Business Practices Subcommittee Update
February 21, 2012
2 Free Template from www.brainybetty.com 2
WEQ BPS Update - Meetings
• Subcommittee Meetings since last update
– October 31, 2011 (Conf. Call)
– November 8-9, 2011 (Atlanta, GA)
– December 14-15, 2011 (Houston, TX)
– January 18-19, 2012 (Houston, TX)
– February 15-16, 2012 (Redwood Shores, CA)
• Sub-teams – Several Meetings
– First-to-Curtail Requirements
– Credit for Redispatch • Scheduled subcommittee meetings
– March 6-7, 2012 (Little Rock, AR)
– April 3-4, 2012 (Carmel, IN)
– May 16-17, 2012 (Atlanta, GA) Joint with NERC IDCWG
3 Free Template from www.brainybetty.com 3
Coordination with Other Groups
• Executive Committee Leadership – EC Leadership is participating in multiple forums to support BPS
activities• NAESB/NERC monthly coordination calls• NERC Standards Committee • NERC ORS
• NERC Operating Reliability Subcommittee– November 15, 2011– February 8, 2012
• NERC - Interchange Distribution Calculator Working Group– December 8, 2011– February 1, 2012
• NAESB - Joint Electric• Scheduling Subcommittee
– January 5-6, 2012
4 Free Template from www.brainybetty.com 4
Parallel Flow Visualization – Recent Activity
• Continued Finalizing Parallel Flow Visualization Permanent Solution White Paper (Latest Draft included in EC Meeting Materials)– Common requirements– Component specific requirements– Definitions– Assumptions– Impacted entities– Coordination with other organizations
• Key Decisions– Credit for Redispatch Approach– Support two impact calculations currently in use today– Mapping requirements to support tagging – Vertical stacked tags (network and point-to-point on same tag) – Initiation and termination Coordination Agreement exceptions
• Identified Categories of Subcommittee Members to review Test Data
5 Free Template from www.brainybetty.com 5
Parallel Flow Visualization – Challenges
• Continuing to have “What if” scenarios• BPS by default is the forum for understanding the big
picture• NERC Standards Coordination
– BPS has included assumptions that NERC would modify standards
• Interchange, Scheduling, and Coordination (INT) standards - INT-012 Intra-Balancing Authority Transaction Identification (FERC Order 693)
• Interconnection Reliability Operations and Coordination (IRO) – IRO-006-EAST Transmission Loading Relief Procedure for the Eastern Interconnection
– The timing for the changes to the INT and IRO standards should coincide with Parallel Flow Visualization moving into production
– NAESB cannot set priority of NERC standards development nor can it direct the outcome
6 Free Template from www.brainybetty.com 6
Parallel Flow Visualization – Challenges (Contd.)
– NERC SC requested NERC ORS to identify Reliability Gap– NAESB BPS and EC Co-chairs presented PFV
requirements to ORS on Feb 8th.– ORS discussed the alternative presented by NERC
Director Standards that NAESB develop requirements/standards for tagging Intra-BA transactions – no final action taken.
• NERC INT standards will need to be coordinated with JESS
7 Free Template from www.brainybetty.com 7
Parallel Flow Visualization – Next Steps
• March – Finalize Whitepaper / Address remaining open issues
• April/May– Develop standards from Parallel Flow Visualization Permanent
Solution White Paper– Vote to post standards/recommendation for 30-day formal
comment period– Probability that BPS vote on recommendation may slide into
June• June/July
– Develop Late Comments for standards/recommendation
8 Free Template from www.brainybetty.com 8
Questions/Feedback
?