUATE SERVICES-1 1/4" = 1'-0"6 GRADUATE SERVICES-2

1/4" = 1'-0"7 GRADUATE SERVICES-3

1/4" = 1'-0"8 GRADUATE SERVICES-4 1/4" = 1'-0"9 INFO SYSTEMS LAB-1

1/4" = 1'-0"10 INFO SYSTEMS LAB-2 1/4" = 1'-0"11 INFO SYSTEMS LAB-3 12 INFO SYSTEMS LAB-4

1/4" = 1'-0"1 GRAD ASSISTANT SUITE ELEVATION-1 1/4" = 1'-0"2 GRAD ASSISTANT SUITE ELEVATION-2

1/4" = 1'-0"3 GRAD ASSISTANT SUITE ELEVATION-3 1/4" = 1'-0"4 GRAD ASSISTANT SUITE ELEVATION-1

1/4" = 1'-0"13 DEAN'S OFFICE ELEVATION-1

1/4" = 1'-0"14 DEAN'S OFFICE ELEVATION-2 1/4" = 1'-0"15 DEAN'S OFFICE ELEVATION-3

1/4" = 1'-0"16 DEAN'S OFFICE ELEVATION-4 1/4" = 1'-0"17 DEAN'S SUITE ELEVATION-1

1/4" = 1'-0"18 DEAN'S SUITE ELEVATION-2 1/4" = 1'-0"19 DEAN'S SUITE ELEVATION-3

1/4" = 1'-0"20 DEAN'S SUITE ELEVATION-4

1/4" = 1'-0"21 DEAN'S RECEPTION ROOM ELEVATION-1 1/4" = 1'-0"23 DEAN'S RECEPTION ROOM ELEVATION-3

1/4" = 1'-0"24 DEAN'S RECEPTION ROOM ELEVATION-4 1/4" = 1'-0"22 DEAN'S RECEPTION ROOM ELEVATION-2

1/4" = 1'-0"

Page 10: C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" = 1'-0" 3 TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-2 1/4" = 1'-0" 5 TYPICAL EXECUTIVE

13

A5.51

1/4" = 1'-0"1 MARKETING- 1

1/4" = 1'-0"2 MARKETING-2 1/4" = 1'-0"3 MARKETING- 3

1/4" = 1'-0"4 MARKETING - 4

1/4" = 1'-0"9 ECONOMIC & FINANCE DEPT ELEVATION-1 1/4" = 1'-0"10 1/4" = 1'-0"11 1/4" = 1'-0"12

1/4" = 1'-0"17 INFORMATION & OPERATIONS SUITE ELEVATION-1 1/4" = 1'-0"18INFORMATION & OPERATIONS SUITE ELEVATION-2

1/4" = 1'-0"19 INFORMATION & OPERATIONS SUITE ELEVATION-3 1/4" = 1'-0"20INFORMATION & OPERATIONS SUITE ELEVATION-4

SHEET NUMBER:

SHEET TITLE:

Copyright (c) by Environetics, Inc. All Rights Reserved.

CLIENT:

PROJECT TEAM:

MO

NTC

LAIR

, N

EW J

ERSE

Y

Mon

tcla

ir S

tate

Uni

vers

ity

090771

REV DATE DESCRIPTION

1/4" = 1'-0"5LARGE CONFERENCE ROOM ELEVATION 1

1/4" = 1'-0"6 LARGE CONFERENCE ROOM ELEVATION 2 1/4" = 1'-0"7LARGE CONFERENCE ROOM ELEVATION 3

1/4" = 1'-0"8 LARGE CONFERENCE ROOM ELEVATION 4

1/4" = 1'-0"13 MANAGEMENT SUITE ELEVATION-1 1/4" = 1'-0"14 MANAGEMENT SUITE ELEVATION-2

1/4" = 1'-0"15 MANAGEMENT SUITE ELEVATION-3 1/4" = 1'-0"16 MANAGEMENT SUITE ELEVATION-4

ECONOMIC & FINANCE DEPT ELEVATION-2 ECONOMIC & FINANCE DEPT ELEVATION-3 ECONOMIC & FINANCE DEPT ELEVATION-4

Page 11: C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" = 1'-0" 3 TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-2 1/4" = 1'-0" 5 TYPICAL EXECUTIVE

A5.52SHEET NUMBER:

SHEET TITLE:

Copyright (c) by Environetics, Inc. All Rights Reserved.

CLIENT:

PROJECT TEAM:

MO

NTC

LAIR

, N

EW J

ERSE

Y

Mon

tcla

ir S

tate

Uni

vers

ity

090771

REV DATE DESCRIPTION

1/4" = 1'-0"1 CENTER FOR INTERNATIONAL BUSINESS - 1 1/4" = 1'-0"2 1/4" = 1'-0"3 1/4" = 1'-0"4

1/4" = 1'-0"5 VIDEO PRODUCTION-1 1/4" = 1'-0"6 VIDEO PRODUCTION-2

1/4" = 1'-0"7 VIDEO PRODUCTION-3 1/4" = 1'-0"8 VIDEO PRODUCTION-4

CENTER FOR INTERNATIONAL BUSINESS - 2 CENTER FOR INTERNATIONAL BUSINESS - 3 CENTER FOR INTERNATIONAL BUSINESS - 4

1/4" = 1'-0"9 TYPICAL SUITE ENTRANCE ELEVATION 1/4" = 1'-0"10 INCUBATOR OFFICE

1/4" = 1'-0"11 INCUBATOR OFFICE

1/4" = 1'-0"12 INCUBATOR OFFICE 1/4" = 1'-0"13 INCUBATOR OFFICE

Page 12: C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" = 1'-0" 3 TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-2 1/4" = 1'-0" 5 TYPICAL EXECUTIVE

UP

UP

UP

FINISH PLAN LEGEND

FINISH CEILINGTYPE REF. RCP

PLANS FORADDITIONAL INFO.

FINISH FLOORINGMATERIAL

DESCRIPTIONSYMBOL

FINISH TAG

WALL BASEMATERIAL

WALL FINISHMATERIAL

TRANSITION STRIP SPECIFY TYPEPER FLOORING MATERIAL CHANGE

SYMBOL/DESCRIPTION

FINISH NOTES:

GYPSUM BOARD CEILINGGYP

CONCRETE SEALED - NO BASE

CONCRETE PAINTED - NO BASE

CARPET BROADLOOM

CP

CS

CPB

ACOUSTIC CEILING TILE (Type 1)ACT

FINISH KEYDESCRIPTIONKEY

RESILIENT BASERB

XX

WOOD BASE

PAINT

PLASTIC LAMINATE

NO FINISH

DESCRIPTION

WB

PL

PNT

N

KEY

FINISH TAG =

CARPET MODULAR TILECPT

VINYL COMPOSITION TILEVCT

TRANSITION & STAIR NOSING STRIPTS

GROUTGR

BASEB

FLOOR TILEFT

FIBER REINFORCED PLASTICFRP

DECORATIVE GLASSGL

LUXURY VINYL TILELVT

MARKER BOARDMB

MARBLE SADDLEMS

DECORATIVE PANELINGPNL

QUARRY TILEQT

STAINST

TRIM PACKAGE (WOOD)TP

WALLCOVERINGWC

WALL TILEWT

WALK-OFF MATTINGWM

**REF. ELEVATIONS FOR WALLFINISHES

1. G.C. TO CONFIRM THAT ALL WALLS ARE PLUMBED & STRAIGHTENED AS NECESSARY FORINSTALLATION OF NEW FINISHES.

2. PROVIDE 12" PRE-MANUFACTURED EXPANSION JOINTS 20'-0" O.C. IN ALL TILE

(TERRAZZO & CERAMIC TILE)

3. ALL CERAMIC TILE INTERIOR JOINTS AT INSIDE WALL TO WALL AND WALL TO FLOORINTERSECTIONS MUST BE CAULKED.

4. G.C. SHALL SET ALL COUNTER BASES PRIOR TO COMMENCEMENT OF ANY TILE WORK

5. ALL WINDOW SILLS TO RECEIVE SS-1 UNLESS OTHERWISE NOTED. MODIFY INTERIORFURRING TO ACCOMMODATE WINDOW SILLS.

6. SEE INTERIOR ELEVATIONS FOR ALL WALL FINISH DESIGNATIONS, REFLECTED CEILINGPLAN FOR CEILING & SOFFIT FINISHES, & FLOOR FINISH PLAN FOR FLOOR FINISHES.

7. G.C RESPONSIBLE FOR PROVIDING FIRE RETARDANT TREATED BLOCKING IN ALL WALLS,SOFFITS, & OTHER SUSPENDED ELEMENTS FOR SUPPORT.

8. G.C. SHALL PROVIDE WATERPROOFING MEMBRANE UNDER ALL QUARRY TILE FLOORING &UNDER WALL BASE.

9. ALL EXTERIOR WINDOW FRAMES & MULLION TO RECEIVE PNT-10.

10. COORDINATE WITH TECHNOLOGY EQUIPMENT DRAWINGS FOR LOCATION AND SIZE OF FLATPANELS DISPLAY SCREENS.

CEILINGBASEWALLFLOOR

XXXX

A5.10

11

12

13

14

A5.1015

16

17

18

A5.40 1

4

2

3

A5.40

9

11

1210

U CLASSROOM015

U CLASSROOM011

INCUBATORSPACE

014

STAIR0S03

CAFE070

TRADING FLOOR001

CORRIDOR0C04

CORRIDOR0C03

WOMEN'SRESTROOM

0R01

ELEC.0E01

CORRIDOR0C06

STAIRS0S01

WOMENSLOCKERS

050

CHS

0X01

AV/IT0D01

U CLASSROOM021

U CLASSROOM025

MECHANICAL0M01

VESTIBULE0C08

COOLER002C

FREEZER002A

CATERINGSETUP002B

A5.38

4

5

6

7

MEN'SRESTROOM

0R02

CAFE SERVERY060

STAIRS0S05

ELEV. MACH.0M02

VESTIBULE0C01

UNISEXRESTROOM

0R03

CORRIDOR0C05

CORRIDOR0C02

PNT8

KITCHENSERVERY

001B

PNL1

A5.10 22

21

20

23

A5.373

4

5

2

PNT1

WT11

PNT6

MB1

PNT6

PNT6

MB1

PNT6

PNT6

MB1

PNT6

PNT6

MB1

PNT6

PNT6

PNT21

WT11

PNT21

WT11

PNT10

MB1

PNT10

A5.11 13

12

14

11

MENS LOCKERS048

HOUSEKEEPING044

LOADING DOCK0L01

OFFICE052

HK LUNCH046

VCT2

TYP.

VCT2

TYP.

VCT1 VCT

1TYP.

VCT2 TYP.

VCT1

VCT1

WORK IN THIS AREA TO BE PERFORMED UNDER SEPERATECONTRACT

14' - 2"

UNISEXRESTROOM

0R04

25' -

11

1/2"

16' - 10 3/4"

A5.40 65

A5.40

7

8

A5.42

MB

4'X25

'

MB1

MB1

MB1

MB1

MB1

MB1

MB1

MB1

VCT1

MB

4'X25

'

WT11

PNT1

WT11

PNT1

MB

4'X12

'

MB

4'X25

'

MB 4'X25' MB 4'X25'

MB 4'X25' MB 4'X25'

MB

4'X25

'

ALIGN, TYP.

ALIGN, TYP.ALIGN, TYP.

ALIGN, TYP.

MB

4'X12

'

MB

4'X12

'M

B 4'X

12'

MB

4'X12

'

MB

4'X12

'

MB 4'X12'

MB 4'X12'

MB 4'X12'

MB 4'X12'

MB 4'X12'

MB 4'X12'

MB 4'X12'

MB 4'X12'

VCT2

9' - 6"

5' -

3"4'

- 2"

VCT2 TYP.VCT

1

VCT2 TYP.

EQ.

6' -

1"EQ

.

EQ. 9' - 6" EQ.

A5.41

9

10

11

12

A5.4113 15

14

16

HK0J01

BLOOMBERG090

CENTER FORENTREPRENEURSHIP

080

MEDIUMCONFERENCE

ROOM012

DIRECTOR080A OFFICE

080B

A5.42

13

15

1416

3

1

A5.422 4

TYP.

OFFICE080C

PNT13

A5.52

10

1211

13

WT11

PNT1

WT11

PNT1

VCT2

WT11

PNT1

WT11

PNT1

WT11

PNT1

WT11

PNT1

WT11

PNT1

WT11

PNT1

WT11

PNT1

WT11

PNT1

PNT8

WT11

PNT1

WT11

PNT1

A8.23-16

VCT - 1

SYMBOL DESCRIPTION

SYMBOLS LEGEND

VCT - 2

FT-1

QT-1

TZ-1

WM-1

TZ-2

1/8" = 1'-0"1 Lower Level Finish Plan ALTERNATE:

REFERENCE SPECIFICATIONSSECTION 01230 FOR ADDITIONAL INFO

Page 13: C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" = 1'-0" 3 TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-2 1/4" = 1'-0" 5 TYPICAL EXECUTIVE

UPDN

DN

UP

UP

UP

UP

UP

UP

UP

A5.10 5

4

3

6

A5.10 7

10

9

8

A5.32

3

2

4

1

A5.30 2

4

5

3

A5.36 5

4

3

6

A5.20

2

6 3

A5.50

1

3

42

A5.42

5

6

7

8

A5.42 9

12

11

10

A5.41

1

3

42

A5.415

6

7

8

A5.21

2

3

4

A5.33

3

4

LOBBY1C07

VESTIBULE1C01

U CLASSROOM124

C CLASSROOM128

CLUBS130

CLOSET140B

EXECUTVE ED.MULTI-PURPOSE

ROOM140

STUDY138

STUDY136

STUDY134

CORRIDOR1C05

SBUS TECHINGLAB120

SEMINAR118

CORRIDOR1C04

STUDY119

A/V BOOTH121

STUDY123

STUDY125

LECTURE HALL101

U CLASSROOM114

C CLASSROOM110

WOMEN'SRESTROOM

1R01 MEN'SRESTROOM

1R02

OFFICE170L

OFFICE170K

FILES170N

MAIL/STORAGE170P

INTERVIEWROOM170Q

STUDENTSERVICES

170

OFFICE170A

OFFICE170B

OFFICE170C

OFFICE170D

INTERVIEWROOM170G

INTERVIEWROOM170H

SMALLCONFERENCE

ROOM172

IT1D01

HK1J01

PROJECTIONAV/IT101A

5

5

12

STAIR1S03

STORAGE170M

CORRIDOR1C02

ATRIUM100

STAIR1S02

CORRIDOR1C03

ELEC.1E01

CPT3

STAIRS1S05

PNT8

PNT16

STAIR1S01

SINK

SERV

ERY

EMAIL STATION

PNT6

MB1

PNT6

PNT6

MB1

WT11

PNT21

PNT6

MB1

PNT6

PNT6

MB1

PNT6

PNT6

MB1

PNT6

WT11

PNT21

REF. ENLARGED PLANS A5.30

1/2" S.S STRIPS (TYP.)

1/2" S.S STRIPS (TYP.) 10' - 3" 4"

0"26

' - 3

3/4

"0"

PNT1

REF. ELEVATION FORWALL FINISHES

36' - 11"CPT

3

9' -

9 1/

4"8'

- 4"

10' -

0"

8' -

0 3/

4"

18' -

2 1

/4"

PNT6

A5.31 32

CORRIDOR1C06

MB 4'X25' MB 4'X25'

MB

4'X25

'

MB 4X8MB1

MB1

MB1

MB1

MB1

MB1

MB 4'X25'MB1

MB 4X6

MB1

MB 4X6MB1

MB 4X6

MB 4'X25'

MB1

MB1

MB 4'X25'

MB1

MB1

MB

4X6

MB

4X6

MB

4X6

MB1

MB1

MB 4'X10'

MB1

VCT1

VCT1

VCT1

CHASE1X01

PNT1

WT11

MB 4'X25' MB 4'X25'

MB 4'X25'

OPEN TO BELOW

WP1

WP1

WP1

MB

4'X12

'

MB

4'X12

'

MB

4'X12

'

MB

4'X12

'

MB

4'X12

'

MB

4'X12

'

MB

4'X12

'

MB

4'X12

'

MB 4'X16'

VCT2

VCT2VCT

2

VCT2

VCT2VCT

2

VCT1

VCT1

ALIGN, TYP.

ALIGN, TYP.

PNT16

INTERVIEWROOM170J

OFFICE170F

OFFICE170E

STUDY190

PNT8

6' - 5" 6' - 0"6' - 0"

15' -

0 1

/2"

6' -

0"EQ

.EQ

.

VCT4

VCT4

CHASE1X02

CHASE1X05

CHASE1X03

AV CL.140A

WT11

PNT1

TZ3

TZ3

WT11

PNT1

WT11

PNT1

VCT - 1

SYMBOL DESCRIPTION

SYMBOLS LEGEND

VCT - 2

FT-1

QT-1

TZ-1

WM-1

TZ-2

1/8" = 1'-0"1 First Floor Finish Plan ALTERNATE:

REFERENCE SPECIFICATIONSSECTION 01230 FOR ADDITIONAL INFO

Page 14: C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" = 1'-0" 3 TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-2 1/4" = 1'-0" 5 TYPICAL EXECUTIVE

UP

DN

DN

UP

UP

DN

DN

UP

DN

A5.5013

14

15

16

A5.112

3

4

5

A5.116

7

8

9

A5.5021 23

24

A5.5017

18

19

20

A5.43 13

16

15

14

A5.43 1

4

3

2

A5.435

6

7

8

A5.24

9

10

11

12

A5.25

1

2

3

4

A5.24

1

2

3

4

A5.23

2

5

4

3

SBUS TEACHINGLAB224

FLEXIBLESTANDARD

220

CORRIDOR2C05

IT DEPT230

HELP DESK230A

OFFICE230B

ASSOC. DIR.230C

ASSOC. DIR.230D

DIRECTOR230E

SECURESTORAGE

230F CENTER FORSUSTAINABILITY

250

DIRECTOR250A

STUDY237

STUDY235

STUDY233

STUDY231

GRAD. STUDY255

DEAN'S OFFICE290H

ASSOCIATEDEAN290F

ASSOCIATEDEAN290E

EXECUTIVE ED210

EXECUTIVE ED214

CORRIDOR2C04

EXECUTIVE ED.211

FLEXIBLESTANDARD

215

TUTORING OPENLAB225

U CLASSROOM221

WOMEN'SRESTROOM

2R01

HK2J01

ELEC.2E01

IT2D01

MEN'SRESTROOM

2R02

CORRIDOR2C04

CORRIDOR2C01

STUDY289

STUDY287

STUDY285

STUDY283

BREAKOUTROOM

217

BREAKOUTROOM

227

STAIRS2S01

STAIRS2S03

RECEPTION290.

STUDENTWORKERS

GRAD.ASSISTANTS

290A

SECURE FILESTORAGE

290N

ADMIN.290B

ASSISTANTDEAN290C

ADMIN.290M

ADMIN.290L

COPY/ COFFEE290D

DEAN'S SUITE290

ASSOCIATEDEAN290J

DEAN'SCONFERENCE

290KCORRIDOR

2C02

STUDY281

STAIR2S02

STUDY239

CORRIDOR2C03

STAIR2S06

PNT8

PNT8

PNT8

*REF ELEVATIONSFOR WALL FINISHES

*REF ELEVATIONSFOR WALL FINISHES

PNT1

PNT1

WT11

PNT8

PNT1

PNT1

PNT6

MB1

PNT6

PNT6

MB1

WT11

PNT21

PNT6

MB1

PNT6

MB1

WT11

PNT21

PNT10

MB1

PNT10

EMAIL STATION

VCT2

HELP COUNTERREF. MILLWORK SHEETFOR DETAILS

VCT4

PNT6

EQ. 6' - 0" 12' - 0" 6' - 0" EQ.

PNT10

MB1

PNT10

PNT10

MB1

PNT10

WT12

MB

4'X25

'

MB1

MB1

MB 4'X25' MB 4'X25'

MB 4'X10'

MB1

OPEN TO BELOW

MB

4X6

MB

4X6

MB

4X6

MB

4X6

MB

4X6

MB

4X6

MB

4X6

MB

4X6

MB

4X6

MB

4X6

TZ2

TZ2

EQ.

6' -

0"9'

- 0"

6' -

0"EQ

.

EQ.6' - 0"16' - 0"6' - 0"EQ.

EQ.

6' -

0"8'

- 0"

6' -

0"EQ

.

VCT4 TYP.

MB1

MB1

MB1

MB1

MB1

MB1

MB1

MB1

MB1

MB1

MB 4'X16'

MB 4'X16'

MB 4'X16'

MB 4'X16'MB 4'X16'

VCT1

VCT2 TYP.

VCT2 TYP.

VCT1

VCT2

VCT1

VCT2 TYP. VCT

2 TYP.

VCT1

ALIGN, TYP.

ALIGN, TYP.

A5.23

2

5

4

3

A5.23

2

35

4

22

TYP.

TYP.

PNT6

MB1

PNT6

VCT2

VCT2

VCT2

VCT2

MB1

MB1

ATRIUM100

CHASE2X02

CHASE2X01

CHASE2X03

CHASE2X04

MB 4X20

WT11

PNT1

WT11

PNT1

VCT - 1

SYMBOL DESCRIPTION

SYMBOLS LEGEND

VCT - 2

FT-1

QT-1

TZ-1

WM-1

TZ-2

1/8" = 1'-0"1 Second Floor Finish Plan

Page 15: C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" = 1'-0" 3 TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-2 1/4" = 1'-0" 5 TYPICAL EXECUTIVE

UPDN

DNUP

DN

DN

UP

A5.50

5

6

7

8

A5.43

9

10

11

12

U CLASSROOM324

C CLASSROOM320

OFFICE347

OFFICE349OFFICE

340

OFFICE346

OFFICE348

OFFICE350

OFFICE352

OFFICE354

OFFICE356

OFFICE358

OFFICE360

OFFICE362

OFFICE364

OFFICE366

OFFICE368

OFFICE370

OFFICE378

OFFICE376

OFFICE375

OFFICE374

OFFICE373

OFFICE372

CORRIDOR3C02

OFFICE371

OFFICE369

OFFICE367

OFFICE363

OFFICE361

OFFICE381

OFFICE383

OFFICE385

OFFICE387

STUDY389

ACCOUNTINGLAB384

STORAGE392B

COPY/MAIL390

CORRIDOR3C06

CORRIDOR3C01

IT3D01

ELEC3E01

MEN'SRESTROOM

3R02

WOMEN'SRESTROOM

3R01

CORRIDOR3C08

C CLASSROOM310

U CLASSROOM314

SEMINAR327

STAFF LOUNGE325

CORRIDOR3C07

FHTCLASSROOM

321

FHTCLASSROOM

311

OFFICE351

OFFICE353

OFFICE339

OFFICE337

OFFICE335

OFFICE333

STUDY331

MED. CONF. RM380

CORRIDOR3C03

CORRIDOR3C04

STAIRS3S03

C CLASSROOM315

STAIRS3S01

HK3J01

CORRIDOR3C05

STAIR3S06

PNT8

PNT8

PNT8

PNT8

*REF ELEVATIONSFOR WALL FINISH

*REF ELEVATIONSFOR WALL FINISH

PNT6

MB1

PNT6

PNT6

MB1

PNT6

WT11

PNT6

PNT6

PNT6

PNT6

PNT6

MB1

PNT6

PNT6

MB1

PNT6

PNT6

MB1

WT11

PNT21

WT11

PNT21

CHS

3X06

VCT2

VCT2

VCT2

MB 4X6

MB 4X6

OPENTO

BELOW

BREAKOUTROOM

317

MB 4'X10'

MB 4'X25' MB 4'X25'

MB1

MB1

MB1

MB1

MB

4'X25

'

MB1

MB1

MB

4X20

MB 4X20

MB1

MB1

MB 4'X25'

MB1

MB1

MB 4'X25'

MB1

MB1

MB1

MB1

MB1

MB1

STAIRS3S02

SKYLIGHTSBELOW

WT12

MB

4'X12

'

MB

4'X12

'

MB

4'X12

'

MB

4'X12

'

MB 4'X12'

MB 4'X12'

MB

4'X12

'

MB

4'X12

'

MB

4'X12

'

MB

4'X12

'

MB 4'X16'

GRADUATESERVICES

330

OFFICE330A

OFFICE330B

DIRECTOR330C

STORAGE330D

CENTER FORINTERNATIONAL

BUSINESS336

DIRECTOR336A VIDEO

PRODUCTION345

CHAIR392A

ACCOUNTING392

GRADUATEASSISTANT

388

ADJUNCT HOTEL386

OFFICE355

OFFICE357

OFFICE359

A5.52

1

42

3

A5.52 5

6

7

8

PNT8

VCT2

VCT2

VCT2

VCT2

VCT2

VCT2

A5.24

7

8

5

6

A5.122

A5.126

7

8

9

3

4

5

*WALLS TO BE PAINTEDIN A MATTE FINISH

CHASE3X02

CHASE3X01

CHASE3X04

CHASE3X03

WT11

PNT1

WT11

PNT1

VCT - 1

SYMBOL DESCRIPTION

SYMBOLS LEGEND

VCT - 2

FT-1

QT-1

TZ-1

WM-1

TZ-2

1/8" = 1'-0"1 Third Floor Finish Plan

Page 16: C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" = 1'-0" 3 TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-2 1/4" = 1'-0" 5 TYPICAL EXECUTIVE

UPDN

DNUP

UP

UP

DN

A5.50

9

11

1012

A5.51 13

16

15

14

C-CLASSROOM422

MANAGEMENT430

COPY/MAIL432

GRADASSISTANT

434

ADJUNCT HOTEL438

OFFICE440

CORRIDOR4C05

OFFICE431

OFFICE433

OFFICE435

OFFICE437

OFFICE439

OFFICE441

CORRIDOR4C03

OFFICE449

OFFICE447

OFFICE446

OFFICE448

OFFICE450

OFFICE452

OFFICE454

OFFICE456

OFFICE458

OFFICE460

OFFICE462

OFFICE464

OFFICE466

OFFICE468

OFFICE470

CORRIDOR4C02

OFFICE469

OFFICE463

OFFICE461

OFFICE459

OFFICE453

OFFICE481

OFFICE483

OFFICE485

OFFICE487

OFFICE489

OFFICE480

OFFICE482

OFFICE484

OFFICE486

INFO ANDOPERATIONS

492

CHAIR492A

STORAGE492B

COPY/MAIL494

ADJUNCT408

GRADASSISTANT

410

SEMINAR412

CORRIDOR4C08

FLEXIBLESTANDARD

TECH411

MEN'SRESTROOM

4R02

IT4D01

ELEC4E01

CORRIDOR4C01

HK4J01

WOMEN'SRESTROOM

4R01

CORRIDOR4C07

FLEXIBLESTANDARD

TECH.421

CORRIDOR4C06

STAIRS4S01

CHAIR430A

OFFICE455

OFFICE457

STAIR4S03

STAIR4S06

PNT8

PNT8

PNT8

PNT8

WT11

PNT6

MB1

PNT6

PNT21

WT11

PNT6

MB1

PNT6

PNT21

WT11

STAIRS4S02

MB 4'X25'

MB1

MB1

MB 4'X25'

OPEN TO ATRIUMSKYLIGHT BELOW.

TERRACE

TERRACE

OFFICE467

A5.51 1819

20

17

CORRIDOR4C04

STORAGE430B

INFO SYSTEMSLAB488

PNT6

PNT6

MB1

MB 4'X25'

PNT8

WT12

A2.15 13

4

2

A5.122

3

4

5

A5.126

7

8

9

VCT2VCT

2

VCT2VCT

2

CHASE4X03

CHASE4X04

CHASE4X01

CHASE4X02

MB

4'X12

'M

B 4'X

12'

A2.15

6

8

5 7

WT11

PNT1

WT11

PNT1

VCT - 1

SYMBOL DESCRIPTION

SYMBOLS LEGEND

VCT - 2

FT-1

QT-1

TZ-1

WM-1

TZ-2

1/8" = 1'-0"1 Fourth Floor Finish Plan ALTERNATE:

REFERENCE SPECIFICATIONSSECTION 01230 FOR ADDITIONAL INFO

Page 17: C:Userswaldahondo.ENVIRONETICSDocumentsMSU …...TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-1 1/4" = 1'-0" 3 TYPICAL EXECUTIVE ED CLASSROOM ELEVATION-2 1/4" = 1'-0" 5 TYPICAL EXECUTIVE

DN

DN

UP

DN

DN

A5.51

1

3

42

A5.51

5

68

7

A5.51

9

11

1210

SEMINAR524

OFFICE532

OFFICE534

OFFICE536

OFFICE538

OFFICE540

LARGECONFERENCE

ROOM550

OFFICE552

OFFICE566

LARGECONFERENCE

ROOM570

OFFICE580

OFFICE582

OFFICE584

OFFICE586

ADJUNCT HOTEL588

OFFICE563

OFFICE581

OFFICE583

OFFICE585

OFFICE587

OFFICE589

OFFICE561

OFFICE559

OFFICE557

OFFICE553

OFFICE541

OFFICE539

OFFICE537

OFFICE535

OFFICE533

OFFICE531

CORRIDOR5C07

WOMEN'SRESTROOM

5R01

HK5J01

ELEC.5E01

IT5D01

MEN'SRESTROOM

5R02

C CLASSROOM511

SMALLCONFERENCE

ROOM514

GRADASSISTANT

508STORAGE

592B

COPY / MAIL506

MARKETING592

CHAIR592A

CORRIDOR5C04

CORRIDOR5C06

CORRIDOR5C01

OFFICE555

OFFICE558

OFFICE560

OFFICE562

OFFICE564

OFFICE554

OFFICE556

STORAGE530B

COPY/MAIL520

STAIRS5S01

C CLASSROOM521

ECONOMICS &FINANCE DEPT

530

STAIRS5S03

STAIR5S06

PNT8

PNT8

PNT8

*REF ELEVATIONFOR WALL FINISH

*REF ELEVATIONFOR WALL FINISH

CHAIR530A

PNT6

MB1

PNT6

PNT3

MB1

PNT6

WT11

PNT21

WT11

PNT21

CHS

2X06

WT11

MB 4'X25'

MB 4'X25'

MB1

MB1

OPEN TO ATRIUMSKYLIGHT BELOW.

STAIR5S02

TERRACE BELOW

TERRACE BELOW

MB

4'X12

'M

B 4'X

12'

MB

4'X10

'

MB1

MB 4'X10'

MB1

MB

4'X10

'

MB1

SMALLCONFERENCE

ROOM510MRO

512

WAITING AREA5C08

MRO516

GRADASSISTANT

526

ADJUNCT522

WT12

PNT8

A5.122

2

4

5

A5.126

7

8

9

A5.515

6

7

8

VCT2VCT

2

VCT2

VCT2

VCT2

VCT2

VCT2

A2.15

6

8

5 7

WT11

PNT1

WT11

PNT1

VCT - 1

SYMBOL DESCRIPTION

SYMBOLS LEGEND

VCT - 2

FT-1

QT-1

TZ-1

WM-1

TZ-2

1/8" = 1'-0"1 Fifth Floor Finish Plan ALTERNATE:

REFERENCE SPECIFICATIONSSECTION 01230 FOR ADDITIONAL INFO