Building Use

download Building Use

of 25

Transcript of Building Use

  • 7/24/2019 Building Use

    1/25

    Dewi - Larashintya - Tia Rafka Annisa Yoni

    Setu Pladhen

  • 7/24/2019 Building Use

    2/25

  • 7/24/2019 Building Use

    3/25

  • 7/24/2019 Building Use

    4/25

  • 7/24/2019 Building Use

    5/25

  • 7/24/2019 Building Use

    6/25

  • 7/24/2019 Building Use

    7/25

    Single unit housing

    Retail

    Public Space

    !"LD"#$ !S%

  • 7/24/2019 Building Use

    8/25

    Single unit housing

    &ertical unit housing

    Retail

    'pen Space

    (ater

    Public Space

    !"LD"#$ !S%

  • 7/24/2019 Building Use

    9/25

    )'#)%PT

    e+an,aatkan danau eksisting sebagai su+ber dayaang dike+bangkan untuk sektor perekono+ianendidikan dan pariwisata

  • 7/24/2019 Building Use

    10/25

    &"S"./ Penghe+atan energi0/ *engurangi konsu+si air1/ *engurangi li+bah padat2/ *engurangi Polusi udara3/ *enciptakan peluang ekono+i +elalui

    bisnis lokal

    !D"DAYA P%R"4A#A# A"R TA(AR

    %D!4AS"

    P%#$%*A#$A# %4'#'*"

    4A(ASA# R%4R%AS"

    P%*A#5AATA# DA#A!

  • 7/24/2019 Building Use

    11/25

    Single unit housing

    &ertical unit housin

    Retail

    'pen Space

    (ater

    Public Space

    *i6ed !sed

    !"LD"#$ !S

  • 7/24/2019 Building Use

    12/25

    Perhitungan Tata $una Lahan

    Luas Area 7 8 9a : 8;/;;; +0

    5asilitas Sosial

    alai perte+uan warga 7 1;; +0

    Pos 9ansip 7 .0 +0

    $ardu listrik 7 1; +0

    TPS 7 .; +0

    Parkir u+u+ 7 2;; +0

    Te+pat "badah 7 8;; +0

    RT9 7 .?/0;; +0

    9unian 7 1;/.@ +0

    4o+ersil 7 .;/;;; +0

  • 7/24/2019 Building Use

    13/25

    Perhitungan Bu+lah Peduduk

    4epadatan Penduduk 7 23; orangC 9a

    Bu+lah Penduduk 7 0?;;

  • 7/24/2019 Building Use

    14/25

    Bu+lah dan tipe hunian

    9unian 7 1;/.@ +0

    &ertical !nit housing

    Luas 7 .3/.@ +0

    Penghuni 7 .@;; iwa

    Single unit housing

    Luas 7 .3/;;; +0

    Bu+lah unit 7 .@; unit < asu+si7 3 iwa per-

    unit>Penghuni 7 ;; iwa

  • 7/24/2019 Building Use

    15/25

    4ebutuhan air ersih dan

    pengelolaah li+bahBaringan li+bah

    Sptic tank

    idang resapan

    Baringan pe+ipaan air

  • 7/24/2019 Building Use

    16/25

    Pengolahan AirKebutuhan Air Bersih:PDA* Air Tanah Rainwater 9arEesting Treat+entBu+lah kebutuhan air 7 .3; LCorangChari 6 0?;; orang 7 2;3/;;;LChari 7 28@ LCs

    Air Limbah Domestik yang dihasilkanAsu+si @;= dari Air yang digunakan: @;= 6 28@ LCs: 1 ?3 LCs

    Penanganan 7 +enggunakan Septic Tankuntuk Black Waterdan +enggunakan siste+ Combine Sewage TreatmentuntukGrewaterdengan perpaduan wetland sebelu+ dialirkan kesaluran drainase dan dialirkan ke badan air

    Stormwater !anagement

  • 7/24/2019 Building Use

    17/25

    L"D

    Low "+pactDeEelop+entThe goal o, sustainable stor+water+anage+ent is tore"uce runo#directly ,ro+the point o, sources as +uch as possible and totreat the runo#in order to eFectiEely controlstor+water infltration and eEaporation i+proEewater Guality and supply the water de+and

    ./ &egetated 5ilter Strips

    0/ Sheet 5low to )onserEation Area

    1/ ioretention

    2/ Per+eablePaEe+ent

    3/ $rassSwale8/ "nfltration

    ?/ RegeneratiEeStor+water

    )onEeyanceS ste+@/ Rainwater9arEestin

    / $reen Roo,s

    .;/ 5iltration Practice

    ../ Stor+water(etlands

    (est &irginia Stor+water*anage+ent H Design$uidance *anual 0;.0

  • 7/24/2019 Building Use

    18/25

    "'R%T%#T"'#

    ioretention is a

    Eersatile stor+waterpractice that flters

    runoF through 1 parts7PLA#TS

    an%#$"#%%R%D S'"L

    *"Iand o,ten an

    !#D%RDRA"#

    *anage the frst oneinch o, rain,all on-site

    Reduce runoF to $% & '%%

    (Reduce pollutant loads

    Total Suspended Solids ?; 3 =

    Total Phosphorus 33 ; =Total #itrogen 82 0 =

    (est &irginia Stor+water*anage+ent H Design

  • 7/24/2019 Building Use

    19/25

    ApplicationSeattle (ashington$reendale (isconsin

  • 7/24/2019 Building Use

    20/25

    P%R*%AL% PA&%*%#TSPer+eable PaEe+ents are

    ALT%R#AT"&% PA&"#$ S!R5A)%thatcapture and te+porarily store theTarget Treat+ent &olu+e by

    fltering runoF through Eoids in thepaEe+ent sur,ace into an underlying

    stone reserEoir/ 5iltered runoF +ay

    be collected and returned to theconEeyance syste+ or allowed topartially infltrate into the soil/*anage the frst one

    inch o, rain,all on-site

    Reduce runoF to )* &

    '%% (Reduce pollutant loads

    Total Suspended Solids @.. =

    Total Phosphorus 3 @. =Total #itrogen 3 @. =

    (est &irginia Stor+water*anage+ent H Design

  • 7/24/2019 Building Use

    21/25

    Application

    Lola Do+enech "taly

  • 7/24/2019 Building Use

    22/25

    RA"#(AT%R 9AR&%ST"#$

    Rainwater 9arEesting syste+sintercept diEert store and releaserain,all ,or ,uture use/ Their runoFand pollutant reduction rates are

    based on the syste+Js siKeconfguration water de+and and

    use o, secondary practices to+anage oEerow ,ro+ Rainwater9arEesting syste+s/*anage the frst one

    inch o, rain,all on-site

    Reduce pollutant loads

    Reduce runoF to ; =

    Total Suspended Solids ; =Total Phosphorus ?8 =

    Total #itrogen ?2 =

  • 7/24/2019 Building Use

    23/25

    ApplicationBakarta

    Shige+oto Sahara-san

    Bapan

  • 7/24/2019 Building Use

    24/25

    $R%%#R

    ''5S

  • 7/24/2019 Building Use

    25/25

    Application!niEersitas "ndonesia DepokT! Del,t A+sterda+