C A SECTION C-C TOP VIEW

1
Striem 3100 Brinkerhoff Kansas City, KS 66115 Tel: 913-222-1500 Fax: 913-291-0457 www.striemco.com Made in the U.S.A 4" 8" 69" Minimum 208" Minimum 2-1/2" Minimum 4" 45° 12" Minimum Additional Options SS - Slick Stick™ Oil Level Monitoring System* AK-1 - High Water Anchor Kit *Monitoring system will raise covers by 2-1/2". Threaded plug Cast Iron cover Sioux Chief model 850-4I Riser to match service line size and type 8" PVC pipe Must be at least 2-1/2" and cannot exceed 4" Lower clamp* Upper clamp* Gasket Tank Adapter Riser/Adapter C C SECTION C-C Pickable cast iron cover Crushed gravel or sand Native soil H20 traffic loading slab AK-1 Anchor Kit Riser to finished grade Finished Grade 33" TYP Oil separator vent to be piped independently 24" Risers to grade H20 rated slab required for all installations Sample port to match service line pipe size Two-way cleanout tee Vent to connect to building piping AK-1 Anchor Kit TYPICAL JOINT Connect with Fernco Strongback RC Coupler or Mission Flex-Seal ARC (by others) Oil separator vent to be piped independently Connect with Fernco Strongback RC Coupler or Mission Flex-Seal ARC (by others) 36" Minimum 68" TYP 17" TYP 17" TYP Adjustable adapters with H20 rated pickable cast iron covers TYP 16" C L of vent TYP 16" C L of vent TYP A A 70-1/4" 40" C L of vents 20" Water seal TYP 30" min 82" max 24-1/2" TYP 38" C L of Inlets and Outlets Top of Inlet Top of Outlet Open top Inlet diffusers Closed top outlet diffusers to provide sewer gas trap All piping by others Static water line Static water line SECTION A-A TOP VIEW UNIT INSTALLATION Lower and center the unit into hole. 1. Ensure the top of riser is level with finished grade. 2. Connect waste piping to the unit. 3. Connect vent piping to vent connection on sidewall of tank. If auxiliary 4. vent is used, remove cap and install on inlet side vent. Fill unit with water before backfilling to stabilize unit, check for leaks, 5. and prevent float out during backfilling. ALL PIPE EMBEDMENT IN ACCORDANCE WITH JCW STANDARDS BACKFILLING & FINISHED CONCRETE SLAB Preparation of sub grade per geotech recommendations. 1. Stabilize and compact sub grade to 95% proctor. 2. Fill tank with water before backfilling to prevent float out during 3. piping installation. Before backfilling and pouring of slab secure covers and risers (if 4. necessary) to the units. Backfill using crushed aggregate material approximately 3/4" size 5. rock, or sand, with no fines. Place 6" aggregate base under slab. Aggregate should be 3/4" size 6. rock, or sand, with no fines. Concrete to be 28 day compressive strength to 4000 PSI with 7. 6%±1% air entrainment. NO. 4 rebar ( 1/2") grade 60 steel per ASTM A615: connected 8. with tie wire. Rebar to be 2-1/2" from edge of concrete. 9. Rebar spacing 12" grid. 4" spacing around access openings. 10. EXCAVATION Install unit(s) as close as possible to fixtures being serviced. 1. Width and length of excavation shall be minimum 12" greater 2. than the tank on all sides. Depth of excavation shall be 6" deeper than tank bottom. 3. Set the tank in well-packed crushed aggregate material 4. approximately 3/4" size rock, or sand, with no fines. AK-1 ANCHOR KIT INSTALLATION STEPS AK-1 Anchor kit is required for installations in high water table conditions 1. to prevent float out. To be determined by specifying engineer. See detail on this sheet. Slide "Anchor Strap" over tie down point on end wall 2. and bolt together using provided hardware Bolt "Anchor Strap" to "Anchor Plate" using provided hardware 3. Hold down force achieved by backfill weight acting on Anchor Plate. 4. Anchor Plate may be bolted to concrete slab, if required, by using 5. holes provided in Anchor Plate. SPECIFICATIONS Max flow rate: 100 GPM 1. Capacities: Liquid: 500 gal. (67 cu. ft.); Oil: 288 gal.; Sand: 95 gal. 2. Unit weight: 692 lbs. 3. Maximum operating temperature 140 F continuous. 4. H20 rated pickable cast iron cover: 16,000 lb. capacity. 5. NOTES Snap-in Flow control (ships with unit). 1. For gravity drainage applications only. 2. Do not use for pressure applications. Seamless medium density polyethylene tank. 3. Unit supplied with built-in adapter for up to 6" of 4. adjustability. Additional riser(s) available for deeper burial depth. Cover placement allows full access to tank 5. for proper maintenance. Engineered inlet and outlet diffusers are removable to 6. inspect/clean piping. DIFFUSION FLOW TECHNOLOGY The inlet diffuser splits influent into three paths, creating laminar flow and utilizing the entire liquid volume of the tank for efficient oil separation. The calibrated openings greatly reduce influent turbulence. The influent enters the main chamber without disturbing the existing oil or sand layers. The bottom of the outlet diffuser allows only effluent that is free of oil to exit the tank. ENGINEER SPECIFICATION GUIDE Striem Oil Reserve™ oil/sand separator model OS-500-100-JCW shall be lifetime guaranteed and made in USA of seamless, rotationally-molded polyethylene. Separator shall be furnished for below grade installation, with field adjustable riser system, snap-in flow control and (4) vent connections. Separator flow rate shall be 100 GPM. Separator oil capacity shall be 288 gallons. Sand capacity shall be 95 gallons. Covers shall provide water/gas-tight seal and have a maximum 16,000 lbs load capacity. THIRD PARTY STRUCTURAL ANALYSIS The OS-500-100-JCW has been structurally analyzed in accordance with the requirements of IBC 2012/2015 and ASCE/SEI 7 for direct burial. The maximum burial depth and backfill material are specified in our installation instructions. The structural design has been reviewed and sealed by a professional engineer registered in the state of California. A sealed structural analysis report is available upon request. !!! JCW INSPECTION REQUIREMENTS!!! 1. Interior Sand/Oil Plumbing Inspection - The sand/oil plumbing and fixtures inside the building shall be inspected prior to pouring the interior slab 2. Sand/Oil Separator Inspection - Partial Inspection #1: Excavation, separator, riser(s) and anchor kit (if applicable) shall be inspected prior to backfill. - Partial Inspection #2: Haunched pipe, backfill, cleanout and sampling port shall be inspected prior to pipe backfill. 3. Sand/Oil Separator Concrete Slab Rebar Inspection - The rebar configuration shall be inspected prior to pouring the concrete slab. 4. Sand/Oil Separator Leak Test Inspection -The separator leak test shall be performed after the rebar configuration has been inspected. - Step 1: All pipes entering/exiting the separator shall be plugged. - Step 2: The separator shall be filled to the top of the riser with water. - Step 3: The water level shall be marked and monitored for 30 minutes to confirm the separator is not leaking. - Step 4: The snap-in flow control plate installation on the inlet pipe shall be verified. !!! ALL JCW INSPECTIONS SHALL BE REQUESTED ONLINE THROUGH THE WWW.MYGOVERNMENTONLINE.ORG PORTAL !!! *Tighten all clamps to a minimum of 5 lbs. and a maximum of 8 lbs. of torque OUTLET END VIEW CONCRETE SLAB DETAIL EXCAVATION AND BACKFILL DETAIL PE STAMP (For H20 Slab Design Only) Anchor Kit Required Unless Sealed by Kansas Professional Engineer Stainless steel anchor plate Stainless steel anchor strap Tie-down point Finished Grade Elevation View Rebar Concrete Pad must extend a minimum of 18" outside the unit footprint Rebar Top View 4" 8" 69" Minimum 208" Minimum 2-1/2" Minimum 4" 45° 12" Minimum DESCRIPTION: DWG BY: DATE: REV: PROPRIETARY AND CONFIDENTIAL 07/16/2020 0 POLYETHYLENE OIL SEPARATOR 100 GPM 500 GALLON CAPACITY JOHNSON COUNTY WASTEWATER DETAIL OS-500-100-JCW DATE: REV: THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF STRIEM, LLC. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF STRIEM, LLC. IS PROHIBITED. JCW IS ALLOWED PUBLICATION & DISTRIBUTION PROPRIETARY AND CONFIDENTIAL MJ 0 MODEL NUMBER:

Transcript of C A SECTION C-C TOP VIEW

Page 1: C A SECTION C-C TOP VIEW

Striem3100 Brinkerhoff

Kansas City, KS 66115Tel: 913-222-1500Fax: 913-291-0457

www.striemco.com

Made in the U.S.A

4" 8"

69" Minimum

208" Minimum

2-1/2" Minimum

4"

45°

12" Minimum

Additional Options

SS - Slick Stick™ Oil Level Monitoring System*

AK-1 - High Water Anchor Kit

*Monitoring system willraise covers by 2-1/2".

Threaded plug

Cast Iron coverSioux Chief model 850-4I

Riser to matchservice linesize and type

8" PVC pipe

Must be at least2-1/2" and cannot

exceed 4"

Lower clamp*

Upper clamp*Gasket

TankAdapter

Riser/Adapter

CC

SECTION C-C

Pickable cast iron cover

Crushed gravelor sand

Native soil

H20 traffic loading slab

AK-1 Anchor Kit

Riser to finishedgrade Finished Grade

33" TYP

Oil separator vent to bepiped independently

24" Risersto grade

H20 rated slab requiredfor all installations

Sample port to matchservice line pipe size

Two-way cleanout tee

Vent to connect tobuilding piping

AK-1 Anchor Kit

TYPICAL JOINT

Connect with FerncoStrongback RC Coupler

or Mission Flex-Seal ARC(by others)

Oil separator vent to bepiped independently

Connect with FerncoStrongback RC Coupler

or Mission Flex-Seal ARC(by others)

36"Minimum

68" TYP

17"TYP

17"TYP

Adjustable adapters with H20rated pickable cast iron covers TYP

16"CL of vent TYP

16"CL of vent TYP AA

70-1/4"

40"CL ofvents

20" Water sealTYP

30" min82" max

24-1/2"TYP

38"CL ofInlets and

Outlets

Top of Inlet

Top of Outlet

Open top Inlet diffusers Closed top outlet diffusersto provide sewer gas trap

All piping by others

Staticwaterline

Staticwaterline

SECTION A-A

TOP VIEW

UNIT INSTALLATIONLower and center the unit into hole. 1.Ensure the top of riser is level with finished grade.2.Connect waste piping to the unit. 3.Connect vent piping to vent connection on sidewall of tank. If auxiliary 4.vent is used, remove cap and install on inlet side vent.Fill unit with water before backfilling to stabilize unit, check for leaks, 5.and prevent float out during backfilling.

ALL PIPE EMBEDMENT IN ACCORDANCE WITH JCW STANDARDS

BACKFILLING & FINISHED CONCRETE SLABPreparation of sub grade per geotech recommendations.1.Stabilize and compact sub grade to 95% proctor.2.Fill tank with water before backfilling to prevent float out during 3.piping installation.Before backfilling and pouring of slab secure covers and risers (if 4.necessary) to the units.Backfill using crushed aggregate material approximately 3/4" size 5.rock, or sand, with no fines.Place 6" aggregate base under slab. Aggregate should be 3/4" size 6.rock, or sand, with no fines.Concrete to be 28 day compressive strength to 4000 PSI with 7.6%±1% air entrainment.NO. 4 rebar ( 1/2") grade 60 steel per ASTM A615: connected 8.with tie wire.Rebar to be 2-1/2" from edge of concrete.9.Rebar spacing 12" grid. 4" spacing around access openings.10.

EXCAVATIONInstall unit(s) as close as possible to fixtures being serviced.1.Width and length of excavation shall be minimum 12" greater 2.than the tank on all sides.Depth of excavation shall be 6" deeper than tank bottom.3.Set the tank in well-packed crushed aggregate material 4.approximately 3/4" size rock, or sand, with no fines.

AK-1 ANCHOR KIT INSTALLATION STEPSAK-1 Anchor kit is required for installations in high water table conditions 1.to prevent float out. To be determined by specifying engineer. See detailon this sheet.Slide "Anchor Strap" over tie down point on end wall2.and bolt together using provided hardwareBolt "Anchor Strap" to "Anchor Plate" using provided hardware3.Hold down force achieved by backfill weight acting on Anchor Plate.4.Anchor Plate may be bolted to concrete slab, if required, by using 5.holes provided in Anchor Plate.

SPECIFICATIONS Max flow rate: 100 GPM1.Capacities: Liquid: 500 gal. (67 cu. ft.); Oil: 288 gal.; Sand: 95 gal.2.Unit weight: 692 lbs.3.Maximum operating temperature 140 F continuous.4.H20 rated pickable cast iron cover: 16,000 lb. capacity.5.

NOTESSnap-in Flow control (ships with unit).1.For gravity drainage applications only.2.Do not use for pressure applications.Seamless medium density polyethylene tank.3.Unit supplied with built-in adapter for up to 6" of4.adjustability. Additional riser(s) available for deeper burial depth.Cover placement allows full access to tank5.for proper maintenance.Engineered inlet and outlet diffusers are removable to 6.inspect/clean piping.

DIFFUSION FLOW TECHNOLOGYThe inlet diffuser splits influent into three paths, creating laminarflow and utilizing the entire liquid volume of the tank for efficient oil separation. The calibrated openings greatly reduce influent turbulence. The influent enters the main chamber withoutdisturbing the existing oil or sand layers. The bottom of the outlet diffuser allows only effluent that is free of oil to exit the tank.ENGINEER SPECIFICATION GUIDEStriem Oil Reserve™ oil/sand separator model OS-500-100-JCW shall be lifetime guaranteed and made in USA of seamless, rotationally-molded polyethylene. Separator shall be furnished for below grade installation, with field adjustable riser system, snap-in flow control and (4) vent connections. Separator flow rate shall be 100 GPM. Separator oil capacity shall be 288 gallons. Sand capacity shall be 95 gallons. Covers shall provide water/gas-tight seal and have a maximum 16,000 lbs load capacity.THIRD PARTY STRUCTURAL ANALYSISThe OS-500-100-JCW has been structurally analyzed in accordance with therequirements of IBC 2012/2015 and ASCE/SEI 7 for direct burial. The maximum burial depth and backfill material are specified in our installation instructions. The structural design has been reviewed and sealed by a professional engineer registered in the state of California. A sealed structural analysis report is available upon request.

!!! JCW INSPECTION REQUIREMENTS!!!

1. Interior Sand/Oil Plumbing Inspection- The sand/oil plumbing and fixtures inside the building shall be inspected prior to pouring the interior slab2. Sand/Oil Separator Inspection- Partial Inspection #1: Excavation, separator, riser(s) and anchor kit (if applicable) shall be inspected prior to backfill.- Partial Inspection #2: Haunched pipe, backfill, cleanout and sampling port shall be inspected prior to pipe backfill.3. Sand/Oil Separator Concrete Slab Rebar Inspection- The rebar configuration shall be inspected prior to pouring the concrete slab.4. Sand/Oil Separator Leak Test Inspection-The separator leak test shall be performed after the rebar configuration has been inspected.- Step 1: All pipes entering/exiting the separator shall be plugged.- Step 2: The separator shall be filled to the top of the riser with water.- Step 3: The water level shall be marked and monitored for 30 minutes to confirm the separator is not leaking.- Step 4: The snap-in flow control plate installation on the inlet pipe shall be verified.

!!! ALL JCW INSPECTIONS SHALL BE REQUESTED ONLINE THROUGH THE WWW.MYGOVERNMENTONLINE.ORG PORTAL !!!

*Tighten all clamps to a minimum of5 lbs. and a maximum of 8 lbs. of torque

OUTLET END VIEW

CONCRETE SLAB DETAIL

EXCAVATION AND BACKFILL DETAIL

PE STAMP(For H20 Slab Design Only)

Anchor Kit Required Unless Sealed by Kansas

Professional Engineer

Stainless steelanchor plate

Stainless steelanchor strap

Tie-downpoint

Finished Grade

Elevation View Rebar

Concrete Padmust extend aminimum of 18"outside the unitfootprint

RebarTop View

4" 8"

69" Minimum

208" Minimum

2-1/2" Minimum

4"

45°

12" Minimum

DESCRIPTION:

DWG BY: DATE: REV:PROPRIETARY AND CONFIDENTIAL

07/16/2020 0

POLYETHYLENE OIL SEPARATOR100 GPM

500 GALLON CAPACITYJOHNSON COUNTY WASTEWATER DETAIL

OS-500-100-JCW

DATE: REV:THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF STRIEM, LLC.

ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF STRIEM, LLC. IS PROHIBITED. JCW IS ALLOWED PUBLICATION & DISTRIBUTION

PROPRIETARY AND CONFIDENTIAL

MJ 0

MODEL NUMBER: