by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

20
by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju PURDUE U N I V E R S I T Y SAC MEETING SAC MEETING WETLAND PROJECTS WETLAND PROJECTS 06/07/06 06/07/06

description

SAC MEETING WETLAND PROJECTS 06/07/06. by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju. P URDUE U N I V E R S I T Y. Test site. Near city of Greenfield due east of Indianapolis on I-70. Greenfield Wetland System Schematic. Effluent. - PowerPoint PPT Presentation

Transcript of by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

Page 1: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

byShih-Chieh Kao, Rebeka Sultana, T.P. Chan

Tom Konopka, Tom CooperJ. Alleman, R.S. Govindaraju

PURDUE U N I V E R S I T Y

SAC MEETINGSAC MEETINGWETLAND PROJECTSWETLAND PROJECTS

06/07/0606/07/06

Page 2: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

Test siteTest site

Near city of Greenfield

due east of Indianapolis on I-70.

Page 3: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

W-3

M-1

ST-2 ST-1F-1

LS-3

LS-2FS

LS-1

M-2F-2

M-3

Wetland Cell(W-1)

Wetland Cell(W-2)

Biofield

AS-1AS

-4

AS

-2

AS-3

F-3

Rec

ircul

atio

nACT-1

ACT-2

NNot to scale

LS-4(To city)

LS-2

Lift station/Dosing Chamber

Automatic Sampling Station

M-4

Flume Flow meter

Effluent

Magnetic Flow meter

Weather station

V notch weir Flow meter

Flow splitter

Greenfield Wetland System SchematicGreenfield Wetland System Schematic

Page 4: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

Treatment Performance% Removal vs. Operational Days

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800 900 1000 1100

Days since planting, 08/12/2003

% R

em

ov

al (

AS

1-A

S4

)

BOD TSS NH3 TSS NH3 BOD

Page 5: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

Wetland PerformanceWetland Performance

Sampling Date

2/25/06

After 1st septic tank

At 1st

Lift

station

At 2nd

Lift

Station

Outlet

%

Rem

oval

BOD5 (mg/L)

380 235 202 142 62%

TSS (mg/L)

168 99 81 41 76%

NH4 (mg/L)

270 171 164 153 43%

Table: Wetland performanceTable: Wetland performance

Page 6: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

20031 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21

M1M2M3M4F1 P D D D D D D D D DF2 P D D D D D D D D DF3 P D D D D D D D D D

Drinking O O OWeather P P

20041 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21

M1 P 3 3 P 3 P ? ? ? P 5 5 P P P P O O O O O O O O O O O O O O O OM2 P 3 3 P ? ? ? ? ? P 5 5 P ? ? P O O PM3 P 3 3 P 3 P ? ? ? P 5 5 P P P P O O O O O O O O O O O O O O O OM4 P 3 3 P 3 P ? ? ? P 5 5 P P P P O O O O O O O O O O O O O O O OF1 D D D P O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O OF2 D D D P O O O O O ? ? ? O O O O O O O O P P O O O O O PF3 D D D P O O O O O O O O O O O O O O O O P P O O O O O P P O

Drinking P P O O O O O O O O O O O O O O O O O O O O O O O O O O O O O OWeather O O P P O O O O O O O O O O O O O O O O O O O O O O O O O

20051 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21 1 11 21

M1 O P P O O P P O O O O P P PM2 P P O O PM3 O P P O O P P O O O O P P P P O O PM4 O P P O O P P O O O O P P P P O O PF1 O O O O O O O O O O O O O P P O O O O O O O PF2F3 O P P O O O P

Drinking O O O O O O O PWeather O O O O O O O O O O O O O O O P P O O O O O O O P

M1, M2, M3, M4: Minimum Unit in Minute O: Full Data Available P: Partial Data Available ?: Questionable DataF1, F2, F3, Drink., Weather: Minimum Unit in Hour 3: 3-Min Interval 5: 5-Min Interval D: Daily Interval

Sep Oct Nov DecMay June July AugJan Feb March April

Sep Oct Nov DecMay June July Aug

Feb March April

Jan Feb March April

Sep Oct Nov DecMay June July AugJan

Credit : Shih-Chieh Kao, PhD Candidate

WETLAND DATA AVAILABILITY

Page 7: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

Data AnalysisData Analysis

0

2000

4000

6000

8000

10000

12000

14000

0 5 10 15 20 25 30

Time (Days)

Flo

w (

gp

d)

F1 data

Drinking Water

June, 2004

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

100000

0 5 10 15 20 25 30

Time (Days)

Flo

w (

gp

d)

drinking water

F1 data

September, 2004Oct 22nd to Nov 22nd, 2004

0

1000

2000

3000

4000

5000

6000

7000

8000

0 5 10 15 20 25 30 35

Time (days)

Flo

w (

gp

d)

F1 data

Drinking water

Page 8: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

0

100

200

300

400

500

600

700

800

0 2 4 6 8 10

Time (Days)

Flo

w (

gp

h)

F2 data

Dw data

F1 data

Data Analysis Data Analysis (Contd…)(Contd…)

0

5000

10000

15000

20000

25000

30000

0 2 4 6 8 10

Time (Days)

Flo

w (

gp

h)

F3 data

Dw data

October, 2004

Page 9: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

Data Analysis Data Analysis (Contd…)(Contd…)Last 10 days in April,2004

0

10

20

30

40

50

60

70

0 1 2 3 4 5 6 7 8 9 10

Time(Days)

Flo

w(g

pm

)M1 data

0

5

10

15

20

25

0 1 2 3 4 5 6 7 8 9 10

Time(Days)

Flo

w(g

pm

)M3 data

0

5

10

15

20

25

30

35

40

45

50

0 1 2 3 4 5 6 7 8 9 10

Time(Days)

Flo

w(g

pm

)M4 data

Last 10 days in April,2004

Last 10 days in April,2004

Page 10: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

Data Analysis Data Analysis (Contd…)(Contd…)Last 20 days in November, 2005

0

10

20

30

40

50

60

70

0 5 10 15 20 25

Time (Days)

Flo

w (

gp

m)

M2 data

0

1

2

3

4

5

6

7

0 2 4 6 8 10

Time(Days)

Flo

w (

gp

m)

M2 data

Last 10 days in Oct, 2004

Page 11: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

Hydraulic flow modelHydraulic flow model

LS-1

W-1

LS-4

LS-2

LS-3

W-2

83%

?%

?%

17%Biofield

W-3

ACTST-2

M-3

M-4

M-2

M-1

F-3

F-2

Rain

Recirculation

F-1

Greenfield city

Page 12: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

Model InputsModel Inputs

0

5

10

15

20

25

30

0 1 2 3 4 5 6 7 8 9 10

Time (Days)

Flo

w R

ate

(g

pm

), R

ain

fall

(g

pm

)

F-1 data

Rainfall

November 1 to 10, 2004

Page 13: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

Model ResultsModel Results

5500

6000

6500

7000

7500

8000

0 1 2 3 4 5 6 7 8 9 10

Time (Days)

Vo

lum

e (

Cu

bic

feet)

Parallel wetlands0

0.5

1

1.5

2

2.5

3

0 1 2 3 4 5 6 7 8 9 10

Time (Days)

Dep

th o

f w

ater

( f

eet)

Cell 1

Cell 2

Page 14: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

Model Results Model Results (contd…)(contd…)

600

620

640

660

680

700

720

740

760

780

0 1 2 3 4 5 6 7 8 9 10

Time (Days)

Vo

lum

e (C

ub

ic f

eet)

Polishing wetland

1.4

1.5

1.6

1.7

1.8

1.9

2

0 1 2 3 4 5 6 7 8 9 10

Time (Days)

Dep

th (

feet)

W-3

Page 15: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

T

A

dttVV

t0

)(1

)(

Wetlands HRT η(t)

Parallel wetlandsParallel wetlands 5.48 days 0.67

Polishing wetlandsPolishing wetlands 1.1 days 0.7

Model Results Model Results (contd…)(contd…)

Volumetric efficiency:

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0 2 4 6 8 10

Time (Days)

Vo

lum

etr

ic e

ffic

ien

cy

Parallel Wetlands

W-3

Page 16: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

Model ValidationModel Validation

Input Data: October 22nd to October 31st, 2004

0

2

4

6

8

10

12

14

16

18

20

0 1 2 3 4 5 6 7 8 9 10

Time (days)

Flo

w R

ate

(gp

m)

F-1 Data

Rainfall

Page 17: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

Output from F-2

Output from F-3

Model Validation Model Validation (Contd…)(Contd…)

0

2

4

6

8

10

12

14

0 1 2 3 4 5 6 7 8 9 10

Time(days)

Flow

rat

e(gp

m)

F2-data

Simulation result

0

50

100

150

200

250

300

350

400

450

500

0 1 2 3 4 5 6 7 8 9 10

Time (Days)

Flo

w R

ate

(gp

m)

F-3 data

Simulation Result

Page 18: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

Output from M-1

Output from M-2

Model Validation Model Validation (Contd…)(Contd…)

0

10

20

30

40

50

60

70

0 1 2 3 4 5 6 7 8 9 10

Time(days)

Flo

w R

ate

(gp

m)

M-1 data

M1-simulation result

0

10

20

30

40

50

60

70

80

90

0 1 2 3 4 5 6 7 8 9 10

Time (Days)

Flo

w R

ate

(gp

m)

M2 data

Simulation result

Page 19: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

Output from M-3

Output from M-4

Model Validation Model Validation (Contd…)(Contd…)

0

5

10

15

20

25

0 1 2 3 4 5 6 7 8 9 10

Time (Days)

Flo

w R

ates

(g

pm

)

M-3 Data

Simulation Result

0

5

10

15

20

25

30

35

0 1 2 3 4 5 6 7 8 9 10

Time (Days)

Flo

w R

ate

(g

pm

)M-4 data

Simulation Result

Page 20: by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

Items for Discussion SCADA

– Data since January 2006-who has it? How can we access it?– Training schedule & website access– Surge tank control of flow rates

PLANTS– Clyde Mason recently did some replanting…

INSTRUMENTS– Gaps in data because of equipment failure, data logger unplugged during constructions, etc.– Inherent measurement problems with instruments– Recycle pumps not working (May 22, 2006)

BIOFIELD– No samples available, except for once in the deepest well– Supply to biofield should be shut off.

DATA AVAILABILITY– Should raw data be put on website?– Or this presentation enough detail.

REPORTS– Under preparation– Any suggestions?– Will seek feedback

OTHER ?