CA441 BPM: Introduction to BPR 1 September 2013 Business Process Redesign/Reengineering: Introduction Based on: Malhotra, Business Process Redesign: An Overview, http://www.brint.com/papers/bpr.htm.

Transcript of Business Process Redesign/Reengineering:...

Page 1: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 1September 2013

Business Process Redesign/Reengineering:

Introduction

Based on: Malhotra, Business Process Redesign: An Overview, http://www.brint.com/papers/bpr.htm.

Page 2: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 2September 2013

What this Topic Focuses On

• What is a Business Process?

• What is Business Process Redesign?

• How does it differ from Business Process Reengineering?

• Power of IT/ICT

• Relationship between BPR and IT

• A BPR Methodology

• Other Organizational Devpt Approaches: Total Quality Management (TQM)

• Similarities and differences between BPR and TQM

• Summary

Page 3: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 3September 2013

What is a Business Process?Various Definitions:

• "a set of logically related tasks performed to achieve a defined business outcome.”

• “a structured, measured set of activities designed to produce a specified output for a particular customer or market.”

• “Implies a strong emphasis on how work is done within an organisation" (Davenport).

• Processes have two important characteristics:1 They have customers (internal or external),

2 They cross organisational boundaries, i.e., they occur across or between organisational subunits.

Page 4: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 4September 2013

What is a Business Process? (cont'd)

Identified in terms of:• beginning and end points,• interfaces, • organisation units involved, particularly the customer unit.

High Impact processes should have process owners.

Examples of processes include:• developing a new product;• ordering goods from a supplier;• creating a marketing plan;• processing and paying an insurance claim;• etc.

Page 5: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 5September 2013

What is a Business Process? (cont'd)Defined based on three dimensions:

• Entities: + Processes take place between organisational entities.

+ They could be Interorganisational, Interfunctional or Interpersonal.

• Objects: + Processes result in manipulation of objects.

+ These objects could be Physical or Informational.

• Activities: Processes could involve two types of activities:+ Managerial (e.g. develop a budget) and

+ Operational (e.g. fill a customer order).(Davenport & Short 1990)

Page 6: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 6September 2013

What is Business Process Redesign?

• "the analysis and design of workflows and processes within and between organisations" (Davenport & Short 1990).

• "the critical analysis and radical redesign of existing business processes to achieve breakthrough improvements in performance measures." Teng et al. (1994)

Page 7: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 7September 2013

How Do BP Redesign & Reengineering Differ?• Often by very little; both entail improving BPs in hope of gaining

radical improvements.

• Main difference is in improvement project scope/scale:+ Reengineering:

– complete elimination of existing process & ab initio design of new one

+ Redesign:– may leave existing BP intact

– look at boosting measures such as customer satisfaction, cycle time etc

• Reengineering usually involves core BPs (e.g. recruitment) and may involve corporate continents

• Redesign may involve a more local process/subprocess

• Often the terms are used interchangeably.

Page 8: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 8September 2013

Hammer's Principles of Reengineering

a Organise around outcomes, not tasks;

b Have those who use the output of the process perform the process;

c Subsume info processing work into real work that produces the info;

d Treat geographically dispersed resources as tho they were centralised;

e Link parallel activities instead of integrating their results;

f Put decision point where work is performed, & build control into process;

g Capture information once and at the source

Page 9: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 9September 2013

Power of Information Technology (aka ICT) IT creates a “public good” i.e. a resource that can be accessed by many functions.

• Shared info resource is not “used up” by usage, and retains its value for other users.

• Provides comprehensive info that facilitates accomplishment of process objectives on a more global basis.

• Caveat: have to be very careful of data (not the same as info!):+ Nowadays data can be huge (TB), multi-dimensional and noisy

+ So information from this is a huge challenge to draw conclusions from even for modern computing resources (cloud, HPC)

+ Also lots of messy ethical, proprietorial issues around data use, storage

Page 10: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 10September 2013

Relationship between BPR & Information Technology?

• IT is the key enabler of BPR (Hammer).

• Use IT to challenge the inherent assumptions from before the advent of modern ICT developments.

• Core of reengineering is "discontinuous thinking -- or recognising and breaking away from the outdated rules and fundamental assumptions underlying operations... These rules of work design are based on assumptions about technology, people, and organisational goals that no longer hold."

Page 11: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 11September 2013

BPR and IT: A Recursive relationship

• BPR requires broader view of both IT and business activity, and relationships between them.

+ IT — more than automation/mechanisation: used to fundamentally reshape the way business is done: (“don't pave the cow path”)

+ Business activities — more than a collection of individual or even functional tasks.

• IT and BPR have a recursive relationship

+ IT capabilities should support business processes, and

+ business processes should be in terms of the capabilities IT can provide.

Page 12: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 12September 2013

Recursive relationship between BPR and IT (cont'd)

IT CapabilitiesBusiness ProcessRedesign

How can IT support business processes?

How can business processes be transformed using IT?

IT impact is as a tool for reducing the costs of coordination

Page 13: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 13September 2013

BPR and IT

Awareness of IT capabilities can – and should – influence process design.

How IT capabilities affect the organisation – 1Transactional — can transform unstructured processes into routinised

transactions

Geographical — can transform information with rapidity and ease across large distances

Automational — can replace or reduce human labour in a process

Analytical — can bring complex analytical methods to bear on a process

Page 14: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 14September 2013

BPR and IT (cont'd)

How IT capabilities affect the organisation – 2Informational — can bring vast amounts of detailed info into a

process

Sequential — can enable changes in the sequence of tasks

Knowledge Management — allows capture and dissemination of knowledge

Tracking — allows detailed tracking of task status

Disintermediation — can be used to connect two parties within a process that would otherwise communicate through an intermediary

Page 15: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 15September 2013

BPR & IT (cont'd)

The way related functions participate in a process (functional coupling of a process) can be differentiated along two dimensions:

• degree of mediation - the extent of sequential flow of input and output among participating functions

• degree of collaboration - the extent of information exchange and mutual adjustment among functions when participating in the same process.

Page 16: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 16September 2013

Degree of Mediation (Teng)

X

6

X

5

X

4

X

3

X

2

X

1

T

Q

PP P

T

Q

P

T

Q

P

T

Q

P

K K

R

HIGH(Indirect)

LOW(Direct)Degree of Mediation

Page 17: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 17September 2013

Degree of Collaboration

•Frequency and intensity of information exchange between two functions ranges from none (completely insulated) to extensive (highly collaborative).

•Many process can be improved by increasing the degree of collaboration.

Page 18: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 18September 2013

Functional Coupling Framework of Business Processes

Coupling Pattern: Functions participate in the process sequentially with no mutual information exchange.Environment: Participating functions are sequentially dependent and face low level of uncertainty in I/O requirements.Example: Sales function (A) sends customer order to inventory function (B) for shipping.

Coupling Pattern: Functions participate in the process sequentially with mutual information exchange.Environment: Participating functions are sequentially dependent and face high level of uncertainty in I/O requirements.Example: Engineering (A) provides manufacturing design specifications to production (B) with frequent consultation between A and B.

Coupling Pattern: Functions participate directly in producing the process outcome with no mutual information exchange.Environment: Participating functions are sequentially independent and face low level of uncertainty in I/O requirements.Example: Recruiting workers (A) and equipment requisition (B) participate directly in establishing a new plant with no consultation between A and B.

Coupling Pattern: Functions participate directly in producing the process outcome with mutual information exchange.Environment: Participating functions are sequentially independent and face high level of uncertainty in I/O requirements.Example: Advertising (A) and production (B) directly participate in launching a new product with frequent consultation between A and B.

C

A

B

C

A

B

C

A

B

C

A

B

Insulated Collaborative

Dir

ec

tIn

dir

ec

t

Deg

ree

of M

edia

tion

Low

Hig

h

Low HighDegree of Collaboration

Page 19: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 19September 2013

Application if IT in Alternative Paths for Process Reengineering

C

AB

Degree of Collaboration

Deg

ree

of M

edia

tion

Low

Hig

h Low High

Path X

Primarily through application of Communication Technologies

Pa

th Y

Prim

aril

y th

rou

gh a

pp

lica

tion

of

Sh

are

d

Info

rma

tion

Re

sou

rce

s

Path Z

Application of Communication Technologies and Shared Information Resources

Path X*

Pa

th Y

*

Shared Resource

C

A B

Shared Resource

C

A B

C

AB

Page 20: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 20September 2013

BPR & IT (Teng)

• IT reduces the Degree of Mediation and enhances the Degree of Collaboration.

• Innovative uses of IT leads many firms to develop new, coordination-intensive structures, enabling the coordination of their activities in ways not hitherto possible before.

• Such coordination-intensive structures may raise the organization's capabilities and responsiveness, leading to potential strategic advantages.

• In a later lecture will look at how this has happen in the context of BPM with Service Oriented Architectures.

Page 21: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 21September 2013

A Methodology for BPR. (Davenport and Short) Five-step approach to BPR:• Develop the Business Vision and Process Objectives:

+ prioritise objectives and set stretch targets

• Identify the Processes to be Redesigned:+ Identify critical or bottleneck processes

• Understand and Measure the Existing Processes:+ Identify current problems and set baseline for future efforts

• Identify IT Levers:+ Brainstorm new process approaches

• Design and Build a Prototype of the New Process:+ Implement organisational and technical aspects

Ideally after that should come:

• Process Implementation

• Continuing (re)evaluation

Page 22: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 22September 2013

Other Organizational Devpt Approaches: Total Quality Management (TQM)

TQM:

• Historically preceded & inspired BPR

• An integrative philosophy of management for continuously improving products and process quality.

• Assumes that product and process quality is responsibility of all involved in building/consuming the products or services offered by an organization.

• => requires participation of management, workforce, suppliers, and customers

Page 23: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 23September 2013

How Does BPR Differ from TQM?

• In recent years, increased attention to business processes is largely due to the TQM. TQM and BPR share a cross-functional orientation. (Teng)

• Quality specialists tend to focus on incremental change and gradual improvement of processes, while BPR advocates often seek radical redesign and drastic improvement of processes. (Davenport)

Page 24: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 24September 2013

BPR vs. TQM

• Quality management (TQM or continuous improvement), refers to programs & initiatives that emphasise incremental improvement in work processes & outputs over an open-ended period of time.

• Reengineering, also known as business process redesign or process innovation, refers to discrete initiatives that are intended to achieve radically redesigned and improved work processes in a bounded time frame. (Davenport)

Page 25: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 25September 2013

Process Improvement (TQM) versus Process Innovation (BPR)

From Davenport (1993, p. 11)

Improvement InnovationLevel of Change Incremental RadicalStarting Point Existing Process Clean SlateFrequency of Change One-time/Continuous One-timeTime Required Short LongParticipation Bottom-Up Top-DownTypical Scope Narrow, within functions Broad, cross-functionalRisk Moderate HighPrimary Enabler Statistical Control Information TechnologyType of Change Cultural Cultural/Structural

Page 26: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 26September 2013

Summary

Have seen in this topic:

• What is a Business Process?

• Differences between BP Redesign & Reengineering

• Uses of Information Technology (aka ICT) in BPR

• Degree of Mediation & Collaboration in BPR

• A Methodology for BPR. (Davenport and Short)

• Other Organizational Devpt Approaches: Total Quality Management (TQM)

• Differences BPR Differ from TQM

Page 27: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 27September 2013

References - 1Bashein, B.J., Markus, M.L., & Riley, P. (1994). Preconditions for BPR Success: And How to Prevent Failures, Info Systems Management, 11(2), pp. 7-13.

Caron, M., Jarvenpaa, S.L. & Stoddard, D.B. (1994). BPR at CIGNA Corporation: Experiences and Lessons Learned From First Five Years," MIS Quarterly, p233-250.

Davenport, T.H. & Short, J.E. (1990). The New Industrial Engineering: Information Technology and Business Process Redesign, Sloan Management Review, pp. 11-27.

Davenport, T.H. (1993). Process Innovation, Harvard Business School Press, Boston, MA.

Davenport, T.H. (1994). "Reengineering: Business Change of Mythic Proportions?" MIS Quarterly, pp. 121-127.

Davenport, T.H. & Beers, M.C. (1995). "Managing Information About Processes," Journal of Management Information Systems, 12(1), pp. 57-80.

Earl, M.J., Sampler, J.L. & Short, J.E. (1995). "Strategies for BPR: Evidence from Field Studies," Journal of Management Information Systems, 12(1), pp. 31-56.

Page 28: Business Process Redesign/Reengineering: Introductionmodsci.computing.dcu.ie/~mcrane/CA441/BP_01_BPRIntroductionRevised... · •Reengineering, also known as business process redesign

CA441 BPM: Introduction to BPR 28September 2013

References - 2Grover, V., Jeong, S.R., Kettinger, W.J. & Teng, J.T.C. (1995). The Implementation of Business Process Reengineering," Journal of Management Information Systems, 12(1), pp. 109-144.

Hammer, M. (1990, July). "Reengineering Work: Don't Automate, Obliterate," Harvard Business Review, pp. 104-112.

Kettinger, W.J. & Grover, V. (1995). "Special Section: Toward a Theory of Business Process Change Management," Journal of Management Information Systems, 12(1), pp. 9-30.

King, W.R. (1994). "Process Reengineering: The Strategic Dimensions," Information Systems Management, 11(2), pp. 71-73.

Stoddard, D.B. & Jarvenpaa, S.L. (1995). "Business Process Redesign: Tactics for Managing Radical Change," Journal of Management Information Systems, 12(1), pp. 81-107.

Teng, J.T.C., Grover, V., and Fiedler, K. BPR: Charting a strategic path for the information age. California Management Review 36, 3 (1994), pp 9-31.