Buro Happold Environment Traditional Buildings Conference, 30 March 2011 Building Regulations Part L 2010 Case studies Presented by David Kingstone [email protected]

Transcript of Building Regulations Part L 2010 Case studiesBuro Happold Environment Traditional Buildings...

Buro Happold EnvironmentTraditional Buildings Conference, 30 March 2011

Building Regulations Part L 2010 Case studies

Presented by David Kingstone

[email protected]

Part L 2010 case studies

• Dwelling refurbishment

• Listed Building refurbishment and extension

• Summary

Case Study – Refurbished dwelling

Case Study – Refurbished Dwelling

Existing Dwelling:• Uninsulated stone built mid terrace• Gas fires to two rooms• Electric DHW storage

Proposals• Install central heating via condensing combi boiler• External wall insulation is not an option

Case Study - Dwelling

0

10

20

30

40

50

60

70

ExistingBuilding

NewBuilding

TER

ElementalCompliance

Roof 0.16 Boilerefficiency

93%

4m2 solarthermal

Insulatefloor 0.25

PV panel0.5kWp

Case Study - Dwelling

0

10

20

30

40

50

60

70

ExistingBuilding

NewBuilding

TER

ElementalCompliance

Roof 0.16 Boilerefficiency

93%

4m2 solarthermal

Insulatefloor 0.25

PV panel0.5kWp

Case Study - Dwelling

0

10

20

30

40

50

60

70

ExistingBuilding

NewBuilding

TER

ElementalCompliance

Roof 0.16 Boilerefficiency

93%

4m2 solarthermal

Insulatefloor 0.25

PV panel0.5kWp

Case Study - Dwelling

0

10

20

30

40

50

60

70

ExistingBuilding

NewBuilding

TER

ElementalCompliance

Roof 0.16 Boilerefficiency

93%

4m2 solarthermal

Insulatefloor 0.25

PV panel0.5kWp

Case Study - Dwelling

0

10

20

30

40

50

60

70

ExistingBuilding

NewBuilding

TER

ElementalCompliance

Roof 0.16 Boilerefficiency

93%

4m2 solarthermal

Insulatefloor 0.25

PV panel0.5kWp

Case Study - Dwelling

0

10

20

30

40

50

60

70

ExistingBuilding

NewBuilding

TER

ElementalCompliance

Roof 0.16 Boilerefficiency

93%

4m2 solarthermal

Insulatefloor 0.25

PV panel0.5kWp

Part L 2010 case studies

• Dwelling refurbishment

• Listed Building refurbishment and extension

• Summary

Case Study – listed building

Part L compliance requirements• Change of energy status (CI)• Extension (CI)• Material alteration

Case study – listed building

Extension• Comply with Part L

2010 new buildExisting Building• Limited fabric

improvements possible

• Some cooling added

• Original lighting

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

ConstantVolumefixed FA

ConstantVolumevar FA

VAV Fan CoilUnit

Activebeams

Passivebeams +

displvent

Rel

ativ

e E

mis

sio

ns

Heating Cooling Auxilliary

Case study

Notional Building = TER

• Building fabric U-values

• Systems efficiency

• Ancillary energy

• Lighting

• Emission factors

Emissions

Case study – listed building

0

5

10

15

20

25

30

TER BER Grid Displaced

Em

issi

on

s (k

gC

O2/

m2)

Heating DHW Cooling Auxiliary Lighting Total

15

15

15

14

14

14

13

13

13

12

12

12

11

11

11

10

10

10

9

9

9

8

8

8

7

7

7

6

6

6

5

5

5

4

4

4

3

3

3

2

2

2

1

1

1

A+

A+

A+

A

A

A

B

B

B

C

C

C

D

D

D

-10 0 10 20 30 40 50 60 70 80 90 100

New

Refurbished

EPC Rating

EPC Rating

EPC and Breeam Ene1 credits

Ene1 Credits

EPC 2006

EPC 2010?

The new emissions regulations

• Dwelling refurbishment

• Listed building refurbishment and extension

• Summary

Summary

• The process is not simple

• Compliance strategy must be thought out

• Consider energy efficiency and value

0

10

20

30

40

50

60

70

ExistingBuilding

NewBuilding

TER

ElementalCompliance

Roof 0.16 Boilerefficiency

93%

4m2 solarthermal

Insulatefloor 0.25

PV panel0.5kWp

0

5

10

15

20

25

30

TER BER Grid Displaced

Em

issi

on

s (k

gC

O2/

m2)

Heating DHW Cooling Auxiliary Lighting Total

[email protected]