BUILDING UP project – long term view and roadmapping actions in energy efficiency in building...

34
BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012

Transcript of BUILDING UP project – long term view and roadmapping actions in energy efficiency in building...

Page 1: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

BUILDING UP project – long term view and roadmapping actions in energy efficiency in building

BUILDING UP consortiumJadwiga Fangrat (ITB)

Ljubljana, 29/08/2012

Page 2: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

2 Ljubljana, 29/08/2012

• FrameworkFollow up of the EeB PPP 2010-2013Horizon 2020

• Goal of E2BAPrepare a new Roadmap 2014-2020

• Objective of Building UpDefine cross-ETP priorities to be integrated into the Roadmap

which will be adapted to the E2BA roadmap considered as a basic document for the European Commission, to start working on their programmes

Page 3: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

3 Ljubljana, 29/08/2012

EeB PPP 2010-2013 as the first waveof a Long Term Strategy

Years 01 02 03 04 05 06 07 08 09 10

Wave 1 O

Wave 2 O

Wave 3 O

Continuous Research

D & B

D & B

D & B

Years 01 02 03 04 05 06 07 08 09 10

Wave 1 O

Wave 2 O

Wave 3 O

Continuous Research

D & B

D & B

D & B

Years 01 02 03 04 05 06 07 08 09 10

Wave 1 O

Wave 2 O

Wave 3 O

Continuous Research

D & B

D & B

D & B

i.e. Retrofitting andreduction of energy use

i.e. Energy neutralbuildings/districts

i.e. Energy positivebuildings/districts

EeB PPPEeB PPP2010-132010-13

New RoadmapNew RoadmapTo be preparedTo be prepared

Page 4: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

4 Ljubljana, 29/08/2012

E2BA Roadmapping Process

Page 5: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

5 Ljubljana, 29/08/2012

February/MarchValidate Methodology and working process

Shape the first version of the Roadmap

Roadmap Draft 1

Roadmap Draft 2

April/JuneValidate final Vision 2050 and Targets

2020Validate functional R&I projects

Set time priorities

Roadmap Final Draft

E2BA Workshops(round 2)

E2BA Workshops(round 1)

2nd Semester

Final Public Consultation

PPP Info Days

E2BA Roadmapping Process

April 24-25-26Analyse all inputs from restricted

consultationAgree on Draft 2 preparing process

Build

ing

Up

Road

map

ICT4E2BARoadmap

Build

ing

Up

Road

map

Page 6: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

6 Ljubljana, 29/08/2012

BU contract requirements

• to create an effective coordination of ETPs and major initiatives whose SRAs and activities address energy efficiency in the built environment from an NMP perspective

Need for a jointly shared Industrial and Research Roadmap focused on long term cross-platform research and innovation areasNeed to build a cross-ETP network through large public consultations and debates

Page 7: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

7 Ljubljana, 29/08/2012

No Partner Full Name Short Name ETP or Inititiave represented

1Centre Scientifique et Technique du Bâtiment

CSTB ECTP

2 D'Appolonia DAPP

3Energy Effi cient Buildings Association

E2BA E2BA

4 Steinbeis-Europa-Zentrum SEZ

5 Instytut Techniki Budowlanej ITB ENBRI

6Austrain Society for Environment and Technology

ÖGUT ERACOBUILD

7 Tata Steel UK Tata ESTEP

8Forest-based Sector Technology Platform

FTP FTP

9 Bax & Willems B&W SusChem10 Cranfield University CRAN EUMAT

11European Apparel and Textile Confederation

EURATEXEuropean Textile and Clothing

Technology Platform

Partners

Page 8: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

8 Ljubljana, 29/08/2012

Work Plan and

Associated Tools

WORKFLOW SUPPORTING TOOLS

Brainstorming Wiki contributions (open to expert panels on the project website) Delphi or Expert Panels Web Based Social Network Group discussions Open discussion seminars or events Web Based Social Network Group discussions SWOT Analysis Weighted Voting Business Case methodology (timeline, pay back estimation, risk assessment) Open seminars or events Capitalization: You tube, podcast, web , videos Wiki contributions (open to expert panels on the project website) Delphi (open to advisory board) Open discussion seminars or event Capitalization: You tube, podcast, web, videos

Capitalization: You tube, podcast, web presentation, videos

Page 9: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

9 Ljubljana, 29/08/2012

The main steps of Road mapping that are followed in BU are:

Roadmapping MethodologyRoadmapping process in Building Up

Step 1: Planning

Step 2: Roadmap

Development

Step 3: Plan Preparation

Step 4: Follow-up

Page 10: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

10 Ljubljana, 29/08/2012

Defi

nit

ion

of

Road

map

M

eth

od

olo

gy •Definition of

the structure

•Identification of the process

Cre

ati

on

of

Sch

ed

ule

&

Pla

nn

ing

•Definition of the roadmapping process expected timeline

•Identification of roadmapping meetings/events/

milestones

Info

rmati

on

In

form

ati

on

&

Pre

para

tion

Mate

rial

• Conference calls WP leaders and Building Up project Managers

•Collection & clustering of already available information (WP1)

Step 1: Planning

Step 2: Roadmap

Development

Step 3: Plan Preparation

Step 4: Follow-up

Roadmapping Process –Step 1

Page 11: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

11 Ljubljana, 29/08/2012

Fir

st

ste

p I

nven

tive

Work

sh

op • Identificatio

n of building trends and barriers

• Preliminary identification of cross-ETP research and innovation areas

On

lin

e C

on

su

ltati

on

•Clustered list of cross-platform collaboration areas

•Online survey to stakeholders

•Draft Roadmap structure

•Consideration of E2BA vision

Secon

d ste

p

inven

tive W

ork

sh

op

Step 1: Planning

Step 2: Roadmap

Development

Step 3: Plan Preparation

Step 4: Follow-up

Roadmapping Process – Step 2

•Sharing survey results

•Finalization of the preliminary identified cross-platform areas

•Development of one draft roadmap for each top area

Page 12: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

12 Ljubljana, 29/08/2012

BU

Dra

ft R

oad

map

• Further development of the inventive session results

• Analysis of synergies among roadmaps

• Preliminary clustering

• Reviews by the Advisory Board

Fin

aliza

tion

of

the B

U

Road

map

•Finalised integration of the roadmaps

•Continuous sharing of information with experts (surveys, conference calls, etc.)

•Review by Advisory Board

•Release of the final Roadmap

Step 1: Planning

Step 2: Roadmap

Development

Step 3: Plan Preparation

Step 4: Follow-up

Roadmapping Process – Step 3

Page 13: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

13 Ljubljana, 29/08/2012

Step 1: Planning

Step 2: Roadmap

Development

Step 3: Plan Preparation

Step 4: Follow-up

Roadmapping Process – Step 4

Peri

od

ic R

evie

w

of

Road

map

•Continuous incorporation of changes in roadmap

•Periodic RevisionD

issem

inati

on

&

aw

are

ness

•Sharing with the interested community of the BU vision

•Increase competitiveness

•Increase competences

Page 14: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

14 Ljubljana, 29/08/2012

Survey ResultsExpert Background

Type of Organizations

Page 15: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

15 Ljubljana, 29/08/2012

Survey ResultsExpert Background

Field of Expertise Other =Energy efficiency,Low to zero carbon technologies,research management,Energy simulation and design, Passive house technologies

Page 16: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

16 Ljubljana, 29/08/2012

Survey Results

Preliminary Ranking of Cross-platform Areas

0 5 10 15 20 25 30 35

CP10 High resistant functional coatings in steelCP5 Chemistry for cooling and heating

CP9 Functional coatings textiles CP12 Glazing materials

CP4 U-0 refurbished wallsCP2 Bio based products to substitute fossil-based products

CP6 Energy storage materials CP14 Power distribution and cabling in buildings

CP13 Materials recyclability from buildingsCP11 Lighting in buildings

CP8 Advanced thermal insulation construction materialsCP7 Building integrated solar panels

CP3 Envelop as energy generating system CP1 Multi-material approach

Page 17: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

17 Ljubljana, 29/08/2012

Developing roadmapScenarios and trends (I)

Scenario – description of different sets of assumptions

on possible futures

Scenarios were condenced into following groups:

• Climate change and CO2 emissions

• Growth and competitiveness

• Efficiency (measures) and technological innovation

• Demographic and social aspects, including labour

force

• Renewable and non-renewable resources

Page 18: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

18 Ljubljana, 29/08/2012

Trend – ongoing and/or planned developments

regarding

certain aspects of the built environment and its

stakeholders

More than 60 resources were analysed within

categories:

• Refurbisment to transform existing buildings into

energy-efficient buildings

• Neutral/Energy positive new buildings

• Building materials

• Energy-efficient districts/communities

• Horizontal technological aspects

• Horizontal organizational aspects

Developing roadmapScenarios and trends (II)

Page 19: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

19 Ljubljana, 29/08/2012

Identified barriers

Page 20: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

20 Ljubljana, 29/08/2012

Exemplary barriers for‘Energy genaration, use and managemenet’

• architects’ lack o awareness of latest

technical improvements and energy related effects

• lack of standard solutions

• gap between research and market

Page 21: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

21 Ljubljana, 29/08/2012

• lack of certification of companies

• slowness of buildings sector to adopt new

technology

• payback time

• international availability of components

and products

Exemplary barriers for ‘Materials and components’

Page 22: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

22 Ljubljana, 29/08/2012

List of Cross-ETP Areas (CP)

CP 1 Performance Based Approach for building components, including sustainable

design, Life Cycle Analysis CP 2 Multi-material composites CP 3 Healthy indoor environment (including air quality, ventilation,

lighting, acoustic performance)CP 4 Electric generation and storage materials and systems CP 5 Thermal generation and storage materials and systems, including

building integrated energy technologies CP 6 Advanced thermal insulation construction materials for new

buildings and existing buildings (e.g. aerogel, nanofoams, vacuum insulation

panels) CP 7 Building materials recyclability and re-use of components CP 8 Renewable resource-based products to substitute non-renewable based products

Page 23: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

23 Ljubljana, 29/08/2012

Example CP 1 (draft roadmap)

Page 24: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

24 Ljubljana, 29/08/2012

Example CP 1 (draft roadmap)

Page 25: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

25 Ljubljana, 29/08/2012

2021-2050by 2020

Development, Integration and Optimization of advanced technologies for multifunctional energy

efficient glazing Target

reduction of CO2 emission,reduction of airconditioning use, Safety, Fire Resistance and comfort

Advanced coatings and multifunctional materials for Low-E and solar control glassTechnologies

Expected outcomes

Applications

EXAMPLE (1): Glass-based products including smart windows

Advanced Smart windows integrating different

technologies

Smart Windows and Façades,focus on public buildings and

social housing

Smart Windows and Façades,

focus on private buildings

High-Strength and acoustic insulating Glass (flexible glass, lightweight glass, self-healing glass)

reduction of CO2 emissionreduction of airconditioning use

Safety, Fire Resistance and comfort

Solar thermal collectors, photovoltaic modules and Concentrated Solar Power plants

Page 26: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

26 Ljubljana, 29/08/2012

2021-2050by 2020All building components meet an ecodesign approach

covering the whole chain of the building lifeTarget

Building design tools for architects for real time building

ecodesign

Technologies

Expected outcomes

Applications

EXAMPLE (2): Building components including sustainable design, LCA

Speaking components (with indicators), increasing the use of

embodied energy calculations and LCA in product manufacturing

Focus on new-erected buildings, new design and retrofitting, Standards and assessment applied to both new and traditional construction

Emerging market of biobased materials, combinating different

building materials to obtain a cost-optimum solution

Higher building physics performance

Page 27: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

27 Ljubljana, 29/08/2012

Policy recommendations

CONTENT

1. Introduction

2. Objective

3. Target audience

4. Current economic environment

5. Existing legislation

6. Proposed actions

7. Expected impact

8. Concluding remarks

9. References

Page 28: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

28 Ljubljana, 29/08/2012

How to overcome barriers?

• New products development production research & technology development

• Establishment of Eco (Energy) Euroclass system for construction products

• Fast path for technical evaluation and approval of innovative product

• Standardization and Harmonization

• Education training programmes: architects, designers, builders, property management, academy, producers, policy makers, central and local administration

• Building regulations

• Building control

• Information campaign (public)

• ……

Page 29: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

29 Ljubljana, 29/08/2012

HORIZON 20202014 - 2020

low growth

insufficient innovation

environmental and social challenges

Page 30: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

30 Ljubljana, 29/08/2012

HORIZON 2020 Areas of funding

Page 31: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

31 Ljubljana, 29/08/2012

HORIZON 2020Areas of funding

Page 32: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

32 Ljubljana, 29/08/2012

HORIZON 2020 What’s new?

• integration of research and innovation –

funding from idea to market• support for innovation leading to

a direct economic stimulus• focus on creating business opportunities• inclusive approach open to new participants

from Europe and beyond• more possibilities for new entrants

and young scientists• simplicity – less bureaucracy, fewer audits

Page 33: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

33 Ljubljana, 29/08/2012

INVITATION

BOOSTING ENERGY EFFICIENCY IN CONSTRUCTIONBUILDING UP workshop

Thursday 4th October 2012Leuven, Belgium

http://www.buildingup-e2b.eu

Page 34: BUILDING UP project – long term view and roadmapping actions in energy efficiency in building BUILDING UP consortium Jadwiga Fangrat (ITB) Ljubljana, 29/08/2012.

34 Ljubljana, 29/08/2012

Thank you!

ITB HeadquartersFiltrowa 1, 00-611 Warsaw

POLAND

http://www.buildingup-e2b.eu

http://www.itb.pl

[email protected]