Bush Skitek Technical Officer - Planning
Transcript of Bush Skitek Technical Officer - Planning
Bush Skitek Technical Officer
Draft State Transmission Code- screening and prudent avoidance
Co-use Guidelines document
explains philosophies applied in co-use application assessment
posted on Powerlink websitewww.powerlink.com.au
Network» Property & Easements
» Co-Use requests
Resources are available
What we consider
Public safety statutory clearances
Network operational integrity do we have operational access 24/7 to all structures? Is there a fire hazard?
Future network expansion consideration is given to plans to expand, upgrade, and augment the network, eg space for additional structures especially on angles
Reconfiguration of lots to accommodate Powerlink easements
Construction phase of the proposal maintenance of exclusion zones Safety Regulations Schedule 2
Terms and definitions
Conductor Shadow Area (CSA)
Blow out conductor condition
Every day condition and Maximum Sag Design
20m access around structures
Powerlink structure references XXXX-STR-XXXX
Annexure A list of other issues to consider
Conductor Shadow Area
Still no wind condition
100Pa wind
250Pa wind
350Pa wind
500Pa wind max design
500Pa wind max design
The surveyed conductor height will NOT be at its lowest conductor position 99.9%
Everyday Temp. (EDT) and Max Design Temp.
20m access around structures
Typical plant set up for maintenance work
Recognising Powerlink structures
Recognising Powerlink structures
Electrical Safety Regulations 2002
Schedule 2 operating plant by untrained person exclusion zones
Plant, eg crane in operating modeVehicle, eg crane in travelling configuration
Schedule 4 statutory clearances
Need to comply under all operating conditions
Lot reconfiguration
Rearranged the boundary to follow the easement
One unencumbered lot Lot 7
Approximate area of the lots stayed the same
Permitted, conditional and prohibited activities
Permittedeveryday activities which can be safely carried out on the Easement e.g. walking, gardening, driving, parking
Conditional
Subject to detailed Powerlink investigation and written consent some prohibited activities may be carried out provided that conditions are met
Prohibited
In line of Powerlink s prudent avoidance policy, no dwellings or substantial structures will be allowed on the easement
Permitted activities - Walking, driving, parking
Conditional activities
Trees planted in the CSA +5m
More detailed investigations incur costs
Prohibited
Unauthorised dumping of soil within the easement area
Prohibited
Unauthorised bikeway restricting access to structures
Summary
There are three (3) levels of review:
- Co use request for permitted activities
- Technical review for conditional activities
- Detailed engineering investigation for conditional activities