BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

22
BUILDING MARKING SYSTEM BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING

Transcript of BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

Page 1: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

BUILDING MARKING SYSTEMBUILDING MARKING SYSTEM

STRUCTURE / HAZARDS EVALUATION MARKING

Page 2: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

Structure Hazards Evaluation Form

Building Marking Systems

Page 3: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

FIRST STREET

A S

TR

EE

T

P.S. #1SCHOOL K-6

GOODMARKET

CHURCH

MAP TEAM NAME: DATE/TIME OF QUAKE:TX-TF1 SEARCH #1 SUN 23FEB92 110 HRS

N

B S

TR

EE

T

Page 4: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

Building Marking Systems

STRUCTURE / HAZARDS MARK

• Structure and Hazmat spec make a 2’ x 2’ box on building adjacent to accessible entry.

• Done after doing hazards assessment and filling out structure / hazards evaluation.

• Box is spray painted with using international orange (in TF cache)

Page 5: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

Building Marking Systems

STRUCTURE / HAZARDS MARK

• Structure relatively safe for SAR ops. There is little chance of further collapse. – Victims could be trapped by contents– Victim could be unconscious

Page 6: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

Building Marking Systems

STRUCTURE / HAZARDS MARK

• Structure is significantly damaged. Some areas may be relatively safe, but others may need shoring, bracing, removal, and/or monitoring of hazards– Building could be completely pancaked

Page 7: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

Building Marking Systems

STRUCTURE / HAZARDS MARK

• Structure is NOT SAFE for rescue ops and may be subject to sudden collapse. Remote search ops may proceed at significant risk. If rescue ops are undertaken, safe haven areas, & rapid evacuation routes (with structural monitoring) should be created.

Page 8: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

Building Marking Systems

STRUCTURE / HAZARDS MARK

• Arrow next to Marking Box indicates the direction of Safest Entry to Structure

Page 9: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

HM

Building Marking Systems

STRUCTURE / HAZARDS MARK

• HM indicates hazardous material condition in or adjacent to structure. SAR Ops normally will not be allowed until condition is better defined or eliminated.

Page 10: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

STRUCTURE / HAZARDS MARK - SUMMARY

15JUN92

HM NATURAL GAS

OR-1

No entry until gas is turned off. When it’s mitigated, should line out the HM

mark and record new date and TF

Building Marking Systems

Page 11: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

SEARCH ASSESSMENT MARKING

BUILDING MARKING SYSTEMBUILDING MARKING SYSTEM

Page 12: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

First slash madewhen entering

Crossing slash made as TF exits

15JUL921400 HR

RATS

3 DEAD

OR-1

2’x2’ X neareach entry

Building Marking Systems

SEARCH ASSESSMENT MARK

Page 13: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

VICTIM LOCATION MARKING

BUILDING MARKING SYSTEMBUILDING MARKING SYSTEM

Page 14: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

CA6

CONFIRMEDLIVE VICTIM

REMOVED VICTIM

CONFIRMEDDEAD VICTIM

POTENTIALVICTIM CA

6

CA6

CA6

VICTIM LOCATION MARKING

Building Marking Systems

Page 15: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

USAR Marking System

INTERNATIONAL SEARCH AND RESCUE ADVISORYGROUP

Page 16: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

VICTIM LOCATION MARKING

Go or No Go (G/N)

Team

Time/Date of Start

Time/Date of End

HAZARD INFORMATION

# LIVE VICTIMS REMOVED

# DEAD REMOVED

PERSONS UNACCOUNTED FOR LOCATION OF OTHER

VICTIMS

Page 17: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

Note: A circle is drawn around the above box once thebuilding/structure has been completely searched.

Go

UKSAR 1

17/2/04 0830

17/2/04 1147

3 0

4

2 D

Open Shaft: Quad E

Page 18: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

Potential VictimNumber and status unknown

V

Page 19: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

CONFIRMED VICTIM LOCATIONArrow denotes confirmation

L or D denotes number of each

VL 2

Page 20: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

ONLY DEAD BELOW !Arrow denotes confirmation

D denotes number of each

VD2

Page 21: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.

VICTIMS (all) ExtricatedCircle indicates that all located victims have been extricated

(including dead).

VL 2

D 1

Page 22: BUILDING MARKING SYSTEM STRUCTURE / HAZARDS EVALUATION MARKING.