![Page 1: By Himanshu Dubey & Chris Cumming. The Area Draw 7 Park Assembly Square site of redevelopment I-93 Fellsway Orange Line & Commuter Rail Commuter Rail.](https://reader035.fdocuments.net/reader035/viewer/2022062304/56649c375503460f948de435/html5/thumbnails/1.jpg)
The Draw 7 Park Site
ByHimanshu Dubey
&Chris Cumming
![Page 2: By Himanshu Dubey & Chris Cumming. The Area Draw 7 Park Assembly Square site of redevelopment I-93 Fellsway Orange Line & Commuter Rail Commuter Rail.](https://reader035.fdocuments.net/reader035/viewer/2022062304/56649c375503460f948de435/html5/thumbnails/2.jpg)
The Area
Draw 7 Park
Assembly Square siteof redevelopment
I-93
Fellsway
Orange Line & Commuter Rail
Commuter Rail
I-93
Orange Line & Commuter RailFellsway
![Page 3: By Himanshu Dubey & Chris Cumming. The Area Draw 7 Park Assembly Square site of redevelopment I-93 Fellsway Orange Line & Commuter Rail Commuter Rail.](https://reader035.fdocuments.net/reader035/viewer/2022062304/56649c375503460f948de435/html5/thumbnails/3.jpg)
What is there already?The park itself already exists, but it is hidden and does
not see many visitors. Existing elements include:Trees and bushesPaved footpathsBenchesOpen field
![Page 4: By Himanshu Dubey & Chris Cumming. The Area Draw 7 Park Assembly Square site of redevelopment I-93 Fellsway Orange Line & Commuter Rail Commuter Rail.](https://reader035.fdocuments.net/reader035/viewer/2022062304/56649c375503460f948de435/html5/thumbnails/4.jpg)
What can be added?Draw 7 Park has great potential and can be improved
with various elements:Designated soccer fieldBasketball courtPlayground for kidsFountainAdditional points of pedestrian accessGarbage and recycling receptacles
Best of all:Improved access to, and quality of, the waterfront
![Page 5: By Himanshu Dubey & Chris Cumming. The Area Draw 7 Park Assembly Square site of redevelopment I-93 Fellsway Orange Line & Commuter Rail Commuter Rail.](https://reader035.fdocuments.net/reader035/viewer/2022062304/56649c375503460f948de435/html5/thumbnails/5.jpg)
What can be added? (cont.)
![Page 6: By Himanshu Dubey & Chris Cumming. The Area Draw 7 Park Assembly Square site of redevelopment I-93 Fellsway Orange Line & Commuter Rail Commuter Rail.](https://reader035.fdocuments.net/reader035/viewer/2022062304/56649c375503460f948de435/html5/thumbnails/6.jpg)
The Mystic River WaterfrontNo features exist to attract people to the waterfront.The riverbank is ravaged by erosion, sediment, and
debris.A damaged and rusted chainlink fence runs the length of
the bank. It currently serves no purpose.
![Page 7: By Himanshu Dubey & Chris Cumming. The Area Draw 7 Park Assembly Square site of redevelopment I-93 Fellsway Orange Line & Commuter Rail Commuter Rail.](https://reader035.fdocuments.net/reader035/viewer/2022062304/56649c375503460f948de435/html5/thumbnails/7.jpg)
Solutions to the WaterfrontCreation of salt marshes along the shoreMore treesVegetation to control stormwater runoffPlaces to fish
![Page 8: By Himanshu Dubey & Chris Cumming. The Area Draw 7 Park Assembly Square site of redevelopment I-93 Fellsway Orange Line & Commuter Rail Commuter Rail.](https://reader035.fdocuments.net/reader035/viewer/2022062304/56649c375503460f948de435/html5/thumbnails/8.jpg)
Solutions (cont.)
![Page 9: By Himanshu Dubey & Chris Cumming. The Area Draw 7 Park Assembly Square site of redevelopment I-93 Fellsway Orange Line & Commuter Rail Commuter Rail.](https://reader035.fdocuments.net/reader035/viewer/2022062304/56649c375503460f948de435/html5/thumbnails/9.jpg)
Who will hang out here?Some residents from surrounding neighborhoods already
visit the park to play soccer.With the redevelopment of Assembly Square, there will
be an influx of new visitors:Residents ShoppersOrange Line passengers who see the park from the train
![Page 10: By Himanshu Dubey & Chris Cumming. The Area Draw 7 Park Assembly Square site of redevelopment I-93 Fellsway Orange Line & Commuter Rail Commuter Rail.](https://reader035.fdocuments.net/reader035/viewer/2022062304/56649c375503460f948de435/html5/thumbnails/10.jpg)
How do you get there?The only way into the park is a hidden access road that
crosses under the Orange Line bridge.Even so, it is not the most inviting entrance. It is meant
for vehicles.The embankment of the Orange Line approaching the
bridge acts as a giant wall between the park and Assembly Square.
The only good way to see the park is from the train.
![Page 11: By Himanshu Dubey & Chris Cumming. The Area Draw 7 Park Assembly Square site of redevelopment I-93 Fellsway Orange Line & Commuter Rail Commuter Rail.](https://reader035.fdocuments.net/reader035/viewer/2022062304/56649c375503460f948de435/html5/thumbnails/11.jpg)
New & Improved AccessThere should be at least one visible pedestrian crossing
over or under the tracks to the park.Assembly Square Station should also have stairs on the
other side of the mezzanine, providing direct T access to the park.
In East Boston, there is a footbridge crossing over the Blue Line to Constitution Beach. This is a perfect example of attractive pedestrian access.
The removal of the boats at the Winter Hill Yacht Club will open up the existing entrance for more space and visibility.
![Page 12: By Himanshu Dubey & Chris Cumming. The Area Draw 7 Park Assembly Square site of redevelopment I-93 Fellsway Orange Line & Commuter Rail Commuter Rail.](https://reader035.fdocuments.net/reader035/viewer/2022062304/56649c375503460f948de435/html5/thumbnails/12.jpg)
Noise PollutionThe greatest source of noise pollution comes from the
Orange Line trains, which pass frequently.This will be a problem for both park visitors on one side,
and residents and office workers on the other.The loud rumble from trains crossing the bridge is
especially loud.Commuter trains with loud diesel locomotives pass on
either side of the park.
![Page 13: By Himanshu Dubey & Chris Cumming. The Area Draw 7 Park Assembly Square site of redevelopment I-93 Fellsway Orange Line & Commuter Rail Commuter Rail.](https://reader035.fdocuments.net/reader035/viewer/2022062304/56649c375503460f948de435/html5/thumbnails/13.jpg)
Noise AbatementSound walls could be constructed on either side of the
tracks.There may be some kinds of walls that are transparent,
so the park is still visible from the train.The bridge will remain loud to cross under, another
important reason for alternative crossings.
![Page 14: By Himanshu Dubey & Chris Cumming. The Area Draw 7 Park Assembly Square site of redevelopment I-93 Fellsway Orange Line & Commuter Rail Commuter Rail.](https://reader035.fdocuments.net/reader035/viewer/2022062304/56649c375503460f948de435/html5/thumbnails/14.jpg)
THE END