BTS Planning steps and Rules

955
SYSTEM INFORMATION BSS EQUIPMENT PLANNING GSM SOFTWARE RELEASE 8.0 GSR8.0 GMR- 01 68P02900W21-R

Transcript of BTS Planning steps and Rules

SYSTEM INFORMATION BSS EQUIPMENT PLANNINGGSM SOFTWARE RELEASE 8.0

GSR8.0GMR- 0168P02900W21-R

GSR8.0SYSTEM INFORMATION BSS EQUIPMENT PLANNINGGSM SOFTWARE RELEASE 8.0

68P02900W21-R

GMR-01

System Information: BSS Equipment Planning

1993 - 2006 Motorola, Inc. All Rights Reserved

GMR-01

68P02900W21-R 28 Feb 2006

Copyrights The Motorola products described in this document may include copyrighted Motorola computer programs stored in semiconductor memories or other media. Laws in the United States and other countries preserve for Motorola certain exclusive rights for copyright computer programs, including the exclusive right to copy or reproduce in any form the copyright computer program. Accordingly, any copyright Motorola computer programs contained in the Motorola products described in this document may not be copied or reproduced in any manner without the express written permission of Motorola. Furthermore, the purchase of Motorola products shall not be deemed to grant either directly or by implication, estoppel or otherwise, any license under the copyrights, patents or patent applications of Motorola, except for the rights that arise by operation of law in the sale of a product. Restrictions The software described in this document is the property of Motorola. It is furnished under a license agreement and may be used and/or disclosed only in accordance with the terms of the agreement. Software and documentation are copyright materials. Making unauthorized copies is prohibited by law. No part of the software or documentation may be reproduced, transmitted, transcribed, stored in a retrieval system, or translated into any language or computer language, in any form or by any means, without prior written permission of Motorola. Accuracy While reasonable efforts have been made to assure the accuracy of this document, Motorola assumes no liability resulting from any inaccuracies or omissions in this document, or from the use of the information obtained herein. Motorola reserves the right to make changes to any products described herein to improve reliability, function, or design, and reserves the right to revise this document and to make changes from time to time in content hereof with no obligation to notify any person of revisions or changes. Motorola does not assume any liability arising out of the application or use of any product or circuit described herein; neither does it convey license under its patent rights of others. Trademarks Motorola and the Motorola logo are registered trademarks of Motorola Inc. Intelligence Everywhere, M-Cell and Taskfinder are trademarks of Motorola Inc. All other brands and corporate names are trademarks of their respective owners.

GMR-01

28 Feb 2006

Table of Contents

Contents

System Information: BSS Equipment PlanningIssue status of this manual . . . . . . . . . . . . . . . . . . . . Version information . . . . . . . . . . . . . . . . . . . . . Resolution of service requests . . . . . . . . . . . . . . . . Incorporation of CDCNs. . . . . . . . . . . . . . . . . . . General information . . . . . . . . . . . . . . . . . . . . . . . Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . Feature references . . . . . . . . . . . . . . . . . . . . . . Cross references . . . . . . . . . . . . . . . . . . . . . . Data encryption . . . . . . . . . . . . . . . . . . . . . . . Text conventions . . . . . . . . . . . . . . . . . . . . . . Reporting safety issues . . . . . . . . . . . . . . . . . . . . . Safety issue reporting procedure . . . . . . . . . . . . . . . Security Advice . . . . . . . . . . . . . . . . . . . . . . . . . Warnings and cautions . . . . . . . . . . . . . . . . . . . . . . Warnings . . . . . . . . . . . . . . . . . . . . . . . . . . Failure to comply with warnings . . . . . . . . . . . . . . . Cautions . . . . . . . . . . . . . . . . . . . . . . . . . . General warnings . . . . . . . . . . . . . . . . . . . . . . . . Warning labels . . . . . . . . . . . . . . . . . . . . . . . Specific warnings . . . . . . . . . . . . . . . . . . . . . . General cautions . . . . . . . . . . . . . . . . . . . . . . . . Caution labels. . . . . . . . . . . . . . . . . . . . . . . . Specific cautions . . . . . . . . . . . . . . . . . . . . . . Devices sensitive to static . . . . . . . . . . . . . . . . . . . . Special handling techniques . . . . . . . . . . . . . . . . . Caring for the environment. . . . . . . . . . . . . . . . . . . . Disposal of Motorola Networks equipment in EU countries . . Disposal of Motorola Networks equipment in non-EU countries Motorola manual set . . . . . . . . . . . . . . . . . . . . . . . Ordering manuals and CD-ROMs . . . . . . . . . . . . . . Manual amendment . . . . . . . . . . . . . . . . . . . . . . . GMR availability . . . . . . . . . . . . . . . . . . . . . . CDCN availability . . . . . . . . . . . . . . . . . . . . . CDCN instructions . . . . . . . . . . . . . . . . . . . . . CDCN amendment record . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2 3 3 4 4 4 5 6 6 7 7 8 9 9 9 9 11 11 11 15 15 15 16 16 17 17 17 18 18 19 19 19 20 20

Chapter 1: IntroductionManual overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68P02900W21-R 28 Feb 2006 1-2i

GMR-01

Contents

Introduction . . . . . . . . . . . . . . Contents . . . . . . . . . . . . . . . . BSS equipment overview . . . . . . . . . . System architecture . . . . . . . . . . . System components . . . . . . . . . . . BSS features . . . . . . . . . . . . . . . . Features that affect planning . . . . . . . Diversity . . . . . . . . . . . . . . . . Frequency hopping . . . . . . . . . . . Short message service, cell broadcast . . . Code storage facility processor . . . . . . PCU for GPRS upgrade . . . . . . . . . Enhanced-GPRS (EGPRS). . . . . . . . Adaptive Multi-Rate (AMR) . . . . . . . GSM Half Rate . . . . . . . . . . . . . Location services (LCS) . . . . . . . . . {22322} BSC Reset Management . . . . {24347} Advanced Speech Call Item . . . {23769} VersaTRAU backhaul for EGPRS {23956} Quality of Service . . . . . . . {28075} Improved Timeslot Sharing . . . BSS planning overview . . . . . . . . . . . Introduction . . . . . . . . . . . . . . Initial information required . . . . . . . Planning methodology. . . . . . . . . . Acronyms . . . . . . . . . . . . . . . . . Acronym list . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . .

1-2 1-2 1-4 1-4 1-6 1-8 1-8 1-8 1-9 1-10 1-10 1-10 1-11 1-11 1-13 1-14 1-15 1-15 1-16 1-17 1-18 1-19 1-19 1-19 1-22 1-23 1-23

Chapter 2: Transmission systemsBSS interfaces . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . Interconnecting the BSC and BTSs . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . Interconnection rules . . . . . . . . . . . . . . . . . . Network topology . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . Star connection . . . . . . . . . . . . . . . . . . . . . Daisy chain connection . . . . . . . . . . . . . . . . . Daisy chain planning . . . . . . . . . . . . . . . . . . Aggregate Abis . . . . . . . . . . . . . . . . . . . . . RTF path fault containment . . . . . . . . . . . . . . . 16 kbit/s RSL . . . . . . . . . . . . . . . . . . . . . . 16 kbit/s XBL . . . . . . . . . . . . . . . . . . . . . Dynamic allocation of RXCDR to BSC circuits (DARBC) . Managed HDSL on micro BTSs . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . Integrated HDSL interface . . . . . . . . . . . . . . . . General HDSL guidelines . . . . . . . . . . . . . . . . Microcell system planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2 2-2 2-4 2-4 2-4 2-6 2-6 2-7 2-8 2-9 2-11 2-16 2-18 2-22 2-23 2-26 2-26 2-26 2-29 2-30

Chapter 3: BSS cell planningPlanning tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3 3-3

ii

GMR-01

68P02900W21-R 28 Feb 2006

System Information: BSS Equipment Planning

Contents

GSM frequency spectrum . . . . . . . . . . . . . . . . . . The GSM900 frequency spectrum . . . . . . . . . . . . The DCS1800 frequency spectrum . . . . . . . . . . . . Absolute radio frequency channel capacity . . . . . . . . Modulation techniques and channel spacing . . . . . . . . Traffic capacity . . . . . . . . . . . . . . . . . . . . . . . Dimensioning. . . . . . . . . . . . . . . . . . . . . . Channel blocking . . . . . . . . . . . . . . . . . . . . Traffic flow . . . . . . . . . . . . . . . . . . . . . . . Grade of service . . . . . . . . . . . . . . . . . . . . Adaptive multi-rate (AMR) . . . . . . . . . . . . . . . . . Introduction to AMR . . . . . . . . . . . . . . . . . . Capacity and coverage. . . . . . . . . . . . . . . . . . Quality of service . . . . . . . . . . . . . . . . . . . . Applications . . . . . . . . . . . . . . . . . . . . . . Migration to AMR half rate . . . . . . . . . . . . . . . {22064} Interoperability with GSM half rate . . . . . . . {23769} Interoperability with EGPRS . . . . . . . . . . {22064) GSM Half Rate . . . . . . . . . . . . . . . . . . . Introduction to GSM half rate . . . . . . . . . . . . . . Capacity and coverage. . . . . . . . . . . . . . . . . . Quality of service . . . . . . . . . . . . . . . . . . . . Applications . . . . . . . . . . . . . . . . . . . . . . Migration to half rate . . . . . . . . . . . . . . . . . . Interoperability with AMR half rate . . . . . . . . . . . {23769} Interoperability with EGPRS . . . . . . . . . . Propagation effects on GSM frequencies . . . . . . . . . . . Propagation production . . . . . . . . . . . . . . . . . Decibels . . . . . . . . . . . . . . . . . . . . . . . . Fresnel zone . . . . . . . . . . . . . . . . . . . . . . Radio refractive index (RRI) . . . . . . . . . . . . . . . Environmental effects on propagation . . . . . . . . . . Multipath propagation . . . . . . . . . . . . . . . . . . GSM900 path loss. . . . . . . . . . . . . . . . . . . . Path loss GSM900 vs DCS1800 . . . . . . . . . . . . . Frequency re-use . . . . . . . . . . . . . . . . . . . . . . Introduction to re-use patterns . . . . . . . . . . . . . . Re-use pattern . . . . . . . . . . . . . . . . . . . . . Carrier/Interference (C/I) ratio . . . . . . . . . . . . . . Other sources of interference. . . . . . . . . . . . . . . Sectorization of sites . . . . . . . . . . . . . . . . . . Overcoming adverse propagation effects . . . . . . . . . . . Hardware techniques . . . . . . . . . . . . . . . . . . Error protection and detection . . . . . . . . . . . . . . GSM speech channel encoding for Full Rate . . . . . . . GSM speech channel encoding for enhanced Full Rate . . . {22064} GSM speech channel encoding for Half Rate . . . GSM speech channel encoding for AMR Full Rate . . . . GSM speech channel encoding for AMR Half Rate . . . . Link adaptation for AMR channels . . . . . . . . . . . . GSM control channel encoding. . . . . . . . . . . . . . GSM circuit-switched data channel encoding . . . . . . . Mapping logical channels onto the TDMA frame structure . GPRS channel coding schemes. . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-4 3-4 3-5 3-6 3-6 3-8 3-8 3-8 3-9 3-9 3-10 3-10 3-11 3-11 3-12 3-13 3-13 3-13 3-14 3-14 3-14 3-15 3-15 3-16 3-16 3-16 3-17 3-17 3-17 3-18 3-20 3-23 3-27 3-42 3-43 3-44 3-44 3-46 3-48 3-50 3-50 3-51 3-51 3-53 3-58 3-60 3-61 3-62 3-64 3-65 3-68 3-69 3-70 3-79

68P02900W21-R 28 Feb 2006

GMR-01

iii

Contents

16/32 kbit/s TRAU . . . . . . . . . . . . . . . . . . . . . . . . . . . . EGPRS channel coding schemes . . . . . . . . . . . . . . . . . . . . . . 64 kbit/s TRAU for EGPRS . . . . . . . . . . . . . . . . . . . . . . . . Link adaptation (LA) in GPRS/EGPRS . . . . . . . . . . . . . . . . . . . Voice activity detection (VAD) . . . . . . . . . . . . . . . . . . . . . . . Discontinuous transmission (DTX) . . . . . . . . . . . . . . . . . . . . . Receive diversity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Subscriber environment . . . . . . . . . . . . . . . . . . . . . . . . . . . . Subscriber hardware. . . . . . . . . . . . . . . . . . . . . . . . . . . . Environment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Distribution. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Hand portable subscribers . . . . . . . . . . . . . . . . . . . . . . . . . Future planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . The microcellular solution . . . . . . . . . . . . . . . . . . . . . . . . . . . Layered architecture. . . . . . . . . . . . . . . . . . . . . . . . . . . . Combined cell architecture. . . . . . . . . . . . . . . . . . . . . . . . . Combined cell architecture structure . . . . . . . . . . . . . . . . . . . . Expansion solution . . . . . . . . . . . . . . . . . . . . . . . . . . . . Frequency planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction to frequency planning . . . . . . . . . . . . . . . . . . . . . Rules for synthesizer frequency hopping (SFH) . . . . . . . . . . . . . . . Rules for baseband hopping (BBH). . . . . . . . . . . . . . . . . . . . . {22879} Inter-radio access technology (2G-3G) cell reselection and handovers . . Introduction to 2G-3G handovers. . . . . . . . . . . . . . . . . . . . . . 2G-3G handover description . . . . . . . . . . . . . . . . . . . . . . . . Impact of 2G-3G handovers on GSM system architecture . . . . . . . . . . System considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . Call model parameters for capacity calculations . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Typical call parameters . . . . . . . . . . . . . . . . . . . . . . . . . . Control channel calculations . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . . Number of CCCHs and PCCCHs per BTS cell . . . . . . . . . . . . . . . Number of PCCCHs per BTS cell . . . . . . . . . . . . . . . . . . . . . User data capacity on the PCCCH timeslot . . . . . . . . . . . . . . . . . Number of SDCCHs per BTS cell . . . . . . . . . . . . . . . . . . . . . Control channel configurations . . . . . . . . . . . . . . . . . . . . . . . GPRS/EGPRS traffic planning . . . . . . . . . . . . . . . . . . . . . . . . . Determination of expected load . . . . . . . . . . . . . . . . . . . . . . Network planning flow . . . . . . . . . . . . . . . . . . . . . . . . . . GPRS/EGPRS network traffic estimation and key concepts. . . . . . . . . . . . Introduction to the GPRS/EGPRS network traffic estimation and key concepts Dynamic timeslot allocation . . . . . . . . . . . . . . . . . . . . . . . . Carrier timeslot allocation examples . . . . . . . . . . . . . . . . . . . . BSS timeslot allocation methods . . . . . . . . . . . . . . . . . . . . . . Provisioning the network with switchable timeslots . . . . . . . . . . . . . Recommendation for switchable timeslot usage . . . . . . . . . . . . . . . Timeslot allocation process on carriers with GPRS traffic . . . . . . . . . . GPRS/EGPRS air interface planning process . . . . . . . . . . . . . . . . . . Influential factors in GPRS/EGPRS cell planning and deployment . . . . . . Estimating the air interface traffic throughput . . . . . . . . . . . . . . . . Configurable initial coding scheme . . . . . . . . . . . . . . . . . . . . . GPRS/EGPRS data rates. . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-85 3-86 3-97 3-98 3-98 3-99 3-101 3-104 3-104 3-105 3-106 3-107 3-108 3-109 3-109 3-110 3-111 3-112 3-113 3-113 3-113 3-118 3-119 3-119 3-119 3-120 3-121 3-122 3-122 3-122 3-125 3-125 3-126 3-129 3-137 3-142 3-143 3-146 3-151 3-151 3-151 3-152 3-152 3-156 3-162 3-171 3-173 3-178 3-179 3-180 3-180 3-187 3-203 3-203

iv

GMR-01

68P02900W21-R 28 Feb 2006

System Information: BSS Equipment Planning

Contents

Chapter 4: AMR and {22064} GSM planningIntroduction to AMR and {22064} GSM planning . . . AMR basic operation . . . . . . . . . . . . . . {22064} GSM half rate basic operation . . . . . . {22064} AMR and GSM half rate interaction . . . New hardware . . . . . . . . . . . . . . . . . Influencing factors . . . . . . . . . . . . . . . Planning . . . . . . . . . . . . . . . . . . . . Quality and capacity . . . . . . . . . . . . . . . . . Benefits of AMR . . . . . . . . . . . . . . . . AMR Full Rate and AMR Half Rate speech quality AMR voice quality improvement and coverage . . {22064} Benefits of GSM half rate . . . . . . . . {22064} GSM Half Rate speech quality . . . . . Capacity increase due to half rate usage. . . . . . Timeslot usage . . . . . . . . . . . . . . . . . Rate adaptation . . . . . . . . . . . . . . . . . . . Introduction to rate adaptation . . . . . . . . . . Codec modes . . . . . . . . . . . . . . . . . . Thresholds and hystereses . . . . . . . . . . . . Downlink adaptation MS monitor . . . . . . . . Handover and power control . . . . . . . . . . . . . Introduction to handover and power control . . . . Handover and power control thresholds . . . . . . Miscellaneous information . . . . . . . . . . . . . . Emergency call handling. . . . . . . . . . . . . Circuit pooling . . . . . . . . . . . . . . . . . Half rate utilization . . . . . . . . . . . . . . . . . Description . . . . . . . . . . . . . . . . . . . Parameter descriptions. . . . . . . . . . . . . . Operational aspects . . . . . . . . . . . . . . . Hardware . . . . . . . . . . . . . . . . . . . . . . Equipment descriptions . . . . . . . . . . . . . Backhaul . . . . . . . . . . . . . . . . . . . . Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2 4-2 4-3 4-3 4-3 4-4 4-5 4-6 4-6 4-6 4-11 4-12 4-12 4-13 4-16 4-17 4-17 4-17 4-18 4-19 4-21 4-21 4-21 4-24 4-24 4-24 4-26 4-26 4-26 4-30 4-33 4-33 4-36 4-40

Chapter 5: BTS planning steps and rulesBTS planning overview . . . . . . . . . . Introduction . . . . . . . . . . . . . Outline of planning steps . . . . . . . Macrocell cabinets . . . . . . . . . . . . Horizon II macro . . . . . . . . . . . Horizon macro . . . . . . . . . . . . Horizon compact and Horizon compact2 M-Cell6 . . . . . . . . . . . . . . . M-Cell2 . . . . . . . . . . . . . . . Microcell enclosures. . . . . . . . . . . . Horizon II mini . . . . . . . . . . . . Horizonmicro and Horizonmicro2 . . . Horizon II micro . . . . . . . . . . . Receive configurations. . . . . . . . . . . Introduction . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2 5-2 5-3 5-4 5-4 5-4 5-5 5-5 5-5 5-7 5-7 5-8 5-8 5-9 5-9 5-9

68P02900W21-R 28 Feb 2006

GMR-01

v

Contents

Receiver planning actions . . . . . . . . . . . . . . . . . . . . . . . . . . Transmit configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . Transmit planning actions . . . . . . . . . . . . . . . . . . . . . . . . . . EGPRS enabled CTU2 configuration . . . . . . . . . . . . . . . . . . . . . . . EGPRS enabled CTU2 configuration limitations . . . . . . . . . . . . . . . EGPRS general configuration . . . . . . . . . . . . . . . . . . . . . . . . Baseband hopping (BBH) . . . . . . . . . . . . . . . . . . . . . . . . . . Broadcast control channel (BCCH) RTF configuration . . . . . . . . . . . . . Antenna configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . Antenna planning actions . . . . . . . . . . . . . . . . . . . . . . . . . . Carrier equipment (transceiver unit) . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Restrictions when using CTU2s in Horizonmacro BTSs . . . . . . . . . . . . CTU/CTU2 power supply considerations . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . Transceiver planning actions . . . . . . . . . . . . . . . . . . . . . . . . . Micro base control unit (microBCU) . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . MicroBCU planning actions . . . . . . . . . . . . . . . . . . . . . . . . . Network interface unit (NIU) and site connection . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . NIU planning actions . . . . . . . . . . . . . . . . . . . . . . . . . . . . BTS main control unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations - HorizonII macro/HorizonII mini as expansion cabinet . Planning actions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cabinet interconnection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations - Horizon II macro as master cabinet . . . . . . . . . Planning considerations - Horizon II mini as master cabinet . . . . . . . . . . XMUX/FMUX/FOX planning actions . . . . . . . . . . . . . . . . . . . . Site expansion board planning actions (Horizon II macro only) . . . . . . . . . Battery back-up provisioning. . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . External power requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . Power planning actions . . . . . . . . . . . . . . . . . . . . . . . . . . . Network expansion using macro/microcell BTSs . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Expansion considerations . . . . . . . . . . . . . . . . . . . . . . . . . . Mixed site utilization . . . . . . . . . . . . . . . . . . . . . . . . . . . . Line interface modules (HIM-75, HIM-120). . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . HIM-75/HIM-120 planning actions. . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-12 5-13 5-13 5-13 5-15 5-16 5-16 5-16 5-16 5-17 5-18 5-18 5-18 5-19 5-19 5-19 5-20 5-22 5-23 5-24 5-24 5-24 5-24 5-25 5-25 5-25 5-27 5-28 5-28 5-29 5-30 5-31 5-32 5-32 5-33 5-36 5-36 5-37 5-37 5-38 5-38 5-38 5-39 5-39 5-39 5-40 5-41 5-41 5-41 5-41 5-43 5-43 5-43 5-43

vi

GMR-01

68P02900W21-R 28 Feb 2006

System Information: BSS Equipment Planning

Contents

DRI/Combiner operability components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DRI and combiner relationship . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5-44 5-44 5-44

Chapter 6: BSC planning steps and rulesBSC planning overview . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . Mixing of equipment types . . . . . . . . . . . . . . . . . . . . . Outline of planning steps . . . . . . . . . . . . . . . . . . . . . . Capacity calculations . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . Remote transcoding . . . . . . . . . . . . . . . . . . . . . . . . . BSC system capacity . . . . . . . . . . . . . . . . . . . . . . . . . . System capacity summary . . . . . . . . . . . . . . . . . . . . . . Scaleable BSC . . . . . . . . . . . . . . . . . . . . . . . . . . . Enhanced BSC capacity option. . . . . . . . . . . . . . . . . . . . LCS option . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Determining the required BSS signalling link capacities . . . . . . . . . . BSC signalling traffic model . . . . . . . . . . . . . . . . . . . . Typical parameter values . . . . . . . . . . . . . . . . . . . . . . Assumptions used in capacity calculations . . . . . . . . . . . . . . Link capacities . . . . . . . . . . . . . . . . . . . . . . . . . . . Determining the number of RSLs required . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . Determining the number of RSLs. . . . . . . . . . . . . . . . . . . One phase access and enhanced one phase . . . . . . . . . . . . . . Standard traffic model . . . . . . . . . . . . . . . . . . . . . . . . Non-standard traffic model . . . . . . . . . . . . . . . . . . . . . BSC to BTS E1 interconnect planning actions . . . . . . . . . . . . . Determining the number of LCF GPROCs for RSL and GSL processing Determining the number of MTLs required . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . Standard traffic model . . . . . . . . . . . . . . . . . . . . . . . Non-standard traffic model . . . . . . . . . . . . . . . . . . . . . Calculate the number of LCFs for MTL processing . . . . . . . . . . MSC to BSC signalling over a satellite link . . . . . . . . . . . . . . Determining the number of LMTLs required . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . Determining the number of LMTLs . . . . . . . . . . . . . . . . . BSC to SMLC interconnection planning actions . . . . . . . . . . . . Calculate the number of LCFs for LMTL processing. . . . . . . . . . Determining the number of XBLs required . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . Determining the number of XBLs . . . . . . . . . . . . . . . . . . Standard traffic model . . . . . . . . . . . . . . . . . . . . . . . . Non standard traffic model. . . . . . . . . . . . . . . . . . . . . . Determining the number of GSLs required . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . Load balancing . . . . . . . . . . . . . . . . . . . . . . . . . . . Generic processor (GPROC) . . . . . . . . . . . . . . . . . . . . . . . 68P02900W21-R 28 Feb 2006 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3 6-3 6-3 6-4 6-6 6-6 6-6 6-7 6-7 6-8 6-9 6-9 6-11 6-11 6-15 6-18 6-21 6-22 6-22 6-22 6-24 6-24 6-25 6-29 6-35 6-38 6-42 6-42 6-42 6-43 6-46 6-47 6-48 6-49 6-49 6-49 6-50 6-50 6-51 6-52 6-52 6-52 6-52 6-53 6-54 6-55 6-55 6-57 6-61vii

GMR-01

Contents

GPROC nomenclature . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GPROC functions and types . . . . . . . . . . . . . . . . . . . . . . . GPROC3 planning assumptions . . . . . . . . . . . . . . . . . . . . . BSC types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . Cell broadcast link . . . . . . . . . . . . . . . . . . . . . . . . . . . OMF GPROC required . . . . . . . . . . . . . . . . . . . . . . . . . Code storage facility processor . . . . . . . . . . . . . . . . . . . . . . GPROC redundancy . . . . . . . . . . . . . . . . . . . . . . . . . . GPROC planning actions . . . . . . . . . . . . . . . . . . . . . . . . Transcoding. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction to transcoding . . . . . . . . . . . . . . . . . . . . . . . GDP/XCDR/EGDP/GDP2 planning considerations . . . . . . . . . . . . EGDP provisioning . . . . . . . . . . . . . . . . . . . . . . . . . . . T1 conversion. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning actions for transcoding at the BSC . . . . . . . . . . . . . . . . Multiple serial interface (MSI, MSI-2) . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . MSI/MSI-2 planning actions . . . . . . . . . . . . . . . . . . . . . . . Kiloport switch (KSW) and double kiloport switch (DSW2) . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . KSW/DSW2 planning actions . . . . . . . . . . . . . . . . . . . . . . BSU shelves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . BSU shelf planning actions . . . . . . . . . . . . . . . . . . . . . . . Kiloport switch extender (KSWX) and double kiloport switch extender (DSWX) Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . KSWX/DSWX planning actions . . . . . . . . . . . . . . . . . . . . . Generic clock (GCLK). . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . GCLK planning actions . . . . . . . . . . . . . . . . . . . . . . . . . Clock extender (CLKX) . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . CLKX planning actions . . . . . . . . . . . . . . . . . . . . . . . . . Local area network extender (LANX). . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . LANX planning actions . . . . . . . . . . . . . . . . . . . . . . . . . Parallel interface extender (PIX) . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . PIX planning actions . . . . . . . . . . . . . . . . . . . . . . . . . . Line interface boards (BIB, T43) . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . BIB/T43 planning actions . . . . . . . . . . . . . . . . . . . . . . . . Digital shelf power supply . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6-61 6-61 6-61 6-63 6-63 6-64 6-66 6-66 6-67 6-67 6-68 6-69 6-69 6-71 6-72 6-74 6-75 6-77 6-77 6-77 6-78 6-80 6-80 6-80 6-82 6-83 6-83 6-84 6-85 6-87 6-87 6-88 6-89 6-91 6-91 6-91 6-91 6-92 6-92 6-92 6-93 6-94 6-94 6-94 6-94 6-95 6-95 6-95 6-95 6-96 6-96 6-96 6-97 6-98

viii

GMR-01

68P02900W21-R 28 Feb 2006

System Information: BSS Equipment Planning

Contents

Introduction . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . Power supply planning actions . . . . . . . . . Non volatile memory (NVM) board. . . . . . . . . Introduction . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . NVM planning actions . . . . . . . . . . . . Verify the number of BSU shelves and BSSC cabinets Verification . . . . . . . . . . . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

. . . . . . . . .

6-98 6-98 6-98 6-99 6-99 6-99 6-99 6-100 6-100

Chapter 7: RXCDR planning steps and rulesRemote transcoder planning overview . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Outline of planning steps . . . . . . . . . . . . . . . . . . . . . . . . RXCDR system capacity. . . . . . . . . . . . . . . . . . . . . . . . . . . System capacity summary . . . . . . . . . . . . . . . . . . . . . . . . RXCDR to BSC connectivity . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Capacity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RXCDR to BSC links . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . E1 interconnect planning actions . . . . . . . . . . . . . . . . . . . . . T1 interconnect planning actions . . . . . . . . . . . . . . . . . . . . . RXCDR to MSC links . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . E1 interconnect planning actions . . . . . . . . . . . . . . . . . . . . . T1 interconnect planning actions . . . . . . . . . . . . . . . . . . . . . Generic processor (GPROC) . . . . . . . . . . . . . . . . . . . . . . . . . GPROC nomenclature . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . Transcoding. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction to transcoding . . . . . . . . . . . . . . . . . . . . . . . XCDR/GDP/EGDP/GDP2 planning considerations . . . . . . . . . . . . EGDP provisioning . . . . . . . . . . . . . . . . . . . . . . . . . . . T1 conversion. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning actions for transcoding at the RXCDR . . . . . . . . . . . . . . Multiple serial interface (MSI, MSI-2) . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . MSI planning actions . . . . . . . . . . . . . . . . . . . . . . . . . . Kiloport switch (KSW) and double kiloport switch (DSW2) . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . KSW/DSW2 planning actions . . . . . . . . . . . . . . . . . . . . . . RXU shelves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . RXU shelf planning actions . . . . . . . . . . . . . . . . . . . . . . . Kiloport switch extender (KSWX) and double kiloport switch extender (DSWX) Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . KSWX/DSWX planning actions . . . . . . . . . . . . . . . . . . . . . Generic clock (GCLK). . . . . . . . . . . . . . . . . . . . . . . . . . . . 68P02900W21-R 28 Feb 2006 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-2 7-2 7-3 7-4 7-4 7-5 7-5 7-5 7-6 7-6 7-7 7-8 7-9 7-9 7-9 7-10 7-11 7-11 7-11 7-12 7-13 7-13 7-15 7-16 7-18 7-19 7-20 7-20 7-21 7-22 7-23 7-23 7-24 7-26 7-27 7-27 7-28 7-29 7-31 7-31 7-31 7-32 7-34ix

GMR-01

Contents

Introduction . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . GCLK planning actions . . . . . . . . . . . . . Clock extender (CLKX) . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . CLKX planning actions . . . . . . . . . . . . . LAN extender (LANX) . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . LANX planning actions . . . . . . . . . . . . . Parallel interface extender (PIX) . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . PIX planning actions . . . . . . . . . . . . . . Line interfaces (BIB, T43) . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . BIB/T43 planning actions . . . . . . . . . . . . Digital shelf power supply . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . Power supply planning actions . . . . . . . . . . Non volatile memory (NVM) board. . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . Planning Considerations . . . . . . . . . . . . . NVM planning actions . . . . . . . . . . . . . Verify the number of RXU shelves and BSSC cabinets . Verification . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7-34 7-34 7-34 7-35 7-35 7-35 7-36 7-37 7-37 7-37 7-37 7-38 7-38 7-38 7-38 7-39 7-39 7-39 7-40 7-41 7-41 7-41 7-41 7-42 7-42 7-42 7-42 7-43 7-43

Chapter 8: PCU upgrade for the BSSBSS planning for GPRS/EGPRS . . . . . . . . . . Introduction to BSS planning for GPRS/EGPRS. PCU to SGSN interface planning . . . . . . . . Feature compatibility . . . . . . . . . . . . . BSS upgrade to support GPRS/EGPRS . . . . . . . BSS upgrade provisioning rules . . . . . . . . Maximum BSS configuration . . . . . . . . . PCU hardware layout . . . . . . . . . . . . . . . PCU shelf (cPCI) . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . MPROC board . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . PSP planning considerations . . . . . . . . . . DPROC board . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . PICP or PRP planning considerations . . . . . . PMC module . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . Transition module . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . .x

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

8-2 8-2 8-3 8-4 8-11 8-11 8-12 8-18 8-20 8-20 8-21 8-22 8-22 8-22 8-23 8-23 8-23 8-27 8-27 8-27 8-29 8-29 8-29

GMR-01

68P02900W21-R 28 Feb 2006

System Information: BSS Equipment Planning

Contents

PCU equipment redundancy and provisioning goals . . . . . . . . . . . Support for equipment redundancy . . . . . . . . . . . . . . . . . PCU equipment redundancy planning. . . . . . . . . . . . . . . . Upgrading the PCU . . . . . . . . . . . . . . . . . . . . . . . . Multiple (3xPCU) PCUs per BSC . . . . . . . . . . . . . . . . . . . Introduction to multiple PCUs . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . PCU example configurations. . . . . . . . . . . . . . . . . . . . E1 link provisioning for GPRS and EGPRS . . . . . . . . . . . . . . . E1 interface provisioning . . . . . . . . . . . . . . . . . . . . . Planning considerations . . . . . . . . . . . . . . . . . . . . . . {23956} QoS capacity . . . . . . . . . . . . . . . . . . . . . . . . . MTBR allocation philosophy . . . . . . . . . . . . . . . . . . . PRP-PDTCH QoS planning . . . . . . . . . . . . . . . . . . . . PCU-SGSN: traffic and signalling planning . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . Gb entities . . . . . . . . . . . . . . . . . . . . . . . . . . . . General planning guidelines . . . . . . . . . . . . . . . . . . . . Specific planning guidelines . . . . . . . . . . . . . . . . . . . . Gb signalling . . . . . . . . . . . . . . . . . . . . . . . . . . . Determine the net Gb load . . . . . . . . . . . . . . . . . . . . . Gb link timeslots . . . . . . . . . . . . . . . . . . . . . . . . . Frame relay parameter values . . . . . . . . . . . . . . . . . . . BSS-PCU hardware planning example for GPRS . . . . . . . . . . . . Introduction to BSS-PCU hardware planning . . . . . . . . . . . . BSS - PCU planning example for GPRS . . . . . . . . . . . . . . BSS-PCU hardware planning example for EGPRS . . . . . . . . . . . . Introduction to BSS-PCU hardware planning . . . . . . . . . . . . BSS - PCU planning example for EGPRS. . . . . . . . . . . . . . {23956} BSS - PCU planning example for EGPRS with QoS enabled.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-30 8-30 8-30 8-36 8-38 8-38 8-38 8-39 8-41 8-41 8-41 8-43 8-45 8-48 8-50 8-50 8-50 8-52 8-52 8-52 8-53 8-55 8-55 8-58 8-58 8-59 8-67 8-67 8-68 8-76

Chapter 9: Planning exercisesInitial requirements . . . . . . . . . . . . . . . . . Requirements . . . . . . . . . . . . . . . . . . Network topology . . . . . . . . . . . . . . . . The exercises . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . Determine the hardware requirements for BTS B . . . Introduction . . . . . . . . . . . . . . . . . . Cabinet . . . . . . . . . . . . . . . . . . . . Summary . . . . . . . . . . . . . . . . . . . Determine the hardware requirements for BTS K . . . Introduction . . . . . . . . . . . . . . . . . . Cabinet . . . . . . . . . . . . . . . . . . . . Receiver requirements . . . . . . . . . . . . . Transmitter combining requirements . . . . . . . Summary . . . . . . . . . . . . . . . . . . . Determine the hardware requirements for the BSC . . Introduction . . . . . . . . . . . . . . . . . . Summary . . . . . . . . . . . . . . . . . . . . Determine the hardware requirements for the RXCDR . MSI requirements . . . . . . . . . . . . . . . . Transcoder requirement . . . . . . . . . . . . . Link interface . . . . . . . . . . . . . . . . . . 68P02900W21-R 28 Feb 2006 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2 9-2 9-3 9-4 9-4 9-5 9-5 9-5 9-6 9-8 9-8 9-8 9-8 9-9 9-9 9-12 9-12 9-14 9-15 9-15 9-15 9-16xi

GMR-01

Contents

GPROC requirement . . . . . . . . . . . . . . . KSW/DSW2 requirement . . . . . . . . . . . . . KSWX/DSWX requirement . . . . . . . . . . . . GCLK requirement . . . . . . . . . . . . . . . . CLKX requirement . . . . . . . . . . . . . . . . PIX requirement . . . . . . . . . . . . . . . . . LANX requirement . . . . . . . . . . . . . . . . Power supply . . . . . . . . . . . . . . . . . . . Summary . . . . . . . . . . . . . . . . . . . . . Calculations using alternative call models . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . Planning example 1 . . . . . . . . . . . . . . . . Planning example 2 . . . . . . . . . . . . . . . . Planning example 3 . . . . . . . . . . . . . . . . Planning example 4 (using AMR) . . . . . . . . . A planning example of BSS support for LCS provisioning Introduction to the LCS planning example . . . . . Typical parameter values . . . . . . . . . . . . . LCS planning example calculations. . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . .

9-16 9-16 9-17 9-17 9-17 9-17 9-17 9-17 9-17 9-19 9-19 9-19 9-35 9-50 9-68 9-90 9-90 9-90 9-91

Chapter 10: Location area planningLocation area planning considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Location area planning calculations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Example procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-2 10-3 10-3

Chapter 11: Deriving call model parameters from network statisticsDeriving call model parameters from network statistics Standard call model parameters . . . . . . . . . Call duration (T) . . . . . . . . . . . . . . . . Ratio of SMSs per call (S) . . . . . . . . . . . . Ratio of handovers per call (H). . . . . . . . . . Ratio of intra BSS handovers to all handovers (i) . Ratio of location updates per call (I) . . . . . . . Ratio of IMSI detaches per call (I) . . . . . . . . Location update factor (L) . . . . . . . . . . . . Paging rate (PGSM). . . . . . . . . . . . . . . . Pages per call (PPC) . . . . . . . . . . . . . . . Sample statistic calculations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-2 11-2 11-5 11-6 11-7 11-8 11-8 11-9 11-9 11-10 11-11 11-12

Chapter 12: Standard BSS and Horizon BTS configurationsStandard configurations . . . . . . . . . Typical BSS configurations . . . . . . . BSC with 24 BTSs . . . . . . . . . BSC with full redundancy . . . . . . Transcoder . . . . . . . . . . . . . Single cabinet BTS configurations . . . . Single cabinet Horizon II macro BTS . Single cabinet Horizon II mini BTS. . Single cabinet Horizon II micro BTS . Single cabinet Horizonmacro BTS . . Two cabinet BTS configurations . . . . . Two cabinet Horizon II macro BTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-2 12-3 12-3 12-5 12-6 12-7 12-7 12-8 12-9 12-10 12-11 12-11

xii

GMR-01

68P02900W21-R 28 Feb 2006

System Information: BSS Equipment Planning

Contents

Two cabinet Horizon II mini BTS . . . . . . . . . . . . . . . . . . . . . . . . . Two cabinet Horizonmacro BTS . . . . . . . . . . . . . . . . . . . . . . . . . . Three cabinet BTS configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . Three cabinet Horizon II macro BTS . . . . . . . . . . . . . . . . . . . . . . . . Three cabinet Horizon II mini BTS . . . . . . . . . . . . . . . . . . . . . . . . . Three cabinet Horizon II micro BTS . . . . . . . . . . . . . . . . . . . . . . . . Three cabinet Horizonmacro BTS . . . . . . . . . . . . . . . . . . . . . . . . . Four cabinet BTS configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . Four cabinet Horizon II macro BTS . . . . . . . . . . . . . . . . . . . . . . . . Four cabinet Horizon II mini BTS . . . . . . . . . . . . . . . . . . . . . . . . . Four cabinet Horizonmacro BTS . . . . . . . . . . . . . . . . . . . . . . . . . . Horizon macrocell RF configurations . . . . . . . . . . . . . . . . . . . . . . . . . . Overview of configuration diagrams . . . . . . . . . . . . . . . . . . . . . . . . HorizonII macro cabinets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . [DCS1800] 4 or 8 carrier omni with HCUs and air combining . . . . . . . . . . . . [DCS1800] 6 or 12 carrier omni with DHUs . . . . . . . . . . . . . . . . . . . . [DCS1800] 2 sector 3/3 or 6/6 with DHUs . . . . . . . . . . . . . . . . . . . . . [DCS1800] 2 cabinet, 2 sector 4/4 or 8/8 with HCUs and air combining . . . . . . . . [DCS1800] 3 sector 2/2/2 or 4/4/4 with HCUs. . . . . . . . . . . . . . . . . . . . [DCS1800] 2 cabinet, 3 sector 4/4/4 or 8/8/8 with HCUs and air combining . . . . . . [DCS1800] 3 sector 2/2/2 or 4/4/4, 4 branch Rx diversity . . . . . . . . . . . . . . [DCS1800/GSM900] 3 sector 2/2/2 and 2/2/2 . . . . . . . . . . . . . . . . . . . . Horizon II macro cabinets with PGSM Duplexer . . . . . . . . . . . . . . . . . . [PGSM] 4 or 8 carrier omni with HCUs and air combining . . . . . . . . . . . . . . [PGSM900] 6 or 12 carrier omni with DHUs . . . . . . . . . . . . . . . . . . . . [PGSM900] 2 sector 3/3 or 6/6 with HCUs . . . . . . . . . . . . . . . . . . . . . [PGSM900] 2 cabinet, 2 sector 4/4 or 8/8 with HCUs and air combining . . . . . . . [PGSM900] 3 sector 2/2/2 or 4/4/4 . . . . . . . . . . . . . . . . . . . . . . . . . [PGSM900] 2 cabinet, 3 sector 4/4/4 or 8/8/8 with HCUs and air combining . . . . . HorizonII mini cabinets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . [DCS1800/EGSM900/PGSM900] High power Omni-1, standard power Omni-2. . . . [DCS1800/EGSM900/PGSM900] High power Omni-2, standard power Omni-4. . . . [DCS1800/EGSM900] High power Bowtie-2, standard power Bowtie-4 . . . . . . . [DCS1800/EGSM900] High power 2 sector 1/1, standard power 2 sector 2/2 . . . . . [DCS1800/EGSM900/PGSM900] High power 2 sector 2/2, standard power 2 sector 4/4 [DCS1800/EGSM900] High power 3 sector 1/1/1, standard power 3 sector 2/2/2 . . . [DCS1800/EGSM900] High power 3 sector 2/2/2, standard power 3 sector 4/4/4 . . . HorizonII micro cabinets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . [DCS1800/EGSM900] Single cabinet - Horizon II micro. . . . . . . . . . . . . . . [DCS1800/EGSM900] Three cabinet - Horizon II micro . . . . . . . . . . . . . . . Horizonmacro cabinets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . [DCS1800] 4 carrier omni, with duplexed hybrid and air combining . . . . . . . . . [DCS1800] 6 carrier omni, with duplexed dual-stage hybrid and air combining . . . . [DCS1800] 2 sector (3/3), with duplexed dual-stage hybrid combining . . . . . . . . [DCS1800] 2 sector (6/6), with duplexed dual-stage hybrid and air combining . . . . . [DCS1800] 3 sector (2/2/2), with duplexed hybrid combining . . . . . . . . . . . . [DCS1800] 3 sector (4/4/4), with duplexed hybrid and air combining . . . . . . . . . [DCS1800] 3 sector (8/8/8), with duplexed dual-stage hybrid and air combining . . . . Horizoncompact2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . [GSM900/DCS1800] Horizoncompact2 single BTS system . . . . . . . . . . . . . [GSM900/DCS1800] Horizoncompact2 two BTS system . . . . . . . . . . . . . . [GSM900/DCS1800] Horizoncompact2 three BTS system . . . . . . . . . . . . . . Microcell RF configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Horizonmicro2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

12-12 12-13 12-14 12-14 12-15 12-16 12-17 12-19 12-19 12-21 12-22 12-24 12-24 12-24 12-25 12-27 12-29 12-31 12-32 12-34 12-35 12-37 12-39 12-40 12-42 12-44 12-45 12-47 12-48 12-49 12-50 12-52 12-54 12-56 12-58 12-59 12-60 12-61 12-62 12-64 12-66 12-67 12-69 12-71 12-73 12-75 12-77 12-79 12-82 12-83 12-84 12-85 12-87 12-87

68P02900W21-R 28 Feb 2006

GMR-01

xiii

Contents

[GSM900/DCS1800] Horizonmicro2 single BTS system . . [GSM900/DCS1800] Horizonmicro2 two BTS system . . . [GSM900/DCS1800] Horizonmicro2 three BTS system . . Connecting Horizon II macro cabinets to Horizonmacro cabinets Connection overview . . . . . . . . . . . . . . . . . . Compatibility issues . . . . . . . . . . . . . . . . . . . Examples of mixed cabinet configurations . . . . . . . . Using CTU2s in Horizonmacro cabinets . . . . . . . . . Connecting Horizon II macro cabinets to M-Cell6 cabinets . . . Connection overview . . . . . . . . . . . . . . . . . . Compatibility issues . . . . . . . . . . . . . . . . . . . 900 MHz BTSs . . . . . . . . . . . . . . . . . . . . . 1800 MHz BTSs . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

. . . . . . . . . . . . .

12-88 12-89 12-90 12-91 12-91 12-91 12-92 12-98 12-99 12-99 12-99 12-100 12-101

Chapter 13: M-Cell BTS configurationsStandard M-Cell configurations . . . . . . . . . Single cabinet BTS configurations . . . . . . . . Single cabinet M-Cell6 BTS . . . . . . . . . Single cabinet M-Cell2 BTS . . . . . . . . . Two cabinet BTS configuration. . . . . . . . . . Two cabinet M-Cell6 BTS . . . . . . . . . . Two cabinet M-Cell6 BTS with CTU2 Adapter Three cabinet BTS configuration . . . . . . . . . Three cabinet M-Cell2 BTS . . . . . . . . . Four cabinet BTS configuration . . . . . . . . . Four cabinet M-Cell6 BTS . . . . . . . . . . M-Cell RF configurations . . . . . . . . . . . . Overview of M-Cell configuration diagrams . M-Cell6 cabinets . . . . . . . . . . . . . . M-Cell2 cabinets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-2 13-3 13-3 13-4 13-5 13-5 13-6 13-7 13-7 13-8 13-8 13-10 13-10 13-10 13-69

xiv

GMR-01

68P02900W21-R 28 Feb 2006

List of Figures

List of Figures

Figure 1-1: BSS block diagram. . . . . . . . . . . . . . . . . . . . . . . . Figure 2-1: BSS interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . Figure 2-2: Possible network topology . . . . . . . . . . . . . . . . . . . . Figure 2-3: Star connection . . . . . . . . . . . . . . . . . . . . . . . . . Figure 2-4: Closed loop and open ended daisy chains . . . . . . . . . . . . . Figure 2-5: Simple daisy chain . . . . . . . . . . . . . . . . . . . . . . . . Figure 2-6: Daisy chain with branc . . . . . . . . . . . . . . . . . . . . . . Figure 2-7: Typical low capacity BSC/BTS configuration . . . . . . . . . . . Figure 2-8: Example using a switching network . . . . . . . . . . . . . . . . Figure 2-9: Timeslot allocation using new and old algorithms . . . . . . . . . Figure 2-10: Alternative network configuration with E1 switching network . . . Figure 2-11: A configuration with a BTS equipped with two redundant RTFs . . Figure 2-12: A configuration with a BTS equipped with two non-redundant RTFs Figure 2-13: Fully equipped RTF . . . . . . . . . . . . . . . . . . . . . . . Figure 2-14: Sub-equipped RTF . . . . . . . . . . . . . . . . . . . . . . . Figure 2-15: XBL utilization . . . . . . . . . . . . . . . . . . . . . . . . . Figure 2-16: Conversion of E1 to HDSL links by modem and microsite . . . . . Figure 2-17: Microcell daisy chain network configuration . . . . . . . . . . . Figure 2-18: Microcell star network configuration . . . . . . . . . . . . . . . Figure 2-19: Microcell configuration using E1/HDSL links. . . . . . . . . . . Figure 3-1: UK network operators . . . . . . . . . . . . . . . . . . . . . . Figure 3-2: Eight TDMA timeslots per RF carrier . . . . . . . . . . . . . . . Figure 3-3: Modulation techniques and channel spacing . . . . . . . . . . . . Figure 3-4: AMR half rate capacity increase. . . . . . . . . . . . . . . . . . Figure 3-5: AMR Full Rate call quality improvements . . . . . . . . . . . . . Figure 3-6: GSM half rate capacity increase . . . . . . . . . . . . . . . . . . Figure 3-7: GSM half rate codec comparison . . . . . . . . . . . . . . . . . Figure 3-8: First Fresnel zone radius calculation . . . . . . . . . . . . . . . . Figure 3-9: Refraction . . . . . . . . . . . . . . . . . . . . . . . . . . . . Figure 3-10: Measurement of the RRI . . . . . . . . . . . . . . . . . . . . Figure 3-11: Refraction effects on a microwave system . . . . . . . . . . . . Figure 3-12: Attenuation. . . . . . . . . . . . . . . . . . . . . . . . . . . Figure 3-13: Reflection . . . . . . . . . . . . . . . . . . . . . . . . . . . Figure 3-14: Scattering . . . . . . . . . . . . . . . . . . . . . . . . . . . Figure 3-15: Diffraction . . . . . . . . . . . . . . . . . . . . . . . . . . . Figure 3-16: Polarization . . . . . . . . . . . . . . . . . . . . . . . . . . Figure 3-17: Propagation effect - Rayleigh fading environment . . . . . . . . . Figure 3-18: Rayleigh distribution . . . . . . . . . . . . . . . . . . . . . . Figure 3-19: Propagation effect - Rician environment . . . . . . . . . . . . . Figure 3-20: Rician distribution . . . . . . . . . . . . . . . . . . . . . . . Figure 3-21: Plane earth loss . . . . . . . . . . . . . . . . . . . . . . . . . Figure 3-22: Focusing of power . . . . . . . . . . . . . . . . . . . . . . . 68P02900W21-R 28 Feb 2006

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1-5 2-2 2-6 2-7 2-8 2-9 2-11 2-12 2-12 2-13 2-15 2-17 2-17 2-20 2-21 2-23 2-29 2-30 2-30 2-31 3-5 3-6 3-7 3-11 3-12 3-14 3-15 3-19 3-20 3-21 3-22 3-24 3-24 3-25 3-26 3-27 3-28 3-28 3-29 3-29 3-33 3-35xv

GMR-01

List of Figures

Figure 3-23: Figure 3-24: Figure 3-25: Figure 3-26: Figure 3-27: Figure 3-28: Figure 3-29: Figure 3-30: Figure 3-31: Figure 3-32: Figure 3-33: Figure 3-34: Figure 3-35: Figure 3-36: Figure 3-37: Figure 3-38: Figure 3-39: Figure 3-40: Figure 3-41: Figure 3-42: Figure 3-43: Figure 3-44: Figure 3-45: Figure 3-46: Figure 3-47: Figure 3-48: Figure 3-49: Figure 3-50: Figure 3-51: Figure 3-52: Figure 3-53: Figure 3-54: Figure 3-55: Figure 3-56: Figure 3-57: Figure 3-58: Figure 3-59: Figure 3-60: Figure 3-61: Figure 3-62: Figure 3-63: Figure 3-64: Figure 3-65: Figure 3-66: Figure 3-67: Figure 3-68: Figure 3-69: Figure 3-70: Figure 3-71: Figure 3-72: Figure 3-73: Figure 3-74: Figure 3-75: Figure 3-76:

Measurement of gain . . . . . . . . . . . . . . . . . . . . . . . In building propagation . . . . . . . . . . . . . . . . . . . . . . Okumura propagation graphs . . . . . . . . . . . . . . . . . . . BTS antenna height of 50 m, MS height of 1.5 m (GSM900) . . . . . BTS antenna height of 100 m, MS height of 1.5 m (GSM900) . . . . Path loss vs cell radius for small cells . . . . . . . . . . . . . . . Adjacent cell interference . . . . . . . . . . . . . . . . . . . . . 7 cell re-use pattern . . . . . . . . . . . . . . . . . . . . . . . . 4 site - 3 cell re-use pattern . . . . . . . . . . . . . . . . . . . . 2 site - 6 cell re-use pattern . . . . . . . . . . . . . . . . . . . . Carrier interference measurements . . . . . . . . . . . . . . . . . The coding process . . . . . . . . . . . . . . . . . . . . . . . . Coding process illustration (full rate and enhanced full rate speech) . Coding process illustration (AMR full rate and AMR half rate speech) Coding process illustration (GSM HR speech, control and data) . . . Speech channel encoding . . . . . . . . . . . . . . . . . . . . . Preliminary coding for enhanced Full Rate speech. . . . . . . . . . Speech Channel Encoding for GSM Half Rate Speech . . . . . . . . Speech channel encoding for AMR Full Rate . . . . . . . . . . . . Speech channel encoding for AMR Half Rate . . . . . . . . . . . . Control channel coding . . . . . . . . . . . . . . . . . . . . . . Data channel encoding . . . . . . . . . . . . . . . . . . . . . . Diagonal interleaving - full rate speech . . . . . . . . . . . . . . . Diagonal interleaving - half rate speech. . . . . . . . . . . . . . . Rectangular interleaving - control . . . . . . . . . . . . . . . . . Diagonal interleaving - CS data . . . . . . . . . . . . . . . . . . GPRS channel coding scheme 1 (CS1) . . . . . . . . . . . . . . . GPRS channel coding scheme 2 (CS2) . . . . . . . . . . . . . . . GPRS channel coding scheme 3 (CS3) . . . . . . . . . . . . . . . GPRS channel coding scheme 4 (CS4) . . . . . . . . . . . . . . . EGPRS channel coding scheme 1 (MCS-1) . . . . . . . . . . . . . EGPRS channel coding scheme 2 (MCS-2) . . . . . . . . . . . . . EGPRS channel coding scheme 3 (MCS-3) . . . . . . . . . . . . . EGPRS channel coding scheme 4 (MCS-4) . . . . . . . . . . . . . EGPRS channel coding scheme 5 (MCS-5) . . . . . . . . . . . . . EGPRS channel coding scheme 6 (MCS-6) . . . . . . . . . . . . . EGPRS channel coding scheme 7 (MCS-7) . . . . . . . . . . . . . EGPRS channel coding scheme 8 (MCS-8) . . . . . . . . . . . . . EGPRS channel coding scheme 9 (MCS-9) . . . . . . . . . . . . . SACCH multiframe (480 ms) for DTX and Full Rate . . . . . . . . SACCH multiframe (480 ms) for DTX and Half Rate . . . . . . . . Receive diversity . . . . . . . . . . . . . . . . . . . . . . . . . Training sequence code . . . . . . . . . . . . . . . . . . . . . . The subscriber environment . . . . . . . . . . . . . . . . . . . . Subscriber distribution . . . . . . . . . . . . . . . . . . . . . . Layered architecture . . . . . . . . . . . . . . . . . . . . . . . Combined cell architecture . . . . . . . . . . . . . . . . . . . . Combined cell architecture structure . . . . . . . . . . . . . . . . Separating BCCH and TCH bands . . . . . . . . . . . . . . . . . Band usage for macrocells with microcells . . . . . . . . . . . . . Frequency split for TCH re-use planning example . . . . . . . . . . Avoiding co-channel and adjacent channel interference . . . . . . . BBH frequency spectrum allocation . . . . . . . . . . . . . . . . GSM and UMTS system nodes and interfaces. . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3-36 3-37 3-39 3-42 3-42 3-43 3-45 3-46 3-47 3-48 3-49 3-53 3-55 3-56 3-57 3-59 3-60 3-61 3-63 3-65 3-68 3-69 3-72 3-73 3-76 3-78 3-80 3-81 3-82 3-83 3-87 3-88 3-89 3-90 3-91 3-92 3-93 3-94 3-95 3-99 3-100 3-102 3-103 3-105 3-106 3-109 3-110 3-111 3-113 3-113 3-116 3-117 3-118 3-120

xvi

GMR-01

68P02900W21-R 28 Feb 2006

System Information: BSS Equipment Planning

List of Figures

Figure 3-77: CCCH and PCCCH decision tree. . . . . . . . . . . . . . . . . . . . Figure 3-78: Location area diagram. . . . . . . . . . . . . . . . . . . . . . . . . Figure 3-79: MM state models for MS and SGSN . . . . . . . . . . . . . . . . . . Figure 3-80: Carrier with reserved and switchable GPRS/EGPRS timeslots . . . . . . Figure 3-81: 1 circuit-switched carrier, 1 BCCH/CCCH + 1 SDCCH + 6 TCH timeslots Figure 3-82: One carrier, all timeslots (8 TCHs) designated as switchable . . . . . . . Figure 3-83: Generic planning and dimensioning process . . . . . . . . . . . . . . Figure 3-84: Multiplexing 4 TBFs on an air timeslot . . . . . . . . . . . . . . . . . Figure 3-85: LLC_PDU frame layout . . . . . . . . . . . . . . . . . . . . . . . . Figure 3-86: LLC PDU to TDMA bursts . . . . . . . . . . . . . . . . . . . . . . Figure 4-1: AMR FR/clean speech vs EFR vs performance requirements . . . . . . . Figure 4-2: AMR FR/clean speech codec modes. . . . . . . .