BUILDING ENERGY ANALYSIS REPORT
PROJECT:
Project Designer:
Report Prepared by:
Job Number:
Date:
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC – www.energysoft.com.
3267 DUTTON AVESJ CIMINO ELECTRIC INC
SANTA ROSA, CA 954077075426231
38891 MISSION BLVDGOLDEN GATE BAPTIST THEO SEMINARY
FREMONT, CA 94536
3267 DUTTON AVESJ Cimino Electric Inc.
C JONES
SANTA ROSA, CA 95407(707)542-6231
728
7/24/2015
ID: 728EnergyPro 6.6 by EnergySoft User Number: 6923
Job Number:
TABLE OF CONTENTS
Form LTI-03-E Indoor Lighting Power AllowanceForm LTO-01-E Outdoor Lighting
Cover PageTable of ContentsForm LTI-01-E Indoor LightingForm LTI-02-E Lighting Controls
Form LTO-02-E Outdoor Lighting ControlsForm LTO-03-E Outdoor Lighting Power Allowances
1418
1239
2225
ID: 728EnergyPro 6.6 by EnergySoft User Number: 6923
STATE OF CALIFORNIA
INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 1 of 6) Project Name: Date Prepared: A. General Information Climate Zone: Conditioned Floor Area :
Unconditioned Floor Area : Building Type: Nonresidential High-Rise Residential Hotel/Motel Schools Relocatable Public Schools Conditioned Spaces Unconditioned Spaces
Phase of Construction: New Construction Addition Alteration
Method of Compliance: Complete Building Area Category Tailored
Project Address:
B. Lighting Compliance Documents (select yes for each document included)
For detailed instructions on the use of this and all Energy Efficiency Standards compliance documents, refer to the Nonresidential Manual published by the California Energy Commission.
YES NO FORM TITLE
NRCC-LIT-01-E Certificate of Compliance. All Pages required on plans for all submittals.
NRCC-LIT-02-E Lighting Controls, Certificate of Compliance, and PAF Calculation. All Pages required on plans for all submittals.
NRCC-LIT-03-E Indoor Lighting Power Allowance
NRCC-LIT-04-E Tailored Method Worksheets
NRCC-LIT-05-E Line Voltage Track Lighting Worksheets
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
✔
✔
✔
✔
26,324
03
✔
✔
✔
✔
✔
38891 MISSION BLVD
STATE OF CALIFORNIA
INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 2 of 6) Project Name: Date Prepared:
C. Summary of Allowed Lighting Power Conditioned and Unconditioned space Lighting must not be combined for compliance
Indoor Lighting Power for Conditioned Spaces Indoor Lighting Power for Unconditioned Spaces
1. Installed Lighting
NRCC-LTI-01-E, page 4
Watts Installed Lighting
NRCC-LTI-01-E, page 4
Watts
+ +
2. PORTABLE ONLY FOR OFFICES NRCC-LTI-01-E, page 3 +
3. Minus Lighting Control Credits NRCC-LTI-02-E, page 2 - Minus Lighting Control Credits
NRCC-LTI-02-E, page 2 -
4. Adjusted Installed Lighting Power (row 1 plus row 2 minus row 3) = Adjusted Installed Lighting Power
(row 1 minus row 3) =
5. Complies ONLY if Installed ≤ Allowed Complies ONLY if Installed ≤ Allowed
6. Allowed Lighting Power Conditioned NRCC-LTI-03-E, page 1 Allowed Lighting Power
Unconditioned NRCC-LTI-03-E, page 1
D. Declaration of Required Installation Certificates Declare by selecting yes for all Installation Certificates that will be submitted. (Retain copies and verify forms are completed and signed.)
YES NO Form/Title
NRCI-LTI-01-E - Must be submitted for all buildings Field Inspector
NRCI-LTI-02-E - Must be submitted for a lighting control system, or for an Energy Management Control System (EMCS), to be recognized for compliance.
Field Inspector
NRCI-LTI-03-E - Must be submitted for a line-voltage track lighting integral current limiter, or for a supplementary overcurrent protection panel used to energize only line-voltage track lighting, to be recognized for compliance.
Field Inspector
NRCI-LTI-04-E - Must be submitted for two interlocked systems serving an auditorium, a convention center, a conference room, a multipurpose room, or a theater to be recognized for compliance.
Field Inspector
NRCI-LTI-05-E - Must be submitted for a Power Adjustment Factor (PAF) to be recognized for compliance. Field Inspector
NRCI-LTI-06-E - Must be submitted for additional wattage installed in a video conferencing studio to be recognized for compliance.
Field Inspector
E. Declaration of Required Certificates of Acceptance Declare by checking all of the Certificates of Acceptance that will be submitted. (Retain copies and verify forms are completed and signed.)
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
0
11,265
2,059
9,207
0
0
7/24/2015GOLDEN GATE BAPTIST THEO SEMINARY
039,486
✔
✔
✔
✔
✔
✔
STATE OF CALIFORNIA
INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 3 of 6) Project Name: Date Prepared:
YES NO Form/Title
NRCA-LTI-02-A - Must be submitted for occupancy sensors and automatic time switch controls. Field Inspector
NRCA-LTI-03-A - Must be submitted for automatic daylight controls. Field Inspector
NRCA-LTI-04-A - Must be submitted for demand responsive lighting controls. Field Inspector
A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: CONDITIONED SPACE UNCONDITIONED SPACE F. Indoor Lighting Schedule and Field Inspection Energy Checklist The actual indoor lighting power listed on this page and on the next page includes all installed permanent and planned portable lighting systems. When Complete Building Method is used for compliance, list each different type of luminaire on separate lines. When Area Category Method or Tailored Method is used for compliance, list each different type of luminaire by each different function area on separate lines Also include track lighting in schedule, and submit the track lighting compliance form (NRCC-LTI-05-E) when line-voltage track lighting is installed.
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
7/24/2015GOLDEN GATE BAPTIST THEO SEMINARY
✔
✔
✔
STATE OF CALIFORNIA
INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 4 of 6) Project Name: Date Prepared:
G. Installed Portable Luminaires in Offices – Exception to Section 140.6(a) This section shall be filled out ONLY for portable luminaires in offices (As defined in §100.1). All other planned portable luminaires shall be documented on next page of
this compliance form. This section is used to determine if greater than 0.3 watts of portable lighting is planned for any office Fill out a separate line for each different office. Small offices that are typical (having the same general and portable lighting) may be grouped together. This allowance
shall not be traded between offices having different lighting systems. Office Portable Luminaire Schedule Office Installed Portable Luminaire Watts Per Square Foot Office Location Field Inspector
1 2 3 4 5 6 7 8 9 10
Complete Luminaire Description (i.e., LED, under cabinet, furniture mounted
direct/indirect) Watts per Luminaire
Num
ber of Lum
inaires
Installed portable luminaire watts in
this office (B x C )
Square feet of this office
Watts per
square foot
(D / E)
If F ≤ 0.3, enter zero;
if F > 0.3,
(F-0.3)
E x G Identify Office area in which these portable
luminaires are installed
Pass
Fail
Total installed portable luminaire watts that are greater than 0.3 watts per square foot per office: Enter sum total of all pages into NRCC-LTI-
01-E; Page 1
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
7/24/2015GOLDEN GATE BAPTIST THEO SEMINARY
STATE OF CALIFORNIA
INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 5 of 6) Project Name: Date Prepared: A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: CONDITIONED SPACE UNCONDITIONED SPACE
C. INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Luminaire Schedule Installed Watts Location Field Inspector 1
A B C D E F G H
Nam
e or
Ite
m T
ag
Complete Luminaire Description (i.e, 3 lamp fluorescent troffer,
F32T8, one dimmable electronic ballast) Wat
ts p
er
Lum
inai
re
How wattage was determined
Num
ber
Lum
inai
res
Tota
l Ins
talle
d W
atts
in th
is ar
ea
(C x
E )
Primary Function area in which these luminaires are installed Pass Fail CE
C De
faul
t fr
om N
A8
Acco
rdin
g to
§1
30.0
(c)
INSTALLED WATTS PAGE TOTAL: Enter sum total of all pages into NRCC-LTI-01-E; Page 2
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
240
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
6" LED DOWN LIGHT
✔
✔
✔
✔
✔
✔
2X4 LED TROFFER4' LED STRIP
30" LED VANITY2X2 LED TROFFERStandard Allowance: 1046 sqft at 1.200 watt/sf
A
B
C
D
F
40.0
11.031.0
24.0
21.0
619
27019
351,255735
456
8,370209
Classroom, Lecture, Training
Classroom, Lecture, Training
Classroom, Lecture, TrainingClassroom, Lecture, Training
Classroom, Lecture, TrainingClassroom, Lecture, Training
11,265
STATE OF CALIFORNIA
INDOOR LIGHTING CEC-NRCC-LTI-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-01-E Indoor Lighting (Page 6 of 6) Project Name: Date Prepared: DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:
Company: Signature Date:
Address: CEA Certification Identification (if applicable):
City/State/Zip: Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance
(responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of
Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance
documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the
enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name: Responsible Designer Signature:
Company : Date Signed:
Address: License:
City/State/Zip: Phone:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
SJ CIMINO
SJ CIMINO ELECTRIC INC
3267 DUTTON AVE 343802
SANTA ROSA, CA 95407 7075426231
C JONES
SANTA ROSA, CA 95407
3267 DUTTON AVE
SJ Cimino Electric Inc.
(707)542-6231
7/24/2015
STATE OF CALIFORNIA
INDOOR LIGHTING – LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 1 of 3) Project Name: Date Prepared:
The NRCC-LTI-02-E shall be used to document all mandatory and prescriptive lighting controls that are applicable to the project.
Mandatory Lighting Control Declaration Statements (Indicate if the measure applies by checking yes or no below.)
YES NO Control Requirements
Lighting shall be controlled by self-contained lighting control devices which are certified to the Energy Commission according to the Title 20 Appliance Efficiency Regulations in accordance with Section 110.9.
Lighting shall be controlled by a lighting control a system or energy management control system in accordance with §110.9. An Installation Certificate shall be submitted in accordance with Section 130.4(b).
One or more Track Lighting Integral Current Limiters shall be installed which have been certified to the Energy Commission in accordance with §110.9 and §130.0. Additionally, an Installation Certificate shall be submitted in accordance with Section 130.4(b).
A Track Lighting Supplementary Overcurrent Protection Panel shall be installed in accordance with Section 110.9 and Section 130.0. Additionally, an Installation Certificate shall be installed in accordance with Section 130.4(b).
All lighting controls and equipment shall comply with the applicable requirements in §110.9 and shall be installed in accordance with the manufacturer's instructions in accordance with Section 130.1.
All luminaires shall be functionally controlled with manually switched ON and OFF lighting controls in accordance with Section 130.1(a).
General lighting shall be separately controlled from all other lighting systems in an area. Floor and wall display, window display, case display, ornamental, and special effects lighting shall each be separately controlled on circuits that are 20 amps or less. When track lighting is used, general, display, ornamental, and special effects lighting shall each be separately controlled; in accordance with Section 130.1(a)4.
The general lighting of any enclosed area 100 square feet or larger, with a connected lighting load that exceeds 0.5 watts per square foot shall meet the multi-level lighting control requirements in accordance with Section 130.1(b).
All installed indoor lighting shall be equipped with controls that meet the applicable Shut-OFF control requirements in Section 130.1(c).
Lighting in all Daylit Zones shall be controlled in accordance with the requirements in Section 130.1(d) and daylit zones are shown on the plans.
Lighting power in buildings larger than 10,000 square feet shall be capable of being automatically reduced in response to a Demand Responsive Signal in accordance with Section 130.1(e).
Before an occupancy permit is granted for a newly constructed building or area, or a new lighting system serving a building, area, or site is operated for normal use, indoor lighting controls serving the building, area, or site shall be certified as meeting the Acceptance Requirements for Code Compliance in accordance with Section 130.4.(a). The controls required to meet the Acceptance Requirements include automatic daylight controls, automatic shut-OFF controls, and demand responsive controls.
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
✔
✔
✔
✔
✔
✔
✔
✔
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
STATE OF CALIFORNIA
INDOOR LIGHTING – LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 2 of 3) Project Name: Date Prepared:
A separate document must be filled out for Conditioned and Unconditioned Spaces. This page is used only for the following: CONDITIONED SPACES UNCONDITIONED SPACES MANDATORY AND PRESCRIPTIVE INDOOR LIGHTING CONTROL SCHEDULE, PAF CALCULATION, and FIELD INSPECTION CHECKLIST
Lighting Control Schedule Standards Complying With 1
( all that apply, or enter ‘E’ if Exempted)
PAF Credit Calculation 2 if Acceptance Test Required
Field Inspector
Watts of
Controlled Lighting
PAF
Control Credit (K x L)
A B C D E F G H I J K L M N O
Location in Building
Type/ Description of Lighting Control (i.e.: occupancy sensor,
automatic time switch, dimmer, automatic daylight,
etc…)
# of
Units
§130.1(a)
§130.0(b)
§130.1(c)
§130.1(d)
§130.1(e)
§140.6(a)2
§140.6(d)
Pass
Fail
Control Credit PAGE TOTAL (Sum of Column M): IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column M):
Enter Control Credit total into NRCC-LTI-01-E; Page 1.
1. §130.1(a) = Manual area controls; §130.0(b) = Multi Level; §130.1(c) = Auto Shut-Off; §130.1(d) = Mandatory Daylight; §130.1(e) = Demand Responsive; §140.6(d) = Additional lighting controls installed to earn a PAF; §140.6(d) = Prescriptive Secondary Sidelit Daylight Controls. 2. Check Table 140.6-A for correct Factor. PAFs shall not be traded between conditioned and unconditioned spaces. As a condition to earn a PAF, an Installation Certificate is also required to be filled out, signed, and submitted.
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
Dimming w/Occ Sensor
7/24/2015GOLDEN GATE BAPTIST THEO SEMINARY
✔
LibraryOffices w/ daylight control
Offices w/ daylight control
Offices exempt from daylight control
StorageStorage
Corridor
Occ Sensor - Partial On
Dimming - Multiscene
Dimming w/Occ SensorOcc Sensor - <= 500 sqft
Occ Sensor - <= 250 sqft
Dimming w/Occ Sensor
✔ 735
33
496
248
24
0155
0.20
0.250.20
0.250.20
0.300.25
147
89962
5039
360
2,059
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
STATE OF CALIFORNIA
INDOOR LIGHTING – LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 2 of 3) Project Name: Date Prepared:
A separate document must be filled out for Conditioned and Unconditioned Spaces. This page is used only for the following: CONDITIONED SPACES UNCONDITIONED SPACES MANDATORY AND PRESCRIPTIVE INDOOR LIGHTING CONTROL SCHEDULE, PAF CALCULATION, and FIELD INSPECTION CHECKLIST
Lighting Control Schedule Standards Complying With 1
( all that apply, or enter ‘E’ if Exempted)
PAF Credit Calculation 2 if Acceptance Test Required
Field Inspector
Watts of
Controlled Lighting
PAF
Control Credit (K x L)
A B C D E F G H I J K L M N O
Location in Building
Type/ Description of Lighting Control (i.e.: occupancy sensor,
automatic time switch, dimmer, automatic daylight,
etc…)
# of
Units
§130.1(a)
§130.0(b)
§130.1(c)
§130.1(d)
§130.1(e)
§140.6(a)2
§140.6(d)
Pass
Fail
Control Credit PAGE TOTAL (Sum of Column M): IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column M):
Enter Control Credit total into NRCC-LTI-01-E; Page 1.
1. §130.1(a) = Manual area controls; §130.0(b) = Multi Level; §130.1(c) = Auto Shut-Off; §130.1(d) = Mandatory Daylight; §130.1(e) = Demand Responsive; §140.6(d) = Additional lighting controls installed to earn a PAF; §140.6(d) = Prescriptive Secondary Sidelit Daylight Controls. 2. Check Table 140.6-A for correct Factor. PAFs shall not be traded between conditioned and unconditioned spaces. As a condition to earn a PAF, an Installation Certificate is also required to be filled out, signed, and submitted.
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
Dimming - Multiscene
7/24/2015GOLDEN GATE BAPTIST THEO SEMINARY
✔
RestroomsClassrooms
Vending
Reception
ReceptionRestrooms
Offices w/ daylight control
Occ Sensor - <= 125 sqft
Dimming w/Occ Sensor
Occ Sensor - Partial OnOcc Sensor - Partial On
Occ Sensor - <= 125 sqft
Dimming - Multiscene
✔ 80
1,023
62
88
248
1602,232
0.40
0.200.25
0.200.20
0.400.20
32
2051618
5064446
830
2,059
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
STATE OF CALIFORNIA
INDOOR LIGHTING – LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 2 of 3) Project Name: Date Prepared:
A separate document must be filled out for Conditioned and Unconditioned Spaces. This page is used only for the following: CONDITIONED SPACES UNCONDITIONED SPACES MANDATORY AND PRESCRIPTIVE INDOOR LIGHTING CONTROL SCHEDULE, PAF CALCULATION, and FIELD INSPECTION CHECKLIST
Lighting Control Schedule Standards Complying With 1
( all that apply, or enter ‘E’ if Exempted)
PAF Credit Calculation 2 if Acceptance Test Required
Field Inspector
Watts of
Controlled Lighting
PAF
Control Credit (K x L)
A B C D E F G H I J K L M N O
Location in Building
Type/ Description of Lighting Control (i.e.: occupancy sensor,
automatic time switch, dimmer, automatic daylight,
etc…)
# of
Units
§130.1(a)
§130.0(b)
§130.1(c)
§130.1(d)
§130.1(e)
§140.6(a)2
§140.6(d)
Pass
Fail
Control Credit PAGE TOTAL (Sum of Column M): IF MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column M):
Enter Control Credit total into NRCC-LTI-01-E; Page 1.
1. §130.1(a) = Manual area controls; §130.0(b) = Multi Level; §130.1(c) = Auto Shut-Off; §130.1(d) = Mandatory Daylight; §130.1(e) = Demand Responsive; §140.6(d) = Additional lighting controls installed to earn a PAF; §140.6(d) = Prescriptive Secondary Sidelit Daylight Controls. 2. Check Table 140.6-A for correct Factor. PAFs shall not be traded between conditioned and unconditioned spaces. As a condition to earn a PAF, an Installation Certificate is also required to be filled out, signed, and submitted.
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
Occ Sensor - <= 500 sqft
7/24/2015GOLDEN GATE BAPTIST THEO SEMINARY
✔
Offices exempt from daylight controlStorage
Corridor
Corridor
ClassroomsConference
Conference
Dimming w/Occ Sensor
Occ Sensor - Partial On
Occ Sensor - Partial OnDimming - Multiscene
Occ Sensor - <= 500 sqft
Occ Sensor - <= 500 sqft
✔ 248
288
682
22
2,604
37266
0.25
0.200.20
0.200.20
0.200.20
62
581364
5217413
869
2,059
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
STATE OF CALIFORNIA
INDOOR LIGHTING – LIGHTING CONTROLS CEC-NRCC-LTI-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-02-E Indoor Lighting - Lighting Controls (Page 3 of 3) Project Name: Date Prepared:
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:
Company: Signature Date:
Address: CEA Certification Identification (if applicable):
City/State/Zip: Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance
(responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of
Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance
documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the
enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name: Responsible Designer Signature:
Company : Date Signed:
Address: License:
City/State/Zip: Phone:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
343802
7075426231
C JONES
SANTA ROSA, CA 95407
3267 DUTTON AVE
SJ Cimino Electric Inc.
(707)542-6231
7/24/2015
SANTA ROSA, CA 95407
3267 DUTTON AVE
SJ CIMINO
SJ CIMINO ELECTRIC INC
STATE OF CALIFORNIA
INDOOR LIGHTING POWER ALLOWANCE CEC-NRCC-LTI-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 1 of 4) Project Name: Date Prepared:
ALLOWED LIGHTING POWER A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: CONDITIONED spaces UNCONDITIONED spaces
A. SUMMARY TOTALS OF LIGHTING POWER ALLOWANCES If using Complete Building Method for compliance, use only the total in column (a) as total allowed building watts. If using Area Category Method, Tailored Method, or a combination of Area Category and Tailored Method for compliance, use only the total in column (b) as the total
allowed building watts
(a) (b) 1. Complete Building Method Allowed Watts. Documented in section B of NRCC-LTI-03-E (below on this page)
2. Area Category Method Allowed Watts. Documented in section C-1 of NRCC-LTI-03-E (below on this page)
3. Tailored Method Allowed Watts. Documented in section A of NRCC-LTI-04-E
TOTAL ALLOWED BUILDING WATTS. Enter number into correct cell on NRCC-LTI-01, Page 2, Row 1
Check here if building contains both conditioned and unconditioned areas.
B. COMPLETE BUILDING METHOD LIGHTING POWER ALLOWANCE A B C D
TYPE OF BUILDING (From §140.6 Table 140.6-B) WATTS
PER (ft2) COMPLETE
BLDG. AREA ALLOWED
WATTS X =
Total Area:
Total Watts. Enter Total Watts into section A, row 1 (Above on this page)
C -1 AREA CATEGORY METHOD TOTAL LIGHTING POWER ALLOWANCES (C-2 plus C-3) Watts Total from section C-2 . Total from section C-3 .
Total Watts. Enter Total Watts into section A, row 2 (Above on this page) .
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
✔
39,486
39,486
Comp Bldg Auditorium 1.50 26,324 39,486
STATE OF CALIFORNIA
INDOOR LIGHTING POWER ALLOWANCE CEC-NRCC-LTI-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 2 of 4) Project Name: Date Prepared:
A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: CONDITIONED spaces UNCONDITIONED spaces
C -2 AREA CATEGORY METHOD GENERAL LIGHTING POWER ALLOWANCE Do not include portable lighting for offices. Portable lighting for offices shall be documented only in section B of NRCC-LTI-01-E. Separately list lighting for each primary function area as defined in §100.1 of the Standards.
A B C D AREA CATEGORY (From §140.6 Table 140.6-C) WATTS
PER (ft2) X AREA (ft2) ALLOWED
WATTS Location in Building Primary Function Area per Table 140.6-C =
TOTALS Enter sum total Area Category allowed watts into section C-1 of NRCC-LTI-03-E (this compliance form)
WATTS
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
0
0
✔
STATE OF CALIFORNIA
INDOOR LIGHTING POWER ALLOWANCE CEC-NRCC-LTI-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 3 of 4) Project Name: Date Prepared:
A separate page must be filled out for Conditioned and Unconditioned Spaces. This page is only for: CONDITIONED spaces UNCONDITIONED spaces
C-3 AREA CATEGORY METHOD Additional Lighting Wattage Allowance (from Table 140.6-C Footnotes) A B C 2 D E F G
Primary Function
Sq Ft or linear ft 1
Additional Watts
Allowed
Wattage Allowance
(B x C) Description(s) and Quantity of Special
Luminaire Types in each Primary Function Area Total Design
Watts 3
ALLOWED WATTS
Smaller of D or F
TOTALS – Enter into TOTAL AREA CATEGORY METHOD ADDITIONAL ALLOWANCES – Section C-1 .
1. Use linear feet only for additional allowance for white board or chalk board. All other additional Area Category allowances shall use watts per square foot. 2 . Additional watts are available only when allowed according to the footnotes on bottom of Table 146-C, which include: Specialized task work; Ornamental lighting;
Precision commercial and industrial work; Per linear foot of white board or chalk board; Accent, display and feature lighting; and Videoconferencing Studio lighting.. 3. Luminaire classification and wattage shall be determined in accordance with §130.0(c) of the Standards.
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
0
✔
STATE OF CALIFORNIA
INDOOR LIGHTING POWER ALLOWANCE CEC-NRCC-LTI-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTI-03-E Certificate of Compliance - Indoor Lighting Power Allowance (Page 4 of 4) Project Name: Date Prepared:
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:
Company: Signature Date:
Address: CEA Certification Identification (if applicable):
City/State/Zip: Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance
(responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of
Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance
documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the
enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name: Responsible Designer Signature:
Company : Date Signed:
Address: License:
City/State/Zip: Phone:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
C JONES
SANTA ROSA, CA 95407
3267 DUTTON AVE
SJ Cimino Electric Inc.
(707)542-6231
7/24/2015
7075426231
343802
SJ CIMINO
SJ CIMINO ELECTRIC INC
3267 DUTTON AVE
SANTA ROSA, CA 95407
STATE OF CALIFORNIA
OUTDOOR LIGHTING CEC-NRCC-LTO-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTO-01-E Outdoor Lighting (Page 1 of 4) Project Name: Date Prepared:
Project Address:
Total Illuminated Hardscape Area
General Information Phase of Construction: New Construction Addition Alteration
Outdoor Lighting Zone (OLZ) OLZ-1 OLZ-2 OLZ-3 OLZ-4 I have confirmed with the AHJ which OLZ applies to this site. For default lighting zone designations, see Title 24 Part 6, §10-114
LIGHTING COMPLIANCE DOCUMENTS (check box for each document included)
For detailed instructions on the use of this and all Energy Efficiency Standards compliance documents, refer to the Nonresidential Manual published by the California Energy Commission.
NRCC-LTO-01-E Certificate of Compliance
NRCC-LTO-02-E Outdoor Lighting Controls Certificate of Compliance
NRCC-LTO-03-E Outdoor Lighting Power Allowance Certificate of Compliance
Summary of Allowed Outdoor Lighting Power Watts
1. Sum Total ALLOWED Outdoor Lighting Wattage from NRCC-LTO-03-E, page 1 = Complies ONLY if Installed ≤ Allowed
2. Sum Total INSTALLED Outdoor lighting Wattage from NRCC-LTO-01-E, page 3
Declaration of Required Installation Certificates – Declare by checking all Installation Certificates that will be submitted. (Retain copies and verify forms are completed and signed.) NRCI-LTO-01-E - Must be submitted for all buildings NRCI-LTO-02-E - Must be submitted for a lighting control system, or for an Energy Management Control System (EMCS), to be recognized for compliance.
Field Inspector Field Inspector
Declaration of Required Certificates of Acceptance – Declare by checking all of the Certificates of Acceptance that will be submitted. (Retain copies and verify forms are completed and signed.) NRCA-LTO-02-A - Must be submitted for outdoor lighting controls. Field Inspector
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
38891 MISSION BLVD FREMONT, CA 94536
✔
✔
33,685
2,612
4,820
✔
✔
✔
✔
✔
✔
STATE OF CALIFORNIA
OUTDOOR LIGHTING CEC-NRCC-LTO-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTO-01-E Outdoor Lighting (Page 2 of 4) Project Name: Date Prepared:
Schedule of luminaires exempt from the outdoor lighting power requirements in §140.7 Name or Symbol Description of exempt luminaire in accordance with the exemptions Schedule of luminaires exempt from the cutoff requirements in §130.2(b) Name or Symbol Description of exempt luminaire in accordance with the exemptions Schedule of luminaires exempt from the outdoor lighting control requirements in §130.2(c) Name or Symbol Description of exempt luminaire in accordance with the exemptions
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
STATE OF CALIFORNIA
OUTDOOR LIGHTING CEC-NRCC-LTO-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTO-01-E Outdoor Lighting (Page 3 of 4) Project Name: Date Prepared:
A. OUTDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Luminaire Schedule Installed Watts Location Cutoff Field Inspector
A B C D E F G H I
Name or Item Tag Complete Luminaire Description
Watts per
Luminaire
How wattage was determined N
umber of
Luminaires
Total Installed W
atts in this area (C x E )
Primary Function area in which these luminaires are installed
BUG Rating
Pass
Fail
CEC Default from
NA8
According to §130.0(c)
INSTALLED WATTS PAGE TOTAL: Enter sum total of all pages (Sum Total INSTALLED Outdoor lighting wattage) into NRCC-LTO-01-E; Page 1
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
E
ALC
LBLA
EXTERIOR WALL FLUOR
6" LED DOWN LIGHTACCENT UP-LIGHTS MH
PEDESTRIAN BOLLARD LEDPARKING LOT LED LIGHT, POLE MT
40.011.070.0
25.0
4
68
201,326
160
66
560500
17 Automotive Hardscape
Automotive Hardscape
Automotive Hardscape
Building Facade
Building Facade
✔
✔
✔
✔
✔
2,612
78.0
2,612
STATE OF CALIFORNIA
OUTDOOR LIGHTING CEC-NRCC-LTO-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTO-01-E Outdoor Lighting (Page 4 of 4) Project Name: Date Prepared:
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:
Company: Signature Date:
Address: CEA Certification Identification (if applicable):
City/State/Zip: Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible
designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance
conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement
agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name: Responsible Designer Signature:
Company : Date Signed:
Address: License:
City/State/Zip: Phone:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2013
SJ CIMINO
SJ CIMINO ELECTRIC INC
3267 DUTTON AVE 343802
SANTA ROSA, CA 95407 7075426231
C JONES
SANTA ROSA, CA 95407
3267 DUTTON AVE
SJ Cimino Electric Inc.
(707)542-6231
7/24/2015
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
STATE OF CALIFORNIA
OUTDOOR LIGHTING CONTROLS CEC-NRCC-LTO-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTO-02-E Outdoor Lighting Controls (Page 1 of 3) Project Name: Date Prepared:
The NRCC-LTO-02-E shall be used to document all mandatory outdoor lighting controls that are applicable to the project. Mandatory Outdoor Lighting Control Declaration Statements Check all that apply: Lighting shall be controlled by self-contained lighting control devices which are certified to the Energy Commission according to the Title 20 Appliance
Efficiency Regulations in accordance with §110.9(a). Lighting shall be controlled by a lighting control system or energy management control system in accordance with §110.9. An Installation Certificate
shall be submitted in accordance with §130.4(b). All lighting controls and equipment shall comply with the applicable requirements in §110.9 and shall be installed in accordance with the manufacturer's
instructions in accordance with §130.1 Part-Night Outdoor Lighting Controls, as defined in Section 100.1(b), shall meet the requirements in Section 110.9(b)5 All outdoor incandescent luminaires rated over 100 watts, determined in accordance with Section 130.0(c), shall be controlled by a motion sensor. All outdoor luminaires rated for use with lamps greater than 150 lamp watts, determined in accordance with Section 130.0(c), shall comply with
Backlight, Uplight, and Glare (collectively referred to as "BUG") in accordance with Section 130.2(b) All installed outdoor lighting shall be controlled by a photocontrol or outdoor astronomical time-switch control in accordance with Section 130.2(c)1 All installed outdoor lighting shall be circuited and independently controlled from other electrical loads by an automatic scheduling control in
accordance with Section 130.2(c)2 All installed outdoor lighting, where the bottom of the luminaire is mounted 24 feet or less above the ground, shall be controlled with automatic
lighting controls in accordance with Section 130.2(c)3 For Outdoor Sales Frontage, Outdoor Sales Lots, and Outdoor Sales Canopies lighting, an automatic lighting control in accordance with Section
130.2(c)4 For Building Facade, Ornamental Hardscape and Outdoor Dining lighting, an automatic lighting control in accordance with Section 130.2(c)5 Before an occupancy permit is granted for a newly constructed building or area, or a new lighting system serving a building, area, or site is operated for
normal use, indoor lighting controls serving the building, area, or site shall be certified as meeting the Acceptance Requirements for Code Compliance in accordance with §130.4.(a). Outdoor lighting controls shall comply with the applicable requirements of Section 130.2(c) and Reference Nonresidential Appendix NA7.8
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
✔
✔
✔
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
STATE OF CALIFORNIA
OUTDOOR LIGHTING CONTROLS CEC-NRCC-LTO-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTO-02-E Outdoor Lighting Controls (Page 2 of 3) Project Name: Date Prepared:
MANDATORY OUTDOOR LIGHTING CONTROL SCHEDULE and FIELD INSPECTION CHECKLIST
Outdoor Lighting Control Schedule Standards Complying With
( all that apply, or enter ‘E’ if Exempted)
if Acceptance
Test Required
Field Inspector
A B C D E F G H I N O
Location and Application of Luminaires being controlled
Type/ Description of Lighting Control (i.e. motion sensor, photocontrol, outdoor
astronomical time-switch control, centralized time-based zone lighting
control)
# of
Units
§130.2(a)
§130.2(c)1
§130.2(c)2
§130.2(c)3
§130.2(c)4
§130.2(c)5
Pass
Fail
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
STATE OF CALIFORNIA
OUTDOOR LIGHTING CONTROLS CEC-NRCC-LTO-02-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTO-02-E Outdoor Lighting Controls (Page 3 of 3) Project Name: Date Prepared:
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:
Company: Signature Date:
Address: CEA Certification Identification (if applicable):
City/State/Zip: Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance
(responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of
Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance
documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the
enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name: Responsible Designer Signature:
Company : Date Signed:
Address: License:
City/State/Zip: Phone:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
343802
7075426231
C JONES
SANTA ROSA, CA 95407
3267 DUTTON AVE
SJ Cimino Electric Inc.
(707)542-6231
7/24/2015
SANTA ROSA, CA 95407
3267 DUTTON AVE
SJ CIMINO
SJ CIMINO ELECTRIC INC
STATE OF CALIFORNIA
OUTDOOR LIGHTING POWER ALLOWANCES CEC-NRCC-LTO-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTO-03-E Outdoor Lighting Power Allowances (Page 1 of 4) Project Name: Date Prepared:
A. OUTDOOR LIGHTING POWER ALLOWANCE SUMMARY 1. General Hardscape Lighting Power Allowance (Site Total from Section B of NRCC-LTO-03-E) 1. 2. Additional Specific “use it or lose it” Lighting Power Allowances listed in each of these cells shall be identical to total allowed watts determined in Section C-1 to C-4 of NRCC-LTO-03-E.
PER APPLICATION from Section C-1
+
PER UNIT LENGTH (SALES FRONTAGE)
from Section C-2 +
PER HARDSCAPE AREA (ORNAMENTAL LIGHTING)
from Section C-3 +
PER SPECIFIC AREA from Section C-4.
=
2. 3. Sum Total ALLOWED Outdoor Lighting Wattage (add rows 1 and 2) 3.
B. GENERAL HARDSCAPE LIGHTING POWER ALLOWANCE FROM TABLE 140.7-A
Area Wattage Allowance (AWA) Linear Wattage Allowance (LWA) Initial Wattage
Allowance (IWA)
Total General Hardscape Lighting Allowance
A B C D E F G H I
Name of area Illuminated
Hardscape Area
AWA Per
Square Foot AWA (B x C)
Perimeter Length of General Hardscape
LPA per
Linear Foot
LWA
(E x F)
IWA
(Watts)
D + G + H
TOTAL
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
0 0 0 226 2264,820
4,594
33,685 0.090 3,032 1,321 0.600 793 770 4,594
4,594
Parking Lot
STATE OF CALIFORNIA
OUTDOOR LIGHTING POWER ALLOWANCES CEC-NRCC-LTO-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTO-03-E Outdoor Lighting Power Allowances (Page 2 of 4) Project Name: Date Prepared:
C. ADDITIONAL “USE IT OR LOSE IT” OUTDOOR LIGHTING POWER ALLOWANCES FOR SPECIFIC APPLICATIONS
The additional specific outdoor lighting power allowance shall be the smaller of the allowed lighting power or the actual lighting power used. Use Outdoor Lighting Zone (OLZ) that is documented on page 1 of NRCC-LTO-01-E to calculate the specific wattage allowances.
C-1. WATTAGE ALLOWANCE PER APPLICATION – Table 140.7-B Available only for qualifying locations, which include Building Entrances or Exits; Primary Entrances to Senior Care Facilities, Police Stations, Hospitals, Fire Stations, and
Emergency Vehicle Facilities; Drive Up Windows; Vehicle Service Station Uncovered Fuel Dispenser If more than one luminaire type is used per location, use multiple rows for that location
A B C D E F G H I J
Name of Location for which allowance is
claimed
ALLOTTED WATTS DESIGN WATTS
Number of qualifying locations
Wattage Allowance per
qualifying location
Allotted Watts (B x C)
Luminaire Code or Symbol Luminaire Description
Luminaire Quantity
Watts per luminaire
Design Watts (G x H)
Allowed Watts (smaller of D or I)
Sum total allowance per application on this site:
C-2. WATTAGE ALLOWANCE PER UNIT LENGTH (Sales Frontage) from Table 140.7-B If more than one luminaire type is used per location, use multiple rows for that location
A B C D E F G H I J
Name of Location for which allowance is
claimed
ALLOTTED WATTS DESIGN WATTS
Linear feet of Sales Frontage
Wattage Allowance per
linear foot
Allotted Watts (B x C)
Luminaire Code or Symbol Luminaire Description
Luminaire Quantity
Watts per luminaire
Design Watts (G x H)
Allowed Watts (smaller of D or I)
Sum total allowance for sales frontage on the site:.
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
0
0
STATE OF CALIFORNIA
OUTDOOR LIGHTING POWER ALLOWANCES CEC-NRCC-LTO-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTO-03-E Outdoor Lighting Power Allowances (Page 3 of 4) Project Name: Date Prepared:
C-3. WATTAGE ALLOWANCE PER SQUARE FOOT OF HARDSCAPE AREA (Ornamental Lighting) – Table 140.7-B
Allowance for the total site illuminated hardscape area. Luminaires qualifying for this allowance shall be rated for 100 watts or less as determined in accordance with Section 130.0(c), and shall be post-top luminaires, lanterns, pendant luminaires, or chandeliers.
If more than one luminaire type is used per location, use multiple rows for that location A B C D E F G H I J
Name of area for which ornamental allowance is
claimed
ALLOTTED WATTS DESIGN WATTS
Square feet of Hardscape
Wattage Allowance per
square foot
Allotted Watts (B x C)
Luminaire Code or Symbol Luminaire Description
Luminaire Quantity
Watts per luminaire
Design Watts (G x H)
Allowed Watts (smaller of D or I)
Sum total allowance for ornamental lighting on the site:.
C-4. WATTAGE ALLOWANCE PER SQUARE FOOT OF SPECIFIC AREA - Table 140.7-B Allowances for Building Facades; Outdoor Sales Lots; Vehicle Service Station Hardscape; Vehicle Service Station Canopies; Sales Canopies; Non-sales Canopies; Guard Stations; Student Pick-up/Drop-off zone: Outdoor Dining; Special Security Lighting for Retail Parking and Pedestrian Hardscape. If more than one luminaire type is used per location, use multiple rows for that location
A B C D E F G H I J
Name of Location for which allowance is
claimed
ALLOTTED WATTS DESIGN WATTS
Illuminated Area of Application
Wattage Allowance per
square foot
Allotted Watts (B x C)
Luminaire Code or Symbol Luminaire Description
Luminaire Quantity
Watts per luminaire
Design Watts (G x H)
Allowed Watts (smaller of D or I)
Sum total allowance for specific area on the site:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
6" LED DOWN LIGHT
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
West Exterior StairwellRear EntranceFront Entrance
Est Exterior Stairwell 1,3441,344576576
0.3500.3500.3500.350
470470202202
EEAA
0
EXTERIOR WALL FLUOREXTERIOR WALL FLUOR
6" LED DOWN LIGHT
233
40.040.011.011.0
80803333
226
80803333
2
STATE OF CALIFORNIA
OUTDOOR LIGHTING POWER ALLOWANCES CEC-NRCC-LTO-03-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-LTO-03-E Outdoor Lighting Power Allowances (Page 4 of 4) Project Name: Date Prepared:
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:
Company: Signature Date:
Address: CEA Certification Identification (if applicable):
City/State/Zip: Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance
(responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of
Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance
documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the
enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name: Responsible Designer Signature:
Company : Date Signed:
Address: License:
City/State/Zip: Phone:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
SJ CIMINO
SJ CIMINO ELECTRIC INC
3267 DUTTON AVE 343802
SANTA ROSA, CA 95407 7075426231
GOLDEN GATE BAPTIST THEO SEMINARY 7/24/2015
C JONES
SANTA ROSA, CA 95407
3267 DUTTON AVE
SJ Cimino Electric Inc.
(707)542-6231
7/24/2015
STATE OF CALIFORNIA
MECHANICAL SYSTEMS CEC-NRCC-MCH-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC‐MCH‐01‐E Mechanical Systems (Page 1 of 3) Project Name: Date Prepared:
CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance June 2014
MECHANICAL COMPLIANCE FORMS & WORKSHEETS (check box if worksheet is included)
For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, refer to the 2013 Nonresidential Manual Note: The Enforcement Agency may require all forms to be incorporated onto the building plans.
YES NO Form/Worksheet # Title NRCC‐MCH‐01‐E (Part 1 of 3) Certificate of Compliance, Declaration. Required on plans for all submittals. NRCC‐MCH‐01‐E (Part 2 of 3) Certificate of Compliance, Required Acceptance Tests (MCH‐02A to 11A). Required on plans for all submittals. NRCC‐MCH‐01‐E (Part 3 of 3) Certificate of Compliance, Required Acceptance Tests (MCH‐12A to 18A). Required on plans where applicable. NRCC‐MCH‐02‐E (Part 1 of 2) Mechanical Dry Equipment Summary is required for all submittals with Central Air Systems. It is optional on plans. NRCC‐MCH‐02‐E (Part 2 of 2) Mechanical Wet Equipment Summary is required for all submittals with chilled water, hot water or condenser water
systems. It is optional on plans. NRCC‐MCH‐03‐E Mechanical Ventilation and Reheat is required for all submittals with multiple zone heating and cooling systems. It is
optional on plans.
MECHANICAL HVAC ACCEPTANCE FORMS (check box for required forms) Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for HVAC systems. The designer is required to check the applicable boxes for all acceptance tests that apply and list all equipment that requires an acceptance test. All equipment of the same type that requires a test, list the equipment description and the number of systems. Installing Contractor: The contractor who installed the equipment is responsible to either conduct the acceptance test them self or have a qualified entity run the test for them. If more than one person has responsibility for the acceptance testing, each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible. Enforcement Agency: Plancheck – The NRCC‐MCH‐01‐E form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. Inspector ‐ Before occupancy permit is granted all newly installed process systems must be tested to ensure proper operations.
Test Description MCH‐02A MCH‐03A MCH‐04A MCH‐05A MCH‐06A MCH‐07A MCH‐08A MCH‐09A MCH‐10A MCH‐11A Equipment Requiring Testing or Verification
# of units
Outdoor Air
Single Zone Unitary
Air Distribution
Ducts
Economizer Controls
Demand Control
Ventilation (DCV)
Supply Fan VAV
Valve Leakage Test
Supply Water Temp. Reset
Hydronic System
Variable Flow Control
Automatic Demand Shed
Control
Golden Gate Baptist Seminary 6/13/2015
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
Daikin REYQ144PBTJ
Daikin REYQ72PBTJ
3
2
STATE OF CALIFORNIA
MECHANICAL SYSTEMS CEC-NRCC-MCH-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC‐MCH‐01‐E Mechanical Systems (Page 2 of 3) Project Name: Date Prepared:
CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance June 2014
MECHANICAL HVAC ACCEPTANCE FORMS (check box for required forms) Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for HVAC systems. The designer is required to check the applicable boxes for all acceptance tests that apply and list all equipment that requires an acceptance test. All equipment of the same type that requires a test, list the equipment description and the number of systems. Installing Contractor: The contractor who installed the equipment is responsible to either conduct the acceptance test them self or have a qualified entity run the test for them. If more than one person has responsibility for the acceptance testing, each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible. The following tests require a Enforcement Agency: Plancheck – The NRCC‐MCH‐01‐E form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. Inspector ‐ Before occupancy permit is granted all newly installed process systems must be tested to ensure proper operations.
Test Description MCH‐12A MCH‐13A MCH‐14A MCH‐15A MCH‐16A MCH‐17A MCH‐18A Equipment Requiring Testing or Verification
# of units
Fault Detection & Diagnostics for DX
Units
Automatic Fault Detection &
Diagnostics for Air & Zone
Distributed Energy Storage DX AC
Systems
Thermal Energy Storage (TES)
Systems
Supply Air Temperature Reset
Controls
Condenser Water Reset Controls
ECMS
Golden Gate Baptist Seminary 6/13/2015
Daikin REYQ144PBTJ
Daikin REYQ72PBTJ
3
2
✔
✔
STATE OF CALIFORNIA
MECHANICAL SYSTEMS CEC-NRCC-MCH-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC‐MCH‐01‐E Mechanical Systems (Page 3 of 3) Project Name: Date Prepared:
CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance June 2014
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:
Company: Signature Date:
Address: CEA/ HERS Certification Identification (if applicable):
City/State/Zip: Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible
designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance
conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement
agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name: Responsible Designer Signature:
Company : Date Signed:
Address: License:
City/State/Zip: Phone:
Golden Gate Baptist Seminary 6/13/2015
Nicholas Donzelli
Green Air Heating & Air Conditioning Inc.
5153 C Commercial Circle
Concord, CA 94520
Philip Neumann
Mill Valley, CA 94941
193A W Blithedale
Philip Neumann Energy Design
650-630-4818
6/13/2015
925-28GREEN
STATE OF CALIFORNIA
HVAC SYSTEM REQUIREMENTS CEC-NRCC-MCH-02-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC‐MCH‐02‐E HVAC Dry System Requirements (Page 1 of 3)Project Name: Date Prepared:
CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance June 2014
Equipment Tags and System Description1
MANDATORY MEASURES T‐24 Sections Reference to the Requirements in the Contract Documents2
Heating Equipment Efficiency3 110.1 or 110.2(a)Cooling Equipment Efficiency3 110.1 or 110.2(a)HVAC or Heat Pump Thermostats 110.2(b), 110.2(c)Furnace Standby Loss Control 110.2(d)Low leakage AHUs 110.2(f)Ventilation4 120.1(b)Demand Control Ventilation5 120.1(c)4 Occupant Sensor Ventilation Control6 120.1(c)5, 120.2(e)3Shutoff and Reset Controls7 120.2(e)Outdoor Air and Exhaust Damper Control 120.2(f)Isolation Zones 120.2(g)Automatic Demand Shed Controls 120.2(h)Economizer FDD 120.2(i)Duct Insulation 120.4
PRESCRIPTIVE MEASURES
Equipment is sized in conformance with 140.4 (a & b)
140.4(a & b)Y/N Y/N Y/N
Supply Fan Pressure Control 140.4(c) Simultaneous Heat/Cool8 140.4(d)Economizer 140.4(e)Heat and Cool Air Supply Reset 140.4(f)Electric Resistance Heating9 140.4(g)Duct Leakage Sealing and Testing.10 140.4(l)Notes: 1. Provide equipment tags (e.g. AHU 1 to 10) and system description (e.g. Single Duct VAV reheat) as appropriate. Multiple units
with common requirements can be grouped together. 2. Provide references to plans (i.e. Drawing Sheet Numbers) and/or specifications (including Section name/number and relevant
paragraphs) where each requirement is specified. Enter "N/A" if the requirement is not applicable to this system. 3. The referenced plans and specifications must include all of the following information: equipment tag, equipment nominal
capacity, Title 24 minimum efficiency requirements, and actual rated equipment efficiencies. Where multiple efficiency requirements are applicable (e.g. full‐ and part‐load) include all. Where appliance standards apply (110.1), identify where equipment is required to be listed per Title 20 1601 et seq.
4. Identify where the ventilation requirements are documented for each central HVAC system. Include references to both central unit schedules and sequences of operation. If one or more space is naturally ventilated identify where this is documented in the plans and specifications. Multiple zone central air systems must also provide a MCH‐03‐E form.
5. If one or more space has demand controlled ventilation identify where it is specified including the sensor specifications and the sequence of operation.
6. If one or more space has occupant sensor ventilation control identify where it is specified including the sensor specifications and the sequence of operation
7. If the system is DDC identify the sequences for the system start/stop, optimal start, setback (if required) and setup (if required). For all systems identify the specification for the thermostats and time clocks (if applicable).
8. Identify where the heating, cooling and deadband airflows are scheduled for this system. Include a reference to the specification of the zone controls. Provide a MCH‐03‐E form.
9. Enter N/A if there is no electric heating. If the system has electric heating indicate which exception to 140.4(g) applies. 10. If duct leakage sealing and testing is required, a MCH‐04‐A form must be submitted.
Golden Gate Baptist Seminary 6/13/2015
Y Y Y
First Floor West Second Floor West First Floor East
STATE OF CALIFORNIA
HVAC SYSTEM REQUIREMENTS CEC-NRCC-MCH-02-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC‐MCH‐02‐E HVAC Dry System Requirements (Page 1 of 3)Project Name: Date Prepared:
CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance June 2014
Equipment Tags and System Description1
MANDATORY MEASURES T‐24 Sections Reference to the Requirements in the Contract Documents2
Heating Equipment Efficiency3 110.1 or 110.2(a)Cooling Equipment Efficiency3 110.1 or 110.2(a)HVAC or Heat Pump Thermostats 110.2(b), 110.2(c)Furnace Standby Loss Control 110.2(d)Low leakage AHUs 110.2(f)Ventilation4 120.1(b)Demand Control Ventilation5 120.1(c)4 Occupant Sensor Ventilation Control6 120.1(c)5, 120.2(e)3Shutoff and Reset Controls7 120.2(e)Outdoor Air and Exhaust Damper Control 120.2(f)Isolation Zones 120.2(g)Automatic Demand Shed Controls 120.2(h)Economizer FDD 120.2(i)Duct Insulation 120.4
PRESCRIPTIVE MEASURES
Equipment is sized in conformance with 140.4 (a & b)
140.4(a & b)Y/N Y/N Y/N
Supply Fan Pressure Control 140.4(c) Simultaneous Heat/Cool8 140.4(d)Economizer 140.4(e)Heat and Cool Air Supply Reset 140.4(f)Electric Resistance Heating9 140.4(g)Duct Leakage Sealing and Testing.10 140.4(l)Notes: 1. Provide equipment tags (e.g. AHU 1 to 10) and system description (e.g. Single Duct VAV reheat) as appropriate. Multiple units
with common requirements can be grouped together. 2. Provide references to plans (i.e. Drawing Sheet Numbers) and/or specifications (including Section name/number and relevant
paragraphs) where each requirement is specified. Enter "N/A" if the requirement is not applicable to this system. 3. The referenced plans and specifications must include all of the following information: equipment tag, equipment nominal
capacity, Title 24 minimum efficiency requirements, and actual rated equipment efficiencies. Where multiple efficiency requirements are applicable (e.g. full‐ and part‐load) include all. Where appliance standards apply (110.1), identify where equipment is required to be listed per Title 20 1601 et seq.
4. Identify where the ventilation requirements are documented for each central HVAC system. Include references to both central unit schedules and sequences of operation. If one or more space is naturally ventilated identify where this is documented in the plans and specifications. Multiple zone central air systems must also provide a MCH‐03‐E form.
5. If one or more space has demand controlled ventilation identify where it is specified including the sensor specifications and the sequence of operation.
6. If one or more space has occupant sensor ventilation control identify where it is specified including the sensor specifications and the sequence of operation
7. If the system is DDC identify the sequences for the system start/stop, optimal start, setback (if required) and setup (if required). For all systems identify the specification for the thermostats and time clocks (if applicable).
8. Identify where the heating, cooling and deadband airflows are scheduled for this system. Include a reference to the specification of the zone controls. Provide a MCH‐03‐E form.
9. Enter N/A if there is no electric heating. If the system has electric heating indicate which exception to 140.4(g) applies. 10. If duct leakage sealing and testing is required, a MCH‐04‐A form must be submitted.
Golden Gate Baptist Seminary 6/13/2015
Y Y
Second Floor East OA Tempered Area
STATE OF CALIFORNIA
HVAC SYSTEM REQUIREMENTS CEC-NRCC-MCH-02-E (Revised 06/13) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC‐MCH‐02‐E HVAC Wet System Requirements (Page 3 of 3)Project Name: Date Prepared:
CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance June 2014
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:
Company: Signature Date:
Address: CEA/ HERS Certification Identification (if applicable):
City/State/Zip: Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design
identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system
design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name: Responsible Designer Signature:
Company : Date Signed:
Address: License:
City/State/Zip: Phone:
Golden Gate Baptist Seminary 6/13/2015
Nicholas Donzelli
Green Air Heating & Air Conditioning Inc.
5153 C Commercial Circle
Concord, CA 94520
Philip Neumann
Mill Valley, CA 94941
193A W Blithedale
Philip Neumann Energy Design
650-630-4818
6/13/2015
925-28GREEN
STATE OF CALIFORNIA
MECHANICAL VENTILATION AND REHEAT CEC-NRCC-MCH-03-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC‐MCH‐03‐E Mechanical Ventilation & Reheat (Page 1 of 2) Project Name: Date Prepared:
CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance June 2014
ACTUAL DESIGN INFO (FROM EQUIPMENT SCHEDULES, ETC) AREA BASIS OCCUPANCY BASIS MINIMUM
VAV Reheated Primary Air CFM
VAV Deadband Primary Air CFM
A B C D E F G H I J K L M N O P Q R S T
ZONE/ SYSTEM
/ VA
V BOX TA
G
DESIG
N PRIM
ARY
COOLIN
G AIRFLO
W
(CFM)
DESIG
N PRIM
ARY
DEA
D‐BAN
D
AIRFLO
W (CFM
)
DESIG
N PRIM
ARY
HEA
TING AIRFLO
W
(CFM)
CNTRL TYPE D
DC
(Y/N)
TRANSFER
AIRFLO
W
(CFM)
CONDI‐TIO
NED
AREA
(ft 2)
MIN CFM
PER AREA
MIN CFM
BY AREA
NUM. O
F PEOPLE
CFM PER PERSO
N
MIN CFM
BY OCCU
‐PA
NT
REQ'D VEN
T AIRFLO
W
(MAX O
F I OR L)
(CFM)
COM‐PLIES
BASED
DESIG
N
PRIMARY CO
OLIN
G
AIR
(50% DDC,30%
NON‐DDC)
(CFM)
MAXIM
UM REH
EAT
CFM (M
AX OF M
OR O
)
COM‐PLIES?
AIR
(20% DDC, N
/A
NON‐DDC)
(CFM)
(larger of M or R,
N/A for N
ON‐
DDC)
(CFM)
COM‐PLIES
Yellow shaded cells require user input. Remaining cells are protected and automatic B. The largest amount of primary air supplied by the terminal unit when it's operating in the cooling mode. C. The smallest amount of primary air supplied by the terminal unit in the deadband mode. D. The largest amount of primary air supplied by the terminal unit when it's operating in the heating mode. E. A terminal unit can be controlled with DDC controls, or non‐DDC controls. Each control category has different reheat limitations in code. F. Transfer Air must be provided where Required Ventilation Airflow (Column M) is greater than the Design Primary Deadband Airflow (Column C). H. Minimum ventilation rate per Section §120.1. Table 120.1‐A. J. Based on number of fixed seats where applicable or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating. M. Required Ventilation Airflow (Req'd Ventilation Airflow) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column I or L) N. This column identifies whether or not the Design Primary Deadband Airflow complies or not. It compares the value in column M to the value in column C and column F. O. Design Primary Cooling Airflow * 0.50 for DDC, Design Primary Cooling Airflow * 0.30 for Non‐DDC. If the Design Primary Cooling Airflow is less than 300 cfm, then this is not applicable. P. Maximum of Column M and Column O. If the Design Primary Cooling Airflow is 300 cfm or less, then this is not applicable. Q. This column identifies whether or not the Design Primary Reheat Airflow at the zone level, complies or not. It compares the value in column P to the value in column D. R. Design Primary Cooling Airflow * 0.20 for DDC. Not applicable for Non‐DDC zones or zones where Design Primary Cooling Airflow is is 300 cfm or less. S. Maximum of Column M and Column R. Not applicable if the Design Primary Cooling Airflow is 300 cfm or less. T. This column identifies whether or not the Design Primary Deadband Airflow at the zone level, complies or not. It compares the value in column S to the value in column C.
Golden Gate Baptist Seminary 6/13/2015
Ground Floor West
Library Office & Research - Reading
North Offices
Conference Room
South Offices
Small Classroom
Large Classroom
Seminar Room
Vending Room
0
0
00
0
00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
00
0
0
0
0
606
98
305
248
320
206
369
266
582
Y
Y
Y
YY
Y
Y
YY
4,041
657
2,031
4962,131
5761,033
746388
0.150.15
0.15
0.500.15
0.000.00
0.00
1.50
606
98
305248
320
00
0
582
37.9
5.7
15.85.036.8
20.636.9
26.6
9.7
7.5
7.5
7.5
7.57.5
10.010.0
10.0
7.5
285
43Total
119
37276
Total
206369
26673
606
98
705
305
248
320872
206369
266
582
0
0
00
0
00
0
0
Y
Y
Y
Y
Y
Y
Y
Y
Y
606
98
305
248320
206369
266
582
YY
Y
YY
Y
YY
Y
0
0
0
0
0
00
0
0
606
98
305248
320
206369
266
582
Y
Y
Y
Y
Y
Y
Y
YY
STATE OF CALIFORNIA
MECHANICAL VENTILATION AND REHEAT CEC-NRCC-MCH-03-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC‐MCH‐03‐E Mechanical Ventilation & Reheat (Page 1 of 2) Project Name: Date Prepared:
CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance June 2014
ACTUAL DESIGN INFO (FROM EQUIPMENT SCHEDULES, ETC) AREA BASIS OCCUPANCY BASIS MINIMUM
VAV Reheated Primary Air CFM
VAV Deadband Primary Air CFM
A B C D E F G H I J K L M N O P Q R S T
ZONE/ SYSTEM
/ VA
V BOX TA
G
DESIG
N PRIM
ARY
COOLIN
G AIRFLO
W
(CFM)
DESIG
N PRIM
ARY
DEA
D‐BAN
D
AIRFLO
W (CFM
)
DESIG
N PRIM
ARY
HEA
TING AIRFLO
W
(CFM)
CNTRL TYPE D
DC
(Y/N)
TRANSFER
AIRFLO
W
(CFM)
CONDI‐TIO
NED
AREA
(ft 2)
MIN CFM
PER AREA
MIN CFM
BY AREA
NUM. O
F PEOPLE
CFM PER PERSO
N
MIN CFM
BY OCCU
‐PA
NT
REQ'D VEN
T AIRFLO
W
(MAX O
F I OR L)
(CFM)
COM‐PLIES
BASED
DESIG
N
PRIMARY CO
OLIN
G
AIR
(50% DDC,30%
NON‐DDC)
(CFM)
MAXIM
UM REH
EAT
CFM (M
AX OF M
OR O
)
COM‐PLIES?
AIR
(20% DDC, N
/A
NON‐DDC)
(CFM)
(larger of M or R,
N/A for N
ON‐
DDC)
(CFM)
COM‐PLIES
Yellow shaded cells require user input. Remaining cells are protected and automatic B. The largest amount of primary air supplied by the terminal unit when it's operating in the cooling mode. C. The smallest amount of primary air supplied by the terminal unit in the deadband mode. D. The largest amount of primary air supplied by the terminal unit when it's operating in the heating mode. E. A terminal unit can be controlled with DDC controls, or non‐DDC controls. Each control category has different reheat limitations in code. F. Transfer Air must be provided where Required Ventilation Airflow (Column M) is greater than the Design Primary Deadband Airflow (Column C). H. Minimum ventilation rate per Section §120.1. Table 120.1‐A. J. Based on number of fixed seats where applicable or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating. M. Required Ventilation Airflow (Req'd Ventilation Airflow) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column I or L) N. This column identifies whether or not the Design Primary Deadband Airflow complies or not. It compares the value in column M to the value in column C and column F. O. Design Primary Cooling Airflow * 0.50 for DDC, Design Primary Cooling Airflow * 0.30 for Non‐DDC. If the Design Primary Cooling Airflow is less than 300 cfm, then this is not applicable. P. Maximum of Column M and Column O. If the Design Primary Cooling Airflow is 300 cfm or less, then this is not applicable. Q. This column identifies whether or not the Design Primary Reheat Airflow at the zone level, complies or not. It compares the value in column P to the value in column D. R. Design Primary Cooling Airflow * 0.20 for DDC. Not applicable for Non‐DDC zones or zones where Design Primary Cooling Airflow is is 300 cfm or less. S. Maximum of Column M and Column R. Not applicable if the Design Primary Cooling Airflow is 300 cfm or less. T. This column identifies whether or not the Design Primary Deadband Airflow at the zone level, complies or not. It compares the value in column S to the value in column C.
Golden Gate Baptist Seminary 6/13/2015
Elevator Mechanical Room
Tempered OA Rooms
0
0
0
0
0
0
11
728
Y
Y
72
4,857
0.15
0.15
11
728
0.1
55.5
7.5
7.5
1
TotalTotal
417
Total
11
1,434
951
728
728
0
0
Y
Y
11
728
Y
Y
0
0
11
728
Y
Y
STATE OF CALIFORNIA
MECHANICAL VENTILATION AND REHEAT CEC-NRCC-MCH-03-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC‐MCH‐03‐E Mechanical Ventilation & Reheat (Page 2 of 2) Project Name: Date Prepared:
CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance June 2014
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:
Company: Signature Date:
Address: CEA/ HERS Certification Identification (if applicable):
City/State/Zip: Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible
designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance
conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement
agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name: Responsible Designer Signature:
Company : Date Signed:
Address: License:
City/State/Zip: Phone:
Golden Gate Baptist Seminary 6/13/2015
925-28GREEN
Philip Neumann
Mill Valley, CA 94941
193A W Blithedale
Philip Neumann Energy Design
650-630-4818
6/13/2015
Concord, CA 94520
5153 C Commercial Circle
Nicholas Donzelli
Green Air Heating & Air Conditioning Inc.
STATE OF CALIFORNIA
REQUIRED ACCEPTANCE TESTS CEC-NRCC-MCH-04-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC‐MCH‐04‐E Required Acceptance Tests (Page 1 of 3) Project Name: Date Prepared:
CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance June 2014
MECHANICAL COMPLIANCE FORMS & WORKSHEETS (indicate if worksheet is included)
For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, refer to the 2013 Nonresidential Manual Note: The Enforcement Agency may require all forms to be incorporated onto the building plans. Forms NRCC‐MCH‐04‐E and NRCC‐MECH‐05‐E are alternative forms to NRCC‐MCH‐01‐E, NRCC‐MCH‐02‐E and NRCC‐MCH‐03‐E for projects using only single zone packaged HVAC systems.
YES NO Form Title
NRCC‐MCH‐04‐E (1 of 2) Certificate of Compliance. Required on plans when used.
NRCC‐MCH‐04‐E (2 of 2) Mechanical Acceptance Tests. Required on plans when used.
NRCC‐MCH‐05‐E (1 of 2) HVAC Prescriptive Requirements. It is required on plans when used.
NRCC‐MCH‐05‐E (2 of 2) Mechanical SWH Equipment Summary is required for all submittals with service water heating, pools or spas. It is required on plans where applicable.
Golden Gate Baptist Seminary 6/13/2015
✔
✔
✔
✔
STATE OF CALIFORNIA
REQUIRED ACCEPTANCE TESTS CEC-NRCC-MCH-04-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC‐MCH‐04‐E Required Acceptance Tests (Page 2 of 3) Project Name: Date Prepared:
CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance June 2014
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency:
Systems Acceptance. Before occupancy permit is granted for a newly constructed building or space, or a new space‐conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance. Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. .
The NRCC‐MCH‐04‐E form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked‐off forms are required for ALL newly installed and replaced equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of Section 10‐103(b) and Title 24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy.
Test Description MCH‐02‐A MCH‐03‐A MCH‐04‐A MCH‐05‐A MCH‐06‐A MCH‐07‐A MCH‐11‐A MCH‐12‐A MCH‐14‐A MCH‐18‐A Test Performed By: Equipment Requiring Testing or Verification
# of units
Outdoor Air
Single Zone Unitary
Air Distribution Ducts
Economizer Controls
Demand Control Ventilation (DCV)
Supply Fan VAV
Automatic Demand Shed Control
FDD for Packaged DX Units
Distributed Energy Storage DX AC Systems
Energy Management Control System
Golden Gate Baptist Seminary 6/13/2015
✔
✔
✔
✔
Daikin REYQ144PBTJ
Daikin REYQ72PBTJ
3
2
STATE OF CALIFORNIA
REQUIRED ACCEPTANCE TESTS CEC-NRCC-MCH-04-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC‐MCH‐04‐E Required Acceptance Tests (Page 3 of 3) Project Name: Date Prepared:
CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance June 2014
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:
Company: Signature Date:
Address: CEA/ HERS Certification Identification (if applicable):
City/State/Zip: Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible
designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance
conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement
agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name: Responsible Designer Signature:
Company : Date Signed:
Address: License:
City/State/Zip: Phone:
Golden Gate Baptist Seminary 6/13/2015
Philip Neumann
Mill Valley, CA 94941
193A W Blithedale
Philip Neumann Energy Design
650-630-4818
6/13/2015
925-28GREENConcord, CA 94520
5153 C Commercial Circle
Nicholas Donzelli
Green Air Heating & Air Conditioning Inc.
STATE OF CALIFORNIA
REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS CEC-NRCC-MCH-05-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC‐MCH‐05‐E Requirements for Packaged Single‐Zone Units (Page 1 of 2) Project Name: Date Prepared:
CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance June 2014
Equipment Tag(s)1 MANDATORY MEASURES T‐24 Sections Requirement3 As Scheduled3 Requirement3 As Scheduled3 Requirement3 As Scheduled3 Heating Equipment Efficiency4 110.1 or 110.2(a) Cooling Equipment Efficiency4 110.1 or 110.2(a) Thermostats5 110.2(b), 110.2(c) Furnace Standby Loss Control6 110.2(d) Low Leakage AHU 110.2(f) Ventilation7 120.1(b) Demand Control Ventilation8 120.1(c)4 Occupant Sensor Ventilation Control8 120.1(c)5, 120.2(e)3 Shutoff and Reset Controls9 120.2(e) Outdoor Air and Exhaust Damper Control 120.2(f) Automatic Demand Shed Controls 120.2(h) Economizer FDD 120.2(i) Duct Insulation 120.4 PRESCRIPTIVE MEASURES Equipment is sized in conformance with 140.4 (a & b)
140.4(a & b)
Economizer 140.4(e) Electric Resistance Heating10 140.4(g) Duct Leakage Sealing and Testing.11 140.4(l) Notes: 1. Provide equipment tags (e.g. AC1 or AC1 to 10). Multiple units of the same make and model with the same application and accessories can be grouped together. 2. Enter the following information as appropriate: Unit Manufacturer; Unit Model Number (including all accessories); Description of the unit (e.g. gas‐pack or heat pump; rated heating capacity
(enter "N/A" if no heating); and, rated cooling capacity (enter "N/A" if no cooling). For unit capacities include the units (e.g. kBtuh or tons). 3. For each requirement, enter the minimum requirement from the Standard In the left column (under "Standard Requirement"). In the right column (under "As Scheduled") enter the value for
the units as specified. 4. Where there is more than one requirement (e.g. full and part load efficiency) enter both with the appropriate labels (e.g. COP and IEER). 5. In the left column identify the thermostatic requirements from the standard (e.g. programmable setback thermostat or heatpump with electric heat), . In the right column indicate the
capabilities of the thermostat as scheduled. 6. If the unit has a furnace which is rated at >=225,000 Btuh of capacity, indicate the rated standby loss and ignition source (e.g. IID). If there is no furnace or the unit is rated for <225,000 Btuh
indicate "N/A". 7. In the left column, enter both the required ventilation value from Table 120.1A and for the number of occupants times 15 cfm/person. In the right column enter the actual minimum
ventilation as scheduled. If the space is naturally ventilated enter "N/A" in the left column and "the space is naturally ventilated" in the right column. 8. If the space is required to have either DCV or Occupant Sensor Ventilation Control indicate "required" in the left column (otherwise indicate "N/A" in the left column). If either DCV or Occupant
Sensor Ventilation Control is provided indicate "provided" in the right column (otherwise indicate "N/A" in the right column) 9. In the left column indicate the required time controls from the standard. In the right column identify the device that provides this functionality (e.g. EMCS or programmable timeclock). 10. Enter N/A if there is no electric heating. If the system has electric heating indicate which exception to 140.4(g) applies. 11. If duct leakage sealing and testing is required, a MCH‐04‐A form must be submitted.
Golden Gate Baptist Seminary 6/13/2015
First Floor West Second Floor West First Floor East
12.4 kWn/aSetbackn/aNR705NR
ReqReqNRNR
12.4 kW11.0 kWSetback
none595No
Programmable SwitchAutonone
5.6 kWn/aSetbackn/aNR872NR
ReqReqNRNR
5.6 kW4.5 kWSetback
none1,279No
Programmable SwitchAutonone
12.4 kWn/aSetbackn/aNR1,434NR
ReqReqNRNR
12.4 kW11.0 kWSetback
none915No
Programmable SwitchAutonone
151,158 Btu/hrReqNo
139,221 Btu/hrNo EconomizerYes No
Req134,014 Btu/hr 71,230 Btu/hr
No EconomizerYes
89,117 Btu/hrReqNo
145,416 Btu/hrNo EconomizerYes
n/a
101,068 Btu/hr
none
144,012 Btu/hr
R-8
136,369 Btu/hr
R-8.0
72,006 Btu/hr
R-8
102,330 Btu/hr
R-8.0
144,012 Btu/hr
NR No NR No NR No
STATE OF CALIFORNIA
REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS CEC-NRCC-MCH-05-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC‐MCH‐05‐E Requirements for Packaged Single‐Zone Units (Page 1 of 2) Project Name: Date Prepared:
CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance June 2014
Equipment Tag(s)1 MANDATORY MEASURES T‐24 Sections Requirement3 As Scheduled3 Requirement3 As Scheduled3 Requirement3 As Scheduled3 Heating Equipment Efficiency4 110.1 or 110.2(a) Cooling Equipment Efficiency4 110.1 or 110.2(a) Thermostats5 110.2(b), 110.2(c) Furnace Standby Loss Control6 110.2(d) Low Leakage AHU 110.2(f) Ventilation7 120.1(b) Demand Control Ventilation8 120.1(c)4 Occupant Sensor Ventilation Control8 120.1(c)5, 120.2(e)3 Shutoff and Reset Controls9 120.2(e) Outdoor Air and Exhaust Damper Control 120.2(f) Automatic Demand Shed Controls 120.2(h) Economizer FDD 120.2(i) Duct Insulation 120.4 PRESCRIPTIVE MEASURES Equipment is sized in conformance with 140.4 (a & b)
140.4(a & b)
Economizer 140.4(e) Electric Resistance Heating10 140.4(g) Duct Leakage Sealing and Testing.11 140.4(l) Notes: 1. Provide equipment tags (e.g. AC1 or AC1 to 10). Multiple units of the same make and model with the same application and accessories can be grouped together. 2. Enter the following information as appropriate: Unit Manufacturer; Unit Model Number (including all accessories); Description of the unit (e.g. gas‐pack or heat pump; rated heating capacity
(enter "N/A" if no heating); and, rated cooling capacity (enter "N/A" if no cooling). For unit capacities include the units (e.g. kBtuh or tons). 3. For each requirement, enter the minimum requirement from the Standard In the left column (under "Standard Requirement"). In the right column (under "As Scheduled") enter the value for
the units as specified. 4. Where there is more than one requirement (e.g. full and part load efficiency) enter both with the appropriate labels (e.g. COP and IEER). 5. In the left column identify the thermostatic requirements from the standard (e.g. programmable setback thermostat or heatpump with electric heat), . In the right column indicate the
capabilities of the thermostat as scheduled. 6. If the unit has a furnace which is rated at >=225,000 Btuh of capacity, indicate the rated standby loss and ignition source (e.g. IID). If there is no furnace or the unit is rated for <225,000 Btuh
indicate "N/A". 7. In the left column, enter both the required ventilation value from Table 120.1A and for the number of occupants times 15 cfm/person. In the right column enter the actual minimum
ventilation as scheduled. If the space is naturally ventilated enter "N/A" in the left column and "the space is naturally ventilated" in the right column. 8. If the space is required to have either DCV or Occupant Sensor Ventilation Control indicate "required" in the left column (otherwise indicate "N/A" in the left column). If either DCV or Occupant
Sensor Ventilation Control is provided indicate "provided" in the right column (otherwise indicate "N/A" in the right column) 9. In the left column indicate the required time controls from the standard. In the right column identify the device that provides this functionality (e.g. EMCS or programmable timeclock). 10. Enter N/A if there is no electric heating. If the system has electric heating indicate which exception to 140.4(g) applies. 11. If duct leakage sealing and testing is required, a MCH‐04‐A form must be submitted.
Golden Gate Baptist Seminary 6/13/2015
Second Floor East OA Tempered Area
12.4 kWn/aSetbackn/aNR951NR
ReqReqNRNR
12.4 kW11.0 kWSetback
none951No
Programmable SwitchAutonone
5.6 kWn/aSetbackn/aNR728NR
ReqReqNRNR
5.6 kW4.5 kWSetback
none417No
Programmable SwitchAutonone
72,122 Btu/hrReqNo
145,844 Btu/hrNo EconomizerYes No
Req159,308 Btu/hr 70,313 Btu/hr
No EconomizerYes
R-8
101,558 Btu/hr
R-8.0
144,012 Btu/hr
R-8
102,489 Btu/hr
R-8.0
72,006 Btu/hr
NR No NR No
STATE OF CALIFORNIA
REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS CEC-NRCC-MCH-05-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC‐MCH‐05‐E Requirements for Packaged Single‐Zone Units (Page 2 of 2) Project Name: Date Prepared:
CA Building Energy Efficiency Standards ‐ 2013 Nonresidential Compliance June 2014
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:
Company: Signature Date:
Address: CEA/ HERS Certification Identification (if applicable):
City/State/Zip: Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible
designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance
conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement
agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name: Responsible Designer Signature:
Company : Date Signed:
Address: License:
City/State/Zip: Phone:
Golden Gate Baptist Seminary 6/13/2015
Nicholas Donzelli
Green Air Heating & Air Conditioning Inc.
5153 C Commercial Circle
Concord, CA 94520
Philip Neumann
Mill Valley, CA 94941
193A W Blithedale
Philip Neumann Energy Design
650-630-4818
6/13/2015
925-28GREEN
STATE OF CALIFORNIA
FAN POWER CONSUMPTION CEC-NRCC-MCH-07-E (Revised 07/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-07-E
Power Consumption of Fans Requirements (Page 1 of 2) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance July 2014
January 2014
Constant Volume Fans Systems
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Constant Volume Fan Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).
A B C D E F
FAN DESCRIPTION
DESIGN BRAKE HP
EFFICIENCY
NUMBER OF
FANS
PEAK WATTS B x E x 746 /
(C x D) MOTOR DRIVE
Variable Air Volume Fans Systems
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).
A B C D E F
FAN DESCRIPTION
DESIGN BRAKE HP
EFFICIENCY
NUMBER OF
FANS
PEAK WATTS B x E x 746 /
(C x D) MOTOR DRIVE
Totals and Adjustments
FILTER PRESSURE ADJUSTMENT Equation 140.4-A in §140.4(c) of the Building Energy Efficiency Standards. A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on Line 5. B) Calculate Fan Adjustment and enter on line 6. C) Calculate Adjusted Fan Power Index and enter on Row 7
1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUMN F)
W
2) SUPPLY DESIGN AIRFLOW CFM
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2)1
W/CFM
4) SPa in W.C
or Pa
5) SPf in W.C
or Pa
6) Fan Adjustment = 1-(SPa – 1)/SPf
7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1
W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 w/cfm for Constant Volume systems or 1.25 w/cfm for VAV systems.
187
3,435
0.054
0.021
0.000
100.0 %
100.0 %
FXAQ12MVJU
Exhaust Fan
85.5 %
85.5 %
0.021
0.000
85.5 %
85.5 %
100.0 %
100.0 %
112
0
6.0
1.0
4.0
1.0
75
0
FXAQ07MVJU
Exhaust Fan
Golden Gate Baptist Seminary 6/13/2015
STATE OF CALIFORNIA
FAN POWER CONSUMPTION CEC-NRCC-MCH-07-E (Revised 07/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-07-E
Power Consumption of Fans Requirements (Page 1 of 2) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance July 2014
January 2014
Constant Volume Fans Systems
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Constant Volume Fan Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).
A B C D E F
FAN DESCRIPTION
DESIGN BRAKE HP
EFFICIENCY
NUMBER OF
FANS
PEAK WATTS B x E x 746 /
(C x D) MOTOR DRIVE
Variable Air Volume Fans Systems
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).
A B C D E F
FAN DESCRIPTION
DESIGN BRAKE HP
EFFICIENCY
NUMBER OF
FANS
PEAK WATTS B x E x 746 /
(C x D) MOTOR DRIVE
Totals and Adjustments
FILTER PRESSURE ADJUSTMENT Equation 140.4-A in §140.4(c) of the Building Energy Efficiency Standards. A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on Line 5. B) Calculate Fan Adjustment and enter on line 6. C) Calculate Adjusted Fan Power Index and enter on Row 7
1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUMN F)
W
2) SUPPLY DESIGN AIRFLOW CFM
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2)1
W/CFM
4) SPa in W.C
or Pa
5) SPf in W.C
or Pa
6) Fan Adjustment = 1-(SPa – 1)/SPf
7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1
W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 w/cfm for Constant Volume systems or 1.25 w/cfm for VAV systems.
345
2,839
0.121
0.176
0.000
100.0 %
100.0 %
FXMQ24PVJU
Exhaust Fan
85.5 %
85.5 %
0.043
0.000
85.5 %
85.5 %
100.0 %
100.0 %
154
0
1.0
1.0
1.0
1.0
38
0
FXZQ12M7VJU
Exhaust Fan
Golden Gate Baptist Seminary 6/13/2015
STATE OF CALIFORNIA
FAN POWER CONSUMPTION CEC-NRCC-MCH-07-E (Revised 07/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-07-E
Power Consumption of Fans Requirements (Page 1 of 2) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance July 2014
January 2014
Constant Volume Fans Systems
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Constant Volume Fan Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).
A B C D E F
FAN DESCRIPTION
DESIGN BRAKE HP
EFFICIENCY
NUMBER OF
FANS
PEAK WATTS B x E x 746 /
(C x D) MOTOR DRIVE
Variable Air Volume Fans Systems
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).
A B C D E F
FAN DESCRIPTION
DESIGN BRAKE HP
EFFICIENCY
NUMBER OF
FANS
PEAK WATTS B x E x 746 /
(C x D) MOTOR DRIVE
Totals and Adjustments
FILTER PRESSURE ADJUSTMENT Equation 140.4-A in §140.4(c) of the Building Energy Efficiency Standards. A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on Line 5. B) Calculate Fan Adjustment and enter on line 6. C) Calculate Adjusted Fan Power Index and enter on Row 7
1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUMN F)
W
2) SUPPLY DESIGN AIRFLOW CFM
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2)1
W/CFM
4) SPa in W.C
or Pa
5) SPf in W.C
or Pa
6) Fan Adjustment = 1-(SPa – 1)/SPf
7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1
W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 w/cfm for Constant Volume systems or 1.25 w/cfm for VAV systems.
345
2,839
0.121
0.176 100.0 %FXMQ24PVJU 85.5 % 1541.0
Golden Gate Baptist Seminary 6/13/2015
STATE OF CALIFORNIA
FAN POWER CONSUMPTION CEC-NRCC-MCH-07-E (Revised 07/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-07-E
Power Consumption of Fans Requirements (Page 1 of 2) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance July 2014
January 2014
Constant Volume Fans Systems
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Constant Volume Fan Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).
A B C D E F
FAN DESCRIPTION
DESIGN BRAKE HP
EFFICIENCY
NUMBER OF
FANS
PEAK WATTS B x E x 746 /
(C x D) MOTOR DRIVE
Variable Air Volume Fans Systems
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).
A B C D E F
FAN DESCRIPTION
DESIGN BRAKE HP
EFFICIENCY
NUMBER OF
FANS
PEAK WATTS B x E x 746 /
(C x D) MOTOR DRIVE
Totals and Adjustments
FILTER PRESSURE ADJUSTMENT Equation 140.4-A in §140.4(c) of the Building Energy Efficiency Standards. A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on Line 5. B) Calculate Fan Adjustment and enter on line 6. C) Calculate Adjusted Fan Power Index and enter on Row 7
1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUMN F)
W
2) SUPPLY DESIGN AIRFLOW CFM
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2)1
W/CFM
4) SPa in W.C
or Pa
5) SPf in W.C
or Pa
6) Fan Adjustment = 1-(SPa – 1)/SPf
7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1
W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 w/cfm for Constant Volume systems or 1.25 w/cfm for VAV systems.
631
3,053
0.207
0.172
0.332
100.0 %
100.0 %
FXMQ18PVJU
FXMQ36PVJU
85.5 %
85.5 %
0.176
0.021
85.5 %
85.5 %
100.0 %
100.0 %
150
290
1.0
1.0
1.0
1.0
154
19
FXMQ24PVJU
FXAQ12MVJU
Golden Gate Baptist Seminary 6/13/2015
STATE OF CALIFORNIA
FAN POWER CONSUMPTION CEC-NRCC-MCH-07-E (Revised 07/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-07-E
Power Consumption of Fans Requirements (Page 1 of 2) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance July 2014
January 2014
Constant Volume Fans Systems
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Constant Volume Fan Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).
A B C D E F
FAN DESCRIPTION
DESIGN BRAKE HP
EFFICIENCY
NUMBER OF
FANS
PEAK WATTS B x E x 746 /
(C x D) MOTOR DRIVE
Variable Air Volume Fans Systems
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).
A B C D E F
FAN DESCRIPTION
DESIGN BRAKE HP
EFFICIENCY
NUMBER OF
FANS
PEAK WATTS B x E x 746 /
(C x D) MOTOR DRIVE
Totals and Adjustments
FILTER PRESSURE ADJUSTMENT Equation 140.4-A in §140.4(c) of the Building Energy Efficiency Standards. A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on Line 5. B) Calculate Fan Adjustment and enter on line 6. C) Calculate Adjusted Fan Power Index and enter on Row 7
1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUMN F)
W
2) SUPPLY DESIGN AIRFLOW CFM
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2)1
W/CFM
4) SPa in W.C
or Pa
5) SPf in W.C
or Pa
6) Fan Adjustment = 1-(SPa – 1)/SPf
7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1
W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 w/cfm for Constant Volume systems or 1.25 w/cfm for VAV systems.
631
3,053
0.207
0.021 100.0 %FXAQ12MVJU 85.5 % 191.0
Golden Gate Baptist Seminary 6/13/2015
STATE OF CALIFORNIA
FAN POWER CONSUMPTION CEC-NRCC-MCH-07-E (Revised 07/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-07-E
Power Consumption of Fans Requirements (Page 1 of 2) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance July 2014
January 2014
Constant Volume Fans Systems
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Constant Volume Fan Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).
A B C D E F
FAN DESCRIPTION
DESIGN BRAKE HP
EFFICIENCY
NUMBER OF
FANS
PEAK WATTS B x E x 746 /
(C x D) MOTOR DRIVE
Variable Air Volume Fans Systems
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).
A B C D E F
FAN DESCRIPTION
DESIGN BRAKE HP
EFFICIENCY
NUMBER OF
FANS
PEAK WATTS B x E x 746 /
(C x D) MOTOR DRIVE
Totals and Adjustments
FILTER PRESSURE ADJUSTMENT Equation 140.4-A in §140.4(c) of the Building Energy Efficiency Standards. A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on Line 5. B) Calculate Fan Adjustment and enter on line 6. C) Calculate Adjusted Fan Power Index and enter on Row 7
1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUMN F)
W
2) SUPPLY DESIGN AIRFLOW CFM
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2)1
W/CFM
4) SPa in W.C
or Pa
5) SPf in W.C
or Pa
6) Fan Adjustment = 1-(SPa – 1)/SPf
7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1
W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 w/cfm for Constant Volume systems or 1.25 w/cfm for VAV systems.
733
2,948
0.249
0.176
0.332
100.0 %
100.0 %
FXMQ24PVJU
FXMQ36PVJU
85.5 %
85.5 %
0.332 85.5 % 100.0 %
154
290
1.0
1.0
1.0 290FXMQ36PVJU
Golden Gate Baptist Seminary 6/13/2015
STATE OF CALIFORNIA
FAN POWER CONSUMPTION CEC-NRCC-MCH-07-E (Revised 07/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-07-E
Power Consumption of Fans Requirements (Page 1 of 2) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance July 2014
January 2014
Constant Volume Fans Systems
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Constant Volume Fan Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).
A B C D E F
FAN DESCRIPTION
DESIGN BRAKE HP
EFFICIENCY
NUMBER OF
FANS
PEAK WATTS B x E x 746 /
(C x D) MOTOR DRIVE
Variable Air Volume Fans Systems
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp of Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fans §140.4(c).
A B C D E F
FAN DESCRIPTION
DESIGN BRAKE HP
EFFICIENCY
NUMBER OF
FANS
PEAK WATTS B x E x 746 /
(C x D) MOTOR DRIVE
Totals and Adjustments
FILTER PRESSURE ADJUSTMENT Equation 140.4-A in §140.4(c) of the Building Energy Efficiency Standards. A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on Line 5. B) Calculate Fan Adjustment and enter on line 6. C) Calculate Adjusted Fan Power Index and enter on Row 7
1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUMN F)
W
2) SUPPLY DESIGN AIRFLOW CFM
3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2)1
W/CFM
4) SPa in W.C
or Pa
5) SPf in W.C
or Pa
6) Fan Adjustment = 1-(SPa – 1)/SPf
7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1
W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 w/cfm for Constant Volume systems or 1.25 w/cfm for VAV systems.
579
2,260
0.256
0.332 100.0 %FXMQ36PVJU 85.5 % 5792.0
Golden Gate Baptist Seminary 6/13/2015
STATE OF CALIFORNIA
FAN POWER CONSUMPTION CEC-NRCC-MCH-07-E (Revised 07/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-07-E
Power Consumption of Fans Requirements (Page 2 of 2) Project Name: Date Prepared:
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance July 2014
January 2014
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature:
Company: Signature Date:
Address: CEA/ HERS Certification Identification (if applicable):
City/State/Zip: Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design
identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system
design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
5. I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy.
Responsible Designer Name: Responsible Designer Signature:
Company : Date Signed:
Address: License:
City/State/Zip: Phone:
Golden Gate Baptist Seminary 6/13/2015
Nicholas Donzelli
Green Air Heating & Air Conditioning Inc.
5153 C Commercial Circle
Concord, CA 94520
Philip Neumann
Mill Valley, CA 94941
193A W Blithedale
Philip Neumann Energy Design
650-630-4818
6/13/2015
925-28GREEN
BUILDING ENERGY ANALYSIS REPORT
PROJECT:
Project Designer:
Report Prepared by:
Job Number:
Date: 7/24/15
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC – www.energysoft.com.
990 A Street, Suite KRussell Architects
San Rafael, Ca. 94901(415) 671-8892
38891 Mission Blvd.Golden Gate Baptist Theological Seminary (ENV)
Fremont, Ca.
45 Mitchell Blvd. #16Energy Calc Company
Chuck Clemons
San Rafael, Ca. 94903(415) 457-0990
0901GGB
ID: 0901GGBEnergyPro 6.7 by EnergySoft User Number: 1005
Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 1 of 14
Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015
Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06
A. PROJECT GENERAL INFORMATION
1. Project Location (city) Fremont 7. # of dwelling units 0
2. CA Zip Code 8. Compliance Software (version) EnergyPro 6.7
3. Climate Zone 3 9. Building Orientation (deg) (E) 50 deg
4. Total Conditioned Floor Area 19,868 ft2 10. Permitted Scope of Work NewEnvelope
5. Total Unconditioned Floor Area 0 ft2 11. Building Type(s) Nonresidential
6. # of Stories (Habitable Above Grade) 1
B. COMPLIANCE RESULTS FOR PERFORMANCE COMPONENTS § 140.1
BUILDING COMPLIES1. Energy Component 2. Standard Design (TDV) 3. Proposed Design (TDV) 4. Compliance Margin (TDV) 5. Percent Better than Standard
Space Heating 5.6 6.9 -1.3 -23.2%
Space Cooling 70.6 68.0 2.6 3.7%
Indoor Fans 36.0 34.6 1.4 3.9%
Heat Rejection -- -- -- --
Pumps & Misc. 0.5 0.6 -0.1 -20.0%
Domestic Hot Water -- -- -- --
Indoor Lighting 61.4 61.4 -- 0.0%
COMPLIANCE TOTAL 174.1 171.5 2.6 1.5%
Receptacle 67.6 67.6 0.0%
Process -- -- --
Process Ltg -- -- --
TOTAL 241.7 239.1 1.1%
Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 2 of 14
Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015
Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06
C. PRIORITY PLAN CHECK/ INSPECTION ITEMS (in order of highest to lowest TDV energy savings)
1st Space Cooling: Check envelope and mechanical Compliance Margin By Energy Component (from Table B column 4)
Space CoolingIndoor Fans
Heat RejectionDomestic Hot Water
Indoor LightingPumps & Misc.Space Heating
Penalty Energy Credit
2nd Indoor Fans: Check envelope and mechanical
3rd Heat Rejection: Check envelope and mechanical
4th Domestic Hot Water: Check mechanical
5th Indoor Lighting: Check lighting
6th Pumps & Misc.: Check mechanical
7th Space Heating: Check envelope and mechanical
D. EXCEPTIONAL CONDITIONS
The project shows partial compliance, using envelope-only compliance. The building must show either lighting and mechanical partial compliance or full new building compliance before operation.
The project shows partial compliance, either envelope only or mechanical only, excluding lighting systems. The building must show partial compliance including lighting or full new buildingcompliance or show prescriptive lighting compliance before operation
The aged solar reflectance and aged thermal emittance must be listed in the Cool Roof Rating Council database of certified products. For projects where initial reflectance is used, the initialreflectance must be listed, and the aged reflectance is calculated by the software program and used in the compliance model.
The building does not include service water heating. Verify that service water heating is not required and is not included in the design.
E. HERS VERIFICATION
This Section Does Not Apply
F. ADDITIONAL REMARKS
None Provided
Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 3 of 14
Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015
Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06
G. COMPLIANCE PATH & CERTIFICATE OF COMPLIANCE SUMMARY
Identify which building components use the performance or prescriptive path for compliance. “NA”= not in project
For components that utilize the performance path, indicate the sheet number that includes mandatory notes on plans.
Building Component Compliance Path Compliance Forms (required for submittal)Location of Mandatory Notes onPlans
Envelope
Performance NRCC-PRF-ENV-DETAILS (section of the NRCC-PRF-01-E)
Prescriptive NRCC-ENV-01 / 02 / 03 / 04 / 05 / 06-E
NA
Mechanical
Performance NRCC-PRF-MCH-DETAILS (section of the NRCC-PRF-01-E)
Prescriptive NRCC-MCH-01 / 02 / 03 / 04 / 05 / 06 / 07-E
NA
Domestic Hot Water
Performance NRCC-PRF-PLB-DETAILS (section of the NRCC-PRF-01-E)
Prescriptive NRCC-PLB-01-E
NA
Lighting (Indoor Conditioned)
Performance NRCC-PRF-LTI-DETAILS (section of the NRCC-PRF-01-E)
Prescriptive NRCC-LTI-01 / 02 / 03 / 04 / 05-E
NA
Covered Process:Commercial Kitchens
Performace S2 (section of the NRCC-PRF-01-E)
Prescriptive NRCC-PRC-01/ 03-E
NA
Covered Process:Computer Rooms
Performance S3 (section of the NRCC-PRF-01-E)
Prescriptive NRCC-PRC-01/ 04-E
NA
Covered Process:Laboratory Exhaust
Performace S4 (section of the NRCC-PRF-01-E)
Prescriptive NRCC-PRC-01/ 09-E
NA
Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 4 of 14
Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015
Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06
G. COMPLIANCE PATH & CERTIFICATE OF COMPLIANCE SUMMARY
The following building components are only eligible for prescriptive compliance. Indicate which arerelevant to the project.
The following building components may have mandatory requirements per Part 6. Indicatewhich are relevant to the project.
Yes NA Prescriptive Requirement Compliance Forms Yes NA Mandatory Requirement Compliance Forms
Lighting (IndoorUnconditioned) §140.6
NRCC-LTI-01 / 02 / 03 / 04 / 05-ECommissioning: §120.8
Simple SystemsComplex Systems
NRCC-CXR-01 / 02 / 03 / 05-ENRCC-CXR-01 / 02 / 04 / 05-E
Lighting (Outdoor) §140.7 NRCC-LTO-01 / 02 / 03-E Electrical: §130.5 NRCC-ELC-01-E
Lighting (Sign) §140.8 NRCC-LTS-01-E Solar Ready: §110.10 NRCC-SRA-01 / 02-E
Solar Thermal WaterHeating: §140.5
NRCC-STH-01-E
Covered Process: §120.6Parking Garage
Commercial RefrigerationWarehouse Refrigeration
Compressed AirProcess Boilers
NRCC-PRC-01-ENRCC-PRC-02-ENRCC-PRC-05-ENRCC-PRC-06/07/08-ENRCC-PRC-10-ENRCC-PRC-11-E
Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 5 of 14
Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015
Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06
H. CERTIFICATE OF INSTALLATION, CERTIFICATE OF ACCEPTANCE & CERTIFICATE OF VERIFICATION SUMMARY (NRCI/NRCA/NRCV) –Documentation Author to indicate which Certificates must be submitted for the features to be recognized for compliance(Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify).See Tables G. and H. in MCH and LTI Details Sections for Acceptance Tests and forms by equipment.
Confirmed
Building Component Compliance Forms (required for submittal) Pass Fail
Envelope NRCI-ENV-01-E - For all buildings
NRCA-ENV-02-F- NFRC label verification for fenestration
Mechanical
NRCI-MCH-01-E - For all buildings with Mechanical Systems
NRCA-MCH-02-A- Outdoor Air
NRCA-MCH-03-A – Constant Volume Single Zone HVAC
NRCA-MCH-04-H- Air Distribution Duct Leakage
NRCA-MCH-05-A- Air Economizer Controls
NRCA-MCH-06-A- Demand Control Ventilation
NRCA-MCH-07-A – Supply Fan Variable Flow Controls
NRCA-MCH-08-A- Valve Leakage Test
NRCA-MCH-09-A – Supply Water Temp Reset Controls
NRCA-MCH-10-A- Hydronic System Variable Flow Controls
NRCA-MCH-11-A – Auto Demand Shed Controls
NRCA-MCH-12-A- Packaged Direct Expansion Units
NRCA-MCH-13-A- Air Handling Units and Zone Terminal Units
NRCA-MCH-14-A- Distributed Energy Storage
NRCA-MCH-15-A – Thermal Energy Storage
NRCA-MCH-16-A- Supply Air Temp Reset Controls
NRCA-MCH-17-A – Condensate Water Temp Reset Controls
NRCA-MCH-18-A- Energy Management Controls Systems
NRCV-MCH-04-H- Duct Leakage Test
Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 6 of 14
Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015
Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06
H. CERTIFICATE OF INSTALLATION, CERTIFICATE OF ACCEPTANCE & CERTIFICATE OF VERIFICATION SUMMARY (NRCI/NRCA/NRCV) –Documentation Author to indicate which Certificates must be submitted for the features to be recognized for compliance(Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify).See Tables G. and H. in MCH and LTI Details Sections for Acceptance Tests and forms by equipment.
Confirmed
Building Component Compliance Forms (required for submittal) Pass Fail
Plumbing
NRCI-PLB-01-E - For all buildings with Plumbing Systems
NRCI-PLB-02-E - required on central systems in high‐rise residential, hotel/motel application.
NRCI-PLB-03-E - Single dwelling unit systems in high‐rise residential, hotel/motel application.
NRCI-PLB-21-E - HERS verified central systems in high‐rise residential, hotel/motel application.
NRCI-PLB-22-E - HERS verified single dwelling unit systems in high‐rise residential, hotel/motel application.
NRCV-PLB-21-H- HERS verified central systems in high‐rise residential, hotel/motel application.
NRCV-PLB-22-H - HERS verified single dwelling unit systems in high‐rise residential, hotel/motel application.
NRCI-STH-01-E - Any solar water heating
Indoor Lighting
NRCI-LTI-01-E - For all buildings
NRCI-LTI-02-E - Lighting control system, or for an Energy Management Control System (EMCS)
NRCI-LTI-03-E - Line-voltage track lighting integral current limiter, or for a supplementary overcurrent protection panel used toenergize only line-voltage track lighting
NRCI-LTI-04-E - Two interlocked systems serving an auditorium, a convention center, a conference room, or a theater
NRCI-LTI-05-E - Lighting Control Credit Power Adjustment Factor (PAF)
NRCI-LTI-06-E - Additional wattage installed in a video conferencing studio
NRCA-LTI-02-A - Occupancy sensors and automatic time switch controls.
NRCA-LTI-03-A - Automatic daylighting controls
NRCA-LTI-04-A - Demand responsive lighting controls
Outdoor Lighting
NRCI-LTO-01-E – Outdoor Lighting
NRCI-LTO-02-E- EMCS Lighting Control System
NRCA-LTO-02-A - Outdoor Lighting Control
Sign Lighting NRCI-LTS-01-E – Sign Lighting
Electrical NRCI-ELC-01-E - Electrical Power Distribution
Photovoltaic NRCI-SPV-01-E Photovoltaic Systems
Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 7 of 14
Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015
Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06
H. CERTIFICATE OF INSTALLATION, CERTIFICATE OF ACCEPTANCE & CERTIFICATE OF VERIFICATION SUMMARY (NRCI/NRCA/NRCV) –Documentation Author to indicate which Certificates must be submitted for the features to be recognized for compliance(Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify).See Tables G. and H. in MCH and LTI Details Sections for Acceptance Tests and forms by equipment.
Confirmed
Building Component Compliance Forms (required for submittal) Pass Fail
Covered Process
NRCI-PRC-01-E Refrigerated Warehouse
NRCA-PRC-01-F- Compressed Air Systems
NRCA-PRC-02-F- Kitchen Exhaust
NRCA-PRC-03-F- Garage Exhaust
NRCA-PRC-04-F- Refrigerated Warehouse- Evaporator Fan Motor Controls
NRCA-PRC-05-F- Refrigerated Warehouse- Evaporative Condenser Controls
NRCA-PRC-06-F- Refrigerated Warehouse- Air Cooled Condenser Controls
NRCA-PRC-07F- Refrigerated Warehouse- Variable Speed Compressor
NRCA-PRC-08-F- Electrical Resistance Underslab Heating System
I. ENVELOPE GENERAL INFORMATION (See NRCC-PRF-ENV-DETAILS for more information)
1. Total Conditioned Floor Area 19,868 ft2 5. Number of Floors Above Grade 1 Confirmed
2. Total Unconditioned Floor Area 0 ft2 6. Number of Floors Below Grade 0
Pass
Fail
3. Addition Conditioned Floor Area 0 ft2
4. Addition Unconditioned Floor Area 0 ft2
7. Opaque Surfaces & Orientation 8. Total Gross Surface Area 9. Total Fenestration Area 10. Window to Wall Ratio
North Wall 1,520 ft2 414 ft2 27.2%
East Wall 4,872 ft2 2,210 ft2 45.4%
South Wall 1,520 ft2 414 ft2 27.2%
West Wall 5,184 ft2 2,076 ft2 40.0%
Total 13,096 ft2 5,114 ft2 39.0%
Roof 10,377 ft2 0 ft2 00.0%
Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 8 of 14
Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015
Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06
J. FENESTRATION ASSEMBLY SUMMARY § 110.6 Confirmed
1. 2. 3. 4. 5. 6. 7. 8. 9. Pass
FailFenestration Assembly Name /Tag or I.D.
Fenestration Type Certification Method1 Assembly Method Area ft2OverallU-factor
OverallSHGC
OverallVT
Status2
Milgard Low-E Vinyl VerticalFenestration NFRCRated Manufactured 3382 0.36 0.32 0.50 N
NFRC Curtain Wall VerticalFenestration NFRCRated Manufactured 1732 0.38 0.35 0.63 N1 Newly installed fenestration shall have a certified NFRC Label Certificate or use the CEC default tables found in Table 110.6-A and Table 110.6-B. Site-built fenestration less than 1,000 ft2, or more than or equal to 1,000 ft2 see Reference NonresidentialAppendix NA6.2 Status: N - New, A – Altered, E – Existing
Taking compliance credit for fenestration shading devices? (if "Yes", see NRCC-PRF-ENV-DETAILS for more information)
K. OPAQUE SURFACE ASSEMBLY SUMMARY § 120.7/ § 140.3 Confirmed
1. 2. 3. 4. 5. 6. 7. 8. Pass
Fail
Surface Name Surface Type Area (ft2)FramingType
CavityR-Value
ContinuousR-Value
U-Factor / F-Factor/ C-Factor
Status1
R-30 Roof4 Roof 10377 NA 0 30 U-Factor: 0.031 N
R-19 Wall6 ExteriorWall 13096 Wood 19 NA U-Factor: 0.072 N
Slab On Grade21 UndergroundFloor 10377 NA 0 NA F-Factor: 0.730 N
R-0 Floor No Crawlspace34 InteriorFloor 9551 NA 0 NA U-Factor: 0.220 N1 Status: N - New, A – Altered, E – Existing
L. ROOFING PRODUCT SUMMARY § 140.3 Confirmed
1. 2. 3. 4. 5. 6. 7. Pass
Fail
Product Type Product ≥25 lb ft2Aged SolarReflectance
ThermalEmittance
SRICool RoofCredit
CRRC Product ID Number
R-30 Roof4 No 0.68 0.84 Not Provided Yes CRRC Prod. ID: R-30 Roof
M. HVAC SYSTEM SUMMARY (see NRCC-PRF-MCH-DETAILS for more information)
This Section Does Not Apply
N. ECONOMIZER & FAN SYSTEMS SUMMARY1 § 140.4
This Section Does Not Apply
Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 9 of 14
Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015
Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06
1 Mechanical ventilation calculations and exhaust fans are included in the NRCC-PRF-MCH-DETAILS section
O. EQUIPMENT CONTROLS § 120.2
This Section Does Not Apply
P. SYSTEM DISTRIBUTION SUMMARY § 120.4/ § 140.4(i)
This Section Does Not Apply
Multifamily or Hotel/ Motel Occupancy? (if "Yes", see NRCC-PRF-MCH-DETAILS for DHW system information) No
Q. INDOOR CONDITIONED LIGHTING GENERAL INFO (see NRCC-PRF-LTI-DETAILS for more info)
This Section Does Not Apply
R. INDOOR CONDITIONED LIGHTING SCHEDULE (Adapted from NRCC-LTI-01-E)1 § 130.0
This Section Does Not Apply1If lighting power densities were used in the compliance model Building Departments will need to check prescriptive forms for Luminaire Schedule details.
S1. COVERED PROCESS SUMMARY – ENCLOSED PARKING GARAGES § 140.9
This Section Does Not Apply
S2. COVERED PROCESS SUMMARY – COMMERCIAL KITCHENS § 140.9
This Section Does Not Apply
S3. COVERED PROCESS SUMMARY – COMPUTER ROOMS § 140.9
This Section Does Not Apply
S4. COVERED PROCESS SUMMARY – LABORATORY EXHAUSTS § 140.9
This Section Does Not Apply
T. UNMET LOAD HOURS
This Section Does Not Apply
Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 10 of 14
Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015
Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06
U. ENERGY USE SUMMARY
Electric(kWh/yr)
Natural Gas(therms/yr)
Total Annual Baseline 155337 599.865
Total Annual Proposed 153613 756.915
Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 11 of 14
Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015
Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT § 10-103
I certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name: Chuck ClemonsSignature:
Company: Energy Calc Company
Address: 45 Mitchell Blvd. #16 Signature Date:
City/State/Zip: San Rafael Ca. 94903 CEA Identification (If applicable):
Phone: (415) 457-0990
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I amlicensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
2I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section 5537.2 or 6737.3 to sign this document as the person responsible for itspreparation; and that I am a licensed contractor performing this work.
3I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant toBusiness and Professions Code Sections 5537, 5538 and 6737.1.
Responsible Envelope Designer Name:Signature:
Company: Russell Architects
Address: 990 A Street, Suite K Date Signed:
City/State/Zip: San Rafael Ca. 94901 Declaration Statement Type:
Phone: (415) 671-8892 Title: License #:
Responsible Lighting Designer Name:Signature:
Company:
Address: Date Signed:
City/State/Zip: Declaration Statement Type:
Phone: Title: License #:
Responsible Mechanical Designer Name: - specify -Signature:
Company:
Address: Date Signed:
City/State/Zip: Declaration Statement Type:
Phone: Title: License #:
Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 12 of 14
Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015
Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06
NRCC-PRF-ENV-DETAILS -SECTION START-
A. OPAQUE SURFACE ASSEMBLY DETAILS Confirmed
1. 2. 3. 4. Pass
Fail
Surface Name Surface Type Description of Assembly Layers Notes
R-30 Roof4 Roof
Built-up roofing - 3/8 in.Plywood - 1/2 in.
Air - Cavity - Wall Roof Ceiling - 4 in. or moreMetal Deck - 1/16 in.
Extruded Polystyrene - XPS - 6 in. R30.00
R-19 Wall6 ExteriorWall
Stucco - 7/8 in.Vapor permeable felt - 1/8 in.
Wood framed wall, 16in. OC, 5.5in., R-19Gypsum Board - 1/2 in.
Slab On Grade21 UndergroundFloor
R-0 Floor No Crawlspace34 InteriorFloorPlywood - 1/2 in.Carpet - 3/4 in.
B. OVERHANG DETAILS (Adapted from NRCC-ENV-02-E)
This Section Does Not Apply
C. OPAQUE DOOR SUMMARY Confirmed
1. 2. 3. 4. 5.
Pass FailOpaque Door Assembly Name / Tagor I.D.
Door Type Certification Method Operation Overall U-factor
NRCC-PRF-MCH-DETAILS -SECTION START-
A. MECHANICAL VENTILATION AND REHEAT (Adapted from 2013-NRCC-MCH-03-E)
This Section Does Not Apply
B. ZONAL SYSTEM AND TERMINAL UNIT SUMMARY
This Section Does Not Apply
Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 13 of 14
Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015
Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06
C. EXHAUST FAN SUMMARY
This Section Does Not Apply
D. DHW EQUIPMENT SUMMARY – (Adapted from NRCC-PLB-01)
This Section Does Not Apply
E. MULTI-FAMILY CENTRAL DHW SYSTEM DETAILS
This Section Does Not Apply
F. SOLAR HOT WATER HEATING SUMMARY (Adapted from NRCC-STH-01)
This Section Does Not Apply
G. MECHANICAL HVAC ACCEPTANCE TESTS & FORMS (Adapted from 2013-NRCC-MCH-01-E) § RA4
This Section Does Not Apply
NRCC-PRF-LTI-DETAILS -SECTION START-
A. INDOOR CONDITIONED LIGHTING CONTROL CREDITS (Adapted from NRCC-LTI-02-E) § 140.6
This Section Does Not Apply
B. INDOOR CONDITIONED LIGHTING MANDATORY LIGHTING CONTROLS (Adapted from NRCC-LTI-02-E) § 130.1
This Section Does Not Apply
C. TAILORED METHOD LIGHTING POWER ALLOWANCE SUMMARY AND CHECKLIST (Adapted from NRCC-LTI-04-E) § 140.6
This Section Does Not Apply
D. GENERAL LIGHTING POWER (Adapted from NRCC-LTI-04-E) § 140.6-D
This Section Does Not Apply
E. GENERAL LIGHTING FROM SPECIAL FUNCTION AREAS (Adapted from NRCC-LTI-04-E) § 140.6(c) 3H
This Section Does Not Apply
Project Name: Golden Gate Baptist Theological Seminary NRCC-PRF-01-E Page 14 of 14
Project Address: 38891 Mission Blvd. Fremont Calculation Date/Time: 07:50, Fri, Jul 24, 2015
Compliance Scope: NewEnvelope Input File Name: 0901GGB.xml
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-09012015-760 Report Generated at: 2015-07-24 07:51:06
F. ROOM CAVITY RATIO (Adapted from NRCC-LTI-04-E)
This Section Does Not Apply
G. ADDITIONAL "USE IT OR LOSE IT" (Adapted from NRCC-LTI-04-E)
This Section Does Not Apply
H. INDOOR & OUTDOOR LIGHTING ACCEPTANCE TESTS & FORMS (Adapted from NRCC-LTI-01-E and NRCC-LTO-01-E) § 130.4
This Section Does Not Apply
ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV-MM Project Name Date
DESCRIPTION Building Envelope Measures:
§110.8(a):Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4, Article 3.
§110.8(c):All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2.
§110.8(f):The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R-value of no less than R-13 between framing members.
§110.7(a):All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed.
§110.6(a):Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.² of window area, 0.3 cfm/ft.² of door area for residential doors, 0.3 cfm/ft.² of door area for nonresidential single doors (swinging and sliding), and 1.0 cfm/ft.² for nonresidential double doors (swinging).
§110.6(a): Fenestration U-factor shall be rated in accordance with NFRC 100, or the applicable default U-factor.
§110.6(a) :Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site-built fenestration, or the applicable default SHGC.
§110.6(b):Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors).