![Page 1: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/1.jpg)
Bus Ramps Public Outreach Presentation
September 10, 2014
1
![Page 2: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/2.jpg)
CM/GC: Webcor -Obayashi
Contractor: Shimmick Construction
ConstructionOversight:
Turner Construction
Owner: TJPA
Bus RampTeam
2
![Page 3: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/3.jpg)
Bus Ramps Overall Site Plan
Bus RampScope of Work
3
![Page 4: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/4.jpg)
Bus Ramps Alignment
Bus Ramp ProjectScope of Work
Howard St.
4
![Page 5: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/5.jpg)
Bus Ramps Overall Site Plan
Bus RampScope of Work
5
![Page 6: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/6.jpg)
Bus Ramp Timeline Summary
Demolition and CIDH Drilled Piles
Substructures CIDH Drilled Piles, Foundations, Bents etc.
Cable Stay Bridge
Overhead Concrete Viaduct
Bus Ramp Lights, paving and finishes
![Page 7: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/7.jpg)
Bus RampDemolition
7
![Page 8: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/8.jpg)
CIDH Pile Equipment Staging
• (17) CIDH piles• 8 ft. & 9 ft. diameters• Length 65-150 ft. 8
![Page 9: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/9.jpg)
CIDH Pile Installation
CIDH starter casing installation CIDH rebar cage installation
9
![Page 10: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/10.jpg)
Tehama and Howard St. CIDH Piles
New CIDH Piles
Teha
ma
St.
How
ard
St.
CIDH Pile Foundation
10
![Page 11: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/11.jpg)
Folsom St. and Clementina St. CIDH Piles
New CIDH Piles
Fols
om S
t.
Cle
men
tina
St.
11
![Page 12: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/12.jpg)
Cast In Drilled Hole (CIDH) Piles
Bus Ramp Construction - Cast In Drilled Hole Piles
Lot Location CIDH Piles Qty.
Typ. 9 foot diameter-Pile Depth
Target Start Date Target End Date
H Clementina -Tehama 5 90-100 ft. 10/1/2014 10/27/2014
I Clementina -Folsom 5 75-100 ft. 10/28/2014 11/30/2014
A Folsom- Harrison 1 < 65 ft. 12/1/2014 12/7/2014
G Tehama-Howard 6 120-150 ft. 12/8/2014 1/18/2015
12
![Page 13: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/13.jpg)
Bus Ramp ProjectUnderground
Construction HoursPermitted Hours of Demolition: Monday - Friday 13 Hours per day Saturday 7AM - 8PM No Sunday.
Permitted Hours of CIDH Piers Monday - Friday : 24 Hours per day Saturday 7AM - 11PM No Sunday.
13
![Page 14: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/14.jpg)
Tehama St. and Howard St. Overcrossings
Bridge Pylon 9 (2) Barrette PilesTe
ham
a S
t.
How
ard
St.
Barrette Pile Foundation
14
![Page 15: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/15.jpg)
Barrette Pile Equipment Howard and Tehama St.
15
![Page 16: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/16.jpg)
Bridge Pylon 9 Barrette Pile Installation
Slurry batch plant
Excavation
Panel cage
16
![Page 17: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/17.jpg)
Bridge Pylon 9 Barrette Pile Installation
Barrette Pile Schematic 17
![Page 18: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/18.jpg)
Bus RampConcrete Viaduct
Howard St.
Clementina
Harrison
Folsom
Tehama
Concrete Viaduct connects toCable Stay Bridge at Howard Street
18
![Page 19: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/19.jpg)
Bus RampConcrete Viaduct
Tehama St.
HowardSt.
FolsomSt.
Clementina St.
NatomaSt.
19
![Page 20: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/20.jpg)
Bus Ramp Overcrossing Viaduct Falsework
Typical roadway falsework
Typical roadway falsework20
![Page 21: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/21.jpg)
Concrete Viaductand Overcrossings
• Bay Bridge off-ramp to Transbay Transit Center :1. Tehama Overcrossing (Frame 3): Dec. 2014 – June 20152. Clementina Overcross (Frame 2): April 2015 – Feb. 20163. Bay Bridge Off-ramp (Essex): May 2015 – Dec. 20154. Folsom St. Overcross (Frame 1): Sept. 2015 – Feb. 20165. Howard St. Superstructure (Frame 4): Dec. 2014 –Feb. 20166. Connection to Transit Center( Frame 5): Jan. 2016 –May. 2016
21
![Page 22: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/22.jpg)
Bus Ramp ProjectConstruction Hours
Permitted Hours of Demolition: Monday - Friday 13 Hours per day Saturday 7AM - 8PM No Sunday.
Permitted Hours of CIDH Piers Monday - Friday : 24 Hours per day Saturday 7AM - 11PM No Sunday.
Permitted Hours of Falsework and Viaduct Construction: Monday - Friday Hours TBD (will require some 24 hour per day at overcrossings) Saturday 7AM-8PM No Sunday.
22
![Page 23: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/23.jpg)
Bay Bridge/Harrison Ave Concrete Viaduct
Construction Schedule Bay Bridge Off-ramp: Harrison St. Demolition: Oct. 2014 – Dec. 2014
CIDH Piles( 3) 7 ft. diameter: Dec. 2014 – Feb. 2015
CIDH Piles (8) 24” diameter: Dec. 2014 – Feb. 2015
Abutment Construction: Jan. 2015 - May 2015
Harrison St. AWSS Utility Relocate: Dec. 2014–June 2015
Harrison St. Superstructure Viaduct: May 2015- Dec. 2015
23
![Page 24: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/24.jpg)
Harrison St. Retaining Walls
Bus RampNew Foundations
Har
rison
St.
24
![Page 25: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/25.jpg)
Harrison St. Foundations
Bus RampsNew Foundations
25
![Page 26: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/26.jpg)
Howard StreetCable Stay Bridge
Cable Stay Bridge Construction Schedule
Howard Street – Frame 4 Cable Stayed Bridge: Demolition: June 2014 - October 2014 Substructure: June 2014 - October 2014 Bridge Pylon 9: October 2014 – June 2015 Superstructure: December 2014 –November 2015 Cable Installation: Sept. 2015 – February 2016
Bridge Connection Frame 5 to Transit Center: West Connection: Jan. 2016 – May 2016 East Connection: Feb. 2016 – May 2016
26
![Page 27: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/27.jpg)
![Page 28: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/28.jpg)
Cable Stayed Bridge and Green Space
28
![Page 29: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/29.jpg)
FOLS
OM
ST.
HO
WA
RD
ST.
1ST ST.
TEH
AM
A ST.
CLE
ME
NTIN
A ST.
ESSEX ST.
TRA
NS
BAY TR
AN
SIT
CE
NTE
R
29
Overhead RampsUnder-Ramp Park
29
![Page 30: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/30.jpg)
FOLS
OM
ST.
HO
WA
RD
ST.
1ST ST.
TEH
AM
A ST.
CLE
ME
NTIN
A ST.
ESSEX ST.
30
Illustrative PlanUnder-Ramp Park
30
![Page 31: Bus Ramps Public Outreach Presentationtjpa.org/uploads/2014/09/Bus-Ramps-Public-Outreach-Presentation-9...Bus Ramps Public Outreach Presentation September 10, 2014 1. CM/GC: Webcor](https://reader031.fdocuments.net/reader031/viewer/2022022004/5aab9e747f8b9a8d678c0ae5/html5/thumbnails/31.jpg)
Questions? Questions?Should you have any general questions about the Transbay Transit Center Project, please call Adam Alberti or Nathan Bengtsson, Transbay Outreach Team, at: (415) 227-9700 or via e-mail at: [email protected].
Construction Hotline:If you have any urgent questions regarding site-specific demolition or construction activities, please call our construction activity number: (415) 409-TJPA (8572).
Website:Please continue to check our website for the most up to date schedule of activities at: http://transbaycenter.org/construction-updates
Sign-Up! And receive weekly updates via email. Join Our Mailing List !