GROUP MEMBERS: MELVIN LIM VOON SZE LUN JAKE SIA ERVING TIONG SHEILA ANN Building Economics Group Presentation Land Parcel @ Cecil Telok Ayer Street

Transcript of Building Economics Group Presentation Slides

Page 1: Building Economics Group Presentation Slides

GROUP MEMBERS:

MELVIN LIMVOON SZE LUN

JAKE SIA ERVING TIONG

SHEILA ANN

Building EconomicsGroup Presentation

Land Parcel @ Cecil Telok Ayer Street

Page 2: Building Economics Group Presentation Slides

20-storey office floors, 3 commercial floors and 1 underground basement floors.

Total GFA of overall project 77,162 m2

100 m2 F&B Kiosk located at Open Space area.

Pedestrian walkway is constructed to connect plot A1 with A2

Project Brief

1.

Page 3: Building Economics Group Presentation Slides

Project Brief

2.Site Plan

Page 4: Building Economics Group Presentation Slides

Perspective

3.

Side ElevationFront Elevation

Page 5: Building Economics Group Presentation Slides

Cost Plan

4.

DescriptionPercentage (%) Contract Sum (RM)

Preliminaries 10.0% 35,485,540.00

Architecture & Finishes Works 30.0% 106,456,620.00

Structural Cost 28.0% 99,359,512.00

M & E Works 24.0% 85,165,296.00

External Work 3.0% 10,645,662.00

Green certification 5.0% 17,742,770.00

TOTAL 100.0% 354,855,400.00

Page 6: Building Economics Group Presentation Slides

Benchmark Project

5.

Project : Kuala Lumpur Petronas Twin Towers Location : Kuala Lumpur City CentreTotal Gross Development Cost : RM7.05billionGross Floor Area : 1,672,254.72 m2Unit Cost per m2 : RM4,215.86 /m2Green Re Rating : Gold

Page 7: Building Economics Group Presentation Slides

Benchmark Project

6.

Green Features

i. Storm water designKLCC has retention tank basin with water treatment system which able to clean the debris from the rainwater and allow them flow back into the ground.

ii. Light Pollution ReductionKLCC has reduced exterior lighting to prevent the light sent up into the sky. This is better for the nocturnal animal and also better stars view in the sky.

Page 8: Building Economics Group Presentation Slides

Benchmark Project

7.

iii. Lighting System Design and ControllabilityThe light in KLCC is controlled by occupancy sensors and daylight sensors. When the surrounding is filled with sunlight, the light will turn off automatically.

iv. Low Impact Cleaning & Maintenance EquipmentKLCC cleaning department only use environmentally –friendly cleaning equipments to keep the air clean and fresh.

Green Features

Page 9: Building Economics Group Presentation Slides

Parameters

8.

Page 10: Building Economics Group Presentation Slides

Source

9.

Page 11: Building Economics Group Presentation Slides

10.

Parameters

Page 12: Building Economics Group Presentation Slides

Cost Appraisal

11.

Page 13: Building Economics Group Presentation Slides

Proposed MaterialsInternal Doors

INTERNAL DOORSGLAZINGGLASS IN OPENINGSClear float glass as specified6mm Thick to metal rebates with glazing compound0.50m2 – 1.0m2

RM 65 per m2

12.

Page 14: Building Economics Group Presentation Slides

Proposed MaterialsGlass Wall

INTERNAL WALLS & PARTITIONSGLAZINGGLASS IN OPENINGSClear float glass as specified6mm Thick to metal rebates with glazing compoundOver 1.00m2

RM 67 per m2 13.

Page 15: Building Economics Group Presentation Slides

Carpet

INTERNAL FLOOR FINISHESFLOOR, WALL AND CEILING FINISHINGSFLOORFitted CarpetingApproved carpet tile synthetic fibre heavy duty 500mm x 500mm multi level texture loop pile 780gm/m2 including adhesive to PVC fibre glass reinforcement backing and all joint thermo welded to form a seemless flooring all in accordance with manufacturer's instruction to floor

RM 80 per m2

Proposed MaterialsFloor Finishes

14.

Page 16: Building Economics Group Presentation Slides

Semi-glazed ceramic tiles = RM 95.80/m2

Proposed MaterialsFloor Finishes

15.

Page 17: Building Economics Group Presentation Slides

Roller Shutter = RM 3606.10/No.

Proposed MaterialsRoller Shutter

16.

Page 18: Building Economics Group Presentation Slides

Proposed MaterialsPark Furniture

Floral Patio Garden Park Bench

RM 439.00

Basic Outdoor Patio Park Bench

RM 439.0017.

Page 19: Building Economics Group Presentation Slides

RM 536.00 RM 4591.30

Proposed MaterialsPark Furniture

18.

Page 20: Building Economics Group Presentation Slides

Softscape (Plant)

TURFING AND SOFT LANDSCAPINGFENCING, TURFING AND PLANTINGPLANTINGSupply, plant and maintain as specified, the following landscaping work as shown in the drawingTreeBauhinia Purpurea; 75mm diameter x 2.00m height.

RM 258.31 per number of tree

Proposed MaterialsSoftscapes

19.

Page 21: Building Economics Group Presentation Slides

Softscape (Turve)

TURFING AND SOFT LANDSCAPINGFENCING, TURFING AND PLANTINGSEEDING AND TURFINGClose Turfing225mm x 225mm approved cow grass turves as specified obtained from Contractor's own source; trimming, levelling and grading surfaces; 50mm thick top soil as specified, watering and tendering until well established; replacing badly grow turves to slopes and embankments

RM6 per m2

Proposed MaterialsSoftscapes

20.

Page 22: Building Economics Group Presentation Slides

Proposed MaterialsWater Features

7.3JF 3 Phase Lake and Pond Aerating Fountai0n

RM 36,543.74

• Multiple patterns in one unit

• Efficient/low power use

• Clog resistant

• Rugged motor: environmentally friendly design with a hard-face internal mechanical seal and external lip seal for protection against leaks; seals are silicone carbide for long life; long-life top and bottom ball bearings; flood oil lubricated for excellent heat dissipation

• Corrosion resistant: superior all external metal motor, float, and hardware components are of stainless steel composition and protected by a sacrificial zinc anode

• Low maintenance: clean the motor housing once or twice per year and replacing the sacrificial zinc anode when visibly corroded

21.

Page 23: Building Economics Group Presentation Slides

22.

Cost Appraisal

Page 24: Building Economics Group Presentation Slides

Concrete G30 = RM 42/mTempered Glass = RM 178.50/m2

Proposed MaterialsPedestrian Network

23.

Page 25: Building Economics Group Presentation Slides

Proposed MaterialsNight Lighting

Solar Space LED StreetlightRM 1,190.90

LED Tile 20x10cm Outdoor Ground LightRM 1186.75

24.

Page 26: Building Economics Group Presentation Slides

25.

Cost Appraisal

Page 27: Building Economics Group Presentation Slides

26.

Cost Appraisal

Page 28: Building Economics Group Presentation Slides