JERANEAS, S.L. Ronda de Atocha, 37 28012 Madrid - España T international (+34) 911 610 336 M (+34) 697 921 445 Web: www.repoweringsolutions.com Email: [email protected]
STRICTLY CONFIDENTIAL SUBJECT TO CONDITIONS OF NON-DISCLOSURE Proposal_economical_GE LMS100_rev101 Page 1 of 14 Date September 11, 2015
Budget Offer: COMPLETE TURBINE GE LMS100
Dear Sir, In response to your enquiry, we are pleased to attach our budget offer for the supply of equipment listed below. The offer is an open offer, for budgetary purposes only and is defined in our technical specification and scope of supply as attached. It is ruled by Spain law. After verification of the respective site specific data, we would be pleased to make you a more detailed firm quotation upon request.
JERANEAS, S.L. Ronda de Atocha, 37 28012 Madrid - España T international (+34) 911 610 336 M (+34) 697 921 445 Web: www.repoweringsolutions.com Email: [email protected]
STRICTLY CONFIDENTIAL SUBJECT TO CONDITIONS OF NON-DISCLOSURE Proposal_economical_GE LMS100_rev101 Page 2 of 14 Date September 11, 2015
SUBJECT
Offer 1 unit GTG PACKAGE LMS100PA
PRICE
EXWORKS PRICE for request
TRANSPORT COST TO FOB BILBAO PORT for package is 1.900.000,00 USD
The above prices exclude VAT or any other taxes, and are binding.
CONDITIONS
All prices quoted in USD
The equipment described is sold “AS IS WHERE IS” WITHOUT WARRANTY. The equipment has zero hours of operation and is available for inspection.
FOB BILBAO PORT, SPAIN
Equipment manufactured in 2008 in Houston-SPAIN and arrival at temporary storage in 2009.
Man equipment stored in controlled environment with optimum temperature and humidity conditions
Optimum packing equipment and structural protections.
The storage have followed a preservation program according to the procedures established for long-term storage by GE consisting of:
Daily inspection of the conditions of temperature and humidity. Weekly inspections of the equipment packing Monthly inspections of the state of the mechanical parts of the equipment’s Video scope biannual inspections of the several parts of the gas turbine
JERANEAS, S.L. Ronda de Atocha, 37 28012 Madrid - España T international (+34) 911 610 336 M (+34) 697 921 445 Web: www.repoweringsolutions.com Email: [email protected]
STRICTLY CONFIDENTIAL SUBJECT TO CONDITIONS OF NON-DISCLOSURE Proposal_economical_GE LMS100_rev101 Page 3 of 14 Date September 11, 2015
TERMS OF PAYMENT
100% of the total price receipt of payment shall mean the date of firm placement of order to the client.
SCOPE OF SUPPLY GTG PACKAGE LMS100PA
Gas Turbine GE LMS100PA 3 spool hybrid gas turbine in the LM family:
Low pressure compressor (LPC) Aeroderivative supercore (high pressure compressor, combustor and high pressure
turbine and intermediate pressure turbine) Five stages low pressure turbine turbine (LPT)
Generator
Air cooled Hitachi (model GH1150A) made 2-pole generator rated at min 138,75kVA @ 0.80pf, 15ºC cooling air, 11.500 volts, 50Hz
Gas Turbine Enclosure
Weatherproof acoustic enclosure and a removable roof for quick engine removal and replacement
Turbine Baseplate
Support structure for the gas turbine
Air Inlet System
High efficiency self cleaning filtration system with platforms and ladders to service the inlet filter
Anti-icing system
Anti-icing cooling system based on gas turbine axial compressor bleed air
Intercooler
Intercooler system that includes water cooled heat exchanger, variable bleed valve (VBV), VBV silencer, and interconnect piping and supports.
JERANEAS, S.L. Ronda de Atocha, 37 28012 Madrid - España T international (+34) 911 610 336 M (+34) 697 921 445 Web: www.repoweringsolutions.com Email: [email protected]
STRICTLY CONFIDENTIAL SUBJECT TO CONDITIONS OF NON-DISCLOSURE Proposal_economical_GE LMS100_rev101 Page 4 of 14 Date September 11, 2015
Turbine Exhaust
Right-hand (aft looking forward) rectangular exhaust outlet with connection flange to facilitate mounting of the exhaust system
Fuel system
Natural gas system using an electronically controlled fuel-metering valve All necessary shutoff valves, piping and instruments between baseplate connection and
the engine
Water injection for NOx control
Water injection system for NOx emissions limitations consisting of an inlet strainer, pump, motor, valves, piping and controls.
Cooling water pumps skid
Water pumps skid with 2x100% water pumps to supply cooling water to both the gas turbine intercooler and GTG lube oil coolers, and a third pump to supply cooling water to the GTG lube oil coolers during the GTG shutdown.
Lube oil systems Two separate lube oil systems:
Synthetic lube oil system for gas turbine core & intermediate pressure turbine:
Skid with 2x100% filters, 2x100% shell and tube coolers and thermostatically- controlled electric heaters.
Mineral lube oil system for generator, low pressure compressor & powerturbine:
Skid with 2x100% filters, 2x100% shell and tube coolers and thermostatically-controlled electric heaters.
Electro-hydraulic start system
An electric motor driven hydraulic pump assembly, filters, cooler and controls.
Fire protection system
Factory installed fire protection system with optical flame detection, hydrocarbon sensing and thermal detectors, piping and nozzles in the engine compartment.
24VDC battery and charger to power the fire protection system
JERANEAS, S.L. Ronda de Atocha, 37 28012 Madrid - España T international (+34) 911 610 336 M (+34) 697 921 445 Web: www.repoweringsolutions.com Email: [email protected]
STRICTLY CONFIDENTIAL SUBJECT TO CONDITIONS OF NON-DISCLOSURE Proposal_economical_GE LMS100_rev101 Page 5 of 14 Date September 11, 2015
Gas Turbine Generator Control System
Freestanding GE MK VIe control panel mounted in the Power Control Module
Battery systems Battery systems mounted in the Power Control Module:
24V DC battery systems for the fire protection and gas turbine generator control systems 125V DC battery system for control cooling backup 240V DC battery system to power the mineral lube oil system DC motor driven backup
pump.
Generator Protective Relays
Microprocessor-based Beckwith M-3425 Integrated Generator Protection system module (IGPS) mounted in the turbine control panel.
“On Line” and “Off Line” Cleaning and Soak wash system
Reservoir and piping for “on-line” cleaning system and “off-line” soak cleaning system
Simple Cycle Exhaust System Exhaust stack assembly:
Expansion joint Elbow duct Stack (40 meters high) Emission ports for sample probes Four emission ports dedicated to the Environmental Protection Agency testing
requirements. Ladders and platforms All bolting hardware, gaskets and field insulation
CO Reduction System CO emissions catalyst reduction system (COR) as a part of the exhaust stack:
Expansion joint Ductwork CO oxidation catalyst
Gas Fuel Filter / Coalescing Skid
Skid consisting of duplex (2x100%) coalescing gas fuel filters
JERANEAS, S.L. Ronda de Atocha, 37 28012 Madrid - España T international (+34) 911 610 336 M (+34) 697 921 445 Web: www.repoweringsolutions.com Email: [email protected]
STRICTLY CONFIDENTIAL SUBJECT TO CONDITIONS OF NON-DISCLOSURE Proposal_economical_GE LMS100_rev101 Page 6 of 14 Date September 11, 2015
Demineralized water filter skid
Skid consisting of 2x100% water filters
Continuous Emissions Monitoring System (CEMS) One CEMS system for the combustion turbine package with an extractive sampling system that provides continuous monitoring of the following parameters:
./ NOx ./ SO2 ./ CO ./ O2 ./ VOC ./ TSP ./ Temperature ./ Pressure ./ Humidity ./ Turbine exhaust flow
GTG Foundation Anchoring system
Equipment foundation anchoring systems for the combustion turbine generator package only.
GTG Motor Control Center
AC Motor Control Center for the gas turbine package motors and heaters
Power Control Module (PCM)
Prefabricated Power Control Module designed for the installation of the GTG electrical control gear
Interconnect piping
Interconnecting piping between supplied equipment
Vent piping
Vent piping for the supplied equipment
Electrical control and power interconnect cable
Interconnecting cabling between supplied equipment Cable trays, supports and accessories for the interconnecting cabling
JERANEAS, S.L. Ronda de Atocha, 37 28012 Madrid - España T international (+34) 911 610 336 M (+34) 697 921 445 Web: www.repoweringsolutions.com Email: [email protected]
STRICTLY CONFIDENTIAL SUBJECT TO CONDITIONS OF NON-DISCLOSURE Proposal_economical_GE LMS100_rev101 Page 7 of 14 Date September 11, 2015
Component testing and factory test for package
The core gas turbine is performance tested at a GE Test Cell The generator is factory-tested at is factory of manufacture
Drawings, data and manuals
General Arrangement drawings Flow & Instrument diagrams Electrical on-line drawings Electrical schematic diagrams Logic diagrams O&M manuals Quality Plan and associated quality documentation applicable to the equipment supplied
and testing activities
JERANEAS, S.L. Ronda de Atocha, 37 28012 Madrid - España T international (+34) 911 610 336 M (+34) 697 921 445 Web: www.repoweringsolutions.com Email: [email protected]
STRICTLY CONFIDENTIAL SUBJECT TO CONDITIONS OF NON-DISCLOSURE Proposal_economical_GE LMS100_rev101 Page 8 of 14 Date September 11, 2015
PHOTO
Turbine Skid
JERANEAS, S.L. Ronda de Atocha, 37 28012 Madrid - España T international (+34) 911 610 336 M (+34) 697 921 445 Web: www.repoweringsolutions.com Email: [email protected]
STRICTLY CONFIDENTIAL SUBJECT TO CONDITIONS OF NON-DISCLOSURE Proposal_economical_GE LMS100_rev101 Page 9 of 14 Date September 11, 2015
GTG Package Equipment inside the warehouse
JERANEAS, S.L. Ronda de Atocha, 37 28012 Madrid - España T international (+34) 911 610 336 M (+34) 697 921 445 Web: www.repoweringsolutions.com Email: [email protected]
STRICTLY CONFIDENTIAL SUBJECT TO CONDITIONS OF NON-DISCLOSURE Proposal_economical_GE LMS100_rev101 Page 10 of 14 Date September 11, 2015
Auxiliary Skids stored inside the
warehouse
JERANEAS, S.L. Ronda de Atocha, 37 28012 Madrid - España T international (+34) 911 610 336 M (+34) 697 921 445 Web: www.repoweringsolutions.com Email: [email protected]
STRICTLY CONFIDENTIAL SUBJECT TO CONDITIONS OF NON-DISCLOSURE Proposal_economical_GE LMS100_rev101 Page 11 of 14 Date September 11, 2015
Generator
Outdoor storage area for the GTG Package Equipment (1)
JERANEAS, S.L. Ronda de Atocha, 37 28012 Madrid - España T international (+34) 911 610 336 M (+34) 697 921 445 Web: www.repoweringsolutions.com Email: [email protected]
STRICTLY CONFIDENTIAL SUBJECT TO CONDITIONS OF NON-DISCLOSURE Proposal_economical_GE LMS100_rev101 Page 12 of 14 Date September 11, 2015
Outdoor storage area for the GTG
Package Equipment (2)
Outdoor storage area for the GTG Package Equipment (3)
JERANEAS, S.L. Ronda de Atocha, 37 28012 Madrid - España T international (+34) 911 610 336 T Spain (+34) 902 103 771 M (+34) 697 921 445 Web: www.repoweringsolutions.com www.jeraneas.com Email: [email protected]
STRICTLY CONFIDENTIAL SUBJECT TO CONDITIONS OF NON-DISCLOSURE Proposal_economical_GE LMS100_rev101 Page 13 of 14 Date September 11, 2015
Intercooler
PCM
JERANEAS, S.L. Ronda de Atocha, 37 28012 Madrid - España T international (+34) 911 610 336 T Spain (+34) 902 103 771 M (+34) 697 921 445 Web: www.repoweringsolutions.com www.jeraneas.com Email: [email protected]
STRICTLY CONFIDENTIAL SUBJECT TO CONDITIONS OF NON-DISCLOSURE Proposal_economical_GE LMS100_rev101 Page 14 of 14 Date September 11, 2015
. Yours sincerely JERANEAS.
Alfonso Alvaro - Commercial Director -
LMS100®
Flexible Power
GE Energy
GE Energy is a leading supplier of
aeroderivative gas turbines and
packaged generator sets for
industrial and marine applications.
We provide power-generating
equipment to utilities, industries
and marine fleets throughout the
world and are the world’s largest,
most experienced gas turbine
service provider.
Defining a new era of flexible power generation, GE’s revolutionaryLMS100 provides a single, economical solution for the dispatchneeds of nearly every market condition. With unparalleled efficiency,10-minute start times, unmatched hot day performance, load fol-lowing and cycling capabilities, and reliability derived from provenarchitecture and technology, the LMS100 is the ideal solution forpower generation planners and developers.
A combination of frame and aeroderivative gas turbine technologies,this powerful machine represents the most extensive collaborationof design and manufacturing expertise in the history of GE—delivering over 100 MW with thermal efficiency in excess of 44%.
Offering superior value unavailable in other 80–160 MW gas turbines through high part-power efficiency, cycling capabilitywithout maintenance impact, dispatch reliability, turndown capability, and low emissions, the LMS100 gives dispatchers confidence they can meet customer and business needs at anytime, day or night.
A Single Solution for Your Needs
Efficiency+ Fast starts+ Hot day performance+ Load following and
cycling capabilities+ Reliability+ No maintenance penalties
= LMS100® Flexible Power
L M S 1 0 0 : F L E X I B L E P O W E R 1
2 L M S 1 0 0 : F L E X I B L E P O W E R
The LMS100 provides unsurpassed simple-cycle efficiency and
increased power output thanks to an innovative intercooling system.
The intercooling system takes compressed airfrom the low-pressure compressor, cools it tooptimal temperatures and then redelivers it tothe high-pressure compressor. In providing anear constant stream of low temperature airto the high pressure compressor, the work ofcompression is reduced. The result is a higherpressure ratio (42:1) and increased mass flow(460 lb/sec).
In simple-cycle applications, the LMS100 canachieve thermal efficiency in excess of 44%.That’s nearly a 10 point improvement overevery turbine in its size range. The impressivelevel of efficiency—when combined with theability to cycle without maintenance intervalimpact—may translate into $4-7 MM in NetPresent Value Savings over 15 years.*
Our Foundation for Flexibility
Model ISO BaseRating (kW)
Heat Rate(Btu/kWh) Efficiency% Mass Flow
(lb/sec)Turbine
Speed (RPM)ExhaustTemp (F) Comments
LMS100PB 97,718 7,592 45.0% 453 3,600 783 DLE, 25 ppm NOx
LMS100PB 97,878 7,579 45.0% 453 3,000 784 DLE, 25 ppm NOx
LMS100PA 103,112 7773 43.9% 469 3,600 770 water injected to 25 ppm NOx
LMS100PA 103,162 7769 43.9% 469 3,000 767 water injected to 25 ppm NOx
LMS100 ISO Performance Data
Conditions: Performance at the generator terminals; NOx = 25 ppm or 50 mg/Nm3; 59F or 15C, 60% Relative Humidity; No Losses; Fuel Spec. Gas (LHV= 19,000 BTU/lb)
* 5¢/mmBtu gas
L M S 1 0 0 : F L E X I B L E P O W E R 3
As the only company with the necessary technology base and product experience to bring
this innovative product to the power generation industry, GE has incorporated extensive
customer feedback into the LMS100 development program—ensuring it has the flexibility
to meet current and future needs. The resulting breakthrough system delivers 100 MW
of power with:
Features of Flexibility
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Spee
d, R
PM
0
10
20
30
40
50
60
70
80
90
100
Pow
er, M
W
10 Minutes
Core Speed
Power Turbine Speed
Power
Dry motor/Purge
Ignition
Synch idle
Accelerate to synch idle
Accelerate to power
110000
105000
100000
95000
90000
85000
80000
75000
700000 20 40 60
Temperature (°F)
80 100 120
Pow
er (k
W)
LMS 100 Nat. Gas WaterOther Industrial GT
25.0%
30.0%
35.0%
40.0%
45.0%
50.0%
50.0% 60.0% 70.0% 80.0% 90.0% 100.0%
LHV
Effic
ienc
y,%
LMS100Conv. GT
Power Level
10-minute fast starts with cycling capabilityThe flexibility of aircraft engine technology—with 10-minute startsfrom cold iron to full power—and the ability to start and stop in short15 minute cycles (several times per day, if needed) without impactingmaintenance intervals.
Improved load following and part load efficiencyThe flexibility to provide 50 MW of power in less than one minute. Whenoperating at 50% power, the LMS100 can ramp to full power in lessthan 60 seconds, providing fast response to load demand variations.
The flexibility to provide power at part load as efficiently as most gasturbines at full load—enabling efficient operation anywhere between 50 and 100 MW, as demand requires. At 50% load, the LMS100 candeliver power at 40% simple-cycle efficiency.
The flexibility to provide grid support without load reduction. Even withup to 5% grid frequency variation, the LMS100 can operate with verylittle power loss—making it uniquely capable of supporting the grid intimes of high demand and load fluctuations.
Incredible hot day performanceThe flexibility to sustain power levels on hot days when demand isgreatest . The LMS100 will increase in power as the temperaturerises—up to 75°F (~24°C)—and then fall off in power at a much slowerrate than conventional gas turbines. When the temperature againincreases demand on the grid, the LMS100 will be at the top of thelist to dispatch
4 L M S 1 0 0 : F L E X I B L E P O W E R
Better efficiency also means less fuel burned per megawatt generated and less CO2 emissions.
The efficiency advantage of the LMS100 offers potential savings in terms of CO2 taxes through
reduced greenhouse gas emissions of as much as $0.6 MM each year when compared to a typical
simple-cycle gas turbine plant.
Based on an average peaking season of 2,184 hours, the LMS100 reduces CO2 emissionsby more than 30,000 tons when compared to a typical simple-cycle 100 MW gas turbineplant. This CO2 reduction is equal to the amount of carbon dioxide absorbed byapproximately 7,400 acres of forest.
Efficient Performance
Ecomagination is GE's commitment to aggressively
bring to market new technologies that will help
customers meet pressing environmental challenges.
Ecomagination technologies offer improved efficiency,
lower emissions and/or improved operating
performance compared to other similar power
generation technologies in the same power class.
The LMS100, as one of the newest products in the
ecomagination portfolio offers our customers 100
MW at 46% thermal efficiency with a wide range of
operating flexibility for peaking, mid-range and
base-load operation with lower start up emissions
and 10-minute starts.
L M S 1 0 0 : F L E X I B L E P O W E R 5
Sound heritageThe LMS100 core engine is derived from the CF6 family of aircraft engines, the same baselinearchitecture as the LM6000®. The current LM6000 fleet includes 588 operating engines withover 10.5 million accumulated fired hours of operation. Reliability for the LM6000 fleet iscurrently 99.14% and availability is currently 97.76%. The low-pressure compressor (LPC)is derived from GE’s MS6001FA gas turbine which has 65 units in operation with morethan 1,000,000 hours of operation.
*Based on ORAP® reliability data, using current sample, which includes 151 operating units.ORAP®; All rights reserved: SPS®
Customer-designed controlsThe LMS100 control system employs the Mark VIe and fiber optics for signal transmissionbetween the package and control system. This system reduces the number of signalinterconnects by 90% and the number of mechanical interconnects by 25%—which yieldsa simpler and more reliable design with a faster, more efficient installation and startup.
Designed for reliabilityIn addition, the integrated control system includes redundant sensors with smart selectionlogic to reduce single sensor failure trips. The fiberoptic distributed I/O (input/output) systemis located outside the module to prevent electromagnetic or radio frequency interferenceand minimize false trips. Reliability of the LMS100 is further enhanced by redundant fans,fuel pumps, resistance temperature detectors (RTDs) and remote monitoring and diagnostics.
Comprehensive full scale validation testsConsistent with GE’s practice for design validation, extensive design assurance and validationtests were established and executed for both the engine and balance of plant equipment.
The core engine, a gas generator consisting of the LMS100 high-pressure compressor, singleannular combustor and high-pressure turbine, completed testing in December 2004 atthe high altitude test cell in GE’s aircraft engine facility in Ohio. More than 1500 pieces ofinstrumentation were used to measure key design parameters. The testing confirmedaeromechanics, mechanical design and variable geometry optimization for performance,paving the way for full scale power plant validation testing.
Extensive, full scale testing of an LMS100 simple-cycle power plant was conducted at GE’spackaging facility in Houston, Texas. More than 2,500 pieces of instrumentation were usedto validate performance, emissions, intercooler operation and sub-system capability at themost extreme operating conditions expected in commercial service.
The LMS100 full load power plant test, completed in November 2005, confirmed performance,operability, emissions, mechanical and electrical operations all successfully met orexceeded the requirements. Testing demonstrated 10-minute starts, fast load following,transient capability and efficiency—all hallmark characteristics of the LMS100.
Proven, Reliable Technology
6 L M S 1 0 0 : F L E X I B L E P O W E R
Designed for Availability and MainMaintainability features● Modular construction permits replacement of the aero components without total disassembly
● Multiple borescope ports allow on-condition monitoring without turbine disassembly
● Condition-based maintenance and remote diagnostics
● Split casing construction of the booster (LPC) and aeroderivative compressor allows detailed on-site inspection and blade replacement
● Package accessory systems are externally mounted for ease of on-site replacement
● Package mounted maintenance cranes in auxiliary module
Modular “supercore” enhances power plant availabilityGE has established a target availability of 97.5% and 98.5% target reliability for a mature LMS100 power plant. The “supercore” consistsof the HPC, Combustor, HPT and IPT rotable modules, which can be exchanged in less than four days during on-site maintenance tooptimize plant availability.
F R O N T F R A M E
H I G H P R E S S U R EC O M P R E S S O R
( H P C ) C O M B U S T O R
H I G H P R E S S U R E T U R B I N E
( H P T )
I N T E R M E D I AT E P R E S S U R E T U R B I N E
( I P T )T U R B I N E
M I D F R A M E
2 4 H O U R B R E A K E R - T O - B R E A K E RC H A N G E O U T O F T H E S U P E R C O R E
LMS100 service intervals
Maintenance servicesAll warranty and follow-on services for the LMS100 will be provided by GE Energy either on site or at one of several service centerlocations around the world. These services can include Contractual Service Agreements (CSAs), lease engines, spare parts, rotable modules,training resources and user conferences.
GE Energy’s Contractual Services Agreements provide the field service, labor, parts and repairs necessary for equipment maintenancewhile protecting your investment and minimizing your costs. CSA programs can be structured to include unplanned maintenance eventswith guarantee incentives on reliability and availability.
GE’s lease engine program provides a spare “supercore” that can be installed in 24 hours when service center maintenance is required.The power turbine module can also be replaced within an additional 24 hours.
L M S 1 0 0 : F L E X I B L E P O W E R 7
tainability
Interval Scheduled Maintenance Action Outage Duration4,000 hours (every 4K h) Borescope inspection (includes cool-down time) 12 hours
25,000 hours
50,000 hours
75,000 hours
Depot maintenance(b)
1) Major hot section overhaul (combustor, HPT, IPT)2) Inspect booster, intercooler, scroll frames, HPC, aft shaft and bearings(c)
3) Power turbine overhaul
Hot section interval(b)
1) On-site hot section replacement (combustor, HPT, IPT)
Hot section interval*1) On-site hot section replacement (combustor, HPT, IPT)
4 days(a)
4 days(a)
4 days(a)
100,000 hours Depot maintenance(b)
1) Major hot section overhaul (combustor, HPT, IPT)2) Inspect booster, intercooler, scroll frames, HPC, aft shaft and bearings(c)
3) Power turbine overhaul
4 days(a)
(a) Rotable module installed during maintenance period.(b) Lease/spare “supercore” and Power Turbine modules are installed during maintenance period. For depot maintenance, outage duration is 60 days if no spare/lease module(s) are used.(c) Roller and ball bearings are replaced at 50,000 hours; hydrodynamic bearings are inspected.
The LMS100 is a flexible growth platform designed to meet your changing energy
needs. While actual plant layout depends on specific customer needs and site
requirements, there are four basic LMS100 configurations available when combined
with intercooler selection and combustion technology.
• LMS100 Single Annular Combustor with Water – Water or steam can beinjected into the combustor to provide emission reduction and achieve25 ppm NOX levels while operating on natural gas fuels between 50%
and 100% power.
• LMS100 DLE – An advanced dry low emission (DLE) combustor will beavailable for sites that have a restriction on water usage. Using the DLEcombustor, customers will be able to achieve 25 ppm for both NOX and
CO emissions while operating on natural gas fuels.
• Intercooler Options – Water is the primary cooling agent in the shell and tube heat exchanger available with the LMS100. In areas withan abundant water supply, a standard evaporative cooling tower can be integrated. An optional closed-loop wet intercooler can be providedwith a secondary dry, fin-fan cooler if water usage is restricted.
Applications• Feed Water Applications—Increased efficiency, improved flexibility and better economics are among the potential benefits of integrating
the LMS100 gas turbine for feed water heating in a coal fired steam plant. The improved efficiency and increased output are achievedthrough minor modifications of the steam cycle to reduce or eliminate steam extractions in lieu of the gas turbine exhaust andintercooler to heat the feed water.
• Wind Farm Integration – The operating characteristics of the LMS100 make it an ideal solution for firming variable wind power. Alternativepower sources require high maneuverability, high efficiency (even at partial load), fast starting, low initial capital costs (consistent withmoderate to low capacity factors) and good environmental characteristics. The LMS100 simple-cycle gas turbine has all of thesecharacteristics, making a high performance hybrid wind-GT system now economically possible.
Flexible Growth Platform
8 L M S 1 0 0 : F L E X I B L E P O W E R
Gas, Liquid or Dual Fuel
Single Annular(SAC)
25 ppmNoneNoneDLE2GasLMS100 DLE, 50/60 Hz
25 ppmNoneWaterLMS100 SAC, 50/60 Hz
NOx LevelPowerAugmentation
DiluentCombustorFuelProductOfferings
LMS100 System Configurations
Four basic LMS100 configurations are available as this proudct is introduced. When combined with intercooler selection and duty applications, the LMS100 offers 20 different configuration choices.
GE Energy1333 West Loop SouthHouston, Texas 77027713.803.0900www.ge-energy.com/lms100
For more information on the LMS100gas turbine system, contact your GE Energyrepresentative or email us at [email protected].
©2006 General Electric Company. All Rights Reserved.
GEA-14355 A (09/06)