GROUP MEMBERS:
MELVIN LIMVOON SZE LUN
JAKE SIA ERVING TIONG
SHEILA ANN
Building EconomicsGroup Presentation
Land Parcel @ Cecil Telok Ayer Street
20-storey office floors, 3 commercial floors and 1 underground basement floors.
Total GFA of overall project 77,162 m2
100 m2 F&B Kiosk located at Open Space area.
Pedestrian walkway is constructed to connect plot A1 with A2
Project Brief
1.
Project Brief
2.Site Plan
Perspective
3.
Side ElevationFront Elevation
Cost Plan
4.
DescriptionPercentage (%) Contract Sum (RM)
Preliminaries 10.0% 35,485,540.00
Architecture & Finishes Works 30.0% 106,456,620.00
Structural Cost 28.0% 99,359,512.00
M & E Works 24.0% 85,165,296.00
External Work 3.0% 10,645,662.00
Green certification 5.0% 17,742,770.00
TOTAL 100.0% 354,855,400.00
Benchmark Project
5.
Project : Kuala Lumpur Petronas Twin Towers Location : Kuala Lumpur City CentreTotal Gross Development Cost : RM7.05billionGross Floor Area : 1,672,254.72 m2Unit Cost per m2 : RM4,215.86 /m2Green Re Rating : Gold
Benchmark Project
6.
Green Features
i. Storm water designKLCC has retention tank basin with water treatment system which able to clean the debris from the rainwater and allow them flow back into the ground.
ii. Light Pollution ReductionKLCC has reduced exterior lighting to prevent the light sent up into the sky. This is better for the nocturnal animal and also better stars view in the sky.
Benchmark Project
7.
iii. Lighting System Design and ControllabilityThe light in KLCC is controlled by occupancy sensors and daylight sensors. When the surrounding is filled with sunlight, the light will turn off automatically.
iv. Low Impact Cleaning & Maintenance EquipmentKLCC cleaning department only use environmentally –friendly cleaning equipments to keep the air clean and fresh.
Green Features
Parameters
8.
Source
9.
10.
Parameters
Cost Appraisal
11.
Proposed MaterialsInternal Doors
INTERNAL DOORSGLAZINGGLASS IN OPENINGSClear float glass as specified6mm Thick to metal rebates with glazing compound0.50m2 – 1.0m2
RM 65 per m2
12.
Proposed MaterialsGlass Wall
INTERNAL WALLS & PARTITIONSGLAZINGGLASS IN OPENINGSClear float glass as specified6mm Thick to metal rebates with glazing compoundOver 1.00m2
RM 67 per m2 13.
Carpet
INTERNAL FLOOR FINISHESFLOOR, WALL AND CEILING FINISHINGSFLOORFitted CarpetingApproved carpet tile synthetic fibre heavy duty 500mm x 500mm multi level texture loop pile 780gm/m2 including adhesive to PVC fibre glass reinforcement backing and all joint thermo welded to form a seemless flooring all in accordance with manufacturer's instruction to floor
RM 80 per m2
Proposed MaterialsFloor Finishes
14.
Semi-glazed ceramic tiles = RM 95.80/m2
Proposed MaterialsFloor Finishes
15.
Roller Shutter = RM 3606.10/No.
Proposed MaterialsRoller Shutter
16.
Proposed MaterialsPark Furniture
Floral Patio Garden Park Bench
RM 439.00
Basic Outdoor Patio Park Bench
RM 439.0017.
RM 536.00 RM 4591.30
Proposed MaterialsPark Furniture
18.
Softscape (Plant)
TURFING AND SOFT LANDSCAPINGFENCING, TURFING AND PLANTINGPLANTINGSupply, plant and maintain as specified, the following landscaping work as shown in the drawingTreeBauhinia Purpurea; 75mm diameter x 2.00m height.
RM 258.31 per number of tree
Proposed MaterialsSoftscapes
19.
Softscape (Turve)
TURFING AND SOFT LANDSCAPINGFENCING, TURFING AND PLANTINGSEEDING AND TURFINGClose Turfing225mm x 225mm approved cow grass turves as specified obtained from Contractor's own source; trimming, levelling and grading surfaces; 50mm thick top soil as specified, watering and tendering until well established; replacing badly grow turves to slopes and embankments
RM6 per m2
Proposed MaterialsSoftscapes
20.
Proposed MaterialsWater Features
7.3JF 3 Phase Lake and Pond Aerating Fountai0n
RM 36,543.74
• Multiple patterns in one unit
• Efficient/low power use
• Clog resistant
• Rugged motor: environmentally friendly design with a hard-face internal mechanical seal and external lip seal for protection against leaks; seals are silicone carbide for long life; long-life top and bottom ball bearings; flood oil lubricated for excellent heat dissipation
• Corrosion resistant: superior all external metal motor, float, and hardware components are of stainless steel composition and protected by a sacrificial zinc anode
• Low maintenance: clean the motor housing once or twice per year and replacing the sacrificial zinc anode when visibly corroded
21.
22.
Cost Appraisal
Concrete G30 = RM 42/mTempered Glass = RM 178.50/m2
Proposed MaterialsPedestrian Network
23.
Proposed MaterialsNight Lighting
Solar Space LED StreetlightRM 1,190.90
LED Tile 20x10cm Outdoor Ground LightRM 1186.75
24.
25.
Cost Appraisal
26.
Cost Appraisal
THE END
Thank You