BUILDING FRAMES ERECTION SCHEME BUILDING FINITE …
1
BUILDING FRAMES ERECTION SCHEME BRIDGE ERECTION SCHEME AND CABLES HAULING SEQUENCE BUILDING FINITE ELEMENT MODEL VERTICAL DISPLACEMENTS CONTOUR TUBE DECK BRIDGE TYPICAL SECTION EXISTING WATER TANK TOWER PYLON BASE SECTION PYLON MIDDLE SECTION BRIDGE FINITE ELEMENT MODEL DEFORMED SHAPE UNDER VERTICAL LOADS BRIDGE DECK: 37 PREASSEMBLED MODULES BRIDGE PYLON: 20 PREASSEMBLED MODULES MAIN DECK SPAN: 108m SECONDARY DECK SPAN: 78m PYLON HEIGHT: 45m above existing water tank EXISTING WATER TANK TOWER
Transcript of BUILDING FRAMES ERECTION SCHEME BUILDING FINITE …
![Page 1: BUILDING FRAMES ERECTION SCHEME BUILDING FINITE …](https://reader030.fdocuments.net/reader030/viewer/2022012205/61dea09d56827a5b94554cfc/html5/thumbnails/1.jpg)
BUILDING FRAMES ERECTION SCHEME
BRIDGE ERECTION SCHEME ANDCABLES HAULING SEQUENCE
BUILDING FINITE ELEMENT MODELVERTICAL DISPLACEMENTS CONTOUR
TUBE DECK BRIDGETYPICAL SECTION
EXISTING WATER TANK TOWER
PYLON BASE SECTION
PYLON MIDDLE SECTION
BRIDGE FINITE ELEMENT MODEL DEFORMED SHAPE UNDER VERTICAL LOADS
BRIDGE DECK: 37 PREASSEMBLED MODULES BRIDGE PYLON: 20 PREASSEMBLED MODULES
MAIN DECK SPAN: 108mSECONDARY DECK SPAN: 78mPYLON HEIGHT: 45m above existing water tank EXISTING WATER TANK TOWER