BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

download BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

of 29

Transcript of BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    1/29

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    2/29

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    3/29

    3

    As much as 50% of capital investment in newequipment is made to compensate for theunderperformance of existing equipment.

    Reputation Customer satisfaction

    Repeat business

    Competitive advantage

    Why Focus on Asset Reliability

    Optimizing Equipment Lifecycle: Enterprise Asset Management

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    4/29

    4

    What is Equipment Life Cycle?

    Optimizing Equipment Lifecycle: Enterprise Asset Management

    Commission

    Operate

    Maintain

    Retire / Replace

    Design

    Construct

    Equipment & Asset

    Life-Cycle

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    5/29

    5

    Cost savings

    - Reduction in maintenance expense 10% to 30%

    Areas of savings

    - Increase in production yield 3% to 5%- Reduced maintenance downtime 20% to 40%

    - Reduced scrap / rework 5% to 10%

    - Reduction in annual purchases 5% to 15%

    - Improved labor utilization 10% to 30%

    - Increased equipment service life 2 years

    Why Optimize Equipment Life Cycle?

    Optimizing Equipment Lifecycle: Enterprise Asset Management

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    6/29

    6

    Project controls

    Asset management

    - Plant maintenance

    -

    MRO / spares inventory- MRO purchasing

    How QAD EAM Assists

    Optimizing Equipment Lifecycle: Enterprise Asset Management

    EAM Project Controls

    EAM Asset Management

    Commission

    Operate

    Maintain

    Retire /

    Replace

    Design

    Construct

    Equipment& Asset

    Life-Cycle

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    7/29

    7

    AP recorded, spreadsheets

    Last updated?

    Purchase costs only?

    Internal labor? Internal materials?

    Subcontractor services?

    True acquisition cost?

    Project Engineering Challenges

    Optimizing Equipment Lifecycle: Enterprise Asset Management

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    8/29

    8

    Spending control

    - Electronic workflow approval

    - Spending alert notification

    - Provide segregation of duties

    Project work breakdownstructure

    Customer projects

    - Customer reimbursements

    -Scheduled supplier payments

    - Margin

    EAM Project Controls: Key Capabilities

    Optimizing Equipment Lifecycle: Enterprise Asset Management

    EAM Project Controls

    EAM Asset Management

    Commission

    Operate

    Maintain

    Retire /

    Replace

    Design

    Construct

    Equipment& Asset

    Life-Cycle

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    9/29

    9

    Manufacturing

    - Inventory master

    - Work order costs

    -

    BOM Service and support

    management

    EAM Project Controls: Roadmap

    Optimizing Equipment Lifecycle: Enterprise Asset Management

    EAM Project Controls

    EAM Asset Management

    Commission

    Operate

    Maintain

    Retire /

    Replace

    Design

    Construct

    Equipment& Asset

    Life-Cycle

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    10/29

    10

    Overall equipment effectiveness (OEE)

    - Global average is 55%

    Average unplanned / reactive work is 55%

    -

    World class is

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    11/29

    11

    Supports preventativemaintenance (PM) / PDM

    PMs triggered based on actual

    production

    Analyze repair costs for labor,material and contractor

    expenses

    Measure mean time between

    failure (MTBF)

    Breakdown alerts via email orpage

    EAM Plant Maintenance: Key Capabilities

    Optimizing Equipment Lifecycle: Enterprise Asset Management

    EAM Project Controls

    EAM Asset Management

    Commission

    Operate

    Maintain

    Retire /

    Replace

    Design

    Construct

    Equipment& Asset

    Life-Cycle

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    12/29

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    13/29

    13

    Annual MRO purchases can equal 1% to 5% ofrevenue

    In most cases, MRO is expensed at receipt

    Unnecessary or incorrect purchases can range

    from 10% to 25%

    As much as 30% of MRO inventory is obsolete

    Typical MRO Environment

    Optimizing Equipment Lifecycle: Enterprise Asset Management

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    14/29

    14

    Manage company catalogfor MRO items

    Automatic stock replenish

    Supplier price schedules

    Consignment inventory

    Transfer parts across plants

    Request for quote (RFQ)

    Requisition approvalworkflow

    EAM MRO: Key Capabilities

    Optimizing Equipment Lifecycle: Enterprise Asset Management

    EAM Project Controls

    EAM Asset Management

    Commission

    Operate

    Maintain

    Retire /

    Replace

    Design

    Construct

    Equipment& Asset

    Life-Cycle

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    15/29

    15

    Share RFQ with suppliers via SC Portal

    Contract purchasing

    EAM MRO: Roadmap

    Optimizing Equipment Lifecycle: Enterprise Asset Management

    EAM Project Controls

    EAM Asset Management

    Commission

    Operate

    Maintain

    Retire /

    Replace

    Design

    Construct

    Equipment& Asset

    Life-Cycle

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    16/29

    16

    Make better decisions

    Support intentional decisionmaking

    - from preparation

    - to decision making

    - to implementation

    Manage by Fact

    Improve shareholder value

    EAM: Business Intelligence

    Optimizing Equipment Lifecycle: Enterprise Asset Management

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    17/29

    17

    An out-of-the-box, performance management toolthat instantly transforms transactional data fromEAM into visually-depicted trends.

    EAM Roadmap: Business Intelligence

    Optimizing Equipment Lifecycle: Enterprise Asset Management

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    18/29

    18

    Start with a high-level KPI

    EAM Roadmap: Business Intelligence

    Optimizing Equipment Lifecycle: Enterprise Asset Management

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    19/29

    19

    Drill-down to further detail

    EAM Roadmap: Business Intelligence

    Optimizing Equipment Lifecycle: Enterprise Asset Management

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    20/29

    20

    Drill-down to further detail

    EAM Roadmap: Business Intelligence

    Optimizing Equipment Lifecycle: Enterprise Asset Management

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    21/29

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    22/29

    22

    Projects

    Cash flow forecast

    Expenditure analysis

    Budget summary

    Indirect purchasing Spending analysis

    Spending by equipment

    Purchases by vendor

    Purchases by commodity

    Rush orders

    Late receipts

    MRO inventory

    Inventory turns

    Slow moving inventory

    Inventory value trends

    Stock out analysis

    Financials

    Operational expense cashflow

    Actual vs. Budget

    Top cost center by % ofbudget

    EAM Roadmap: Business Intelligence

    Optimizing Equipment Lifecycle: Enterprise Asset Management

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    23/29

    23

    Maintenance

    Top equipment by cost andby MTBF

    Top equipment failures

    Top reason by downtime Planned vs. Unplanned work

    orders

    Planned vs. unplannedlabor hours

    PM vs. CM work orders

    Work order count by priority

    Equipment availability

    Maintenance (by period)

    Total maintenance cost

    Service request count

    Work order backlog

    Count

    Labor hours

    Average days open

    PM compliance

    EAM Roadmap: Business Intelligence

    Optimizing Equipment Lifecycle: Enterprise Asset Management

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    24/29

    24

    March 2011: general available (GA)

    Supported versions

    - 2007 SE through 2010 SE

    - 2007 EE through 2011 EE

    QAD EAM Status

    Optimizing Equipment Lifecycle: Enterprise Asset Management

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    25/29

    25

    Project controls- Bring projects in on-time and within budget

    - Control excessive spending

    Plant maintenance

    - Increase equipment efficiency

    - Lower cost of repairs

    MRO inventory and purchasing

    - Right-sizing inventory lowering obsolete items

    - Minimize stock-out thereby limited equipment

    downtime

    - Eliminate unnecessary purchases

    Review

    Optimizing Equipment Lifecycle: Enterprise Asset Management

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    26/29

    26

    Metrics Affected

    Optimizing Equipment Lifecycle: Enterprise Asset Management

    Process Benefit Value

    Manage PM Production yield

    Scrap / rework

    Equipment service life

    +10 to 20%

    -20 to 50%

    +10 to 20%

    Manage labor resources Labor utilization +10 to 25%

    Manage uptime Maintenance downtime

    Production yield

    -20 to 50%

    +10 to 20%

    Optimize inventory Inventory value - availability,common across plants

    Stock-outs

    -20 to 30%

    -30 to 50%

    Manage spend Annual purchases -10 to 20%

    Officially source items Approved suppliers, bestprice

    - 5 to 10%

    Control project costs Manage costs withinbudget

    Save services

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    27/29

    27

    Get involved in customer advisory groups

    Stop by the EXPO for a demo

    Ask your account manager for an EAM

    QScan

    Next Steps

    Optimizing Equipment Lifecycle: Enterprise Asset Management

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    28/29

  • 8/6/2019 BT10 Hagler Optimizing Equipment Life Cycle Enterprise Asset Management

    29/29