BY
www.presidentofindia.nic.in
Productivity Enhancement using ICT at Rashtrapati Bhavan
V. PonrajDirector (Technology Interface)
President’s SecretariatRashtrapati Bhavan
E-Governance – Vision of H.E. Dr. APJ Abdul KalamE-Governance – Vision of H.E. Dr. APJ Abdul Kalam
Agriculture
LAW
CIVIL
PoliceTransport
Electricity
RuralPWDWater
Pvt.Public
Industries
Education
State State GovernmentsGovernments
E-Gov Data Centre at State/ Central Level
G 2 GG 2 G
G 2 CG 2 C
E-Governance Grid connecting the State and Central Government Departments and E-Governance Grid connecting the State and Central Government Departments and ensuring interoperable flow of information for G2G and G2C connectivityensuring interoperable flow of information for G2G and G2C connectivity
““A transparent smart e-governance with seamless access, secure and authentic A transparent smart e-governance with seamless access, secure and authentic flow of information crossing the inter-departmental barrier and providing a fair flow of information crossing the inter-departmental barrier and providing a fair
and unbiased service to all the citizens.”and unbiased service to all the citizens.” – Dr. APJ Abdul Kalam – Dr. APJ Abdul Kalam
““Bringing change in Bringing change in thinking and in doing so”thinking and in doing so”Democratizing the Democratizing the information information Administrative reforms Administrative reforms eliminating the procedural eliminating the procedural bottlenecks bottlenecks
www.presidentofindia.gov.in
Website has a hit Website has a hit rate of over two rate of over two hundred and fifty hundred and fifty thousand per day. thousand per day.
Whenever the Whenever the president visits president visits various parts of the various parts of the country, the hit rate country, the hit rate will be more than will be more than double than the double than the present hit rate. present hit rate.
In the year 2007, In the year 2007, average monthly hit average monthly hit is more than 1 is more than 1 Crore hitsCrore hits
On certain special On certain special occasions like occasions like Independence Day, Independence Day, Republic Day, it Republic Day, it touches nearly a touches nearly a million hits million hits
G2G
RB E-Governance Portal
NewsNews
Human Resource ManagementHuman Resource Management
Appointment ManagementAppointment Management
Meeting ManagementMeeting Management
File/Record/Correspondence ManagementFile/Record/Correspondence Management
Messaging and CollaborationMessaging and Collaboration
Issue ManagementIssue Management
Project ManagementProject Management
CircularCircular NoticesNotices IOMIOM
Gri
evan
ces
Man
agem
ent
Gri
evan
ces
Man
agem
ent
Do
cum
ents
Man
agem
ent
Do
cum
ents
Man
agem
ent
Budget Control ManagementBudget Control Management E-P
rocu
rem
ent
Man
agem
ent
E-P
rocu
rem
ent
Man
agem
ent
Task ManagementTask Management
Jet-Mail
DiscussionForum
VirtualConference
VirtualLibrary
MediaLab
InvitationMgmt
HelpDesk
RB e-Governance PortalRB e-Governance Portal
Secured Dynamic Workflow / Message QueueSecured Dynamic Workflow / Message Queue
G2CG2C
Pre
sid
en
t’s
Sec
reta
riat
U
se
rs
Management Information Systems (MIS) Management Information Systems (MIS) Departmental Information Systems (DIS)Departmental Information Systems (DIS)
Secured Access Control Secured Access Control Smart Card based Employee ServicesSmart Card based Employee Services
www.presidentofindia.gov.in
RB e-Governance PortalRB e-Governance PortalGrievances/Petitions/Letters/SuggestionsGrievances/Petitions/Letters/Suggestions Citizens Citizens Petitions from sensitive cases, criminal cases Petitions from sensitive cases, criminal cases Ministers Ministers MPMP MLAMLA Ex. MLAs, Ex. MPsEx. MLAs, Ex. MPs Email Email Junk Letters Junk Letters
www.presidentofindia.gov.in
CR SectionCR Section
SO – Public – I SO – Public – I
Public – I SectionPublic – I Section
US(P)US(P)
File StorageFile Storage
Dir (A&E)Dir (A&E)
JSPJSP
The PresidentThe President
Scanning/ProcessingScanning/ProcessingAt CR Section At CR Section Scan CentreScan Centre
CR Section CR Section ForwardsForwards
To To SO – Public - ISO – Public - I
SO – Public – ISO – Public – IAssigns to Assigns to
Dealing Dealing AssistantAssistant Public – IPublic – I
Dealing Dealing AssistantAssistant
Comments & Comments & Forwards to SO Public - IForwards to SO Public - ISO – Public –I SO – Public –I
Put up to Put up to US(P)US(P)
US(P)US(P)Put up to Put up to DIR(A&E)DIR(A&E)
DIR(A&E)DIR(A&E)Put up to Put up to
JSPJSP
JSPJSPWrites toWrites to
MPMPDispatch throughDispatch through
CRCR
CR sends letter CR sends letter By Post to MPBy Post to MP
Letter Letter Sent to MP Sent to MP
By By PostPost
It seamlessly It seamlessly Happens Happens through through
E-Governance E-Governance PortalPortal
• No Physical file movement No Physical file movement • File Electronically moves File Electronically moves • Faster response timeFaster response time• Secured flowSecured flow• Reaches CR section for dispatchReaches CR section for dispatch• Easily searchable like GoogleEasily searchable like Google
RB e-Governance PortalRB e-Governance Portal
Letter from MP/Letter from MP/CITIZENCITIZEN
www.presidentofindia.gov.in
Personal Cell
PSP(P)Scan
May write to concernedOrganisations/authorities
For Advice
Dealing Asstt.1The
PresidentPSP(HS)
RB e-Governance PortalRB e-Governance PortalREQUESTS FOR APPOINTMENTS
CR
Dealing Asstt.2
Dealing Asstt.3
Regret
Accept
For MM
Secretary
PS to Secy
MM
Reply fromOrganisations/authorities
The President
With advicePSP(HS)
PSP(P)Regret
Accept
Fix date and time
CR
Only letter For dispatch
File all related papersFor record.
Dealing Asstt.Per.Cell
Secy
JSP
Dir-TI
…..
Acceptance Letter for
VIPs/Govt. bodies
Intimation Over tel.
www.presidentofindia.gov.in
Personal Cell
PSP(P)Scan
May write to concernedOrganisations/authorities
For Advice
Dealing Asstt.1The
PresidentPSP(HS)
RB e-Governance PortalRB e-Governance PortalREQUESTS FOR FUNCTIONS
CR
JSP
Secretary
MSP/DMSP
OSD(R)/Dir(TI)
Press Secy
Dealing Asstt.2
Dealing Asstt.3
Regret
Accept
For MM
Accept+MM
Secretary
PS to Secy
MM
Reply fromOrganisations/authorities
The President
With advicePSP(HS)
PSP(P)Regret
Accept (Wait)
Accept
Give a date &Send a letter
CR
Only letter For dispatch
File all related papersFor record.
Dealing Asstt.Per.Cell
www.presidentofindia.gov.in
Dir(A&E)Dir(A&E)
JSPJSP
SecretarySecretaryThe PresidentThe President
Initiate Note (Green Sheet) DirectlyInitiate Note (Green Sheet) Directly
DIR (A&E) – Put up DIR (A&E) – Put up To JSPTo JSP
IFAIFA
US(A) - Puts up a note to Dir (A&E)
The President The President ApprovalApproval
JSP Forwards to IFA JSP Forwards to IFA For Financial For Financial ConcurrenceConcurrence
IFA Sends to IFA Sends to IIAU/PAO SectionIIAU/PAO Section
To PUT UPTo PUT UP
IIAU/PAOIIAU/PAOPUT UPPUT UP
The file backThe file backTo IFATo IFA
IFA Concurs IFA Concurs PUT up to PUT up to
JSPJSP
JSP – Put up to JSP – Put up to SecretarySecretary
Secretary – Puts up to Secretary – Puts up to PresidentPresident
www.presidentofindia.gov.in
G2GG2GBackbone forBackbone for
Effective & SmartEffective & SmartE-GovernanceE-Governance
President’s SecretariatPresident’s Secretariat
Central/State GovernmentCentral/State GovernmentE-Governance PortalE-Governance Portal
JSPJSPSecretarySecretary
The PresidentThe President
FILES from PMO/Ministry/ RajBhavan/ FILES from PMO/Ministry/ RajBhavan/ State Government to The PRESIDENTState Government to The PRESIDENT
File is File is Decrypted Decrypted
Digital SignDigital SignVerifiedVerified
File is Digitally Signed File is Digitally Signed Encrypted and sent to Encrypted and sent to
President’s OfficePresident’s Office
Through Secured VPNThrough Secured VPNBroadband NetworkBroadband Network
Secretary Secretary Analyze the Analyze the
PUT UP PUT UP NOTE to NOTE to
The PresidentThe President
Dir(CA)Dir(CA)
Secu
red V
PN
Netw
ork – M
essage
Secu
red V
PN
Netw
ork – M
essage
Orien
ted A
rchitectu
reO
riented
Arch
itecture
Files/DAKFiles/DAKInitiated atInitiated at
PMO/ Ministry/ Raj Bhavan/ PMO/ Ministry/ Raj Bhavan/ State SecretariatState Secretariat
Work Flow with Work Flow with in the organizationin the organization
DIR(CA)DIR(CA)Sends toSends toCA-I/CA-IICA-I/CA-II
Section to Put up Section to Put up the filethe file
CA Section CA Section Put up to Put up to DIR(CA)DIR(CA)
DIR(CA)DIR(CA)Analyses and Analyses and
Put up the NotePut up the NoteTo JSPTo JSP
JSP Analyses JSP Analyses And And
PUT UP to PUT UP to The SecretaryThe Secretary
The President The President Approval / Selection / Approval / Selection /
Send back for ReconsiderationSend back for ReconsiderationSigns/ Rejects/ Decision takenSigns/ Rejects/ Decision taken
Communicated back to theCommunicated back to theConcerned Ministry / Department /Concerned Ministry / Department /
Governor / State Government Governor / State Government
G2G Communication in a secured frameworkG2G Communication in a secured framework
www.presidentofindia.gov.in
Rashtrapati BhavanRashtrapati Bhavan
Sta
te
Sta
te
Go
vern
men
tsG
ove
rnm
ents
Central Central GovernmentsGovernments
Sta
te
Sta
te
Raj
Bh
avan
sR
ajB
hav
ans
G2GG2G G2GG2G
G2GG2G
G2CG2C
CITIZEN INTERFACECITIZEN INTERFACE
www.presidentofindia.gov.in
www.presidentofindia.nic.in
Productivity increase through e-Gov Willingness, mindset, acceptance to change, adoptability and the
commitment are the ingredients for productivity enhancement in any ICT
implementation.
Implementation of e-Governance necessitated the re-organization of
process and procedures.
It has necessitated rethinking that led to the amalgamation of certain
sections, separation of certain activities and redeployment of manpower
for a productive work.
Manual searching of files and documents was one of the major task
Search and retrieval is independent of the availability of the person who is
holding the file.
The decision maker is freed from search for linked information and
absorption. All the information is available on the fly. Enabling him to
intellectually analyze and provided a considered decision on the issue
once for all.
www.presidentofindia.nic.in
• Level of file movement is ¼th the time if there are 4 levels. It gave independent opportunity for each functionary to think, when the files were sent to 4 people at a time for certain type of tasks. Thus, the quality of decision making improved a lot.
• Even when the sequential file movement were followed in majority of the cases, the e-governance system provided an opportunity and given amble time for intellectual thinking rather than handling mundane tasks.
• System chases the pendency and reminds the decision maker to take a decision for speedy clearance of files.
• Synchronization of data and its verification and validation mechanism not in place earlier led to duplication of efforts. E-Governance system eliminated that duplication, repetition, authentication and brought uniformity in the system because of validation and verification mechanism is in place.
• The places where we found work is beyond human control, due to ICT intervention the human intervention has been drastically reduced and helped to enhance the productivity.
• The change in thinking and doing so is very essential.
Productivity increase through e-Gov
Petitions in Public-I Section
Manual
Petitions 20 per day
To clear 3 – 4 days Min 72 hrs
E-Gov
Petitions 40 per day
Scan & upload 3 hrs
SO to Dealing Assts 30 m
3 Dealing assistants takes in parallel
Max 30m
US(P) – to generate letters 2 hrs
Dispatch – for postage by 3 DA 30 m
To clear 40 petitions per day 5.30 hrs per day
Performance Metrics – e-Governance
Items Days Output
Appointments with President (Normal letter)
1 letter 4 days 4-6 appointments per day will be cleared
Appointments Manual E-Gov
Scan & upload - 10 m
PSP 1 day 5 m
President 1 day 10 m
Secretary/MSP 1 day 10 m
MM (Sec/MSP) with President
1 day 1 day
PSP(HS) 1 day 10 m
Decision (Regret/OK) 2 days 10 m
Dispatch 1 day 10 m
Total time taken 8 days 1d 55 m
Performance Metrics - E-Governance
Message Request 1 message req 7days 2-8 per messages per day
Scan & upload 10 m
PSP 1 d 5 m
Deputy Press Sec 2 d (Draft msg) 30 m
Press Sec 2 d (Draft msg) 2 hrs
Sec 1 d 1 hr
PSP 1 d 30 m
President 1 day 1 hr
8 days 5.15 hrs
Performance Metrics - E-Governance
E-mail 300 - 500 emails
1 day 20 % emails answered in little detail. 10% emails go for Workflow and further action – leading to letters to various ministries and action items. 40% mails simple response sent30% mails no response.
Performance Metrics - E-Governance
Email & e-Gov Work Flow
PETITIONS RECEIVED THROUGH EMAIL
APSP(RK)
Secretary
Email to presidentofindia
account
[ President of India
Email - Dealt by APSP (RK) ]
RB e-Governance PortalRB e-Governance Portal
The PresidentEmail - Read
Email - Reply
MM
JSP DIR-CA OSR® DIR-TI
By Email By workflow
www.presidentofindia.gov.in
www.presidentofindia.nic.in
Borderless worldBorderless worldCollaboration between Collaboration between INDO-US Universities INDO-US Universities
• 342 Universities• 7 IIT’s• 1 IISc
www.presidentofindia.nic.in
www.presidentofindia.nic.in
US – INDIA Summit Multimedia Tele-conferenceUS – INDIA Summit Multimedia Tele-conference
Using high definition and high bandwidth network from Rashtrapati BhavanUsing high definition and high bandwidth network from Rashtrapati Bhavan
Borderless World: Equitable Access to Resources Borderless World: Equitable Access to Resources
ACCESS TO
• High precision equipments
• High resolution devices to map materials to subatomic level
• Femto Second Lasers
• Nano Fabs
DISTRIBUTED GRAPHICAL DISTRIBUTED GRAPHICAL
LOCATIONSLOCATIONS
LEADING LEADING
TO TO
BORDER LESS BORDER LESS
RESEARCHRESEARCH
www.presidentofindia.nic.in
Collaborative Conferencing – at Rashtrapati BhavanCollaborative Conferencing – at Rashtrapati Bhavan
www.presidentofindia.nic.in
Productivity increase through Communication
• Irrespective of distance, the technology enables you to reach the quality material to the remote corners of the country.
• It is not the video conferencing, but multimedia tele-conference in a synchronized environment.
• It is the power of technology, which makes the concept, penetrates the minds instead of just delivering a talk.
• Normally, a tolerance time for any talk is only 15 minutes. • But with the power of technology, communication and the
synergy in bringing the multimedia tools together sky is the limit for the presenter to present, to captivate the intellectual audience for more than 1.30 hrs with spell bound interaction at the end.
• It is being witnessed in more than 20 multimedia conferences held nationally and international level.
www.presidentofindia.nic.in
Productivity increase through Communication
• It is being authenticated based on the feedback that the President receives from the intellectual gathering for further progress of the missions spelt out by the President.
• It is not one-to-one but one-to-many and many-to-many conferences. The multiplier effect it brings increasing the productivity with national perspective.
• The entire interactive sessions becomes available in the knowledge management with complete tracking of multimedia interactions, where it helps in review learning as well as for future references on the fly during the live lecture sessions.
• Enables qualitative improvements of the lecture using the feedback from students, and other participants.
• The high quality multimedia with high definitions systems using the ICT tools, the system makes thousands of people and intellectuals at the remote locations feel that the President was with them with out much security hassles and they enjoy the interaction in a much bigger picture in a lively environment.
• These multimedia conferences enhanced the productivity of the President’s Office to be more dynamic, responsive, live and proactive to the people’s expectations at large.
www.presidentofindia.nic.in
Healthcare at RB
• ICT assisted health checkup for over 1000 personnel during Nov 2003 and a follow up check up during Dec 2004.
• A team of 14 doctors and paramedical staff drawn from CARE hospitals and President Estate Clinic carried out this checkup.
• The health checkup included
– general information about the patient
– his or her habits like smoking, alcohol intake and family history.
• After general physical examination of the employee about height, weight, BP etc., they were examined for Cardiovascular and respiratory diseases, the pathological examination included haemogram, lipid profile, Urine analysis, ECG, Chest X-ray, ultrasound and echocardiography.
www.presidentofindia.nic.in
Healthcare at RB• After the examination, the medical team made suitable
inferences about the health status of individuals and provided them suitable advice
• The whole process of examination and subsequent follow up has been done with in a short time of two weeks every year for all the 1000 individuals.
• The data is now available in electronic form for further examination in future years.
• on manual basis, it would have taken at least 3 months for the first examination and subsequently same kind of repeated effort will be needed for creating the records, maintaining the records and providing the advice.
• Use of ICT tools has enabled creation of one time record and with the unique Electronic medical record number; the follow up is all done automatically with incremental effort using the integrated healthcare and tele-medicine system.
www.presidentofindia.nic.in
Healthcare at RB
• The productivity index in the first examination is over 6,
whereas in subsequent follow up examination the productivity
factor has gone up to 15.
• In addition, many of the follow up examination has been done
through the tele-medicine links between Rashtrapati Bhavan
Clinic and CARE hospital Hyderabad.
• This has saved the movement of doctors or the movement of
patients by train or by air. It is difficult to quantify the individual
productivity index arising out of non-movement of personnel,
though it is substantially high.